CN102467697A - Material demand generation method and system - Google Patents

Material demand generation method and system Download PDF

Info

Publication number
CN102467697A
CN102467697A CN2010105522781A CN201010552278A CN102467697A CN 102467697 A CN102467697 A CN 102467697A CN 2010105522781 A CN2010105522781 A CN 2010105522781A CN 201010552278 A CN201010552278 A CN 201010552278A CN 102467697 A CN102467697 A CN 102467697A
Authority
CN
China
Prior art keywords
key
key component
low level
level code
demand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105522781A
Other languages
Chinese (zh)
Inventor
郭喜胜
李海生
邓永彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kingdee Software China Co Ltd
Original Assignee
Kingdee Software China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kingdee Software China Co Ltd filed Critical Kingdee Software China Co Ltd
Priority to CN2010105522781A priority Critical patent/CN102467697A/en
Publication of CN102467697A publication Critical patent/CN102467697A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a material demand generation method. The method comprises the following steps of: extracting a material list from a database and extracting a material replacement relationship from the material list; establishing a temporary table according to the material replacement relationship and setting material low-level codes with the same matched replacement relationship to the same layer; and calculating critical parts, non-critical parts and quantity demands of replacement materials used for replacing the critical parts and the non-critical parts in the materials layer by layer according to the low-level codes. In the material demand generation method and a system thereof, through the introduction of the matched replacement relationship, the low-level codes are set according to the combined replacement relationship in the materials and the material low-level codes with the same matched replacement relationship are set to the same layer, so that the calculation order of the quantity demands is determined; the replacement of a certain material also causes the replacement of the relevant matched material and the quantity demands of the material and the relevant matched material are automatically generated when the replacement of the material occurs; and therefore, less errors occur, and the efficiency is effectively improved.

Description

Material requirement generates method and system
[technical field]
The present invention relates to the handling of goods and materials technology, particularly relate to a kind of material requirement and generate method and system.
[background technology]
In the production run of reality, for supplying needed product of client or supply the market demand on time, and avoid causing stock, usually need carry out MRP (Material Requirement Planning is called for short MRP).MRP is the plan management of materials and quipment pattern of a kind of product manufacturing enterprise; Be meant subordinate and quantitative relation according to the material of each level of product structure; With each material is the plan object; With intact man-hour is the time reference back scheduling, by the time in advance length difference each article assign plans sequencings of time.
Yet traditional MRP can only support a certain material to be substituted use respectively by other several materials, still; In industries such as electronics, machine-building, usually exist such application scenarios, promptly when producing material substitution, some materials alternative substitutes when having caused its relevant auxiliary materials; For example, in the process of producing computer, the mouse interface in the computer on the main frame is circular; Corresponding interface also should be circular in the main frame so, therefore when circular mouse interface is in short supply, has used square mouse interface to substitute, at this moment; Corresponding interface also will substitute simultaneously in the main frame, is transformed into square.In the process that traditional material requirement generates, usually need be aided with the related needs that manual mode draws supporting alternative unclassified stores, and adjust, exist the defective of time-consuming, effort, easy error.
[summary of the invention]
Based on this, be necessary to provide a kind of material requirement generation method of raising the efficiency.
In addition, also be necessary to provide a kind of material requirement generation system of raising the efficiency.
A kind of material requirement generation method may further comprise the steps: from database, extract BOM, and from said BOM, extract the material substitution relation that obtains; Set up temporary table according to said material substitution relation, and the material Low Level Code that has identical supporting fallback relationship in the said temporary table is changed to layer; According to said Low Level Code, successively calculate key component in the said material, non-key and substitute said key component and the demand of non-key alternative material.
Preferably; The said relation according to said material substitution set up temporary table; And the step that the material Low Level Code that has supporting fallback relationship in the said temporary table is changed to layer comprises: the material substitution relation is imported temporary table; In all materials of identical supporting fallback relationship, get the Low Level Code of the minimum number of plies; The Low Level Code of all materials in the said supporting fallback relationship is changed to the Low Level Code of the said minimum number of plies.
Preferably, said according to said Low Level Code, also comprise before successively calculating key component in the said material, non-key and substituting the step of the said key component and the demand of non-key alternative material: material is carried out nested inspection; It is nested to judge whether said material produces; Be, then obtain producing nested material, and finish; Otherwise, the calculating that then gets into said material requirement.
Preferably; Said according to said Low Level Code; Successively calculate key component in the said material, non-key and substitute said key component and the step of the demand of non-key alternative material comprises: use with and replace field according to preset; Calculate key component and with the demand of the corresponding alternative part of said key component, and then obtain key component and with the use amount of the corresponding alternative part of said key component; Use amount and supporting fallback relationship according to said key component obtain non-key use amount; According to said non-key use amount and stock, obtain non-key and with the demand of non-key corresponding alternative material.
Preferably; Said according to said Low Level Code; Successively calculate key component in the said material, non-key and substitute said key component and the step of the demand of non-key alternative material after also comprise: according to said key component, non-key and substitute said key component and the demand of non-key alternative material, generate the MRP order.
A kind of material requirement generation system comprises at least: database is used to store BOM; Extraction module is used to extract BOM, and from said BOM, extracts the material substitution relation that obtains; Module is set, is used for setting up temporary table, and the material Low Level Code that has identical supporting fallback relationship in the said temporary table is changed to layer according to said material substitution relation; Computing module is used for according to said Low Level Code, successively calculates key component in the said material, non-key and substitutes said key component and the demand of non-key alternative material.
Preferably, the said module that is provided with comprises: the Low Level Code acquiring unit, be used for the material substitution relation is imported temporary table, and in all materials of identical supporting fallback relationship, get the Low Level Code of the minimum number of plies; Processing unit is used for the Low Level Code of said identical supporting all materials of fallback relationship is changed to the Low Level Code of the said minimum number of plies.
Preferably, comprise also that said nested inspection module is used for said Low Level Code is carried out nested inspection for the material with layer between the nested inspection module that is provided with between module and the computing module; It is nested to judge whether said material produces; Be, then obtain producing nested material, and finish; Otherwise, the calculating that then gets into said material requirement.
Preferably; Said computing module comprises: the key component computing unit; Be used for using with and replacing parameter according to preset, calculate key component and with the demand of the corresponding alternative material of said key component, and then obtain key component and with the use amount of the corresponding alternative material of said key component; Non-key computing unit is used for use amount and supporting fallback relationship according to said key component, obtains non-key use amount; The contrast unit is used for according to said non-key use amount and stock, obtain non-key and with the demand of non-key corresponding alternative material.
Preferably, also comprise the order generation module, said order generation module is used for according to said key component, non-key and substitutes said key component and the demand of non-key alternative material, generates the MRP order.
Above-mentioned material requirement generates in the method and system through introducing supporting fallback relationship; According to the relation of the combination replacement in the material Low Level Code is provided with; And the material Low Level Code that will have identical supporting fallback relationship is changed to layer, thereby confirms the sequencing that demand is calculated, and realized when producing material substitution; Substituting of some materials causes substituting of its relevant auxiliary materials simultaneously; And generate this material automatically and the demand of the auxiliary materials of providing and delivering, be difficult for makeing mistakes, and improved efficient effectively.
It is core that above-mentioned material requirement generates in the method and system with the key component; With the Matching Relationship of material and non-key demand is auxiliary; Consider to use with and replace the parameter value of field, carry out the calculating of demand, thereby realize the flexible transformation of the various alternative scenario of material.
[description of drawings]
Fig. 1 is the process flow diagram of the material requirement generation method of an embodiment;
Fig. 2 is the temporary table among the embodiment;
Fig. 3 is the material requirement generation method among another embodiment;
Fig. 4 is the detailed block diagram of the material requirement generation system among the embodiment;
Fig. 5 is the synoptic diagram that module is set among the embodiment;
Fig. 6 is the synoptic diagram of the computing module among the embodiment;
Fig. 7 is the material basic document table among the embodiment;
Fig. 8 is the combination replacement mode table among Fig. 7.
[embodiment]
As shown in Figure 1, the material requirement generation method of an embodiment may further comprise the steps:
In step S10, from database, extract BOM, and from BOM, extract the material substitution relation that obtains.In the present embodiment, BOM (Bill of Materials is called for short BOM) has shown structural relation and needed quantity between all materials.Key component, non-key and alternative material have usually been comprised in the BOM; Wherein, Key component is to be worth bigger or more important material in the material; Non-key the material for matching with key component substitutes part and be when key component and non-key are short, is used for alternative key component and non-key 's material.The BOM of from database, being stored extracts major ingredient in the material (be key component, non-key) and substitutes the relation between the material, so that carry out the calculating of material requirement in the supporting fallback relationship of material.
In step S20, set up temporary table according to the material substitution relation, and the material Low Level Code that has identical supporting fallback relationship in the temporary table is changed to layer.In the present embodiment; As shown in Figure 2; The material substitution relation is imported in the temporary table; Obtained writing down major ingredient and substituted the concrete material in the material, from this temporary table, can obtain and the corresponding alternative material of each major ingredient, thereby when the shortage of stock of major ingredient, can carry out major ingredient and substitute using with and replace between expecting.Low Level Code (Low Level Code is called for short LLC) is material minimum exponent in BOM; In product structure, the Low Level Code of the superiors is 0, and following one deck parts are 1; The rest may be inferred, between layer parts and following one deck portion, is the relation of father's item material and subitem material.
Among another embodiment, comprise also after the step S20 of above-mentioned material requirement generation method material carried out nested inspection that it is nested to judge whether material produces, and is, then obtains producing nested material, and finishes, otherwise, step S30 then got into.In the present embodiment, for avoiding the conflict of Low Level Code in the material, need carry out nested inspection to material, for example, in a BOM, father's item material of subitem material X is A, when then Low Level Code calculates, Low Level Code=MAX of subitem material X (Low Level Code of A+1 ...); If occurred such BOM again, his father's item material is X, the subitem material is A, and just occurred nested this moment, because Low Level Code=MAX of A (Low Level Code of X+1 ...) taken place to conflict with the Low Level Code of above-mentioned X.
In step S30,, successively calculate the demand of key component in the material, non-key and alternative key component and non-key 's alternative material according to Low Level Code.In the present embodiment, according to Low Level Code, according to ascending order computation demand, to avoid double counting.In supporting material, key component and non-key should be comparatively speaking, and promptly the material outside the key component all is non-key component, and for example, A, B, C are supporting material, if A is a key component, then B and C are non-key, with the A replacement, just must replace B and C.
In other embodiments, also comprise after the step S30 in the above-mentioned material requirement generation system according to key component, non-key and substitute key component and the demand of non-key alternative material, generate the MRP order.In the present embodiment, this MRP has write down information such as material, Date Required and quantity.
As shown in Figure 3, in embodiment more specifically, material requirement generation method may further comprise the steps:
In step S210, from database, extract BOM, and from BOM, extract the material substitution relation that obtains.
In step S220, the material substitution relation is imported temporary table, in all materials of identical supporting fallback relationship, get the Low Level Code of the minimum number of plies.In the present embodiment, set up the temporary table that has write down the material substitution relation, so that obtain major ingredient and substitute the details of expecting.
In step S230, the Low Level Code of all materials in the identical supporting fallback relationship is changed to the Low Level Code of the minimum number of plies.In the present embodiment, the Low Level Code of all materials is set to layer, so that calculate successively according to Low Level Code in the identical supporting fallback relationship.
In step S240, material is carried out nested inspection, it is nested to judge whether material produces, and is, then gets into step S250, otherwise, the calculating that then gets into step S260 material requirement.In the present embodiment, as previously mentioned, for fear of between the material because conflict that Low Level Code caused is carried out nested inspection to material.
In step S250, obtain producing nested material.In the present embodiment, for example, in certain BOM 01; Father's item material is A, in its subitem material X is arranged, but in another one BOM11; Father's item is X, A occurred in its subitem material, and just occurred nested this moment; Produce nest information, this nest information has write down the numbering of above-mentioned two BOMs and nested material has taken place.
In step S260, use with and replace field according to preset, calculate key component and with the demand of the corresponding alternative part of key component, and then obtain key component and with the use amount of the corresponding alternative part of key component.In the present embodiment; Introduced and used with and replace field, this is used with and replaces field has two kinds of parameters respectively, is " Y " or " N "; Shortage according to key component is a demand; And consider to obtain the actual use amount of key component by " using with " and " replacement " two parameter values, and obtain the use amount with the corresponding alternative part of this key component thus.
In step S270, use amount and supporting fallback relationship according to key component obtain non-key use amount.In the present embodiment, key component and non-key are matching used, and have constituted supporting relation, therefore can obtain non-key use amount through this Matching Relationship.In like manner, calculate the use amount with non-key corresponding alternative material through fallback relationship.
In step S280, according to non-key use amount and stock, obtain non-key and with the demand of non-key corresponding alternative material.In the present embodiment, non-key quantity among non-key use amount and the stock is compared, obtained non-key demand and with the demand of this non-key corresponding alternative material.
In step S290, according to key component, non-key and substitute key component and the demand of non-key alternative material, generate the MRP order.In the present embodiment, this MRP order record information such as material, Date Required, quantity.
In addition, as shown in Figure 4, a kind of material requirement generation system also is provided.The material requirement generation system comprises database 10, extraction module 20, module 30 and computing module 40 is set.
Database 10 is used to store BOM.In the present embodiment, BOM (Bill of Materials is called for short BOM) has shown structural relation and needed quantity between all materials.
Extraction module 20 is used to extract BOM, and from BOM, extracts the material substitution relation that obtains.In the present embodiment, the BOM that extraction module 20 is stored from database 10 extracts major ingredient in the material (be key component, non-key) and substitutes the relation between the material, so that carry out the calculating of material requirement amount in the supporting fallback relationship of material.
Module 30 is set, is used for setting up temporary table, and the material Low Level Code that has identical supporting fallback relationship in the temporary table is changed to layer according to the material substitution relation.In the present embodiment; As previously mentioned; Module 30 is set to import the material substitution relation in the temporary table; Obtained writing down major ingredient and substituted the concrete material in the material, from this temporary table, can obtain and the corresponding alternative material of each major ingredient, thereby when the shortage of stock of major ingredient, can carry out major ingredient and substitute using with and replace between expecting.
Among another embodiment, being provided with between module 30 and the computing module 40 of above-mentioned material requirement generation system also comprised nested inspection module, and this nested inspection module is used for Low Level Code is carried out nested inspection for the material with layer; It is nested to judge whether material produces; Be then to obtain producing nested material, and stop; Otherwise, then get into the calculating of material requirement amount.In the present embodiment, for avoiding the conflict of Low Level Code in the material, nested inspection module need be carried out nested inspection to material.
Computing module 40 is used for according to Low Level Code, successively calculates key component in the material, non-key and substitutes key component and the demand of non-key alternative material.In the present embodiment, computing module 40 is according to Low Level Code, according to ascending order computation demand, to avoid double counting.
In other embodiments, above-mentioned material requirement generation system also comprises the order generation module, and this order generation module is used for according to key component, non-key and substitutes key component and the demand of non-key alternative material, generates the MRP order.In the present embodiment, the MRP order record that the order generation module generated information such as material, Date Required and quantity.
As shown in Figure 5, in embodiment more specifically, module 30 is set comprises Low Level Code acquiring unit 310, processing unit 330.
Low Level Code acquiring unit 310 is used for the material substitution relation is imported temporary table, in all materials of identical supporting fallback relationship, gets the Low Level Code of minimum derivative.In the present embodiment, Low Level Code acquiring unit 310 is set up the temporary table that has write down the material substitution relation, so that obtain major ingredient and substitute the details of expecting.
Processing unit 330 is used for the Low Level Code of identical supporting all materials of fallback relationship is changed to the Low Level Code of the minimum number of plies.In the present embodiment, the Low Level Code of all materials is set to layer, so that calculate successively according to Low Level Code in the processing unit 330 identical supporting fallback relationships.
As shown in Figure 6, in embodiment more specifically, computing module 40 comprises key component computing unit 410, non-key computing unit 430 and contrast unit 450.
Key component computing unit 410 is used for using with and replacing field according to preset, calculate key component and with the demand of the corresponding alternative part of key component, and then obtain key component and with the use amount of the corresponding alternative part of key component.In the present embodiment; Key component computing unit 410 has been introduced and has been used with and replace field, and this is used with and replaces field has two kinds of parameters respectively, is " Y " or " N "; Shortage according to key component is a demand; And consider to obtain the actual use amount of key component by " using with " and " replacement " two parameter values, and obtain the use amount with the corresponding alternative part of this key component thus.
Non-key computing unit 430 is used for use amount and supporting fallback relationship according to key component, obtains non-key use amount.In the present embodiment, non-key computing unit 430 can obtain non-key use amount through Matching Relationship, and calculates the use amount with non-key corresponding alternative material through fallback relationship.
Contrast unit 450 is used for use amount and stock according to non-key, obtain non-key and with the demand of non-key corresponding alternative material.In the present embodiment, contrast unit 450 compares non-key quantity among non-key use amount and the stock, obtained non-key demand and with the demand of this non-key corresponding alternative material.
Set forth the application process that material requirement generates method and system below in conjunction with a detailed embodiment.Among this embodiment, extraction module 20 extracts BOM from database 10, and from this BOM, has obtained the material substitution relation, and is as shown in Figure 7.In the material basic document of Fig. 7, A is a key component, and A1 is and the corresponding alternative material of key component A, and B is and supporting non-key of A, and B1 is and the corresponding alternative material of B, and the demand of A is 100, and wherein A, B, A1, B1 are all in stock.Module 30 is set sets up temporary table, and the material Low Level Code that has identical supporting fallback relationship in the temporary table is changed to layer according to above-mentioned substitutional relation.At this moment, nested inspection module is carried out nested inspection, and discovery does not produce nested, and then computing module 40 gets into the calculating of material requirement amounts.As shown in Figure 8; Key component computing unit 410 is according to using with and replacing the parameter value in the field; Can obtain 4 kinds of combinations; And obtain the demand of key component A, and then according to whether carrying out key component A and substitute using with and replacing the demand that obtains substituting material A1 of material A1, and calculate the actual use amount of A and A1.Non-key computing unit 430 according to the actual use amount of A and with the Matching Relationship of non-key B, obtain the actual use amount of B and the actual use amount of B1.Contrast unit 450 has obtained the demand of B and B1, thereby has obtained the MRP order according to the stock.
Above-mentioned material requirement generates in the method and system through introducing supporting fallback relationship; According to the relation of the combination replacement in the material Low Level Code is provided with; And the material Low Level Code that will have identical supporting fallback relationship is changed to layer, thereby confirms the sequencing that demand is calculated, and realized when producing material substitution; Substituting of some materials causes substituting of its relevant auxiliary materials simultaneously; And generate this material automatically and the demand of the auxiliary materials of providing and delivering, be difficult for makeing mistakes, and improved efficient effectively.
It is core that above-mentioned material requirement generates in the method and system with the key component; With the Matching Relationship of material and non-key demand is auxiliary; Consider to use with and replace the parameter value of field, carry out the calculating of demand, thereby realize the flexible transformation of the various alternative scenario of material.
The above embodiment has only expressed several kinds of embodiments of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to claim of the present invention.Should be pointed out that for the person of ordinary skill of the art under the prerequisite that does not break away from the present invention's design, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with accompanying claims.

Claims (10)

1. material requirement generation method may further comprise the steps:
From database, extract BOM, and from said BOM, extract the material substitution relation that obtains;
Set up temporary table according to said material substitution relation, and the material Low Level Code that has identical supporting fallback relationship in the said temporary table is changed to layer;
According to said Low Level Code, successively calculate key component in the said material, non-key and substitute said key component and the demand of non-key alternative material.
2. material requirement generation method according to claim 1 is characterized in that, the said relation according to said material substitution set up temporary table, and the step that the material Low Level Code that has supporting fallback relationship in the said temporary table is changed to layer comprises:
The material substitution relation is imported temporary table, in all materials of identical supporting fallback relationship, get the Low Level Code of the minimum number of plies;
The Low Level Code of all materials in the said supporting fallback relationship is changed to the Low Level Code of the said minimum number of plies.
3. material requirement generation method according to claim 1; It is characterized in that; Said according to said Low Level Code, successively calculate key component in the said material, non-key and substitute said key component and the step of the demand of non-key alternative material before also comprise:
Material is carried out nested inspection, and it is nested to judge whether said material produces, and is, then obtains producing nested material, and finishes, otherwise, the calculating that then gets into said material requirement.
4. material requirement generation method according to claim 1 is characterized in that, and is said according to said Low Level Code, successively calculates key component in the said material, non-key and substitutes said key component and the step of the demand of non-key alternative material comprises:
Use with and replace field according to preset, calculate key component and with the demand of the corresponding alternative part of said key component, and then obtain key component and with the use amount of the corresponding alternative part of said key component;
Use amount and supporting fallback relationship according to said key component obtain non-key use amount;
According to said non-key use amount and stock, obtain non-key and with the demand of non-key corresponding alternative material.
5. material requirement generation method according to claim 1; It is characterized in that; Said according to said Low Level Code, successively calculate key component in the said material, non-key and substitute said key component and the step of the demand of non-key alternative material after also comprise:
According to said key component, non-key and substitute said key component and the demand of non-key alternative material, generate the MRP order.
6. a material requirement generation system is characterized in that, comprises at least:
Database is used to store BOM;
Extraction module is used to extract BOM, and from said BOM, extracts the material substitution relation that obtains;
Module is set, is used for setting up temporary table, and the material Low Level Code that has identical supporting fallback relationship in the said temporary table is changed to layer according to said material substitution relation;
Computing module is used for according to said Low Level Code, successively calculates key component in the said material, non-key and substitutes said key component and the demand of non-key alternative material.
7. material requirement generation system according to claim 6 is characterized in that, the said module that is provided with comprises:
The Low Level Code acquiring unit is used for the material substitution relation is imported temporary table, in all materials of identical supporting fallback relationship, gets the Low Level Code of the minimum number of plies;
Processing unit is used for the Low Level Code of said identical supporting all materials of fallback relationship is changed to the Low Level Code of the said minimum number of plies.
8. material requirement generation system according to claim 6 is characterized in that, also comprises between the nested inspection module that is provided with between module and the computing module; Said nested inspection module is used for said Low Level Code is carried out nested inspection for the material with layer, and it is nested to judge whether said material produces, and is; Then obtain producing nested material; And finish, otherwise, the calculating that then gets into said material requirement.
9. material requirement generation system according to claim 6 is characterized in that, said computing module comprises:
The key component computing unit is used for using with and replacing parameter according to preset, calculate key component and with the demand of the corresponding alternative material of said key component, and then obtain key component and with the use amount of the corresponding alternative material of said key component;
Non-key computing unit is used for use amount and supporting fallback relationship according to said key component, obtains non-key use amount;
The contrast unit is used for according to said non-key use amount and stock, obtain non-key and with the demand of non-key corresponding alternative material.
10. material requirement generation system according to claim 6; It is characterized in that; Also comprise the order generation module, said order generation module is used for according to said key component, non-key and substitutes said key component and the demand of non-key alternative material, generates the MRP order.
CN2010105522781A 2010-11-19 2010-11-19 Material demand generation method and system Pending CN102467697A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105522781A CN102467697A (en) 2010-11-19 2010-11-19 Material demand generation method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105522781A CN102467697A (en) 2010-11-19 2010-11-19 Material demand generation method and system

Publications (1)

Publication Number Publication Date
CN102467697A true CN102467697A (en) 2012-05-23

Family

ID=46071314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105522781A Pending CN102467697A (en) 2010-11-19 2010-11-19 Material demand generation method and system

Country Status (1)

Country Link
CN (1) CN102467697A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105303359A (en) * 2015-12-09 2016-02-03 金蝶软件(中国)有限公司 Method and device of determining material requirement planning
CN105809318A (en) * 2014-12-31 2016-07-27 航天信息软件技术有限公司 Product quantity determining method and device
CN108694542A (en) * 2018-05-14 2018-10-23 北京辰森世纪科技股份有限公司 Processing method, device and the equipment of applying and purchasing the experiment materials information
CN112116288A (en) * 2020-08-21 2020-12-22 苏州浪潮智能科技有限公司 Method, system, equipment and medium for ensuring consistency of key parts
CN113610452A (en) * 2021-06-28 2021-11-05 苏州浪潮智能科技有限公司 Key piece material import management method, system, equipment and medium
CN113744076A (en) * 2020-07-17 2021-12-03 北京京东振世信息技术有限公司 Flour auxiliary material blending method and device and computer readable medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101339635A (en) * 2008-08-01 2009-01-07 金蝶软件(中国)有限公司 Method, system and equipment for determining material demand plan and obtaining material low level code

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101339635A (en) * 2008-08-01 2009-01-07 金蝶软件(中国)有限公司 Method, system and equipment for determining material demand plan and obtaining material low level code

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105809318A (en) * 2014-12-31 2016-07-27 航天信息软件技术有限公司 Product quantity determining method and device
CN105303359A (en) * 2015-12-09 2016-02-03 金蝶软件(中国)有限公司 Method and device of determining material requirement planning
CN108694542A (en) * 2018-05-14 2018-10-23 北京辰森世纪科技股份有限公司 Processing method, device and the equipment of applying and purchasing the experiment materials information
CN113744076A (en) * 2020-07-17 2021-12-03 北京京东振世信息技术有限公司 Flour auxiliary material blending method and device and computer readable medium
CN113744076B (en) * 2020-07-17 2024-04-16 北京京东振世信息技术有限公司 Flour auxiliary material blending method, device and computer readable medium
CN112116288A (en) * 2020-08-21 2020-12-22 苏州浪潮智能科技有限公司 Method, system, equipment and medium for ensuring consistency of key parts
CN112116288B (en) * 2020-08-21 2022-06-03 苏州浪潮智能科技有限公司 Method, system, equipment and medium for ensuring consistency of key parts
CN113610452A (en) * 2021-06-28 2021-11-05 苏州浪潮智能科技有限公司 Key piece material import management method, system, equipment and medium
CN113610452B (en) * 2021-06-28 2023-07-18 苏州浪潮智能科技有限公司 Method, system, equipment and medium for managing key piece materials

Similar Documents

Publication Publication Date Title
CN102467697A (en) Material demand generation method and system
CN102567864B (en) Material substitution method in MRP system, device
CN102446303B (en) Distribution method and device of process route assembly
CN101025805A (en) Product-based bill of material generating method
CN101859405A (en) Method for synchronizing data between BOMs by utilizing implicit BOM model
CN102004954A (en) Product information system and information integration method of product design system
CN112487648B (en) Multi-dimensional structured data creation method based on aerospace product features
CN102024209A (en) Method for automatically replacing materials by replacement tree technology
CN111177847A (en) Civil aircraft configuration management method and device
US6856857B2 (en) Method and system for planning disassembly and production of recyclable products and for planning procurement of parts for production
US8494893B2 (en) Production plan making program, device, and method
CN115080019A (en) Aviation aircraft software EBOM structure construction method
KR101656989B1 (en) Integrated platform management system for collaboration between the manufacturing company
CN102081644A (en) Data storage method for storing data and data meanings separately
CN103430152A (en) Method and system for processing data for database modification
CN1963849A (en) Conformity method of managing system of data of product
JP2008052535A (en) Production system creation system and production system creation method
CN102254240A (en) Data object substitution device and data object substitution method
CN102306199A (en) Data management device and data management method
CN102411731A (en) Method and device for automatically calculating low level codes
CN102542364A (en) Method and system for balancing substitute materials in material requirement planning
CN115187117A (en) Order distribution system and method based on component structure tree
KR101709725B1 (en) The method and the system for grouping customized for user by issue of information management in supply chain
CN102184482A (en) Realization method for synchronizing data between BOM (Bill Of Material) by implicit technical BOM model
KR20170055379A (en) Purchase price forecasting methods for new developments utilizing the ERP database

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120523