CN102254240A - Data object substitution device and data object substitution method - Google Patents

Data object substitution device and data object substitution method Download PDF

Info

Publication number
CN102254240A
CN102254240A CN2011101498561A CN201110149856A CN102254240A CN 102254240 A CN102254240 A CN 102254240A CN 2011101498561 A CN2011101498561 A CN 2011101498561A CN 201110149856 A CN201110149856 A CN 201110149856A CN 102254240 A CN102254240 A CN 102254240A
Authority
CN
China
Prior art keywords
alternative
replaced
demand
module
substituting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101498561A
Other languages
Chinese (zh)
Inventor
陆家俊
何剑
罗涛
延鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yonyou Software Co Ltd
Original Assignee
Yonyou Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yonyou Software Co Ltd filed Critical Yonyou Software Co Ltd
Priority to CN2011101498561A priority Critical patent/CN102254240A/en
Publication of CN102254240A publication Critical patent/CN102254240A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a data object substitution device, which comprises an object supply and demand comparing and searching module, a first judgment module and an object substitution module, wherein the object supply and demand comparing and searching module is used for sequentially detecting a net requirement amount of each object; the first judgment module is used for judging the substitution mode of the object when the object supply and demand comparing and searching module detects that the net requirement amount of the object is not zero; and the object substitution module is used for substituting the object according to the substitution mode judged by the first judgment module. The invention further provides an object substitution method. By the technical scheme of the invention, the object substitution is applied to various situations; by reasonable substitution, the production cost of enterprise is reduced; and management efficiency of enterprise data object is improved.

Description

Data object replacement device and data object alternative method
Technical field
The present invention relates to computer technology, in particular to data object replacement device and data object alternative method.
Background technology
Enterprise is generally by MRP (Material Requirement Planning, MRP) data objects such as the product of its production, required material is managed, find that after the processing that finishes data object result does not meet actual demand, not enough and can't satisfy the production demand as the material of needs production or buying, at this moment, enterprise substitutes the material that lacks in order to reduce material cost with unclassified stores.Then, manual again each step process result to the data object carries out successively substituting one by one.Because manual alternative workload is big, efficient is low, makes mistakes easily.When application scenarios is complicated, be difficult to guarantee alternative correctness.
Correlation technique provides a kind of data object information amending method, and data object is handled as material, and as shown in Figure 1, it comprises the steps: to detect successively the net demand amount 102 of each material; When the net demand amount that detects arbitrary material is non-vanishing, search the replaced material corresponding alternative material 104 non-vanishing with the net demand amount according to substitutional relation information and material available stock amount; According to the Bill of Material (BOM) information of replaced material, substitute percent information and the available stock amount of the alternative material that finds, revise the net demand amount of replaced material and relevant stage material down and the available stock amount 106 of the alternative material that finds.
Though said method can be revised the information of data processing object, can't the processing of classifying of the plurality of application scenes of enterprise be caused alternative method to be difficult to be applied in the reality and go.
At first, it can't for example be handled respectively the alternative wish of different material:
1. when object lacks, carry out automatic alternate process at once.
2. when object lacks, judge whether and in time to supply, if can in time supply, just do not adopt alternative object to carry out alternate process.
3., then do not do data processing if not wishing to carry out substitutes automatically.
Secondly, when substituting generation, can't judge the multiple situation that may occur, underaction seems under the application scenarios below.
1. adopt a kind of object to carry out alternate process.Guarantee unanimities such as feasible color, attribute in processing procedure with a collection of product.
2. can use multiple object to carry out alternate process.May use yellow, the object of multiple color such as redness substitutes original blue object.
3. after an alternate process takes place, do not re-use and substitute object as the supply deal with data.For example: enterprise uses 15 cun old money display as the accessory of computing machine always, when 15 cun display stocks use the light time, do not re-use 15 cun display, and use 17 cun display instead, the display that perhaps uses 17 cun, 19 cun simultaneously is as the supply object.
Once more, alternative logic and parameter cannot be set at different levels.
1. for a kind of object, adopt a kind of alternative object all the time.
2. for a kind of multiple BOM (Bill of Material) structure of object, adopt different alternative objects.
Based on the defective in the correlation technique, need a kind of data object substitute technology, not only can avoid inefficiency of manually bringing and the problem that error may occur, it is also conceivable that different application scenarioss, make the alternate process of object become flexible.
Summary of the invention
Technical matters to be solved by this invention is, a kind of data object replacement device and data object alternative method are provided, and can be applied under the several scenes of enterprise demand, and the data object is effectively managed.
The invention provides a kind of data object replacement device, comprising: the object supply and demand ratio is used for detecting successively the net demand amount of each object to retrieval module; First judge module is used for when described object supply and demand ratio retrieval module being detected the described net demand amount of described object when non-vanishing, judges the alternative of described object; And the object alternative module, be used for carrying out substituting of described object according to the described alternative that described first judge module is judged.
In technique scheme, preferably, described object alternative module can also comprise demand document generation unit, be used for when described alternative be that replaced object is when preferential, judging under the situation that described replaced object can supply on time, generating the demand document of described replaced object, wherein, described replaced object be the non-vanishing described object of described net demand amount and for make part and when described alternative when alternative, generate the demand document of described replaced object; When described alternative for substituting object when preferential, described object alternative module uses described alternative object to substitute described replaced object.
In technique scheme, preferably, can also comprise: second judge module, being used in described alternative is that described replaced object is preferential, and under the situation that described replaced object can not be supplied on time and preferential for substituting object in described alternative, use the described replaced object after described alternative object substitutes to also have under the situation of net demand amount, judge the alternative control mode of described replaced object.
In technique scheme, preferably, described object alternative module can also comprise sequencing unit, is used for according to the order of priority each described alternative object being sorted; And computing unit, be used to search the stock of each described alternative object, calculate the demand of each described alternative object successively according to the order of described priority, wherein, the demand of described alternative object is the product of the alternative ratio of the net demand amount of described replaced object and described alternative object.
Described object replacement device can also comprise: modified module is used for revising the relation between supply and demand of described replaced object when described object alternative module is carried out substituting of described replaced object according to the described alternative control mode of judging after.
In technique scheme, preferably, judge that at described second judge module described alternative control mode is under the situation of replacing whole, whether the stock who judges same described alternative object successively satisfies corresponding described demand, when judged result when satisfying, then described object alternative module substitutes described replaced object with same described alternative object, when described judged result when not satisfying, then described object alternative module does not substitute, order according to described priority is carried out judgment processing to the described alternative object of the next one, if the stock of each described alternative object all can not satisfy corresponding demand, then described demand document generation unit generates the demand document of described replaced object; Under described second judge module judges that described alternative control mode is for the alternative situation of part, described object alternative module substitutes described replaced object successively according to the order of the described priority of described alternative object, if the described replaced object after substituting also has the net demand amount, then described demand document generation unit generates the demand document of described replaced object; Under described second judge module judges that described alternative control mode is for the situation of replacing, described object alternative module substitutes described replaced object successively according to the order of the described priority of described alternative object, if the described replaced object after substituting through all described alternative objects also has the net demand amount, then described demand document generation unit generates the demand document of last described alternative object that substitutes and described modified module and described replaced object is replaced to described last described alternative object that substitutes in object inventory structure.
The present invention also provides a kind of data object alternative method, comprising: step 302, object supply and demand ratio detect the net demand amount of each object successively to retrieval module; Step 304, when the described net demand amount that detects described object was non-vanishing, first judge module was judged the alternative of described object; Step 306, the object alternative module is carried out substituting of described object according to the described alternative of judging.
In technique scheme, preferably, described step 306 can comprise: step 3062, when described alternative is that replaced object is when preferential, judge under the situation that described replaced object can supply on time at described first judge module, demand document generation unit generates the demand document of described replaced object, and wherein, described replaced object is the non-vanishing described object of described net demand amount and is the manufacturing part; Step 3064, when described alternative when not substituting, described demand document generation unit generates the demand document of described replaced object; Step 3066, when described alternative for substituting object when preferential, described object alternative module uses described alternative object to substitute described replaced object.
In technique scheme, preferably, can also comprise step 308, second judge module is judged described alternative control mode, and described object alternative module is carried out substituting of described replaced object according to the described alternative control mode of the described alternative of judging; In described step 3062,, carry out described step 308 judge under the situation that described replaced object can not supply on time; In described step 3066, the described replaced object after substituting also has under the situation of net demand amount, carries out described step 308.
In technique scheme, preferably, described step 308 can also comprise: sequencing unit sorts to each described alternative object according to the order of the priority of described alternative object, computing unit is retrieved the stock of each described alternative object, calculate the demand of each described alternative object successively according to the order of described priority, described object alternative module is carried out substituting of described replaced object according to the described demand of described alternative object and the described stock of described alternative object, modified module is revised the relation between supply and demand of described replaced object, wherein, the demand of described alternative object is the product of the alternative ratio of the net demand amount of described replaced object and described alternative object.
In technique scheme, preferably, in described alternative control mode is under the situation of replacing whole, whether the stock who judges same described alternative object successively satisfies corresponding described demand, when judged result when satisfying, then same described alternative object is substituted described replaced object, when described judged result when not satisfying, then do not substitute, order according to described priority is carried out judgment processing to the described alternative object of the next one, if the stock of each described alternative object all can not satisfy corresponding demand, then described demand document generation unit generates the demand document of described replaced object; In described alternative control mode is under the alternative situation of part, order according to the described priority of described alternative object substitutes described replaced object successively, if the described replaced object after substituting also has the net demand amount, then described demand document generation unit generates the demand document of described replaced object; Under the situation of described alternative control mode for replacement, described object alternative module substitutes described replaced object successively according to the order of the described priority of described alternative object, if the described replaced object after substituting through all described alternative objects also has the net demand amount, then generate the demand document of last described alternative object that substitutes and described modified module and in object inventory structure, described replaced object replaced to described last described alternative object that substitutes.
Description of drawings
Fig. 1 shows the process flow diagram of the object information amending method in the MRP system in the correlation technique;
Fig. 2 shows the block diagram of data object replacement device according to an embodiment of the invention;
Fig. 3 shows the process flow diagram of data object alternative method according to an embodiment of the invention;
Fig. 4 shows the process flow diagram of data object alternative method according to an embodiment of the invention;
Fig. 5 shows the synoptic diagram that the definition object substitutes on material product archives according to an embodiment of the invention;
Fig. 6 shows the synoptic diagram that the definition object substitutes on the BOM subitem according to an embodiment of the invention;
Fig. 7 shows the synoptic diagram of plan of needs calculating according to an embodiment of the invention; And
Fig. 8 shows the BOM structural representation of object A according to an embodiment of the invention.
Embodiment
In order more to be expressly understood above-mentioned purpose of the present invention, feature and advantage, the present invention is further described in detail below in conjunction with the drawings and specific embodiments.
Set forth a lot of details in the following description so that fully understand the present invention, still, the present invention can also adopt other to be different from other modes described here and implement, and therefore, the present invention is not limited to the restriction of following public specific embodiment.
Fig. 2 shows the block diagram of data object replacement device according to an embodiment of the invention.
As shown in Figure 2, data object replacement device 200 comprises according to an embodiment of the invention: the object supply and demand ratio is used for detecting successively the net demand amount of each object to retrieval module 202; First judge module 204 is used for when the object supply and demand ratio retrieval module 202 being detected the net demand amount of object when non-vanishing, judges the alternative of object; And object alternative module 206, be used for carrying out substituting of object according to the alternative that first judge module 204 is judged.
In technique scheme, preferably, object alternative module 206 can also comprise demand document generation unit 2062, be used for when alternative be that replaced object is when preferential, judging under the situation that replaced object can supply on time, generating the demand document of replaced object, wherein, replaced object be the non-vanishing object of net demand amount and for make part and when alternative when alternative, generate the demand document of replaced object; When alternative for substituting object when preferential, object alternative module 206 is used and is substituted object and substitute replaced object.
In technique scheme, preferably, can also comprise: second judge module 208, being used in alternative is that replaced object is preferential, and under the situation that replaced object can not be supplied on time and preferential for substituting object in alternative, use the replaced object that substitutes after object substitutes to also have under the situation of net demand amount, judge the alternative control mode of replaced object.
In technique scheme, preferably, object alternative module 206 can also comprise sequencing unit 2064, is used for according to the order of priority each alternative object being sorted; And computing unit 2066, the stock who is used to search each alternative object calculates the demand of each alternative object successively according to the order of priority, and wherein, the demand that substitutes object is the product of the alternative ratio of the net demand amount of replaced object and alternative object;
Data object replacement device 200 can also comprise: modified module 210 is used for revising the relation between supply and demand of replaced object when the object alternative module is carried out substituting of replaced object according to the alternative control mode of judging after.
In technique scheme, preferably, judge that at second judge module 208 substituting control mode is under the situation of replacing whole, whether the stock who judges same alternative object successively satisfies corresponding demand, when judged result when satisfying, then the object alternative module substitutes replaced object with same alternative object, when judged result when not satisfying, then object alternative module 206 does not substitute, order according to priority is carried out judgment processing to the alternative object of the next one, if the stock of each alternative object all can not satisfy corresponding demand, then demand document generation unit 2062 generates the demand document of replaced object; Judge that at second judge module 208 substituting control mode is under the alternative situation of part, object alternative module 206 substitutes replaced object successively according to the order of the priority that substitutes object, if the replaced object after substituting also has the net demand amount, then demand document generation unit 2062 generates the demand document of replaced object; Judge that at second judge module 208 substituting control mode is under the situation of replacing, object alternative module 206 substitutes replaced object successively according to the order of the priority that substitutes object, if the replaced object after substituting through all alternative objects also has the net demand amount, then demand document generation unit 2062 generates the demand document of last alternative object that substitute and modified module 210 and replaced object is replaced to the alternative object that last substitutes in object inventory structure.If it is replaced to liking A, alternative object B, C are arranged, carry out substituting according to the alternate orders of C behind the first B so to the A object, if the stock of B can not satisfy the net demand amount of A, the A object does not just have the net demand amount after needing after B substitutes to continue C substituted, is the C object with the A object modification in the BOM structure then, with the C object as appointed object, just generate later the demand document that C substitutes object, from then on do not re-use the A object.
For the principle of clearer data object replacement device of the present invention, come the exemplary concrete technical scheme of explanation with concrete application scenarios below.Should be appreciated that at this object that data object replacement device is handled can be a material.
Object supply and demand ratio in the data object replacement device is retrieved all demands and the supply of 202 pairs of each objects of retrieval module, and which definite demand can use supply, and the demand that can't satisfy is a net demand.
A. the object supply and demand ratio is as shown in table 1 below to the demand supply data of retrieval module 202 collections:
Object Type The supply and demand type The demand supply The project dimension
Hyundai Motor EL01 Sales order Demand 100 Project A
Hyundai Motor EL01 Produce order Supply 30 Project A
Hyundai Motor EL01 The stock Supply 50 Item B
Hyundai Motor EL01 The stock Supply 60 Project A
Hyundai Motor EL02 The stock Supply 20 Project C
Table 1
B. the object supply and demand ratio is to the supply requirement comparison logic of retrieval module 202.
According to last table 1 process object " Hyundai Motor EL01 " at first, specifying information is: demand sales order 100, project dimension are project A, all supplies of search terms A.Produce order 30, the stock 60.The project dimension be the item B correspondence Hyundai Motor EL01 and to as if the supply data of Hyundai Motor EL02 cannot use.
So, the object supply and demand ratio can detect net demand amount=100-30-60=10 of Hyundai Motor EL01 to retrieval module 202, therefore, also needs regeneration to produce the car of 10 models for " Hyundai Motor EL01 ", project dimension A.
Object alternative module 206 can define substitutional relation on object and two levels of BOM, carry out the data processing that corresponding object substitutes according to three kinds of alternative and three kinds of alternative control modes of providing.
Processing procedure under three kinds of alternative:
(1) be that (replaced object is replaced object under the preferential situation of replaced object if first judge module 204 is judged alternative, the promptly original object that needs), if replaced to as if when making part, continue to judge whether replaced object can in time be supplied, if before the Date Required of replaced object, still can't in time supply, then just consider to use to substitute object.Under this scene, the user wishes to reduce the use that substitutes object as far as possible.
(2) if it is to substitute under the preferential situation of object that first judge module 204 is judged alternative, when replaced object has the net demand amount, substitute according to the corresponding control mode that substitutes.Under this scene, the user wishes to use other objects to substitute replaced object.
(3) if it is not have under the situation about substituting that first judge module 204 is judged alternative, do not consider to substitute when then MRP calculates, can ignore yet even defined to substitute.
With table 2 concrete data handling procedure under three kinds of alternative is described below.
Object Type The supply and demand type The demand supply The ratio of substituting
Silver paint LT01 Satisfy sales order Demand 100 1
Silver paint LT01 Produce order Supply 40 1
Silver paint LT01 The stock Supply 30 1
Silver paint LT02 bottle The stock Supply 50 2
Blue lacquer LT01 The stock Supply 100 1
Table 2
Produce 100 " Hyundai Motor EL01 " as needing in the table 1, producing these 100 cars needs 100 bottles of silver paint LT01.The object supply and demand ratio is collected all demands supplies to retrieval module 202, and it is right to carry out supply and demand ratio.Information from last table 2, object supply and demand ratio can detect net demand amount=100-40-30=30 bottle of silver paint LT01 to retrieval module 202.That is to say, also need 30 bottles of silver paint LT01.At this moment, first judge module 204 is just judged the alternative of object silver paint LT01.
A. be the object of silver paint LT01 when preferential when the data object replacement device adopts the preferential alternative of replaced object, then need regeneration to produce 30 bottles of silver paint LT01, demand document generation unit 2062 generates the demand document of silver paint LT01.
B. when the data object replacement device adopt to substitute the preferential alternative of object, can use " silver paint LT02 bottle " to substitute, but can substitute one bottle " silver paint LT01 " according to 2 bottles of alternative ratios " silver paint LT02 ", 50 bottles only to substitute 25 bottles " silver paint LT01 " so.Like this, after employing " silver paint LT02 bottle " substitutes, net demand amount=100-40-30-50/2=5 bottle of silver paint LT01.
Continuation is that example is come the data handling procedure of description object replacement device three kinds of alternative control modes with table 2.
Concrete alternative control mode is as follows:
(1) be under the situation of replacing whole in alternative control mode, all alternative objects are sorted according to the corresponding priorities order, the data object replacement device is handled alternative object one by one according to priority orders, during processing, calculate earlier the demand of each alternative object, demand is the product of the alternative ratio of the net demand amount of replaced object and alternative object.What substitute object detects the demand whether same alternative object supply sum can satisfy the alternative object that calculates successively according to ranking results, if can not satisfy then abandon this alternative object, whether the supply sum that continues next alternative object of detection can satisfy the demand that substitutes object, till finding satisfiable alternative object, if all alternative objects all can not satisfy the supply of replaced object, generate the demand document of replaced object so.
(2) be under the alternative situation of part substituting control mode, can adopt multiple different object to substitute.All alternative objects are carried out prioritization, also be to handle substituting object one by one according to priority orders, during processing, also need to calculate the demand of each alternative object, successively replaced object is substituted, if also have unsatisfied net demand, then generate the demand document of replaced object.
(3) substituting under the situation of control mode for replacement, all alternative objects are carried out prioritization, handle substituting object one by one according to priority orders equally, when handling, need to calculate the demand of each alternative object equally, successively replaced object is substituted, if alternative this replaced object afterwards through all alternative objects also has unsatisfied net demand amount, then generating the demand document of last alternative object that substitutes and will substituting object modification is getting the raw materials ready in the object inventory structure, when the data object of data object replacement device processing is material, then this object inventory structure is Bill of Material (BOM) (BOM) structure, that is to say in Bill of Material (BOM) (BOM) structure replaced material is replaced to the alternative material that last substitutes.Need to prove, revise after the object relationship in the object inventory structure, to use the object of appointment later on, under the situation that replacing whole and part substitute, do not need to revise getting the raw materials ready in the object inventory structure, that is to say after alternative Process finishes, also be to use original data object later on.
As in the table 2, when adopting the preferential alternative of replaced object, replaced object also has net demand amount=100-40-30=30 bottle.
A. when the data object replacement device adopts the alternative control mode of replacing whole, then cannot use " silver paint LT02 bottle " and " blue lacquer LT03 " to substitute simultaneously, and use " silver paint LT02 bottle ", not satisfy 30 demand only to substitute 25 bottles.So can only adopt " blue lacquer LT03 " to substitute.
B. when the data object replacement device adopts the alternative control mode that partly substitutes, can use " silver paint LT02 bottle " to substitute 25 bottles, re-use " blue lacquer LT03 " and substitute remaining amount 100-40-30-50/2=5 bottle.
Fig. 3 shows the process flow diagram of data object alternative method according to an embodiment of the invention.
As shown in Figure 3, the data object alternative method comprises according to an embodiment of the invention: step 302, object supply and demand ratio detect the net demand amount of each object successively to retrieval module; Step 304, when the net demand amount that detects object was non-vanishing, first judge module was judged the alternative of object; Step 306, the object alternative module is carried out substituting of object according to the alternative of judging.
In technique scheme, preferably, step 306 can comprise: step 3062, when alternative is that replaced object is when preferential, judge under the situation that replaced object can supply on time at first judge module, demand document generation unit generates the demand document of replaced object, and wherein, replaced object is the non-vanishing object of net demand amount and is the manufacturing part; Step 3064, when alternative when not substituting, demand document generation unit generates the demand document of replaced object; Step 3066, when alternative for substituting object when preferential, the object alternative module is used and is substituted object and substitute replaced object.
In technique scheme, preferably, can also comprise step 308, second judge module is judged the alternative control mode of replaced object, the object alternative module is carried out substituting of replaced object according to the alternative control mode of judging; In step 3062,, carry out step 308 judge under the situation that replaced object can not supply on time; In step 3066, the replaced object after substituting also has under the situation of net demand amount, carry out step 308.
In technique scheme, preferably, step 308 can also comprise: sequencing unit sorts to each alternative object according to the order of the priority that substitutes object, computing unit is retrieved the stock of each alternative object, calculate the demand and the object alternative module of each alternative object according to the order of priority successively and carry out substituting of replaced object according to the demand of alternative object and the stock of alternative object, modified module is revised the relation between supply and demand of replaced object, wherein, the demand that substitutes object is the product of the alternative ratio of the net demand amount of replaced object and alternative object.
In technique scheme, preferably, in alternative control mode is under the situation of replacing whole, whether the stock who judges same alternative object successively satisfies corresponding demand, when judged result when satisfying, then same alternative object is substituted this replaced object, when described judged result when not satisfying, then do not substitute, order according to described priority is carried out judgment processing to the described alternative object of the next one, if the stock of each described alternative object all can not satisfy corresponding demand, then described demand document generation unit generates the demand document of described replaced object; Substituting control mode is under the alternative situation of part, time described replaced object is substituted according to the order of the described priority of described alternative object, if the described replaced object after substituting also has the net demand amount, then described demand document generation unit generates the demand document of described replaced object; Substituting under the situation of control mode for replacement, described object alternative module substitutes described replaced object successively according to the order of the described priority of described alternative object, if the replaced object of replaced object after substituting through all alternative objects also has the net demand amount, then generate the demand document of last alternative object that substitutes and modified module and in object inventory structure, replaced object replaced to the alternative object that last substitutes.
Continuation illustrates technical scheme of the present invention with Fig. 4, Fig. 5, Fig. 6 and Fig. 7, Fig. 4 shows the process flow diagram of data object alternative method according to an embodiment of the invention, Fig. 5 shows according to an embodiment of the invention at the synoptic diagram of expecting that the definition object substitutes on the product archives, and Fig. 6 shows synoptic diagram and Fig. 7 that the definition object substitutes on the BOM subitem according to an embodiment of the invention and shows the synoptic diagram of plan of needs calculating according to an embodiment of the invention.
At first, if the user wants that consideration substitutes when carrying out the data object plan of needs, and use the inventory data that substitutes object as supply data automatically, necessary predefined substitutional relation comprises the ratio that substitutes object, substitutes the order of object.
The order that substitutes object often has a plurality of optional object datas exactly when object substitutes, the user can be provided with the priority orders that substitutes object.When substituting, consider earlier the supply data of high object of priority,, consider the object data that priority is low again if can't satisfy.
The ratio that substitutes object is exactly that the user often wishes proportionally replaced object to be substituted in reality substitutes.For example,, can use yellow and viridine green, mix substituting according to a certain percentage if when not having blue pigment.
Alternative definitions occurs on two levels:
1) object layer: definition substitutes object, alternate orders, substitutes ratio on the object archives, is called object and substitutes, as shown in Figure 5.
2) BOM layer: definition substitutes information such as object, alternate orders, usage ratio, alternative control mode on the BOM subitem, is called BOM and substitutes.Same target can define different alternative objects under different BOM structures.When carrying out the data object alternate process, consider that earlier BOM substitutes, consider that again object substitutes, as shown in Figure 6.
Whether the net demand amount that step 402, object supply and demand contrast retrieval module detect each object successively is zero, when judged result for not the time, carry out step 404, when judged result when being, then flow process is restarted.Whether earlier demand was sorted by the demand date, pay the utmost attention to Date Required demand the earliest, judging then had enough supplies to satisfy before Date Required, supply data comprises the stock, produced order, data such as purchase order.If can satisfy, judge the next record demand, if can't satisfy, think that there is the net demand amount in this object.
Step 404 continue to judge that the net demand amount is the alternative of zero object, when alternative when alternative, then carry out step 410,, then carry out step 408 when alternative is that replaced object is preferential and when making part, when alternative for substituting object when preferential, then carry out step 406.
Step 406 when replaced object has the net demand amount, enters the logical process that substitutes control mode, enters step 412 then.
Step 408 judges whether replaced object can be supplied on time, when judged result for not the time, carry out step 410, when judged result when being, carry out step 412.
Step 410 does not substitute replaced object, produces the demand document of replaced object.
Step 412 judging that substituting control mode is under the situation of replacing whole, carry out step 418, and substituting control mode in judgement is under the situation about partly substituting, and carry out step 416, judging under the situation of alternative control mode for replacement, carry out step 414.
Step 414, carry out the ordering of priority to substituting object, successively replaced object is substituted, when the replaced object after substituting through all alternative objects also has the net demand amount, last alternative object that substitutes got the raw materials ready as the appointment of the upper level object of replaced object (be about to replaced object and replace to the alternative object that last substitutes, to use this to substitute object later on, to not use after the replaced object, why Here it is will revise object inventory structural reason) and generate the demand document of last alternative object that substitutes.
Step 416 is carried out the ordering of priority to substituting object, successively replaced object is substituted, if also have unsatisfied net demand amount, generates the demand document of replaced object.
Step 418, carry out the ordering of priority to substituting object, and judge successively whether same alternative object can satisfy the net demand amount of replaced object, if can not satisfy, then abandon this object data, continuation if all alternative objects all can not satisfy the net demand amount of replaced object, then generates the demand document of replaced object in like manner to handle next object data.
Be noted that,, all need handle one by one substituting object, and calculate the demand that substitutes object that demand is the product of the alternative ratio of the net demand amount of replaced object and alternative object according to priority orders no matter be which kind of substitutes control mode.Not to calculate entirely the demand of all alternative objects is disposable simultaneously, but, just calculate the demand of which alternative object, can avoid the waste of computing time when which being handled when substituting object; As the stock who substitutes object during greater than demand, under three kinds of alternative control modes, all substitute, as the stock who substitutes object during less than demand, in control mode is under the situation of replacing whole, do not substitute, next object is handled, and is under the situation that partly substitutes and replace in control mode, substitutes according to priority orders; When all alternative objects fail to satisfy the net demand amount of replaced object, generate the demand document that substitutes object, especially, under the situation of control mode for replacement, the appointment that needs to revise the upper level object of replaced object in the BOM structure is got the raw materials ready, after revising, original object will do not re-used.
Fig. 8 shows the BOM structural representation of object A according to an embodiment of the invention, continues with the concrete example of Fig. 8 technical scheme of the present invention to be described.
Enterprise receives a sales order, needs to produce 100 A objects, enquiry on the 20th.The A object is by 1 B, and 2 C are assembled, and makes part B and is assembled by 2 D and 3 E, as shown in Figure 8.D, C, E are Purchased Items, need to buy.At present, for making part, enterprise wishes that oneself is produced as far as possible, few substituting, and the data object replacement device has adopted the alternative of " replaced object is preferential ".C when the stock does not satisfy, can adopt C1 to liking Purchased Item, and C2 comes to substitute simultaneously, has adopted the alternative control mode of " part substitutes ".Make part B, when the stock does not satisfy, can adopt B1 to substitute, adopt the alternative control mode of " replacing whole ".D makes raw material, needs buying, can use D1 to substitute, and adopts the alternative control mode of " replacement ".Suppose that the alternative ratio of all objects all is 1.
The alternate process process of data object replacement device of the present invention is as follows:
1) object supply and demand comparing module 202 detects the net demand amount of each object successively, at first retrieves all supply requirement data of A object.Find that sales order needs 100 of A objects, the stock is 40 at present, and calculating the net demand amount is 100-40=60.Calculate rank objects (next stage object) demand down, need 60 of B objects, need 120 of C objects.Enter the computing of next object.
2) detect the B object, detect 60 of demand data, do not have inventory data, then calculate 60 of net demand amount data.At this moment, because first judge module 204 judges that the alternative of these B objects be " replaced object is preferential ", and the B object is for making part, if consider oneself production B object, whether can satisfy 20 days delivery date of A object.Find and oneself to produce through calculating.Calculate rank object-oriented requirements down, need 120 of D objects, 180 of E objects.
3) detect the C object, detect 120 of demands, do not have inventory data, then calculating the net demand amount is 120.At this moment the C1 stock 50, and C2 stock 60 because second judge module is judged the alternative control mode that this object adopts " part substitutes ", can consider C1, the stock of C2 simultaneously.After object alternative module 206 is used the C1 alternate process, calculate net demand amount 120-50=70 in addition, consider the stock of C2 again, after substituting, also have net demand amount 70-60=10, then the planned order of demand document generation unit 2062 generation object C is 10, promptly also needs to purchase 10 object C again.
4) continue to detect the D object, detect 120 of demand data, do not have inventory data, then calculating the net demand amount is 120-0=120.Considering to substitute logic, is " replacement " owing to substitute control mode, 150 of D1 object stocks, and the net demand amount greater than calculating can substitute.Simultaneously, modified module 210 is revised the BOM structure of B object, does not re-use the D object as getting the raw materials ready, with D1 object getting the raw materials ready as the B object.
5) detect the E object, detect 180 of demand data, 200 of inventory datas, supply does not have the net demand amount greater than demand.
When the object of data objects processing device processing was material, then shown in Figure 8 was Bill of Material (BOM) (BOM) structure of material A.
In the calculating of data object plan of needs, the user can repeatedly calculate in different plan versions, and a plurality of result of calculations are compared.In different plan versions, the user can select different alternative.Like this, can be in conjunction with the actual replacement scheme that obtains optimum.
Below in conjunction with the accompanying drawings technical scheme of the present invention is had been described in detail,, can assist enterprise that object data is managed by technical scheme of the present invention.
1) improves the efficient of enterprise to the data Object Management group.Calculate substituting of realization data object automatically by MRP, greatly reduce personnel cost.
2) reduce enterprise's production cost, be provided with by reasonably substituting, enterprise can adopt the lower object of cost to produce.
3) shorten the production cycle, by rational calculating, the shortest object time in advance that enterprise can adopting, thus shorten produce the time in advance.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a data object replacement device is characterized in that, comprising:
The object supply and demand ratio is used for detecting successively the net demand amount of each object to retrieval module;
First judge module is used for when described object supply and demand ratio retrieval module being detected the described net demand amount of described object when non-vanishing, judges the alternative of described object; And
The object alternative module is used for carrying out substituting of described object according to the described alternative that described first judge module is judged.
2. data object replacement device according to claim 1, it is characterized in that, described object alternative module also comprises demand document generation unit, be used for when described alternative be that replaced object is when preferential, judging under the situation that described replaced object can supply on time, generate the demand document of described replaced object, wherein, described replaced object be the non-vanishing described object of described net demand amount and for make part and when described alternative when alternative, generate the demand document of described replaced object;
When described alternative for substituting object when preferential, described object alternative module uses described alternative object to substitute described replaced object.
3. data object replacement device according to claim 2, it is characterized in that, also comprise: second judge module, being used in described alternative is that described replaced object is preferential, and under the situation that described replaced object can not be supplied on time and preferential for substituting object in described alternative, use the described replaced object after described alternative object substitutes to also have under the situation of net demand amount, judge the alternative control mode of described replaced object.
4. data object replacement device according to claim 3 is characterized in that, described object alternative module also comprises sequencing unit, is used for according to the order of priority each described alternative object being sorted; And
Computing unit, be used to search the stock of each described alternative object, calculate the demand of each described alternative object successively according to the order of described priority, wherein, the demand of described alternative object is the product of the alternative ratio of the net demand amount of described replaced object and described alternative object;
Described object replacement device also comprises: modified module is used for revising the relation between supply and demand of described replaced object when described object alternative module is carried out substituting of described replaced object according to the described alternative control mode of judging after.
5. data object replacement device according to claim 4, it is characterized in that, judge that at described second judge module described alternative control mode is under the situation of replacing whole, whether the stock who judges same described alternative object successively satisfies corresponding described demand, when judged result when satisfying, then described object alternative module substitutes described replaced object with same described alternative object, when described judged result when not satisfying, then described object alternative module does not substitute, order according to described priority is carried out judgment processing to the described alternative object of the next one, if the stock of each described alternative object all can not satisfy corresponding demand, then described demand document generation unit generates the demand document of described replaced object;
Under described second judge module judges that described alternative control mode is for the alternative situation of part, described object alternative module substitutes described replaced object successively according to the order of the described priority of described alternative object, if the described replaced object after substituting also has the net demand amount, then described demand document generation unit generates the demand document of described replaced object;
Under described second judge module judges that described alternative control mode is for the situation of replacing, described object alternative module substitutes described replaced object successively according to the order of the described priority of described alternative object, if the described replaced object after substituting through all described alternative objects also has the net demand amount, then described demand document generation unit generates the demand document of last described alternative object that substitutes and described modified module and described replaced object is replaced to described last described alternative object that substitutes in object inventory structure.
6. a data object alternative method is characterized in that, comprising:
Step 302, object supply and demand ratio detect the net demand amount of each object successively to retrieval module;
Step 304, when the described net demand amount that detects described object was non-vanishing, first judge module was judged the alternative of described object;
Step 306, the object alternative module is carried out substituting of described object according to the described alternative of judging.
7. data object alternative method according to claim 6, it is characterized in that, described step 306 comprises: step 3062, when described alternative is that replaced object is when preferential, judge under the situation that described replaced object can supply on time at described first judge module, demand document generation unit generates the demand document of described replaced object, and wherein, described replaced object is the non-vanishing described object of described net demand amount and is the manufacturing part;
Step 3064, when described alternative when not substituting, described demand document generation unit generates the demand document of described replaced object;
Step 3066, when described alternative for substituting object when preferential, described object alternative module uses described alternative object to substitute described replaced object.
8. data object alternative method according to claim 7, it is characterized in that, also comprise step 308, second judge module is judged the alternative control mode of described replaced object, and described object alternative module is carried out substituting of described replaced object according to the described alternative control mode of judging;
In described step 3062,, carry out described step 308 judge under the situation that described replaced object can not supply on time;
In described step 3066, the described replaced object after substituting also has under the situation of net demand amount, carries out described step 308.
9. data object alternative method according to claim 8, it is characterized in that, described step 308 also comprises: sequencing unit sorts to each described alternative object according to the order of the priority of described alternative object, computing unit is retrieved the stock of each described alternative object, calculate the demand of each described alternative object successively according to the order of described priority, described object alternative module is carried out substituting of described replaced object according to the described demand of described alternative object and the described stock of described alternative object, modified module is revised the relation between supply and demand of described replaced object, wherein, the demand of described alternative object is the product of the alternative ratio of the net demand amount of described replaced object and described alternative object.
10. data object alternative method according to claim 9, it is characterized in that, in described alternative control mode is under the situation of replacing whole, whether the stock who judges same described alternative object successively satisfies corresponding described demand, when judged result when satisfying, then same described alternative object is substituted described replaced object, when described judged result when not satisfying, then do not substitute, order according to described priority is carried out judgment processing to the described alternative object of the next one, if the stock of each described alternative object all can not satisfy corresponding demand, then described demand document generation unit generates the demand document of described replaced object;
In described alternative control mode is under the alternative situation of part, order according to the described priority of described alternative object substitutes described replaced object successively, if the described replaced object after substituting also has the net demand amount, then described demand document generation unit generates the demand document of described replaced object;
Under the situation of described alternative control mode for replacement, described object alternative module substitutes described replaced object successively according to the order of the described priority of described alternative object, if the described replaced object after substituting through all described alternative objects also has the net demand amount, then generate the demand document of last described alternative object that substitutes and described modified module and in object inventory structure, described replaced object replaced to described last described alternative object that substitutes.
CN2011101498561A 2011-06-03 2011-06-03 Data object substitution device and data object substitution method Pending CN102254240A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101498561A CN102254240A (en) 2011-06-03 2011-06-03 Data object substitution device and data object substitution method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101498561A CN102254240A (en) 2011-06-03 2011-06-03 Data object substitution device and data object substitution method

Publications (1)

Publication Number Publication Date
CN102254240A true CN102254240A (en) 2011-11-23

Family

ID=44981487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101498561A Pending CN102254240A (en) 2011-06-03 2011-06-03 Data object substitution device and data object substitution method

Country Status (1)

Country Link
CN (1) CN102254240A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102779295A (en) * 2012-06-18 2012-11-14 歌尔声学股份有限公司 Device and method for material substitution management
CN104281902A (en) * 2013-07-05 2015-01-14 航天信息软件技术有限公司 Material requirement suggestion making method
CN104866991A (en) * 2015-05-26 2015-08-26 广州视源电子科技股份有限公司 MRP selection method and device
CN109800057A (en) * 2019-01-18 2019-05-24 杭州复杂美科技有限公司 Object reference method, equipment and storage medium
CN109978369A (en) * 2019-03-22 2019-07-05 Oppo(重庆)智能科技有限公司 Work order generation method, device, electronic equipment and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101996360A (en) * 2009-08-11 2011-03-30 佛山市顺德区顺达电脑厂有限公司 Material substitution group generating system and method
CN102034162A (en) * 2010-12-22 2011-04-27 广州视源电子科技有限公司 Material requirement planning (MRP) operation method and device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101996360A (en) * 2009-08-11 2011-03-30 佛山市顺德区顺达电脑厂有限公司 Material substitution group generating system and method
CN102034162A (en) * 2010-12-22 2011-04-27 广州视源电子科技有限公司 Material requirement planning (MRP) operation method and device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102779295A (en) * 2012-06-18 2012-11-14 歌尔声学股份有限公司 Device and method for material substitution management
CN104281902A (en) * 2013-07-05 2015-01-14 航天信息软件技术有限公司 Material requirement suggestion making method
CN104866991A (en) * 2015-05-26 2015-08-26 广州视源电子科技股份有限公司 MRP selection method and device
CN109800057A (en) * 2019-01-18 2019-05-24 杭州复杂美科技有限公司 Object reference method, equipment and storage medium
CN109978369A (en) * 2019-03-22 2019-07-05 Oppo(重庆)智能科技有限公司 Work order generation method, device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
Khatami et al. Benders’ decomposition for concurrent redesign of forward and closed-loop supply chain network with demand and return uncertainties
Keyvanshokooh et al. A dynamic pricing approach for returned products in integrated forward/reverse logistics network design
Morgan et al. A systematic literature review of remanufacturing scheduling
US9152941B2 (en) Systems and methods for automated parallelization of back-order processing
Biswas et al. Optimal batch quantity models for a lean production system with in-cycle rework and scrap
Tahirov et al. Optimization of closed-loop supply chain of multi-items with returned subassemblies
DeCroix et al. A series system with returns: Stationary analysis
CN102779295A (en) Device and method for material substitution management
JP2002510098A (en) Product configuration method and system
CN102254240A (en) Data object substitution device and data object substitution method
Wallis et al. Intelligent Utilization of Digital Manufacturing Data in Modern Product Emergence Processes.
CN111461590A (en) Method for calculating complete set of materials according to sales, inventory and purchase information
KR102111430B1 (en) PLM Apparatus and Managing Method Thereof
Basnet et al. Demand-oriented supply chain strategies–a review of the literature
CN110796416A (en) Industrial networking based order processing method and computer storage medium
Guide et al. Closed-loop supply chains: practice and potential
JP2001273313A (en) Device and method for describing process and method for classifying process
JP6853134B2 (en) Production support system and production support method
US20130144745A1 (en) Method and apparatus for managing a supply chain
WO2008023655A1 (en) Production system creating system and production system creating method
CN102567826A (en) Method and system for processing material bills
Serna-Ampuero et al. Inventory Management Model under the Lean Warehousing Approach to Reduce the Rate of Returns in SME Distributors
Xu A Web-based system for proactive management of supply exceptions
CN112699174A (en) Big data building product drive chain diagram generation method
CN106779909A (en) Material matching process and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111123