CN113294163A - Visual configuration method for shield tunneling monitoring data - Google Patents
Visual configuration method for shield tunneling monitoring data Download PDFInfo
- Publication number
- CN113294163A CN113294163A CN202110570333.8A CN202110570333A CN113294163A CN 113294163 A CN113294163 A CN 113294163A CN 202110570333 A CN202110570333 A CN 202110570333A CN 113294163 A CN113294163 A CN 113294163A
- Authority
- CN
- China
- Prior art keywords
- shield
- vector diagram
- displaying
- monitoring
- visual
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/093—Control of the driving shield, e.g. of the hydraulic advancing cylinders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Abstract
The invention relates to a shield tunneling monitoring data visualization configuration method. The invention aims to provide a visual configuration method of shield tunneling monitoring data, which aims to solve the problems that shield tunneling data is difficult to rapidly release and a display interface is difficult to freely adjust. The technical scheme of the invention is as follows: a shield tunneling monitoring data visualization configuration method is characterized in that: acquiring a structural vector diagram and shield monitoring parameters of a shield machine component; associating the shield monitoring parameters with the corresponding structural vector diagram; displaying a shield monitoring parameter in a first area of a display page, displaying a visual container in a second area of the display page, and displaying a structural vector diagram and a shield monitoring parameter associated with the structural vector diagram in the visual container; and when the shield monitoring parameters exceed the corresponding set thresholds, displaying early warning prompts in the visual container. The invention is suitable for the field of shield construction of underground engineering.
Description
Technical Field
The invention relates to a shield tunneling monitoring data visualization configuration method. The method is suitable for the field of shield construction of underground engineering.
Background
The shield method is a fully mechanical construction method in the construction of the undercut method, the shield machine is pushed in the ground, and the surrounding rocks around the shield machine are supported by a shield shell and duct pieces to prevent collapse into the tunnel. And simultaneously, excavating the soil body in front of the excavation surface by using a cutting device, conveying the soil out of the hole by using an excavating machine, jacking the soil body by pressing at the rear part by using a jack, and assembling precast concrete segments to form the mechanical construction method of the tunnel structure.
With the gradual increase of the scale of the rail traffic engineering and the higher complexity of the engineering structure and the surrounding environment, the monitoring requirement on the tunneling data of the shield engineering is higher and higher. Technicians not only need to obtain shield tunneling implementation data in time, but also need to obtain the relationship between monitoring data and the surrounding environment.
The traditional shield tunneling monitoring display data technology cannot rapidly display shield data, and because shield machines are different in brand and model, a shield data display interface cannot be automatically adapted, so that an operator is inconvenient to monitor and analyze shield data.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: aiming at the existing problems, a shield tunneling monitoring data visualization configuration method is provided to solve the problems that shield tunneling data is difficult to rapidly release and a display interface is difficult to freely adjust.
The technical scheme adopted by the invention is as follows: a shield tunneling monitoring data visualization configuration method is characterized in that:
acquiring a structural vector diagram and shield monitoring parameters of a shield machine component;
associating the shield monitoring parameters with the corresponding structural vector diagram;
displaying a shield monitoring parameter in a first area of a display page, displaying a visual container in a second area of the display page, and displaying a structural vector diagram and a shield monitoring parameter associated with the structural vector diagram in the visual container;
and when the shield monitoring parameters exceed the corresponding set thresholds, displaying early warning prompts in the visual container.
The visual container is a GIS map display component container.
And the first area displays shield monitoring parameters calculated by the edge of the hardware equipment.
And displaying the shield monitoring parameters which are screened, dragged and dropped and adjusted by the user and are associated with the structural vector diagram on the structural vector diagram.
The utility model provides a shield constructs visual configuration device of tunnelling monitoring data which characterized in that:
the acquisition module is used for acquiring a structural vector diagram and shield monitoring parameters of the shield machine component;
the correlation module is used for correlating the shield monitoring parameters with the corresponding structural vector diagram;
the display module is used for displaying the shield monitoring parameters in a first area of a display page, displaying a visual container in a second area of the display page, and displaying a structural vector diagram and shield monitoring parameters related to the structural vector diagram in the visual container;
and the early warning module is used for displaying an early warning prompt in the visual container when the shield monitoring parameter exceeds a corresponding set threshold value.
The visual container is a GIS map display component container.
And the first area displays shield monitoring parameters calculated by the edge of the hardware equipment.
And displaying the shield monitoring parameters which are screened, dragged and dropped and adjusted by the user and are associated with the structural vector diagram on the structural vector diagram.
The utility model provides a shield constructs visual display page of tunnelling monitoring data which characterized in that: displaying the shield monitoring parameters in a first area of a display page; and displaying the visual container in a second area of the display page, and displaying the structural vector diagram and the shield monitoring parameters related to the structural vector diagram in the visual container.
The visual container is a GIS map display component container.
The invention has the beneficial effects that: the method and the system quickly display the structural vector diagram of the shield machine and the shield monitoring data related to the structural vector diagram by using the visual container, and simultaneously display the structural vector diagram and the shield monitoring data such as other surrounding environment data and the like to assist decision making. The method and the system display data in modes of drag and drop, screening and the like which can be configured by a user, and assist technicians in real-time monitoring and early warning of the operation condition of the shield tunneling machine.
Drawings
FIG. 1 is a flow chart of an embodiment.
FIG. 2 is a flowchart of user operation in the embodiment.
Fig. 3 is a schematic diagram of a configuration interface of shield tunneling vector diagram uploading and monitoring data in the embodiment.
Detailed Description
As shown in fig. 1, this embodiment is a shield tunneling monitoring data visualization configuration method, which specifically includes the following steps:
and S01, obtaining a structural vector diagram of the shield machine component and shield monitoring parameters. In the embodiment, a user utilizes the existing software such as CAD software to manufacture a structural vector diagram of shield machine components (a shield cutter head, a screw machine, a grouting system and the like), and uploads the structural vector diagram to the visual container. In the embodiment, the visual container is a GIS map display component container which can be used for displaying the map position where the shield tunneling is located and the like.
And S02, associating the shield monitoring parameters with corresponding structural vector diagrams in the visualization container, for example, the shield cutterhead vector diagram can be associated with IoT monitoring data such as propulsion speed, cutterhead rotating speed, cutterhead torque, total thrust and the like.
S03, displaying a list in a first area on the left side of a display page, wherein the list on the left side of the page shows shield monitoring parameters calculated by the edge of hardware equipment and serves as basic data and a data source; the visual container is displayed in the second area on the right side of the page, a vector diagram layer displaying a structural vector diagram and a data layer displaying shield monitoring parameters related to the structural vector diagram are displayed in the visual container in an overlapped mode, for example, a shield tunneling cutter head, related monitoring data and the map position where shield tunneling is located are displayed, and the basis is made for manually judging the engineering progress and the engineering state.
The user can configure shield monitoring parameters in the second area in a self-defined mode, and related data in the data source are distributed at corresponding appropriate positions on the structural vector diagram in drag-and-drop, screening, adjusting and other modes, so that the optimal mode of data display and application is achieved.
S04, the user can set the threshold value of the shield data according to the requirement, and when the shield monitoring parameter exceeds the corresponding set threshold value, the early warning prompt is displayed in the visual container.
The embodiment also provides a visual configuration device of shield tunneling monitoring data, which is provided with an acquisition module, an association module, a display module and an early warning module.
The acquisition module is used for acquiring a structural vector diagram and shield monitoring parameters of a shield machine component; the correlation module is used for correlating the shield monitoring parameters with the corresponding structural vector diagram; the display module is used for displaying the shield monitoring parameters in a first area of a display page, displaying a visual container in a second area of the display page, and displaying a structural vector diagram and shield monitoring parameters related to the structural vector diagram in the visual container; and the early warning module is used for displaying an early warning prompt in the visual container when the shield monitoring parameter exceeds a corresponding set threshold value.
The present embodiment also provides a storage medium, on which a computer program executable by a processor is stored, where the computer program is executed to implement the steps of the method for visually configuring shield tunneling monitoring data according to the present embodiment.
The embodiment also provides a computer device, which has a memory and a processor, where the memory stores a computer program executable by the processor, and the computer program, when executed, implements the steps of the shield tunneling monitoring data visualization configuration method in the embodiment.
As shown in fig. 2, in this embodiment, the method for performing shield tunneling monitoring data visualization configuration by using a computer device by a user includes:
and S1, manufacturing a shield tunneling machine structure vector diagram. A user utilizes the existing software such as CAD software to manufacture a structural vector diagram of shield machine components (a shield cutter head, a screw machine, a grouting system and the like).
And S2, uploading the vector diagram to a visualization container to form a display interface (see figure 3).
And S3, configuring the display interface to display three types of areas of basic data, monitoring data and analysis data by the user.
And S4, associating and displaying the basic data and the monitoring data in the interface module by the user.
And S5, automatically displaying the analysis data by the user configuration rule. If the threshold value of the shield data is set according to the requirement, when the shield monitoring parameter exceeds the corresponding set threshold value, the early warning prompt is displayed in the visual container.
The embodiment also provides a shield tunneling monitoring data visual configuration display page, wherein a list is displayed in a first region on the left side of the display page, the list on the left side of the display page shows shield monitoring parameters, a visual container is displayed in a second region on the right side of the display page, and a structure vector diagram of shield machine components (a shield cutter head, a screw machine, a grouting system and the like) and shield monitoring parameters related to the structure vector diagram are displayed in the visual container. The visual container is a GIS map display assembly container and can be used for displaying the map position where the shield tunneling is located and the like.
Claims (10)
1. A shield tunneling monitoring data visualization configuration method is characterized in that:
acquiring a structural vector diagram and shield monitoring parameters of a shield machine component;
associating the shield monitoring parameters with the corresponding structural vector diagram;
displaying a shield monitoring parameter in a first area of a display page, displaying a visual container in a second area of the display page, and displaying a structure vector diagram and a shield monitoring parameter associated with the structure vector diagram in the visual container;
and when the shield monitoring parameters exceed the corresponding set thresholds, displaying early warning prompts in the visual container.
2. The shield tunneling monitoring data visualization configuration method according to claim 1, characterized in that: the visual container is a GIS map display component container.
3. The shield tunneling monitoring data visualization configuration method according to claim 1, characterized in that: and the first area displays shield monitoring parameters calculated by the edge of the hardware equipment.
4. The shield tunneling monitoring data visualization configuration method according to claim 1, characterized in that: and displaying the shield monitoring parameters related to the structural vector diagram after being screened, dragged and dropped and adjusted by a user on the structural vector diagram.
5. The utility model provides a shield constructs visual configuration device of tunnelling monitoring data which characterized in that:
the acquisition module is used for acquiring a structural vector diagram and shield monitoring parameters of the shield machine component;
the correlation module is used for correlating the shield monitoring parameters with the corresponding structural vector diagram;
the display module is used for displaying the shield monitoring parameters in a first area of a display page, displaying a visual container in a second area of the display page, and displaying a structural vector diagram and shield monitoring parameters related to the structural vector diagram in the visual container;
and the early warning module is used for displaying an early warning prompt in the visual container when the shield monitoring parameter exceeds a corresponding set threshold value.
6. The shield tunneling monitoring data visualization configuration device according to claim 5, wherein: the visual container is a GIS map display component container.
7. The shield tunneling monitoring data visualization configuration device according to claim 5, wherein: and the first area displays shield monitoring parameters calculated by the edge of the hardware equipment.
8. The shield tunneling monitoring data visualization configuration device according to claim 5, wherein: and displaying the shield monitoring parameters related to the structural vector diagram after being screened, dragged and dropped and adjusted by a user on the structural vector diagram.
9. The utility model provides a shield constructs visual display page of tunnelling monitoring data which characterized in that: displaying shield monitoring parameters in a first area of a display page; and displaying the visual container in a second area of the display page, and displaying the structural vector diagram and the shield monitoring parameters related to the structural vector diagram in the visual container.
10. The shield tunneling monitoring data visual display page according to claim 9, characterized in that: the visual container is a GIS map display component container.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110296797 | 2021-03-19 | ||
CN2021102967974 | 2021-03-19 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113294163A true CN113294163A (en) | 2021-08-24 |
Family
ID=77324632
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110570333.8A Pending CN113294163A (en) | 2021-03-19 | 2021-05-25 | Visual configuration method for shield tunneling monitoring data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113294163A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH041393A (en) * | 1990-04-18 | 1992-01-06 | Ohbayashi Corp | Excavation controlling method for shield excavating machine |
CN102434210A (en) * | 2011-11-25 | 2012-05-02 | 成都畅达通地下工程科技发展有限公司 | Method and system for monitoring underground engineering portrait information and monitoring information safely |
US20180067966A1 (en) * | 2016-09-08 | 2018-03-08 | Mentor Graphics Corporation | Map building with sensor measurements |
CN108549671A (en) * | 2018-03-28 | 2018-09-18 | 微梦创科网络科技(中国)有限公司 | Real time data acquisition and visual implementation method and device |
CN111075463A (en) * | 2020-01-10 | 2020-04-28 | 中国矿业大学(北京) | Visual monitoring management method and visual monitoring management system for shield construction unearthing amount |
CN111594194A (en) * | 2020-06-28 | 2020-08-28 | 中铁十四局集团大盾构工程有限公司 | Shield constructs quick-witted operating condition monitored control system |
CN111927473A (en) * | 2020-08-31 | 2020-11-13 | 南京百夫雄图信息技术有限公司 | Construction control method for determining stratum settlement depth when existing line is penetrated under shield |
CN112016152A (en) * | 2020-09-25 | 2020-12-01 | 中铁第六勘察设计院集团有限公司 | Big data auxiliary construction decision method for tunnel construction BIM management platform |
-
2021
- 2021-05-25 CN CN202110570333.8A patent/CN113294163A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH041393A (en) * | 1990-04-18 | 1992-01-06 | Ohbayashi Corp | Excavation controlling method for shield excavating machine |
CN102434210A (en) * | 2011-11-25 | 2012-05-02 | 成都畅达通地下工程科技发展有限公司 | Method and system for monitoring underground engineering portrait information and monitoring information safely |
US20180067966A1 (en) * | 2016-09-08 | 2018-03-08 | Mentor Graphics Corporation | Map building with sensor measurements |
CN108549671A (en) * | 2018-03-28 | 2018-09-18 | 微梦创科网络科技(中国)有限公司 | Real time data acquisition and visual implementation method and device |
CN111075463A (en) * | 2020-01-10 | 2020-04-28 | 中国矿业大学(北京) | Visual monitoring management method and visual monitoring management system for shield construction unearthing amount |
CN111594194A (en) * | 2020-06-28 | 2020-08-28 | 中铁十四局集团大盾构工程有限公司 | Shield constructs quick-witted operating condition monitored control system |
CN111927473A (en) * | 2020-08-31 | 2020-11-13 | 南京百夫雄图信息技术有限公司 | Construction control method for determining stratum settlement depth when existing line is penetrated under shield |
CN112016152A (en) * | 2020-09-25 | 2020-12-01 | 中铁第六勘察设计院集团有限公司 | Big data auxiliary construction decision method for tunnel construction BIM management platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109630154B (en) | Tunneling robot for tunneling and remote mobile terminal command system | |
CN107278394A (en) | A kind of agricultural non-irrigated soil is digged device and its method of digging | |
CN106437731B (en) | Early warning type double-shielded TBM | |
CN106050254B (en) | Hard rock push-bench deviation-rectifying system design method | |
CN104914008A (en) | Quasi-rectangular shield soil chamber residue soil flow characteristic visualization observation test system and method | |
CN209855792U (en) | Shield tunnel safety monitoring device based on BIM | |
CN108241780A (en) | Composite shield tunnels the computational methods of cutter head torque in ground mixes geology | |
CN113294163A (en) | Visual configuration method for shield tunneling monitoring data | |
JP6783111B2 (en) | Ground improvement equipment | |
WO2020026503A1 (en) | Index-value-specifying device and index-value-specifying method | |
CN104632208A (en) | Clipping device and construction machine | |
CN204903189U (en) | Cutting of class rectangular shield impels analogue test system | |
CN104949851A (en) | Cutting propulsion simulation test system for quasi-rectangular shielding | |
CN204457766U (en) | Cutting means and engineering machinery | |
CN114329984A (en) | Real-time state mapping method of tunneling and anchoring all-in-one machine based on digital twins | |
CN206095556U (en) | A shield machine cutting tool simulation test equipment that weares and teares for going up soft hard ground layer down | |
JP4017781B2 (en) | Property display method of tunnel excavated ground | |
JP2019143385A (en) | Estimation device and estimation method | |
CN206987802U (en) | A kind of hand-held ground auger with the device that fathoms | |
CN209498108U (en) | A kind of broken bamboo container made of bamboo, wicker, ratten, etc. device of full automatic screw | |
JP2020169564A (en) | Ground improvement device | |
CN206816261U (en) | A kind of pipe jacking tunnelling machine | |
JP2926023B2 (en) | Excavation positioning device for excavator | |
CN206091995U (en) | Two shield TBM of early -warning type | |
JP3821538B2 (en) | Tunneling machine excavation control method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |