CN205172139U - Supplementary pole tumbler bearing of embracing of transmission line head of mast - Google Patents

Supplementary pole tumbler bearing of embracing of transmission line head of mast Download PDF

Info

Publication number
CN205172139U
CN205172139U CN201521019858.9U CN201521019858U CN205172139U CN 205172139 U CN205172139 U CN 205172139U CN 201521019858 U CN201521019858 U CN 201521019858U CN 205172139 U CN205172139 U CN 205172139U
Authority
CN
China
Prior art keywords
transmission line
ball
pole
piece
ball bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201521019858.9U
Other languages
Chinese (zh)
Inventor
易实
李刚
王显富
安君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
State Grid Corp of China SGCC
Original Assignee
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Electric Power Transmission & Transformation Construction Co Ltd, State Grid Corp of China SGCC filed Critical Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority to CN201521019858.9U priority Critical patent/CN205172139U/en
Application granted granted Critical
Publication of CN205172139U publication Critical patent/CN205172139U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了一种输电线路杆塔顶部辅助抱杆球支座,包括节点板和固定在节点板上的固定片,所述的固定片上设置有球窝底座,所述球窝底座上设置有球窝,所述的球窝内设置有球头,所述球头上设置有连接件,其可在工作区域内自由偏转,力学性能好且拆装方便。

The utility model discloses an auxiliary rod-holding ball bearing at the top of a transmission line pole tower, which comprises a node plate and a fixing piece fixed on the node plate, the fixing piece is provided with a ball-socket base, and the ball-socket base is provided with A ball socket, the ball socket is provided with a ball head, and the ball head is provided with a connecting piece, which can deflect freely in the working area, has good mechanical properties and is easy to disassemble.

Description

输电线路杆塔顶部辅助抱杆球支座Auxiliary pole-holding ball bearing on the top of transmission line tower

技术领域 technical field

本实用新型涉及输电线路工程施工、抢修工器具领域,更具体地说,是涉及一种输电线路杆塔顶部辅助抱杆球支座。 The utility model relates to the field of power transmission line engineering construction and emergency repair tools, and more specifically relates to an auxiliary pole-holding ball support at the top of a power transmission line pole tower.

背景技术 Background technique

随着特高压电网的快速发展,以及以1250mm2为代表的大截面导线的大量运用,送电线路杆塔持续向高、重、大方向发展。例如±800kV直流特高压直线杆塔全高70m,单侧横担长21m、重4-8吨;1000kV交流特高压直线杆塔全高139m,单侧横担长21m,重约6吨。目前采用的组塔装备或者由于重量大不适合用于交通条件差的野外环境,如动臂塔机、平臂式塔机;或者由于自身缺陷不能满足大吨位、大幅度吊装要求,如内悬浮抱杆;或者由于工艺复杂,难以满足安全吊装,提高生产效率,如摇臂式抱杆。现有抱杆采用如图1所示的支座,包括底座和十字万向节且两者采用铰接结构,其存在如下缺陷:其与塔身的连接强度弱,铰接点弯矩大,拆装困难。 With the rapid development of UHV power grids and the extensive use of large cross-section conductors represented by 1250mm 2 , power transmission line towers continue to develop in the direction of high, heavy and large. For example, the ±800kV DC UHV linear pole tower has a total height of 70m, a single-side cross arm length of 21m, and a weight of 4-8 tons; a 1000kV AC UHV linear pole tower has an overall height of 139m, a single-side cross arm length of 21m, and a weight of about 6 tons. The current tower assembly equipment is not suitable for outdoor environments with poor traffic conditions due to its large weight, such as boom tower cranes and flat-arm tower cranes; or due to its own defects, it cannot meet the requirements of large tonnage and large-scale hoisting, such as internal suspension Pole holding; or due to the complicated process, it is difficult to meet the requirements of safe hoisting and improve production efficiency, such as rocker arm holding pole. The existing pole adopts the support shown in Figure 1, including the base and the cross universal joint, and the two adopt a hinged structure, which has the following defects: the connection strength between it and the tower body is weak, the bending moment at the hinge point is large, and it is difficult to disassemble it. difficulty.

实用新型内容 Utility model content

本实用新型为了解决上述技术问题提供一种输电线路杆塔顶部辅助抱杆球支座,其可在工作区域内自由偏转,力学性能好且拆装方便。 In order to solve the above technical problems, the utility model provides an auxiliary pole-holding ball bearing at the top of a transmission line tower, which can deflect freely in the working area, has good mechanical properties and is easy to disassemble and assemble.

本实用新型解决上述问题所采用的技术方案是: The technical solution adopted by the utility model to solve the above problems is:

输电线路杆塔顶部辅助抱杆球支座,包括节点板和固定在节点板上的固定片,所述的固定片上设置有球窝底座,所述球窝底座上设置有球窝,所述的球窝内设置有球头,所述球头上设置有连接件。本实用新型在现有技术的基础上做了改进,采用“内悬浮抱杆+辅助抱杆”吊装横担工艺,重点在于满足辅助抱杆稳定性和安装的便捷性要求。采用球头和球窝的结构,有效的解决了辅助抱杆在塔顶安装的难题,使得抱杆可在工作区域内自由偏转,受力清晰,力学性能好。 The auxiliary pole-holding ball bearing at the top of the transmission line tower includes a joint plate and a fixed piece fixed on the joint plate. The fixed piece is provided with a ball-socket base, and the ball-socket base is provided with a ball socket. The ball A ball head is arranged in the socket, and a connecting piece is arranged on the ball head. The utility model has been improved on the basis of the prior art, adopts the "inner suspension holding pole + auxiliary holding pole" hoisting cross-arm technology, and focuses on meeting the requirements for the stability of the auxiliary holding pole and the convenience of installation. The structure of the ball head and the ball socket effectively solves the problem of installing the auxiliary pole on the top of the tower, so that the pole can be deflected freely in the working area, the force is clear, and the mechanical performance is good.

作为优选,所述连接件包括连接座和用于连接连接座和球头的连接片,所述连接座上设置有连接孔。 Preferably, the connecting piece includes a connecting seat and a connecting sheet for connecting the connecting seat and the ball head, and the connecting seat is provided with a connecting hole.

进一步的,为了增强其受力性能,所述连接片有多个。利用多个连接片增强球头与连接座之间的连接稳定性,增强其受力性能。 Further, in order to enhance its force-bearing performance, there are multiple connecting pieces. Multiple connecting pieces are used to enhance the connection stability between the ball head and the connecting seat, and enhance its force-bearing performance.

作为优选,为了增强其结构的稳定性,增强力学性能,所述球窝底座四周设置有加强片。 Preferably, in order to enhance the stability of its structure and enhance its mechanical properties, reinforcing sheets are arranged around the ball socket base.

进一步的,所述加强片与固定片之间设置有加强筋。加强筋可增强加强片结构的稳定性。 Further, a reinforcing rib is provided between the reinforcing sheet and the fixing sheet. Ribs can enhance the stability of the stiffener structure.

作为优选,为了便于安装多个支座,所述节点板上设置有多个固定片安装区。 Preferably, in order to facilitate the installation of a plurality of supports, the gusset plate is provided with a plurality of fixing plate installation areas.

作为优选,所述节点板上设置有螺纹孔。 Preferably, threaded holes are provided on the gusset plate.

综上,本实用新型的有益效果是: In summary, the beneficial effects of the utility model are:

本实用新型采用球头和球窝的结构,有效的解决了辅助抱杆在塔顶安装的难题,使得抱杆可在工作区域内自由偏转,受力清晰,力学性能好。 The utility model adopts the structure of the ball head and the ball socket, which effectively solves the problem of installing the auxiliary pole on the top of the tower, so that the pole can be deflected freely in the working area, the force is clear, and the mechanical performance is good.

附图说明 Description of drawings

图1是现有支座的结构示意图。 Fig. 1 is a structural schematic diagram of an existing support.

图2是本实用新型的结构示意图。 Fig. 2 is a schematic structural view of the utility model.

附图中标记及相应的零部件名称:1、节点板;2、固定片;21、球窝底座;3、球头;4、连接件;5、加强片。 The marks in the attached drawings and the names of the corresponding parts: 1. Gusset plate; 2. Fixed piece; 21. Ball socket base; 3. Ball head; 4. Connecting piece; 5. Reinforcing piece.

具体实施方式 detailed description

下面结合实施例及附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。 The technical solutions in the embodiments of the present invention are clearly and completely described below in conjunction with the embodiments and the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

实施例1: Example 1:

如图2所示的一种输电线路杆塔顶部辅助抱杆球支座,包括节点板1和固定在节点板1上的固定片2,所述的固定片2上设置有球窝底座21,所述球窝底座21上设置有球窝,所述的球窝内设置有球头3,所述球头3上设置有连接件4。 As shown in Figure 2, an auxiliary pole-holding ball bearing at the top of a transmission line pole tower includes a node plate 1 and a fixed piece 2 fixed on the node plate 1, and the fixed piece 2 is provided with a ball socket base 21, so A ball socket is arranged on the ball socket base 21 , a ball head 3 is arranged in the ball socket, and a connecting piece 4 is arranged on the ball head 3 .

节点板直接安装在塔顶,连接件4连接在组塔装备上,安装时,直接将球头安放在球窝内即可,避免了现有支座在塔顶安装的难题,避免了因孔位不正造成铰接螺栓安装困难,其装拆方便。球头可在球窝内自由偏转,其受力清晰,力学性能好。节点板可获得塔身部件的稳定支撑,系统的稳定性好。 The gusset plate is directly installed on the top of the tower, and the connecting piece 4 is connected to the tower assembly equipment. During installation, the ball head can be directly placed in the ball socket, which avoids the problem of installing the existing support on the top of the tower, and avoids the problem caused by holes. Improper position makes it difficult to install hinge bolts, which are easy to assemble and disassemble. The ball head can deflect freely in the ball socket, its force is clear and its mechanical properties are good. The gusset plate can obtain the stable support of the tower body parts, and the stability of the system is good.

利用该结构,可采用大型装备,减少了道路修筑、工地运输和吊车租赁等费用,经济性能突出,较内悬浮抱杆和摇臂抱杆组塔安全效益也更加突出。 With this structure, large-scale equipment can be used, which reduces the cost of road construction, construction site transportation and crane rental.

实施例2: Example 2:

如图2所示的一种输电线路杆塔顶部辅助抱杆球支座,本实施例在上述实施例的基础上做了细化,即所述连接件4包括连接座和用于连接连接座和球头的连接片,所述连接座上设置有连接孔。连接座直接连接在大型装备上,连接座可通过螺栓与大型装备相连,为了便于大型设备对球头施力,连接片与连接座垂直固定,且连接片可设置多个,多个连接片之间相互平行设置。 As shown in Figure 2, an auxiliary pole-holding ball bearing at the top of a transmission line tower, this embodiment is refined on the basis of the above-mentioned embodiment, that is, the connecting piece 4 includes a connecting seat and is used to connect the connecting seat and The connecting piece of the ball head is provided with a connecting hole on the connecting seat. The connecting seat is directly connected to the large-scale equipment, and the connecting seat can be connected with the large-scale equipment through bolts. In order to facilitate the large-scale equipment to exert force on the ball head, the connecting piece and the connecting seat are fixed vertically, and multiple connecting pieces can be set. set parallel to each other.

实施例3: Example 3:

如图2所示的一种输电线路杆塔顶部辅助抱杆球支座,为了增强支座结构的稳定性,本实施例在上述实施例的基础上做了优化,即所述球窝底座21四周设置有加强片5。 As shown in Figure 2, an auxiliary pole-holding ball bearing at the top of a transmission line pole tower, in order to enhance the stability of the bearing structure, this embodiment is optimized on the basis of the above-mentioned embodiment, that is, the ball socket base 21 around A reinforcing sheet 5 is provided.

所述加强片5与固定片2之间设置有加强筋。 A reinforcing rib is provided between the reinforcing piece 5 and the fixing piece 2 .

实施例4: Example 4:

如图2所示的一种输电线路杆塔顶部辅助抱杆球支座,本实施例在上述实施例的基础上做了优化,即所述节点板1上设置有多个固定片安装区。如图2所示,虚线左边为已安装区域,右边为待安装区域,在一个节点片上设置多个固定片安装区,便于安装多个球窝结构,当安装在“T”型、“L”型塔顶时,可增强塔受力的均衡性。 As shown in FIG. 2 , an auxiliary pole-holding ball bearing at the top of a power transmission line tower is optimized in this embodiment on the basis of the above-mentioned embodiments, that is, the gusset plate 1 is provided with a plurality of fixing plate installation areas. As shown in Figure 2, the left side of the dotted line is the installed area, and the right side is the area to be installed. Multiple fixed piece installation areas are set on one node piece to facilitate the installation of multiple ball and socket structures. When installed in "T" type, "L" When the top of the tower is shaped, the balance of the tower's force can be enhanced.

所述节点板1上设置有螺纹孔。节点板可通过螺栓与塔身连接,利用塔顶螺栓孔,底座稳定可靠,且通用性能好,避免了节点板与塔顶狭窄结构面难以匹配的问题。节点板1也可通过螺栓与连接片相连。 The gusset plate 1 is provided with threaded holes. The gusset plate can be connected to the tower body through bolts, using the bolt holes on the top of the tower, the base is stable and reliable, and has good general performance, which avoids the problem that the gusset plate is difficult to match with the narrow structural surface of the tower top. The gusset plate 1 can also be connected with the connecting piece by bolts.

如上所述,可较好的实现本实用新型。 As mentioned above, the utility model can be better realized.

Claims (7)

1.输电线路杆塔顶部辅助抱杆球支座,其特征在于:包括节点板(1)和固定在节点板(1)上的固定片(2),所述的固定片(2)上设置有球窝底座(21),所述球窝底座(21)上设置有球窝,所述的球窝内设置有球头(3),所述球头(3)上设置有连接件(4)。 1. The auxiliary pole-holding ball bearing at the top of the transmission line pole tower is characterized in that it includes a gusset plate (1) and a fixed piece (2) fixed on the gusset plate (1), and the fixed piece (2) is provided with A ball socket base (21), the ball socket base (21) is provided with a ball socket, a ball head (3) is provided in the ball socket, and a connecting piece (4) is provided on the ball socket (3) . 2.根据权利要求1所述的输电线路杆塔顶部辅助抱杆球支座,其特征在于:所述连接件(4)包括连接座和用于连接连接座和球头的连接片,所述连接座上设置有连接孔。 2. The auxiliary pole holding ball bearing at the top of the transmission line pole tower according to claim 1, characterized in that: the connecting piece (4) includes a connecting seat and a connecting piece for connecting the connecting seat and the ball head, and the connecting piece (4) The seat is provided with connecting holes. 3.根据权利要求2所述的输电线路杆塔顶部辅助抱杆球支座,其特征在于:所述连接片有多个。 3. The auxiliary pole-holding ball bearing at the top of the power transmission line tower according to claim 2, characterized in that there are multiple connecting pieces. 4.根据权利要求1所述的输电线路杆塔顶部辅助抱杆球支座,其特征在于:所述球窝底座(21)四周设置有加强片(5)。 4. The auxiliary pole-holding ball bearing at the top of the transmission line tower according to claim 1, characterized in that: the ball socket base (21) is provided with reinforcement sheets (5) around it. 5.根据权利要求4所述的输电线路杆塔顶部辅助抱杆球支座,其特征在于:所述加强片(5)与固定片(2)之间设置有加强筋。 5. The auxiliary pole-holding ball bearing at the top of the transmission line tower according to claim 4, characterized in that: a reinforcing rib is provided between the reinforcing piece (5) and the fixing piece (2). 6.根据权利要求1所述的输电线路杆塔顶部辅助抱杆球支座,其特征在于:所述节点板(1)上设置有多个固定片安装区。 6. The auxiliary pole-holding ball bearing at the top of the transmission line pole tower according to claim 1, characterized in that: the node plate (1) is provided with a plurality of fixing plate installation areas. 7.根据权利要求1所述的输电线路杆塔顶部辅助抱杆球支座,其特征在于:所述节点板(1)上设置有螺纹孔。 7. The auxiliary rod-holding ball bearing at the top of the power transmission line tower according to claim 1, characterized in that: the node plate (1) is provided with threaded holes.
CN201521019858.9U 2015-12-10 2015-12-10 Supplementary pole tumbler bearing of embracing of transmission line head of mast Expired - Lifetime CN205172139U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521019858.9U CN205172139U (en) 2015-12-10 2015-12-10 Supplementary pole tumbler bearing of embracing of transmission line head of mast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521019858.9U CN205172139U (en) 2015-12-10 2015-12-10 Supplementary pole tumbler bearing of embracing of transmission line head of mast

Publications (1)

Publication Number Publication Date
CN205172139U true CN205172139U (en) 2016-04-20

Family

ID=55736142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521019858.9U Expired - Lifetime CN205172139U (en) 2015-12-10 2015-12-10 Supplementary pole tumbler bearing of embracing of transmission line head of mast

Country Status (1)

Country Link
CN (1) CN205172139U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592747A (en) * 2022-03-25 2022-06-07 四川省新中能建设工程有限公司 Fixing base of auxiliary holding pole of power transmission tower
CN116357149A (en) * 2023-03-29 2023-06-30 桂林航天工业学院 A bottom supporting device for a main pole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592747A (en) * 2022-03-25 2022-06-07 四川省新中能建设工程有限公司 Fixing base of auxiliary holding pole of power transmission tower
CN114592747B (en) * 2022-03-25 2024-05-31 四川省新中能建设工程有限公司 Fixing base of auxiliary holding pole of power transmission tower
CN116357149A (en) * 2023-03-29 2023-06-30 桂林航天工业学院 A bottom supporting device for a main pole

Similar Documents

Publication Publication Date Title
CN201671391U (en) Light Line Repair Tower
CN208292485U (en) TBM headstock turnniing over and lifting device
CN205172139U (en) Supplementary pole tumbler bearing of embracing of transmission line head of mast
CN105064759B (en) A kind of GFRP pipes reinforced concrete combined structure member multiloop power transmission rod
CN206233122U (en) For bridge cantilever construction with Hanging Basket movable tower crane
CN204455858U (en) A kind of hanger of large sections steel box-girder
CN207846810U (en) A kind of novel ceiling applied on steel construction ceiling framework
CN206148848U (en) Large -tonnage electrified conducting wire's hoisting device
CN218931433U (en) Offshore wind power bolt assembly hoisting tool
CN209260578U (en) Longitudinal temporary connecting structure of suspension bridge concrete stiffening girder installation
CN218786484U (en) High stability construction site tower crane installation abutment
CN216945941U (en) Tower crane adheres to frame
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN205445100U (en) Formula herringbone can be loaded and unloaded and pole base is embraced
CN2937065Y (en) Crane span structure of round pipe truss structure
CN205377234U (en) Yoke plate structure
CN203175134U (en) Truss used for lifting electric transmission line tower connecting legs
CN201146337Y (en) Multifunctional lifting tool
CN202441098U (en) Ladder and pull rope type steel tube tower
CN210508615U (en) Power transformation framework
CN206844792U (en) A kind of electric power tower fixed structure
CN202081693U (en) Straight steel pipe rod of extra-high voltage DC grounding electrode line
CN207276078U (en) Portable hoisting device
CN113896084A (en) Single loop wheel machine hoist and mount overlength fan blade gallows
CN216215224U (en) A kind of weak current engineering equipment installation frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20160420