CN203377549U - Small holding pole attached to tower - Google Patents

Small holding pole attached to tower Download PDF

Info

Publication number
CN203377549U
CN203377549U CN201320504909.1U CN201320504909U CN203377549U CN 203377549 U CN203377549 U CN 203377549U CN 201320504909 U CN201320504909 U CN 201320504909U CN 203377549 U CN203377549 U CN 203377549U
Authority
CN
China
Prior art keywords
pole
bolt
tower
fastener
iron tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320504909.1U
Other languages
Chinese (zh)
Inventor
许可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangyang Power Supply Co of State Grid Hubei Electric Power Co Ltd
State Grid Corp of China SGCC
Nanzhang Power Supply Co of State Grid Hubei Electric Power Co Ltd
Original Assignee
Xiangyang Power Supply Co of State Grid Hubei Electric Power Co Ltd
State Grid Corp of China SGCC
Nanzhang Power Supply Co of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangyang Power Supply Co of State Grid Hubei Electric Power Co Ltd, State Grid Corp of China SGCC, Nanzhang Power Supply Co of State Grid Hubei Electric Power Co Ltd filed Critical Xiangyang Power Supply Co of State Grid Hubei Electric Power Co Ltd
Priority to CN201320504909.1U priority Critical patent/CN203377549U/en
Application granted granted Critical
Publication of CN203377549U publication Critical patent/CN203377549U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

一种塔身附着小抱杆,用于在电力线路塔材组立及起吊材料设备。抱杆顶帽与抱杆杆身通过螺栓一固定连接,抱杆杆身与抱杆杆身紧固件通过螺栓二连接,抱杆杆身与抱杆底座紧固件通过螺栓三连接;抱杆杆身紧固件经螺栓四与铁塔主材连接,抱杆底座紧固件经螺栓五与铁塔主材连接。本实用新型不仅具有传统型塔身附着小抱杆的起吊功能,而且具有重量轻、安装、操作简单方便的优点,有效降低了高空作业时间,提高了工作效率。

Figure 201320504909

The utility model relates to a small pole attached to a tower body, which is used for erecting and hoisting material equipment on power line tower materials. The top hat of the pole is fixedly connected with the pole body through bolt one, the pole pole body is connected with the pole pole body fastener through bolt two, and the pole pole body is connected with the pole base fastener through bolt three; the pole pole The shaft fastener is connected with the main material of the iron tower through bolt four, and the fastener at the base of the pole is connected with the main material of the iron tower through bolt five. The utility model not only has the lifting function of the traditional tower with a small pole attached, but also has the advantages of light weight, simple and convenient installation and operation, which effectively reduces the time for high-altitude operations and improves work efficiency.

Figure 201320504909

Description

塔身附着小抱杆The tower body is attached with a small pole

技术领域 technical field

本实用新型涉及电力输电设施技术领域,具体说是一种用于铁塔组立设备的塔身附着小抱杆。 The utility model relates to the technical field of electric power transmission facilities, in particular to a small pole attached to a tower body used for iron tower erection equipment.

背景技术 Background technique

在电力线路铁塔组立施工过程中,抱杆是起吊的主要工具之一。抱杆不但广泛用于杆塔组立,而且也用于装卸材料设备。在铁塔组立过程中,塔身附着型抱杆主要是通过抱杆紧固件使抱杆根固定在铁塔主材上的结构方式来进行塔材起吊,适用于架空线路工程一般铁塔组立。使用传统塔身附着型抱杆组立铁塔施工时,由于传统抱杆体积大,紧固件沉重,安装繁琐,造成电力施工人员装卸抱杆麻烦,且在高空作业时操作不方便,施工效率低,安全风险高,存在诸多不足。 In the construction process of power line iron tower assembly, the pole is one of the main tools for lifting. Holding poles are not only widely used in tower assembly, but also used for loading and unloading material equipment. During the erection process of the iron tower, the tower body-attached pole is mainly used to lift the tower material by fixing the pole root on the main material of the iron tower through the pole fastener, which is suitable for the general iron tower erection of overhead line engineering. When using traditional tower-attached poles to assemble iron towers for construction, due to the large size of traditional poles, heavy fasteners, and cumbersome installation, it is troublesome for electric construction personnel to load and unload the poles, and it is inconvenient to operate when working at heights, and the construction efficiency is low. , with high security risks and many deficiencies.

发明内容 Contents of the invention

为克服现有技术的不足,本实用新型的发明目的在于提供一种塔身附着小抱杆,以方便电力线路铁塔组立施工。 In order to overcome the deficiencies of the prior art, the purpose of the invention of the utility model is to provide a small pole attached to the tower body to facilitate the erection and construction of the power line iron tower.

为实现上述目的,本实用新型的抱杆顶帽与抱杆杆身通过螺栓一固定连接,抱杆杆身与抱杆杆身紧固件通过螺栓二连接,抱杆杆身与抱杆底座紧固件通过螺栓三连接;抱杆杆身紧固件经螺栓四与铁塔主材连接,抱杆底座紧固件经螺栓五与铁塔主材连接。 In order to achieve the above purpose, the pole top cap of the utility model is fixedly connected with the pole body through the first bolt, the pole body and the pole fastener are connected through the second bolt, and the pole body is tightly connected with the pole base. The firmware is connected by bolt three; the fasteners of the pole-holding shaft are connected with the main material of the iron tower through bolt four, and the fasteners of the base of the pole are connected with the main material of the iron tower through bolt five.

本实用新型与现有技术相比,不仅具有传统型塔身附着小抱杆的起吊功能,而且具有重量轻、安装、操作简单方便的优点,有效降低了高空作业时间,提高了工作效率。 Compared with the prior art, the utility model not only has the lifting function of the traditional tower with a small pole attached, but also has the advantages of light weight, simple and convenient installation and operation, which effectively reduces the time for high-altitude operations and improves work efficiency.

附图说明 Description of drawings

图1为本实用新型的结构示意简图。 Fig. 1 is a schematic diagram of the structure of the utility model.

具体实施方式 Detailed ways

如图1所示,本实用新型主要包括抱杆顶帽1、抱杆杆身2(铝合金圆管)、抱杆杆身紧固件3、抱杆底座紧固件4。抱杆顶帽1与抱杆杆身2通过螺栓一5固定连接,抱杆杆身2与抱杆杆身紧固件3通过螺栓二6连接,抱杆杆身2与抱杆底座紧固件4通过螺栓三8连接;抱杆杆身紧固件3经螺栓四7与铁塔主材连接,抱杆底座紧固件4经螺栓五9与铁塔主材连接。 As shown in Figure 1, the utility model mainly includes a pole top cap 1, a pole body 2 (aluminum alloy round tube), a pole body fastener 3, and a pole base fastener 4. The pole top cap 1 is fixedly connected to the pole body 2 by bolt 1 5, the pole pole body 2 is connected to the pole body fastener 3 by bolt 2 6, and the pole pole body 2 is connected to the pole base fastener 4 is connected by bolt three 8; the pole-holding shaft fastener 3 is connected with the main material of the iron tower through bolt four 7, and the pole-holding base fastener 4 is connected with the main material of the iron tower through bolt five 9.

当使用抱杆进行塔材起吊时,先在已经立起的一段铁塔主撑上悬挂起吊滑轮(图中未示出),在地面上将抱杆顶帽1、抱杆杆身2、抱杆杆身紧固件3、抱杆底座紧固件4通过螺栓组装完成,并在抱杆顶帽1上悬挂定滑轮;用绳子系住抱杆,当通过铁塔主撑上所悬挂的起吊滑轮,将抱杆提升至超过已经立起的铁塔主材两米左右位置时,通过抱杆杆身紧固件3用螺栓四7将抱杆杆身2固定在已经立起的铁塔主材上,此时,抱杆杆身2相对于抱杆杆身紧固件3、抱杆底座紧固件4可移动;继续利用起吊滑轮提升抱杆至合适位置后,通过抱杆底座紧固件4用螺栓五9将抱杆杆身2固定在已经立起的铁塔主材上;再通过螺栓二6、螺栓三8将抱杆杆身2分别与抱杆杆身紧固件3、抱杆底座紧固件4紧固后,即可通过抱杆顶帽1上所悬挂的定滑轮实现塔材起吊。 When using the pole to lift the tower, first hang the lifting pulley (not shown in the figure) on the main support of a section of the iron tower that has been erected, and put the pole top cap 1, the pole shaft 2, and the pole on the ground. The shaft fastener 3 and the pole-holding base fastener 4 are assembled by bolts, and the fixed pulley is hung on the top hat 1 of the pole; When the pole is lifted to a position about two meters above the main material of the iron tower that has been erected, the pole body 2 is fixed on the main material of the iron tower that has been erected through the fastener body of the pole 3 and the bolt 4 7. , the pole body 2 is movable relative to the pole body fastener 3 and the pole base fastener 4; after continuing to use the lifting pulley to lift the pole to a suitable position, the pole base fastener 4 uses bolts 5.9 Fix the pole-holding shaft 2 on the main material of the iron tower that has been erected; then fasten the pole-holding shaft 2 with the pole-holding shaft fastener 3 and the pole-holding base through bolts 2 6 and 3 8 respectively After the part 4 is fastened, the tower material can be hoisted by the fixed pulley suspended on the top hat 1 of the pole.

Claims (1)

1. a tower body adheres to little pole, it is characterized in that: embrace pole cap (1) and be fixedly connected with by bolt one (5) with pole shaft (2), pole shaft (2) is connected by bolt two (6) with pole shaft securing member (3), and pole shaft (2) is connected by bolt three (8) with holding pole base securing member (4); Pole shaft securing member (3) is connected with iron tower main material through bolt four (7), and holding pole base securing member (4) is connected with iron tower main material through bolt five (9).
CN201320504909.1U 2013-08-19 2013-08-19 Small holding pole attached to tower Expired - Fee Related CN203377549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320504909.1U CN203377549U (en) 2013-08-19 2013-08-19 Small holding pole attached to tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320504909.1U CN203377549U (en) 2013-08-19 2013-08-19 Small holding pole attached to tower

Publications (1)

Publication Number Publication Date
CN203377549U true CN203377549U (en) 2014-01-01

Family

ID=49840054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320504909.1U Expired - Fee Related CN203377549U (en) 2013-08-19 2013-08-19 Small holding pole attached to tower

Country Status (1)

Country Link
CN (1) CN203377549U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672743A (en) * 2016-03-22 2016-06-15 贵州电网有限责任公司输电运行检修分公司 Light holding pole for assembling and disassembling of rush-repair tower assmebly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672743A (en) * 2016-03-22 2016-06-15 贵州电网有限责任公司输电运行检修分公司 Light holding pole for assembling and disassembling of rush-repair tower assmebly

Similar Documents

Publication Publication Date Title
CN203284095U (en) Tower crane for cooling tower
CN202415016U (en) Portable transformer lifting appliance
CN102040166A (en) Hoisting tool for equipment on pillar
CN203998746U (en) Portable suspension installation
CN203377549U (en) Small holding pole attached to tower
CN107840255A (en) A double-arm safety tower crane
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN103669978B (en) The multi-functional anchor ear device of the vertical pole of group
CN202488034U (en) Lifting device for electric transmission line of angle iron tower
CN105133916A (en) Auxiliary hanging bracket for mounting of upper frame on telegraph pole
CN202190019U (en) Aerial earth wire ratchet wrench type two-point lifting tool
CN203462807U (en) Electric pole erecting device
CN203865929U (en) Portable crane
CN203412356U (en) Pole erecting device
CN202689671U (en) Lifting type holding rod
CN202594699U (en) Power transmission line lifting device for steel pipe tower
CN201702544U (en) Variable-paddle bearing installing walking table of wind power generator
CN206088848U (en) Tower crane
CN205577584U (en) Electronic, manual dual -purpose pole setting ware
CN204921267U (en) Fan pillar hoist and mount platform structure
CN202231353U (en) Special tools for lifting and transporting post insulators
CN203487805U (en) Rapid purline/steel beam clamping support with safety rope
CN203626372U (en) Multifunctional hoop device for assembling mounting mast
CN102623921A (en) Porcelain bottle shifter
CN202488035U (en) Hoisting device for maintenance of power transmission line above concrete poles

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140101

Termination date: 20180819