CN203284095U - Tower crane for cooling tower - Google Patents
Tower crane for cooling tower Download PDFInfo
- Publication number
- CN203284095U CN203284095U CN2013203459072U CN201320345907U CN203284095U CN 203284095 U CN203284095 U CN 203284095U CN 2013203459072 U CN2013203459072 U CN 2013203459072U CN 201320345907 U CN201320345907 U CN 201320345907U CN 203284095 U CN203284095 U CN 203284095U
- Authority
- CN
- China
- Prior art keywords
- tower
- arm
- pulley
- support
- winch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model belongs to the field of lifting devices, in particular to a tower crane for a cooling tower. The tower crane for the cooling tower comprises a tower body, a cargo boom and a balance arm. A main winch and a balancing weight are installed on the balance arm. The tower crane for the cooling power is characterized in that an auxiliary winch is arranged on the ground on one side of the bottom portion of the tower body, a support for dismantling the balancing weight is arranged on the balance arm, the bottom portion of the tower body, a tower cap and the support are provided with a first pulley, a second pulley and a third pulley respectively, a steel wire rope of the auxiliary winch successively winds around the three pulleys to be connected with the balancing weight, a support used for dismantling arm joints is arranged on the cargo boom, a fourth pulley is arranged on the support for dismantling the arm joints, and a steel wire rope of the main winch winds around the fourth pulley to be connected with the crane arm. The tower crane for the cooling tower has the advantages of being convenient to operate, safe and high in efficiency.
Description
Technical field
The utility model belongs to the hoisting device field, is specifically related to a kind of cooling tower special tower machine.
Background technology
Cooling tower is that power plant is used for the structures that cold water uses, and is highly very high, need to use the special tower machine when building, and after the cooling tower construction is complete, the tower machine need to be dismantled.Dismounting at present is all to dismantle counterweight and every joint crane arm with the winch of tower machine self, and wire rope handling, the rope that falls, cumbersome also very dangerous back and forth.
The utility model content
When being to solve the dismounting of prior art cooling tower special tower machine, the purpose of this utility model only uses the winch of self, wire rope handling, the rope that falls back and forth, cumbersome also very unsafe defect, provide a kind of two winchs that utilize, safe, as fast to dismantle counterweight and crane arm cooling tower special tower machine.
The utility model is achieved by the following technical solution:
it is a kind of cooling tower special tower machine, comprise tower body, crane arm and equilibrium arm, main winch and clump weight are installed on equilibrium arm, the ground that it is characterized in that tower body bottom one side is provided with auxiliary winch, equilibrium arm is provided with dismounting counterweight support, described tower body bottom, on the tower cap, be respectively equipped with first on support, second, the 3rd pulley, the steel rope of auxiliary winch is walked around above-mentioned 3 pulleys successively, be connected with clump weight, described crane arm is provided with the dismounting arm and saves support, the dismounting arm is saved support and is provided with the 4th pulley, the steel rope of described main winch is walked around the 4th pulley and is connected with crane arm.
As a preferred version of the present utility model: the first pulley is fixed on the tower body coxopodite.
Use the step of the utility model dismounting counterweight and crane arm as follows:
1, before tower machine dismounting, the auxiliary winch of 2 tonnages is fixed on ground in cooling tower;
2,22 tons of pulleys (the first pulley and the second pulley) are respectively fixed to tower body coxopodite (the upper first segment of rood beam) and tower cap place;
3, will assist the steel rope of winch to wear around the first pulley, the second pulley, then the dismounting counterweight to equilibrium arm is used in the 3rd pulley of support;
4, the steel rope that will assist winch is through in the counterweight hanger, and with steel rope with 3 12
#Buckle, chucking becomes rope sling, and card is 13 in rope sling
#Shackle is connected with the counterweight hanger;
5, start auxiliary winch and rise, make counterweight leave soon counterweight attachment point 5-10cm and stop rising, bearing pin is extracted out;
6, start again auxiliary winch and descend, until clump weight is put into ground.
7, the crane arm of tower machine is dismantled along with the minimizing of clump weight, prevents from unloading process occurring safety misadventure.
8, will dismantle arm and save on the rear joint that support is fixed on the arm joint that will dismantle, and with the arm that the steel rope of main winch will be dismantled, save and fix;
9, after starting main winch and rising and to make the arm that will dismantle save into the angle of 20-35 degree, main winch quits work, and removes and connects bearing pin;
10, start general who has surrendered's arm joint under main winch and be put into ground;
11, by above-mentioned same steps as dismounting arm joint and clump weight until reach necessary requirement, namely crane arm just can be by the minimum diameter of cooling tower.
The utlity model has easy to operate, safety, advantage that efficiency is high.Main winch of the present utility model only is used for dismantling crane arm, and auxiliary winch only is used for dismantling clump weight, and Each performs its own functions for two winchs, need not back and forth wire rope handling, falls rope, and is easy and simple to handle, efficiency is high, safety performance is high.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the enlarged diagram that the utility model dismounting arm is saved support.
As shown in FIG.: 1-assists winch; The 2-main winch; The 3-clump weight; 4-dismounting counterweight support; The 5-equilibrium arm; 6-the 5th pulley; 7-tower cap; The 8-pull bar; The 9-crane arm; 10-dismounting arm is saved support; The 11-trolley lifting hook; The 12-cooling tower; 13 first pulleys; 14 second pulleys; 15 the 3rd pulleys; 16 the 4th pulleys; 17 tower bodies.
The specific embodiment
as Fig. 1, shown in Figure 2: the tower machine is positioned at cooling tower inside, by main winch 2, clump weight 3, equilibrium arm 5, tower body 17, the 5th pulley 6, tower cap 7, pull bar 8, crane arm 9, trolley lifting hook 11 forms, the inner ground near tower body 17 places of cooling tower is provided with auxiliary winch 1, be provided with 1 dismounting counterweight support 4 near main winch 2 places on described equilibrium arm 5, tower body 17 coxopodites, tower cap 7, the dismounting counterweight is provided with respectively the first pulley 13 with support 4 places, the second pulley 14, the 3rd pulley 15, the steel rope of auxiliary winch is worn and is walked around above-mentioned 3 pulleys and be connected with clump weight 3, crane arm 9 is provided with the dismounting arm and saves support 10, the dismounting arm is saved support 10 and is provided with the 4th pulley 16, the steel rope of main winch 2 is worn and is walked around the 5th pulley 6, the 4th pulley 16 is connected with crane arm 9.
Use the step of the utility model dismounting counterweight and crane arm as follows:
1, before tower machine dismounting, the auxiliary winch 1 of 2 tonnages is fixed on ground in cooling tower;
2,22 tons of pulleys (the first pulley 13 and the second pulley 14) are respectively fixed to tower body 17 coxopodites (the upper first segment of rood beam) and tower cap 7 places;
3, will assist the steel rope of winch 1 to wear around the first pulley 13, the second pulley 14, then the dismounting counterweight to equilibrium arm 5 is used in the 3rd pulley 15 of support 4;
4, the steel rope that will assist winch 1 is through in the counterweight hanger, and with steel rope with 3 12
#Buckle, chucking becomes rope sling, and card is 13 in rope sling
#Shackle is connected with the counterweight hanger;
5, start auxiliary winch 1 and rise, make clump weight 3 leave counterweight attachment point 5-10cm and stop rising, bearing pin is extracted out;
6, start again auxiliary winch 1 and descend, until clump weight 3 is put into ground.
7, the crane arm 9 of tower machine is dismantled along with the minimizing of clump weight 4, prevents from unloading process occurring safety misadventure.
8, will dismantle arm and save on the rear joint that support 10 is fixed on the arm joint that will dismantle, and with the arm that the steel rope of main winch 2 will be dismantled, save and fix;
9, after starting main winch 2 and rising and make the arm that will dismantle save into the angle of 20-35 degree, main winch 2 quits work, and removes and connects bearing pin;
10, start 2 times general who has surrendered's arm joints of main winch and be put into ground;
11, by above-mentioned same steps as dismounting arm joint and clump weight 3 until reach necessary requirement, namely crane arm 9 just can be by the minimum diameter of cooling tower.
Claims (2)
1. cooling tower special tower machine, comprise tower body, crane arm and equilibrium arm, main winch and clump weight are installed on equilibrium arm, the ground that it is characterized in that tower body bottom one side is provided with auxiliary winch, equilibrium arm is provided with dismounting counterweight support, described tower body bottom, on the tower cap, be respectively equipped with first on support, second, the 3rd pulley, the steel rope of auxiliary winch is walked around above-mentioned 3 pulleys successively, be connected with clump weight, described crane arm is provided with the dismounting arm and saves support, the dismounting arm is saved support and is provided with the 4th pulley, the steel rope of described main winch is walked around the 4th pulley and is connected with crane arm.
2. cooling tower special tower machine according to claim 1, is characterized in that the first pulley is fixed on the tower body coxopodite.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203459072U CN203284095U (en) | 2013-06-05 | 2013-06-05 | Tower crane for cooling tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203459072U CN203284095U (en) | 2013-06-05 | 2013-06-05 | Tower crane for cooling tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203284095U true CN203284095U (en) | 2013-11-13 |
Family
ID=49540470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013203459072U Expired - Lifetime CN203284095U (en) | 2013-06-05 | 2013-06-05 | Tower crane for cooling tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203284095U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105174077A (en) * | 2015-10-21 | 2015-12-23 | 无锡港盛重型装备有限公司 | Novel tower crane equipment |
CN105271024A (en) * | 2015-11-25 | 2016-01-27 | 镇海建设集团有限公司 | Tower crane with wind-proof structure |
CN105293311A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Tower crane having windproof function |
CN105293299A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Windproof tower crane for building |
CN105293301A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Windproof tower crane |
CN105293302A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Tower crane with wind resistance function |
CN105293303A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Windproof tower crane for construction |
CN105293312A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Tower crane |
CN106516998A (en) * | 2016-12-30 | 2017-03-22 | 徐州建机工程机械有限公司 | Movable arm and flat arm dual-purpose tower crane |
CN113526366A (en) * | 2021-06-11 | 2021-10-22 | 浙江省建设工程机械集团有限公司 | Multifunctional flat-arm tower crane capable of being used for fire fighting |
-
2013
- 2013-06-05 CN CN2013203459072U patent/CN203284095U/en not_active Expired - Lifetime
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105174077A (en) * | 2015-10-21 | 2015-12-23 | 无锡港盛重型装备有限公司 | Novel tower crane equipment |
CN105293299B (en) * | 2015-11-25 | 2017-08-18 | 镇海建设集团有限公司 | Windproof derrick crane for building |
CN105293303B (en) * | 2015-11-25 | 2017-07-28 | 镇海建设集团有限公司 | A kind of windproof derrick crane for building |
CN105293299A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Windproof tower crane for building |
CN105293301A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Windproof tower crane |
CN105293302A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Tower crane with wind resistance function |
CN105293303A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Windproof tower crane for construction |
CN105293311A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Tower crane having windproof function |
CN105293312A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Tower crane |
CN105293311B (en) * | 2015-11-25 | 2017-07-28 | 镇海建设集团有限公司 | A kind of tower crane with wind-shielding function |
CN105293312B (en) * | 2015-11-25 | 2017-09-22 | 镇海建设集团有限公司 | A kind of derrick crane |
CN105293301B (en) * | 2015-11-25 | 2017-08-08 | 镇海建设集团有限公司 | Windproof tower crane |
CN105271024A (en) * | 2015-11-25 | 2016-01-27 | 镇海建设集团有限公司 | Tower crane with wind-proof structure |
CN105293302B (en) * | 2015-11-25 | 2017-08-18 | 镇海建设集团有限公司 | Tower crane with wind-shielding function |
CN106516998A (en) * | 2016-12-30 | 2017-03-22 | 徐州建机工程机械有限公司 | Movable arm and flat arm dual-purpose tower crane |
CN113526366A (en) * | 2021-06-11 | 2021-10-22 | 浙江省建设工程机械集团有限公司 | Multifunctional flat-arm tower crane capable of being used for fire fighting |
CN113526366B (en) * | 2021-06-11 | 2023-10-03 | 浙江省建设工程机械集团有限公司 | Multifunctional flat arm tower crane for fire fighting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203284095U (en) | Tower crane for cooling tower | |
CN103939299B (en) | The split type mounting process of a kind of offshore wind turbine | |
CN203998705U (en) | Single arm frame steel wire rope luffing stationary crane | |
CN201737639U (en) | Integral inverted hoist | |
CN204281054U (en) | A kind of small-sized caisson suspender | |
CN202744232U (en) | Tower crane long suspension arm lifting steel rope supporting device | |
CN202785542U (en) | Reactor dome hanging basket | |
CN105110205A (en) | Reverse disassembling method for tower crane | |
CN205838348U (en) | A kind of automatically-unhooked suspension hook | |
CN204689352U (en) | A kind of line bar hoisting device | |
CN204737625U (en) | Crane sling fixes a position and prevents putting device | |
CN204752012U (en) | Wall -hanging miniature hoist | |
CN103470057B (en) | A kind of high-altitude component hoisting construction method | |
CN202729645U (en) | Tower crane with elevator | |
CN202098670U (en) | Wind turbine tower conveying and elevating auxiliary device | |
CN205590168U (en) | Overturning lifting device | |
CN204727473U (en) | A kind of crane hanger antiswing device | |
CN201258226Y (en) | Universal crane for metallurgy with double independent wire rope | |
CN203284098U (en) | Disassembled and assembled part self-lifting device for tower crane | |
CN203284100U (en) | Tower crane achieving automatic replacement of steel wire rope | |
CN203295025U (en) | Clamping tool for hoisting single H beam | |
CN201809046U (en) | Hoisting device | |
CN202787930U (en) | Hanging basket for high-place operations | |
CN202379580U (en) | Pipeline horizontal lifting appliance with automatic hook | |
CN101734549A (en) | Lifting sling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20131113 |