CN102434210A - Method and system for monitoring underground engineering portrait information and monitoring information safely - Google Patents
Method and system for monitoring underground engineering portrait information and monitoring information safely Download PDFInfo
- Publication number
- CN102434210A CN102434210A CN2011103809508A CN201110380950A CN102434210A CN 102434210 A CN102434210 A CN 102434210A CN 2011103809508 A CN2011103809508 A CN 2011103809508A CN 201110380950 A CN201110380950 A CN 201110380950A CN 102434210 A CN102434210 A CN 102434210A
- Authority
- CN
- China
- Prior art keywords
- information
- monitoring
- module
- portrait
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 212
- 238000000034 method Methods 0.000 title claims abstract description 35
- 230000010365 information processing Effects 0.000 claims abstract description 59
- 238000005259 measurement Methods 0.000 claims abstract description 40
- 238000004458 analytical method Methods 0.000 claims description 84
- 239000011435 rock Substances 0.000 claims description 57
- 238000010276 construction Methods 0.000 claims description 33
- 238000009412 basement excavation Methods 0.000 claims description 19
- 238000009415 formwork Methods 0.000 claims description 18
- 238000005516 engineering process Methods 0.000 claims description 15
- 238000012545 processing Methods 0.000 claims description 12
- 238000011156 evaluation Methods 0.000 claims description 11
- 230000008569 process Effects 0.000 claims description 11
- 230000008859 change Effects 0.000 claims description 8
- 238000013480 data collection Methods 0.000 claims description 8
- 238000012360 testing method Methods 0.000 claims description 6
- 238000010835 comparative analysis Methods 0.000 claims description 5
- 230000008676 import Effects 0.000 claims description 3
- 230000002159 abnormal effect Effects 0.000 abstract 1
- 238000006073 displacement reaction Methods 0.000 description 7
- 238000013461 design Methods 0.000 description 6
- 241001269238 Data Species 0.000 description 5
- 238000007405 data analysis Methods 0.000 description 5
- 238000007726 management method Methods 0.000 description 4
- 239000003245 coal Substances 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 238000012417 linear regression Methods 0.000 description 2
- 238000004445 quantitative analysis Methods 0.000 description 2
- 238000013139 quantization Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000010998 test method Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241000193935 Araneus diadematus Species 0.000 description 1
- BVKZGUZCCUSVTD-UHFFFAOYSA-L Carbonate Chemical compound [O-]C([O-])=O BVKZGUZCCUSVTD-UHFFFAOYSA-L 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000013499 data model Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000010348 incorporation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000007639 printing Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 238000000611 regression analysis Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 230000003442 weekly effect Effects 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (7)
- Information and the system of monitoring information security monitoring 1. underground engineering is drawn a portrait, it is characterised in that:It includes monitoring measurement information processing system, portrait information processing system, comprehensive safety monitor analysis module, early warning and alarm output module, next stage geologic structure reporting modules, the input of monitoring measurement information processing system and portrait information processing system respectively with comprehensive safety monitor analysis module is connected, and the output end of comprehensive safety monitor analysis module is connected with next stage geologic structure reporting modules, early warning and alarm output module respectively.
- 2. underground engineering portrait information according to claim 1 and the system of monitoring information security monitoring, it is characterised in that:Described monitoring measurement information processing system includes monitoring information acquisition module, monitoring information processing and coffer mechanics current intelligence analysis system, monitoring information database, monitoring information output module, monitoring information security model module, monitoring information acquisition module, monitoring information security model module are handled respectively by monitoring information and coffer mechanics current intelligence analysis system is connected with the input of monitoring information database, and the output end of monitoring information database is connected with monitoring information output module, comprehensive safety monitor analysis module respectively.
- 3. underground engineering portrait information according to claim 1 and the system of monitoring information security monitoring, it is characterised in that:Described portrait information processing system includes portrait information acquisition module, vector graphics information processing system, geological information storehouse, portrait information database, information of drawing a portrait displaying and data for projection generation module, portrait message output module, portrait information acquisition module, geological information storehouse is connected by vector graphics information processing system with the input for information database of drawing a portrait respectively, the output end of portrait information database is shown and data for projection generation module with portrait information respectively, portrait message output module, comprehensive safety monitor analysis module is connected, the output end of the displaying of portrait information and data for projection generation module is connected with portrait message output module.
- 4. underground engineering portrait information according to claim 1 and the system of monitoring information security monitoring, it is characterised in that:Described comprehensive safety monitor analysis module includes vectorial images information module, portrait information analysis formwork module, Analysis of mechanical character of surrounding rock module, monitoring information analyzes formwork module, country rock the evaluation of the safe status module, vectorial images information module is connected by information analysis formwork module of drawing a portrait with Analysis of mechanical character of surrounding rock module, draw a portrait information analysis formwork module input respectively with feature judge module, fender graded judge module, construction technology and condition module, coffer mechanics information specialist library module is connected, the output end of construction technology and condition module, the output end of coffer mechanics information specialist's library module, the input that the output end of monitoring information module analyzes formwork module with monitoring information respectively is connected, the output end of monitoring information analysis formwork module is connected with Analysis of mechanical character of surrounding rock module, the output end of Analysis of mechanical character of surrounding rock module respectively with next stage geologic structure reporting modules, country rock the evaluation of the safe status module is connected, the output end of country rock the evaluation of the safe status module respectively with next stage geologic structure reporting modules, early warning and alarm output module are connected.
- 5. underground engineering portrait information according to claim 1 and the system of monitoring information security monitoring, it is characterised in that:Described monitoring information output module is images outputting module, any combination of report output module.
- Information and the method for monitoring information security monitoring 6. underground engineering is drawn a portrait, it is characterised in that:It includes monitoring measurement information processing, portrait information processing, comprehensive safety monitor analysis, early warning and alarm output, next stage geologic structure and reports five steps:(1)Monitoring measurement information processing:A, monitoring measurement information gathering:By manually gathering, file import and three kinds of modes of automatic data collection any combination acquisition monitoring metric data information;B, safety monitoring:Real-time security monitoring is carried out to the data message collected, found in real time and recording exceptional and data with alert information;C, monitoring measurement information processing:Certificate authenticity is carried out to the data that collect, observed by redundancy, rigorous adjustment is carried out, sequential test progressively excluding gross error carries out comprehensive analysis, judges the obedience distribution character of data, infers and forecast the output possible situation of change of country rock;D, the output of monitoring measurement information:Figure is unified to export by any combination of two kinds of output modes of images outputting and report output;(2)Portrait information processing:A, portrait information gathering:Gather face geology representation data information;B, vector graphics information processing:The data message collected and the information in geological information storehouse are compared, analyzed, vectorized process is carried out to the data message collected;C, portrait information output:Data message after processing is packaged, and portrait information output display, axial information are started by face and shows that setting is exported, projection information sets and exported, the portrait information of different excavation faces is attached, continuously excavation information displaying figure is obtained completely;(3)Comprehensive safety monitor is analyzed:The monitoring and measurement data information collected and representation data information are inputted, portrait information is substantially classified, and carry out comprehensive comparative analysis with monitoring information, data safety integrity level is estimated, corresponding security monitoring report is exported, the safe condition of country rock is confirmed and the safe condition of next stage is predicted;(4)Early warning and alarm output:Exported by complete report and any combination of bulletin information output form carries out early warning and alarm output;(5)Next stage geologic structure is reported:Report geologic structure, the safe condition of next stage.
- 7. underground engineering portrait information according to claim 6 and the method for monitoring information security monitoring, it is characterised in that:Described monitoring measurement information handling step and portrait information handling step also include information and store sub-step, and described information storage is stored to the information of information process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110380950.8A CN102434210B (en) | 2011-11-25 | 2011-11-25 | Method and system for monitoring underground engineering portrait information and monitoring information safely |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110380950.8A CN102434210B (en) | 2011-11-25 | 2011-11-25 | Method and system for monitoring underground engineering portrait information and monitoring information safely |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102434210A true CN102434210A (en) | 2012-05-02 |
CN102434210B CN102434210B (en) | 2014-03-19 |
Family
ID=45982531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110380950.8A Active CN102434210B (en) | 2011-11-25 | 2011-11-25 | Method and system for monitoring underground engineering portrait information and monitoring information safely |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102434210B (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102831671A (en) * | 2012-08-20 | 2012-12-19 | 上海同岩土木工程科技有限公司 | Hand-held subway tunnel structure damage investigation data recorder and recording method therefor |
CN106224007A (en) * | 2016-08-26 | 2016-12-14 | 招商局重庆交通科研设计院有限公司 | Safety for tunnel engineering monitoring and warning management system |
CN106593526A (en) * | 2016-12-23 | 2017-04-26 | 长江三峡勘测研究院有限公司(武汉) | Tunnel geological karst risk evaluation method based on fuzzy judgment |
CN107575234A (en) * | 2017-09-07 | 2018-01-12 | 长沙有色冶金设计研究院有限公司 | A kind of deep-well support design method |
CN108960647A (en) * | 2018-07-11 | 2018-12-07 | 宿州云宏建设安装有限公司 | A kind of highway construction security risk assessment system |
CN110376659A (en) * | 2019-06-10 | 2019-10-25 | 中交一公局桥隧工程有限公司 | Tunnel advance geology forecasting device and system thereof |
CN110568477A (en) * | 2019-09-04 | 2019-12-13 | 中国科学院武汉岩土力学研究所 | Time-lag type rock burst space-time early warning method for tunnel construction |
WO2020155929A1 (en) * | 2019-02-01 | 2020-08-06 | 中国铁建重工集团股份有限公司 | Method for determining rock mass integrity |
CN113294163A (en) * | 2021-03-19 | 2021-08-24 | 中国电建集团华东勘测设计研究院有限公司 | Visual configuration method for shield tunneling monitoring data |
CN114064760A (en) * | 2021-11-18 | 2022-02-18 | 广州泰禾大数据服务有限公司 | Multi-dimensional early warning analysis and judgment method for data |
CN115046663A (en) * | 2022-08-12 | 2022-09-13 | 煤炭科学技术研究院有限公司 | Anchor rod stress monitoring method and anchor rod stress data analysis method |
CN116167748A (en) * | 2023-04-20 | 2023-05-26 | 中国市政工程西南设计研究总院有限公司 | Urban underground comprehensive pipe gallery operation and maintenance method, system and device and electronic equipment |
CN116579150A (en) * | 2023-04-26 | 2023-08-11 | 山东建筑大学 | Full-stage ground surface subsidence prediction and control method |
CN117972437A (en) * | 2024-03-29 | 2024-05-03 | 四川省建筑设计研究院有限公司 | Regional building earthquake damage prediction method and system aiming at complex terrain geological conditions |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101561305A (en) * | 2009-06-05 | 2009-10-21 | 长沙理工大学 | Monitoring and early-warning system and monitoring and early-warning method of accumulated water under bridge or on road surface of tunnel |
CN101956567A (en) * | 2010-09-02 | 2011-01-26 | 上海杰蜀光电科技有限公司 | Intrinsic safety all-fiber underground monitoring system |
CN201753614U (en) * | 2010-03-12 | 2011-03-02 | 常熟市智胜信息技术有限公司 | Portable mining safety monitoring device |
-
2011
- 2011-11-25 CN CN201110380950.8A patent/CN102434210B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101561305A (en) * | 2009-06-05 | 2009-10-21 | 长沙理工大学 | Monitoring and early-warning system and monitoring and early-warning method of accumulated water under bridge or on road surface of tunnel |
CN201753614U (en) * | 2010-03-12 | 2011-03-02 | 常熟市智胜信息技术有限公司 | Portable mining safety monitoring device |
CN101956567A (en) * | 2010-09-02 | 2011-01-26 | 上海杰蜀光电科技有限公司 | Intrinsic safety all-fiber underground monitoring system |
Non-Patent Citations (4)
Title |
---|
吴昊等: "城市隧道安全预测预警系统构架研究", 《上海应用技术学院学报(自然科学版)》 * |
徐建国: "太澳高速公路隧道安全监控与预警系统", 《路基工程》 * |
陈建峰: "隧道施工地质超前预报技术比较", 《地下空间》 * |
陈磊等: "国内隧道施工险情预警预防方法研究", 《公路交通科技(应用技术版)》 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102831671A (en) * | 2012-08-20 | 2012-12-19 | 上海同岩土木工程科技有限公司 | Hand-held subway tunnel structure damage investigation data recorder and recording method therefor |
CN106224007A (en) * | 2016-08-26 | 2016-12-14 | 招商局重庆交通科研设计院有限公司 | Safety for tunnel engineering monitoring and warning management system |
CN106593526A (en) * | 2016-12-23 | 2017-04-26 | 长江三峡勘测研究院有限公司(武汉) | Tunnel geological karst risk evaluation method based on fuzzy judgment |
CN107575234A (en) * | 2017-09-07 | 2018-01-12 | 长沙有色冶金设计研究院有限公司 | A kind of deep-well support design method |
CN108960647A (en) * | 2018-07-11 | 2018-12-07 | 宿州云宏建设安装有限公司 | A kind of highway construction security risk assessment system |
WO2020155929A1 (en) * | 2019-02-01 | 2020-08-06 | 中国铁建重工集团股份有限公司 | Method for determining rock mass integrity |
CN110376659A (en) * | 2019-06-10 | 2019-10-25 | 中交一公局桥隧工程有限公司 | Tunnel advance geology forecasting device and system thereof |
CN110568477B (en) * | 2019-09-04 | 2020-11-24 | 中国科学院武汉岩土力学研究所 | Time-lag type rock burst space-time early warning method for tunnel construction |
CN110568477A (en) * | 2019-09-04 | 2019-12-13 | 中国科学院武汉岩土力学研究所 | Time-lag type rock burst space-time early warning method for tunnel construction |
CN113294163A (en) * | 2021-03-19 | 2021-08-24 | 中国电建集团华东勘测设计研究院有限公司 | Visual configuration method for shield tunneling monitoring data |
CN114064760A (en) * | 2021-11-18 | 2022-02-18 | 广州泰禾大数据服务有限公司 | Multi-dimensional early warning analysis and judgment method for data |
CN115046663A (en) * | 2022-08-12 | 2022-09-13 | 煤炭科学技术研究院有限公司 | Anchor rod stress monitoring method and anchor rod stress data analysis method |
CN116167748A (en) * | 2023-04-20 | 2023-05-26 | 中国市政工程西南设计研究总院有限公司 | Urban underground comprehensive pipe gallery operation and maintenance method, system and device and electronic equipment |
CN116167748B (en) * | 2023-04-20 | 2023-08-25 | 中国市政工程西南设计研究总院有限公司 | Urban underground comprehensive pipe gallery operation and maintenance method, system and device and electronic equipment |
CN116579150A (en) * | 2023-04-26 | 2023-08-11 | 山东建筑大学 | Full-stage ground surface subsidence prediction and control method |
CN116579150B (en) * | 2023-04-26 | 2024-01-26 | 山东建筑大学 | Full-stage ground surface subsidence prediction and control method |
CN117972437A (en) * | 2024-03-29 | 2024-05-03 | 四川省建筑设计研究院有限公司 | Regional building earthquake damage prediction method and system aiming at complex terrain geological conditions |
Also Published As
Publication number | Publication date |
---|---|
CN102434210B (en) | 2014-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102434210B (en) | Method and system for monitoring underground engineering portrait information and monitoring information safely | |
CN101477548B (en) | Regulation based universal space data quality checking technique | |
CN112560154B (en) | Highway tunnel engineering BIM model dynamic creation method based on Unity platform | |
CN109508508B (en) | Surface mine governance investigation design method | |
CN102750413B (en) | Data processing and mapping method of topographic surveying of electric transmission line tower positions | |
CN108710732A (en) | A kind of visualization assessment of shield cutter service phase abrasion and prediction technique | |
CN111241611B (en) | Method for assisting foundation pit implementation | |
CN111125821A (en) | Foundation and foundation subsection engineering analysis and model selection method based on BIM + GIS | |
CN112202242A (en) | Tower comprehensive monitoring and intelligent early warning platform and early warning method | |
CN107119657A (en) | A kind of view-based access control model measures foundation ditch monitoring method | |
CN107688908A (en) | Study and judge the method and device of construction safety risk | |
CN114997003B (en) | Multi-model fusion tunnel construction risk prediction method, system, device and medium | |
CN116011291A (en) | Slope stability digital evaluation platform for tunnel portal multisource information fusion | |
CN115100373A (en) | Surface and underground environment three-dimensional integrated representation method, device, medium and equipment | |
CN114943178A (en) | Three-dimensional geological model modeling method and device and computer equipment | |
Brasebin et al. | Measuring the impact of 3D data geometric modeling on spatial analysis: Illustration with Skyview factor | |
Zhang et al. | Wireless monitoring–based real-time analysis and early-warning safety system for deep and large underground caverns | |
CN114662985B (en) | Mountain area power engineering site selection method and device based on oblique photography modeling and computer readable storage medium | |
CN116304977A (en) | Multi-source geological survey data fusion method, device, equipment and storage medium | |
CN116402959A (en) | Tunnel support design construction method, system and storage medium based on early warning model | |
CN115655098A (en) | Method for measuring and calculating earth and stone excavation and filling in power grid engineering by high-density laser point cloud technology | |
CN105279305B (en) | A kind of Three Dimensional Ground laser scanner technique survey station choosing method | |
CN113806423A (en) | GIS-based power transmission and transformation project environment-friendly detection system and method | |
Wang et al. | Design and Implementation of Intelligent Auxiliary Decision System of Power Transmission and Transformation Pre-Project | |
CN116108312B (en) | Land change area calculation method and device based on single-image-spot result data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Method and system for monitoring underground engineering portrait information and monitoring information safely Effective date of registration: 20150914 Granted publication date: 20140319 Pledgee: Agricultural Bank of China Limited by Share Ltd Chengdu high tech Industrial Development Zone Branch Pledgor: Chengdu Changdatong Underground Engineering Technology Development Co., Ltd. Registration number: 2015510000032 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
C56 | Change in the name or address of the patentee | ||
CP03 | Change of name, title or address |
Address after: The middle high tech Zone Yizhou road in Chengdu city of Sichuan province 610017 1800 No. 4 Building 3 layer 301, 302, 303 Patentee after: Chengdu accessible testing technology Limited by Share Ltd Address before: Dr. Park No. 5 high tech Zone Gaopeng road in Chengdu city of Sichuan Province in 610017 Patentee before: Chengdu Changdatong Underground Engineering Technology Development Co., Ltd. |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20170117 Granted publication date: 20140319 Pledgee: Agricultural Bank of China Limited by Share Ltd Chengdu high tech Industrial Development Zone Branch Pledgor: Chengdu accessible testing technology Limited by Share Ltd Registration number: 2015510000032 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
PM01 | Change of the registration of the contract for pledge of patent right |
Change date: 20170103 Registration number: 2015510000032 Pledgor after: Chengdu accessible testing technology Limited by Share Ltd Pledgor before: Chengdu Changdatong Underground Engineering Technology Development Co., Ltd. |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Method and system for safety monitoring of underground engineering portrait information Effective date of registration: 20211220 Granted publication date: 20140319 Pledgee: Bank of Chengdu science and technology branch of Limited by Share Ltd. Pledgor: CHENGDU CHANGDATONG INSPECTION & TESTING TECHNOLOGY STOCK CO.,LTD. Registration number: Y2021510000299 |
|