CN102465524B CN201010541107.9A CN201010541107A CN102465524B CN 102465524 B CN102465524 B CN 102465524B CN 201010541107 A CN201010541107 A CN 201010541107A CN 102465524 B CN102465524 B CN 102465524B
Authority
CN
China
Prior art keywords
cylindric
cylinder mould
sand
woven bag
rebar cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010541107.9A
Other languages
English (en)
Other versions
CN102465524A (zh
Inventor
汪中卫
刘敏
周黎月
朱嵘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI MUNICIPAL ENGINEERING SURVEY AND DESIGN Co Ltd
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
SHANGHAI MUNICIPAL ENGINEERING SURVEY AND DESIGN Co Ltd
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI MUNICIPAL ENGINEERING SURVEY AND DESIGN Co Ltd, Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical SHANGHAI MUNICIPAL ENGINEERING SURVEY AND DESIGN Co Ltd
Priority to CN201010541107.9A priority Critical patent/CN102465524B/zh
Publication of CN102465524A publication Critical patent/CN102465524A/zh
Application granted granted Critical
Publication of CN102465524B publication Critical patent/CN102465524B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种双重径向网笼砂石桩,其特征在于该网笼砂石桩包括圆柱状钢筋网笼,圆柱状钢筋网笼外设有圆柱状编织袋,圆柱状钢筋网笼内填充有砂石料,侧向约束网笼和圆柱状编织袋之间充注灌缝填料。本发明的有益效果是在提高砂石桩承载力和减小桩自身沉降的同时,能够大量建筑材料用量,降低工程成本,同时扩展桩除承载和抗变形以外的辅助功能。在桩径受控的情况下,有利于提高地基加固的均匀性、稳定性和工程质量,同时有利于设计人员明确设计参数,便于设计推广。

Description

双重径向网笼砂石桩及其施工工艺
技术领域:
本发明涉及土木工程施工技术领域,具体涉及一种双重径向网笼砂石桩及其施工工艺。
背景技术:
随着城市建设的快速发展和交通、港口、码头等行业的蓬勃兴起,因地基承载力不足或地基受荷后沉降过大而需要进行处理的工程项目越来越多,选择一种有效而又价格低廉的加固方法成为土木工程施工技术领域的研究热点问题。在一些砂石料(或其它粒状散体材料)丰富的地区,砂石桩法由于其原材料价格低廉而成为首选的地基加固方法。但由于砂石材料为散体材料,颗粒之间基本无粘结力,且需要加固的地基其土性本身就较差,因此在竖向承受较大荷载时砂石桩侧土所提供的侧向约束力不足而易产生侧胀,从而发生破坏。同时在施工过程由于土体的侧限能力不足而导致在桩孔夯填过程中桩自身直径不易控制,往往每桩的用料明显偏大且不易控制,成桩以后各桩的平均桩径大小不一,承载能力和受荷变形刚度离散性较大而导致工程质量不易保证;同时由于施工中桩身直径的不可控性,导致设计人员很难确定其具体设计参数,给砂石桩的工程应用带来了很大的局限性。
发明内容:
本发明的目的是提供一种双重径向网笼砂石桩,能够克服传统的砂石桩因抗侧限能力差而导致其竖向承载力低,以及成形不易控制而导致设计取值难的问题。
为了实现上述目的,本发明的技术分案是:一种双重径向网笼砂石桩,其特征在于该网笼砂石桩包括圆柱状钢筋网笼,圆柱状钢筋网笼外设有圆柱状编织袋,圆柱状钢筋网笼内填充有砂石料,侧向约束网笼和圆柱状编织袋之间充注灌缝填料。圆柱状钢筋网笼用于约束侧向变形,圆柱状编织袋用于改善灌缝填料效果。
本发明的另一目的是提供一种双重径向网笼砂石桩施工方法,能够克服传统的砂石桩因抗侧限能力差而导致其竖向承载力低,以及成形不易控制而导致设计取值难的问题。
为了实现上述目的,本发明的技术方案是:一种双重径向网笼砂石桩施工方法,其特征在于该方法包括以下步骤:成孔到达设计深度后,迅速压入圆柱状钢筋网笼和圆柱状编织袋,圆柱状编织袋套在圆柱状钢筋网笼外,在钢筋网笼中灌入砂石料,并每灌入一定量后进行夯实后再行灌入;在砂石灌入完毕后,在钢筋网笼和编织袋之间充填灌缝填料。
本发明的有益效果是在提高砂石桩承载力和减小桩自身沉降的同时,能够节约大量建筑材料用量,降低工程成本,同时扩展桩除承载和抗变形以外的辅助功能。在桩径受控的情况下,有利于提高地基加固的均匀性、稳定性和工程质量,同时有利于设计人员明确设计参数,便于设计推广。
附图说明:
图1为本发明的示意图。
图1a为图1的纵剖图。
图1b为图1的横剖图。
图1c为钢筋网笼的结构示意图。
图1d为钢筋网笼的横剖图。
图2为现有技术的示意图。
图2a为图2的A-A纵剖图。
图2b为图2的B-B横剖图。
图3为本发明一实施例的施工流程图。
图4为本发明另一实施例的施工流程图。
具体实施方式:
下面结合附图和实施例对本发明进一步的描述。
图中:1.本发明砂石桩,1a.传统砂石桩,2.地坪线,3.圆柱状编织袋,4.灌缝填料,5.砂石料,6.圆柱状钢筋网笼,7.竖向加强钢筋,8.钢筋(丝)网片,9.水平向加强箍筋,10.传统砂石桩外轮廓线,11.传统砂石桩设计桩径,12.成孔钢管帽,13.成孔钢管,14.钢管靴,15.夯锺,16.充注填料管,17.成孔钻机。
本发明为一种双重径向网笼砂石桩1,其特征在于该网笼砂石桩1包括圆柱状钢筋网笼6,圆柱状钢筋网笼6外设有圆柱状编织袋3,圆柱状钢筋网笼6内填充有级配砂石料5,圆柱状钢筋网笼6和圆柱状编织袋3之间充注灌缝填料4。在满足定位和受荷要求的情况下,钢筋网笼6亦可由其它材料替代,如毛竹或其它人工合成材料等替代材料。编织笼采用圆柱状编织袋3,用于改善灌缝填料效果。圆柱状编织袋3有一定的透水性,但同时又有反滤能力,以避免在充注时灌缝填料大量渗出编织袋。编织袋亦可用满足透水性和反滤能力的其它材料替代,如土工膜等。灌缝填料构成选择有很强的功能调节性,可根据具体工程要求,选择相应的填料成分,以满足桩承载功能以及承载以外的排水固结等其它功能,如须保证桩自身强度和桩承载力,则填料可选用低标号素砼C10或以上,也可采用注浆的形式注入纯水泥浆或水泥粉煤灰混合浆,其浆液具体配比和水灰比由注浆工艺和设计强度要求综合确定;如砂石桩在渗透系数低的软粘土地基处理工程中兼做排水砂井时,则充填材料可以采用透水性的材料,如建筑用普通黄砂或粉煤灰,亦可采用其它透水材料,但须保证其渗透系数和强度不低于建筑用普通黄砂,这样可以保证地基在设定的时间达到预期的固结效果,以减小和控制地基的工后期沉降。如图所示,该圆柱状钢筋网笼包括圆柱状钢筋网片8(采用Φ6~Φ8钢筋编织成方形网格,网格最大间距应不大于对应于80%筛分的砂石料粒径),该圆柱状钢筋网片8上内设有竖向加强钢筋7(采用Φ10~Φ16钢筋,钢筋数量为4~8根,沿圆周环形均布)和水平向加强箍筋9(采用Φ12~Φ14钢筋,间距1.8~2.2m),编织袋经纬密度不低于32×32根/10cm,线密度不低于100tex,同时编织袋与钢筋笼间距为5~10cm,以方便下放钢筋笼。
由实施方式可见,本发明提供的新型双重径向网笼砂石桩,能有效克服传统的砂石桩抗侧限能力弱、无法有效控制桩身直径和桩承载力差等缺陷。通过增加侧向约束部件以提高其抗侧限的能力和有效控制其成桩直径,提高其成桩可控性。同时通过调节桩土之间的充填材料以扩充桩体除承载力和抗变形以外的排水固结等其它功能。
该砂石桩施工方法仍采用传统的沉管法或钻孔法成桩,如图3所不,对沉管法,成孔桩管采用钢管,管壁厚度应保证桩管在成孔过程中不发生变形,所成孔的外径应不小于设计桩身直径。本实施例采用沉管法成孔,利用冲击或振动成桩机将动力荷载作用在成孔钢管帽12上,通过成孔钢管帽12将成孔钢管13和钢管靴14沉入土中直至设计深度。在达到设计深度后,首先用砂石料5将钢管靴14的锥形体填平,然后下放圆柱状钢筋网笼6和圆柱状编织袋3,圆柱状编织袋3套在圆柱状钢筋网笼6外,将圆柱状钢筋网笼6固定后,分批填入砂石料5,每次填入深度应不大于夯锤的有效影响深度,并分批用夯锺15夯实到设计要求密实度或由现场试验确定的密实度。在砂石料5填至地坪线2高程后拔出成孔钢管13,然后在圆柱状钢筋网笼6和圆柱状编织袋3之间下放充注填料管16,利用压力充注系统通过充注填料管16将灌缝填料4填入圆柱状钢筋网笼6和圆柱状编织袋3之间的空隙。灌缝填料配比可视具体工程要求而定,可以是纯水泥浆,可在水泥浆中掺入粉煤灰等其它材料,也可以是纯砂石料等其它材料。灌缝填料可以是固态或液态,充填方式可以是直接填入,也可以通过压力装置压注。
如图4所示,该实施例采用钻孔法成孔,在需成桩位置首先利用成孔钻机17预成孔。在成孔达到设计深度后,然后下放圆柱状钢筋网笼6和圆柱状编织袋3,将圆柱状钢筋网笼6固定后,分批填入砂石料5,并分批用夯锺15夯实。在砂石料5填至地坪线2高程后在圆柱状钢筋网笼6和圆柱状编织袋3之间下放充注填料管16,利用压力充注系统通过充注填料管16将灌缝填料4填入圆柱状钢筋网笼6和圆柱状编织袋3之间的空隙。
级配砂石料可根据工程情况采用不同的配比,以满足不同的设计需要,这属于现有技术,在此不再赘述。

Claims (6)

1.一种双重径向网笼砂石桩,其特征在于该网笼砂石桩包括圆柱状钢筋网笼,圆柱状钢筋网笼外设有圆柱状编织袋,圆柱状钢筋网笼内填充有砂石料,圆柱状钢筋网笼和圆柱状编织袋之间充注灌缝填料,以起到满足桩承载功能以及承载以外的排水固结功能,该圆柱状钢筋网笼上内设有竖向加强钢筋和水平向加强箍筋。
2.如权利要求1所述的一种双重径向网笼砂石桩,其特征在于:圆柱状钢筋网笼采用Φ6~Φ8钢筋编织成方形网格,网格最大间距不大于对应于80%筛分的砂石料粒径;竖向加强钢筋采用4~8根沿圆周均布的Φ10~Φ16钢筋,水平向加强箍筋采用Φ12~Φ14钢筋,两根相邻钢筋的间距为1.8~2.2m。
3.如权利要求1所述的一种双重径向网笼砂石桩,其特征在于:编织袋经纬密度不低于32×32根/10cm,线密度不低于100tex,同时编织袋与钢筋笼间距为5~10cm。
4.一种双重径向网笼砂石桩施工工艺,其特征在于该施工工艺包括以下步骤:成孔到达设计深度后,迅速压入圆柱状钢筋网笼和圆柱状编织袋,圆柱状编织袋套在圆柱状钢筋网笼外,在钢筋网笼中灌入砂石料,并每灌入一定量后进行夯实后再行灌入;在砂石灌入完毕后,在钢筋网笼和编织袋之间充填灌缝填料,以起到满足桩承载功能以及承载以外的排水固结功能。
5.如权利要求4所述的一种双重径向网笼砂石桩施工工艺,其特征在于:成孔时采用沉管法成孔,利用冲击或振动成桩机将动力荷载作用在成孔钢管帽上,通过成孔钢管帽将成孔钢管和钢管靴沉入土中直至设计深度,在达到设计深度后,首先用砂石料将钢管靴的锥形体填平,然后下放圆柱状钢筋网笼和圆柱状编织袋,圆柱状编织袋套在圆柱状钢筋网笼外,将圆柱状钢筋网笼固定后,分批填入砂石料,并分批用夯锺夯实,在砂石料填至地坪线高程后拔出成孔钢管,然后在圆柱状钢筋网笼和圆柱状编织袋之间下放充注填料管,利用压力充注系统通过充注填料管将灌缝填料填入圆柱状钢筋网笼和圆柱状编织袋之间的空隙。
6.如权利要求4所述的一种双重径向网笼砂石桩施工工艺,其特征在于:成孔时采用钻孔法成孔,在需成桩位置首先利用成孔钻机预成孔,在成孔达到设计深度后,然后下放圆柱状钢筋网笼和圆柱状编织袋,将圆柱状钢筋网笼固定后,分批填入砂石料,并分批用夯锺夯实,在砂石料填至地坪线高程后在圆柱状钢筋网笼和圆柱状编织袋之间下放充注填料管,利用压力充注系统通过充注填料管将灌缝填料填入圆柱状钢筋网笼和圆柱状编织袋之间的空隙。
CN201010541107.9A 2010-11-11 2010-11-11 双重径向网笼砂石桩及其施工工艺 Active CN102465524B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010541107.9A CN102465524B (zh) 2010-11-11 2010-11-11 双重径向网笼砂石桩及其施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010541107.9A CN102465524B (zh) 2010-11-11 2010-11-11 双重径向网笼砂石桩及其施工工艺

Publications (2)

Publication Number Publication Date
CN102465524A CN102465524A (zh) 2012-05-23
CN102465524B true CN102465524B (zh) 2016-05-25

Family

ID=46069612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010541107.9A Active CN102465524B (zh) 2010-11-11 2010-11-11 双重径向网笼砂石桩及其施工工艺

Country Status (1)

Country Link
CN (1) CN102465524B (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103670455A (zh) * 2012-09-17 2014-03-26 扬州中矿建筑新材料科技有限公司 一种高水材料充填柱用钢筋罩网
CN102852552A (zh) * 2012-09-17 2013-01-02 扬州中矿建筑新材料科技有限公司 一种高水材料充填柱及其施工方法
CN105507230A (zh) * 2015-12-04 2016-04-20 中铁第四勘察设计院集团有限公司 一种新型侧阻式复合加固地基施工方法
CN105507227A (zh) * 2015-12-04 2016-04-20 中铁第四勘察设计院集团有限公司 一种新型大直径复合结构桩加固地基施工方法
CN105507228A (zh) * 2015-12-04 2016-04-20 中铁第四勘察设计院集团有限公司 一种新型悬浮式复合加固地基施工方法
CN105544502A (zh) * 2015-12-04 2016-05-04 中铁第四勘察设计院集团有限公司 一种新型深厚软土地基加固桩施工工法
CN105350533A (zh) * 2015-12-04 2016-02-24 中铁第四勘察设计院集团有限公司 一种新型深厚软土地基加固桩
CN105350513A (zh) * 2015-12-04 2016-02-24 中铁第四勘察设计院集团有限公司 一种新型端承型复合加固地基施工方法
CN105603961A (zh) * 2016-03-02 2016-05-25 中化岩土工程股份有限公司 预成孔侧向约束桩及其施工方法
CN106592570B (zh) * 2016-12-02 2019-02-15 中冶沈勘工程技术有限公司 一种利用预制挤密型铁尾砂加固体的地基处理工艺
CN114197541B (zh) * 2021-12-22 2023-09-22 长安大学 抑制地下结构空腔冻胀的刚-柔格栅和碎石联合填充方法

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06108478A (ja) * 1992-09-29 1994-04-19 Fujita Corp 液状化対策工法
JP2002054130A (ja) * 2000-08-07 2002-02-20 Koiwa Kanaami Co Ltd 軟弱地盤補強用篭枠及び軟弱地盤補強方法
CN1482307A (zh) * 2002-09-10 2004-03-17 周同和 一种投石压浆无砂砼小桩地基加固法
CN1928250A (zh) * 2006-07-25 2007-03-14 兰州理工大学 散体材料桩的加固方法
CN101392527A (zh) * 2008-10-21 2009-03-25 冯守中 土工织物散体桩处理软基的方法
CN101476315A (zh) * 2009-01-16 2009-07-08 陕西长嘉实业发展有限公司 网袋法处理软弱地基的方法
CN101487254A (zh) * 2009-02-13 2009-07-22 郝东明 一种振动沉管碎石注浆桩施工方法
CN201406682Y (zh) * 2009-03-25 2010-02-17 苏州市交通设计研究院有限责任公司 一种碎石桩
CN101831901A (zh) * 2010-05-13 2010-09-15 广东省长大公路工程有限公司 一种浅层软弱土复合地基加固处理方法
CN101858077A (zh) * 2010-04-27 2010-10-13 河海大学 袋装挤密浆固小直径碎石桩复合地基施工方法
CN201891114U (zh) * 2010-11-11 2011-07-06 上海市政工程设计研究总院 双重径向网笼砂石桩

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06108478A (ja) * 1992-09-29 1994-04-19 Fujita Corp 液状化対策工法
JP2002054130A (ja) * 2000-08-07 2002-02-20 Koiwa Kanaami Co Ltd 軟弱地盤補強用篭枠及び軟弱地盤補強方法
CN1482307A (zh) * 2002-09-10 2004-03-17 周同和 一种投石压浆无砂砼小桩地基加固法
CN1928250A (zh) * 2006-07-25 2007-03-14 兰州理工大学 散体材料桩的加固方法
CN101392527A (zh) * 2008-10-21 2009-03-25 冯守中 土工织物散体桩处理软基的方法
CN101476315A (zh) * 2009-01-16 2009-07-08 陕西长嘉实业发展有限公司 网袋法处理软弱地基的方法
CN101487254A (zh) * 2009-02-13 2009-07-22 郝东明 一种振动沉管碎石注浆桩施工方法
CN201406682Y (zh) * 2009-03-25 2010-02-17 苏州市交通设计研究院有限责任公司 一种碎石桩
CN101858077A (zh) * 2010-04-27 2010-10-13 河海大学 袋装挤密浆固小直径碎石桩复合地基施工方法
CN101831901A (zh) * 2010-05-13 2010-09-15 广东省长大公路工程有限公司 一种浅层软弱土复合地基加固处理方法
CN201891114U (zh) * 2010-11-11 2011-07-06 上海市政工程设计研究总院 双重径向网笼砂石桩

Also Published As

Publication number Publication date
CN102465524A (zh) 2012-05-23

Similar Documents

Publication Publication Date Title
CN102465524B (zh) 双重径向网笼砂石桩及其施工工艺
CN107419630B (zh) 一种有效控制工后沉降的软土地基高填方路堤及施工方法
CN104131555B (zh) 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法
CN104005404B (zh) 一种外包活性材料桩体的预应力管桩及施工方法
CN203924036U (zh) 一种外包活性材料桩体的预应力管桩
CN101858077B (zh) 袋装挤密浆固小直径碎石桩复合地基施工方法
CN108560542B (zh) 一种废旧轮胎包覆建渣的双向增强体及其施工方法
CN105625294A (zh) 一种复合地基及其施工方法
CN102587358A (zh) 一种高聚物材料后注浆挤扩灌注桩技术
CN104711976B (zh) 一种建筑垃圾再生骨料复合载体桩及其制备方法
CN105544512A (zh) 埋设传热管的加筋布袋注浆碎石桩及施工方法
CN101899828B (zh) 袋装夯实小直径水泥土桩复合地基施工方法
CN206784372U (zh) 注浆成型扩底桩
CN106192999A (zh) 抗拔桩的施工方法
CN204000851U (zh) 一种外包透水性钢筋混凝土管碎石注浆桩
CN104762956B (zh) 一种基于建筑垃圾再生骨料桩的成桩方法
CN107012861A (zh) 一种散体材料芯膨胀混凝土桩及其施工方法
CN101349052A (zh) 盐渍土地区组合排水系统及组合排水强夯地基处理方法
WO2017133373A1 (zh) 一种用于桩基的小直径桩簇及其施工方法
CN201891114U (zh) 双重径向网笼砂石桩
CN202672161U (zh) 一种带有土钉的水泥土搅拌筒板联桩护坡结构
CN206956707U (zh) 一种用于富水砂层地层中超深基坑围护的地连墙
CN202787275U (zh) 新型气动冲击锚管式土钉墙
CN204825865U (zh) 置换式压灌水泥土复合桩
CN103981863B (zh) 一种散体材料桩与混凝土桩上下同体组合桩的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant