CN112016152A - Big data auxiliary construction decision method for tunnel construction BIM management platform - Google Patents

Big data auxiliary construction decision method for tunnel construction BIM management platform Download PDF

Info

Publication number
CN112016152A
CN112016152A CN202011028620.8A CN202011028620A CN112016152A CN 112016152 A CN112016152 A CN 112016152A CN 202011028620 A CN202011028620 A CN 202011028620A CN 112016152 A CN112016152 A CN 112016152A
Authority
CN
China
Prior art keywords
construction
data
bim
dimensional
management platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011028620.8A
Other languages
Chinese (zh)
Inventor
付功云
张佩竹
青舟
杨喆
袁文祥
王震宇
王恰时
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
China Railway Liuyuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Liuyuan Group Co Ltd filed Critical China Railway Liuyuan Group Co Ltd
Priority to CN202011028620.8A priority Critical patent/CN112016152A/en
Publication of CN112016152A publication Critical patent/CN112016152A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/02Reliability analysis or reliability optimisation; Failure analysis, e.g. worst case scenario performance, failure mode and effects analysis [FMEA]

Abstract

The invention provides a big data auxiliary construction decision method for a tunnel construction BIM management platform, which comprises the following steps: s100, acquiring tunnel construction management data; s200, data storage and arrangement are carried out on the basis of a big data tunnel construction BIM management platform; s300, acquiring construction data in a certain time period according to business requirements, and performing early warning judgment on the construction data; performing BIM + GIS two-dimensional and three-dimensional correlation display on the construction data and the judgment result; s400, displaying auxiliary construction decisions through association. According to the invention, through big data analysis and integration, early warning analysis and treatment of key construction data are realized, and BIM + GIS two-dimensional and three-dimensional correlation display is carried out, so that an auxiliary construction decision is played in the shield tunnel construction process, and the construction safety management level is improved.

Description

Big data auxiliary construction decision method for tunnel construction BIM management platform
Technical Field
The invention belongs to the technical field of Building Information Modeling (BIM), and particularly relates to a big data auxiliary construction decision method for a tunnel construction BIM management platform.
Background
In the tunnel construction process, information isolated island phenomenon exists in safety, quality, progress, equipment and other related construction management data, and how to carry out big data integration on the data, deeply dig data value and assist decision-making to guide construction becomes a problem which people pay more and more attention to.
Disclosure of Invention
The invention provides a big data auxiliary construction decision method of a tunnel construction BIM management platform, aiming at the technical problems in the prior art, the big data is analyzed and integrated to realize early warning analysis and treatment on important construction data, and two three-dimensional correlation display of BIM (building information model) + GIS (geographic information system) is carried out, so that auxiliary construction decision is played in the shield tunnel construction process, and the construction safety management level is improved.
The technical scheme adopted by the invention is as follows: a big data aided construction decision method for a tunnel construction BIM management platform comprises the following steps:
s100, acquiring tunnel construction management data;
s200, data storage and arrangement are carried out on the basis of a big data tunnel construction BIM management platform;
s300, acquiring construction data in a certain time period according to business requirements, and performing early warning judgment on the construction data; performing BIM + GIS two-dimensional and three-dimensional correlation display on the construction data and the judgment result;
s400, displaying auxiliary construction decisions through association.
Preferably, in step S300, if the construction data does not exceed the early warning value, performing a BIM + GIS two-dimensional and three-dimensional association display directly; and if the construction data exceeds the early warning value, alarming the construction data, triggering the early warning process and disposing, and displaying BIM + GIS two-dimensional correlation results in a disposal result.
Preferably, in step S300, statistical analysis is performed on the construction data, and then BIM + GIS two-dimensional and three-dimensional association display is performed.
Preferably, the construction data statistical analysis result, the early warning judgment and the processing result in the step S300 are simultaneously subjected to BIM + GIS two-dimensional and three-dimensional correlation display.
Preferably, in step 100, the tunnel construction management data includes safety, risk, hidden danger, and equipment data.
Compared with the prior art, the invention has the beneficial effects that: the method solves the problem of island phenomenon of related construction management data information such as safety, quality, progress, equipment and the like in the construction process, realizes early warning analysis and disposal of important construction data concerned through big data analysis and integration, and performs BIM + GIS two-dimensional correlation display, thereby playing a role in assisting construction decision and improving the construction safety management level in the shield tunnel construction process.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Detailed Description
In order to make the technical solutions of the present invention better understood, the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
The embodiment of the invention provides a big data aided construction decision method for a tunnel construction BIM management platform, which comprises the following steps as shown in figure 1:
s100, acquiring tunnel construction management data; taking tunnel construction management data including data of safety, risk, hidden danger, equipment and the like;
s200, data storage and arrangement are carried out on the basis of a big data tunnel construction BIM management platform;
s300, acquiring construction data in a certain time period according to business requirements, and performing statistical analysis and early warning judgment on the construction data; directly carrying out BIM + GIS two-dimensional and three-dimensional correlation display on the construction data and the statistical analysis result;
early warning judgment: if the construction data does not exceed the early warning value, directly carrying out BIM + GIS two-dimensional and three-dimensional correlation display; if the construction data exceed the early warning value, alarming the construction data, triggering the early warning process and disposing, and displaying BIM + GIS two-dimensional association according to the disposal result; performing BIM + GIS two-dimensional correlation display on the construction data, the construction data statistical analysis result, the early warning judgment and the processing result simultaneously;
s400, displaying auxiliary construction decisions through association.
For example: in the step S100, the platform acquires total thrust data of the shield machine equipment in the tunnel ring through a PLC interface;
in the step S200, the platform stores the acquired total thrust data of the tunnel ring according to a timestamp;
in step S300, the platform acquires the 49 th ring total thrust data of the tunnel according to the service requirement; wherein, the acquired 49 th ring data is directly subjected to BIM + GIS two-dimensional and three-dimensional correlation display; carrying out statistical analysis on the data, and directly carrying out BIM + GIS two-dimensional and three-dimensional correlation display on the statistical analysis result;
meanwhile, the total thrust data is used as key attention data, and whether the total thrust data exceeds an early warning value or not is judged when each timestamp: if the construction data exceeds the early warning value, alarming the construction data, triggering and disposing the early warning process, and then carrying out BIM + GIS two-dimensional correlation display; if the construction attention data do not exceed the early warning value, directly carrying out BIM + GIS two-dimensional and three-dimensional correlation display;
in step S400, a construction decision is assisted according to the content of BIM + GIS two-dimensional correlation display, mainly the early warning condition of the total thrust.
The present invention has been described in detail with reference to the embodiments, but the description is only illustrative of the present invention and should not be construed as limiting the scope of the present invention. The scope of the invention is defined by the claims. The technical solutions of the present invention or those skilled in the art, based on the teaching of the technical solutions of the present invention, should be considered to be within the scope of the present invention, and all equivalent changes and modifications made within the scope of the present invention or equivalent technical solutions designed to achieve the above technical effects are also within the scope of the present invention.

Claims (5)

1. A big data aided construction decision method of a tunnel construction BIM management platform is characterized by comprising the following steps: the method comprises the following steps:
s100, acquiring tunnel construction management data;
s200, data storage and arrangement are carried out on the basis of a big data tunnel construction BIM management platform;
s300, acquiring construction data in a certain time period according to business requirements, and performing early warning judgment on the construction data; performing BIM + GIS two-dimensional and three-dimensional correlation display on the construction data and the judgment result;
s400, displaying auxiliary construction decisions through association.
2. The tunnel construction BIM management platform big data aided construction decision-making method according to claim 1, characterized in that: in the step S300, if the construction data does not exceed the early warning value, directly carrying out BIM + GIS two-dimensional and three-dimensional correlation display; and if the construction data exceeds the early warning value, alarming the construction data, triggering the early warning process and disposing, and displaying BIM + GIS two-dimensional correlation results in a disposal result.
3. The tunnel construction BIM management platform big data aided construction decision-making method according to claim 2, characterized in that: in step S300, statistical analysis is performed on the construction data, and then BIM + GIS two-dimensional and three-dimensional association display is performed.
4. The tunnel construction BIM management platform big data aided construction decision-making method according to claim 3, characterized in that: and simultaneously carrying out BIM + GIS two-dimensional correlation display on the construction data, the construction data statistical analysis result, the early warning judgment and the processing result in the step S300.
5. The tunnel construction BIM management platform big data aided construction decision-making method according to any one of claims 1 to 4, characterized in that: in step 100, the tunnel construction management data includes safety, risk, hidden danger and equipment data.
CN202011028620.8A 2020-09-25 2020-09-25 Big data auxiliary construction decision method for tunnel construction BIM management platform Pending CN112016152A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011028620.8A CN112016152A (en) 2020-09-25 2020-09-25 Big data auxiliary construction decision method for tunnel construction BIM management platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011028620.8A CN112016152A (en) 2020-09-25 2020-09-25 Big data auxiliary construction decision method for tunnel construction BIM management platform

Publications (1)

Publication Number Publication Date
CN112016152A true CN112016152A (en) 2020-12-01

Family

ID=73528369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011028620.8A Pending CN112016152A (en) 2020-09-25 2020-09-25 Big data auxiliary construction decision method for tunnel construction BIM management platform

Country Status (1)

Country Link
CN (1) CN112016152A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113294163A (en) * 2021-03-19 2021-08-24 中国电建集团华东勘测设计研究院有限公司 Visual configuration method for shield tunneling monitoring data

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101650480B1 (en) * 2015-07-27 2016-09-05 한국건설기술연구원 System and method for tunnel bim simmulation using tunnel construction data and tunnel face xml data
CN107503757A (en) * 2017-09-20 2017-12-22 中建交通建设集团有限公司 A kind of shield tunnel intelligence construction accessory system and application method based on big data technology
CN107844964A (en) * 2017-11-30 2018-03-27 广州轨道交通建设监理有限公司 A kind of shield construction information management system
CN109376194A (en) * 2018-12-29 2019-02-22 中铁工程装备集团有限公司 A kind of rock tunnel(ling) machine remote monitoring platform based on big data
CN109446717A (en) * 2018-11-15 2019-03-08 中铁第六勘察设计院集团有限公司 Based on two three-dimensional linkage methods of exhibiting of BIM plus 3DGIS linear engineering
CN109493006A (en) * 2018-11-15 2019-03-19 中铁第六勘察设计院集团有限公司 The method that project process comparison is shown based on BIM platform
CN110411370A (en) * 2019-07-26 2019-11-05 北京住总集团有限责任公司 A kind of the risk of tunnel construction managing and control system based on space time parameter
CN110489888A (en) * 2019-08-23 2019-11-22 中铁第六勘察设计院集团有限公司 Based on the three-dimensional association general technology method of BIM platform two
CN110927821A (en) * 2019-12-31 2020-03-27 广西路桥工程集团有限公司 BIM + GIS-based advanced geological forecast information system for tunnel construction
CN111022066A (en) * 2019-11-11 2020-04-17 北京住总集团有限责任公司 Shield machine risk source crossing three-dimensional simulation and monitoring system based on BIM and GIS
KR102125455B1 (en) * 2019-12-18 2020-06-23 한국건설기술연구원 System for establishing data of harbor management based on bim and method thereof

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101650480B1 (en) * 2015-07-27 2016-09-05 한국건설기술연구원 System and method for tunnel bim simmulation using tunnel construction data and tunnel face xml data
CN107503757A (en) * 2017-09-20 2017-12-22 中建交通建设集团有限公司 A kind of shield tunnel intelligence construction accessory system and application method based on big data technology
CN107844964A (en) * 2017-11-30 2018-03-27 广州轨道交通建设监理有限公司 A kind of shield construction information management system
CN109446717A (en) * 2018-11-15 2019-03-08 中铁第六勘察设计院集团有限公司 Based on two three-dimensional linkage methods of exhibiting of BIM plus 3DGIS linear engineering
CN109493006A (en) * 2018-11-15 2019-03-19 中铁第六勘察设计院集团有限公司 The method that project process comparison is shown based on BIM platform
CN109376194A (en) * 2018-12-29 2019-02-22 中铁工程装备集团有限公司 A kind of rock tunnel(ling) machine remote monitoring platform based on big data
CN110411370A (en) * 2019-07-26 2019-11-05 北京住总集团有限责任公司 A kind of the risk of tunnel construction managing and control system based on space time parameter
CN110489888A (en) * 2019-08-23 2019-11-22 中铁第六勘察设计院集团有限公司 Based on the three-dimensional association general technology method of BIM platform two
CN111022066A (en) * 2019-11-11 2020-04-17 北京住总集团有限责任公司 Shield machine risk source crossing three-dimensional simulation and monitoring system based on BIM and GIS
KR102125455B1 (en) * 2019-12-18 2020-06-23 한국건설기술연구원 System for establishing data of harbor management based on bim and method thereof
CN110927821A (en) * 2019-12-31 2020-03-27 广西路桥工程集团有限公司 BIM + GIS-based advanced geological forecast information system for tunnel construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113294163A (en) * 2021-03-19 2021-08-24 中国电建集团华东勘测设计研究院有限公司 Visual configuration method for shield tunneling monitoring data

Similar Documents

Publication Publication Date Title
CN107704637B (en) knowledge graph construction method for emergency
CN105678481B (en) A kind of pipeline health state evaluation method based on Random Forest model
CN111639845B (en) Emergency plan validity assessment method considering integrity and operability
CN103226743B (en) Aircraft equipment technology maturity based on TRL assesses information processing method
CN110825839B (en) Association relation analysis method for targets in text information
CN111898385A (en) Earthquake disaster assessment method and system
CN112364627B (en) Text mining-based safety production accident analysis method and device, electronic equipment and storage medium
CN112016152A (en) Big data auxiliary construction decision method for tunnel construction BIM management platform
CN114492831A (en) Method and device for generating federal learning model
CN110672072A (en) Information multivariate interpretation and characterization method for fractured rock mass structure
CN108846043A (en) Network trace mining analysis method and system based on internet big data
CN113947333A (en) Wisdom subway red line protection management system based on multisource information fusion technique
CN111611404A (en) Method for predicting mineral products in target area based on geological text corpus
CN110362828B (en) Network information risk identification method and system
CN113037934A (en) Hot word analysis system based on call recording of call center
CN105786929A (en) Information monitoring method and device
CN115147248A (en) Big data-based travel information consultation system and method
CN115391519A (en) NLP technology-based enterprise automatic labeling model generation method, system, equipment and storage medium
CN111291376B (en) Web vulnerability verification method based on crowdsourcing and machine learning
CN114912026A (en) Network public opinion monitoring analysis processing method, equipment and computer storage medium
CN113762589A (en) Power transmission and transformation project change prediction system and method
CN107248118A (en) Data digging method, device and system
CN112597748A (en) Corpus generation method, apparatus, device and computer readable storage medium
CN110674269A (en) Cable information management and control method and system
CN113627003B (en) Digital auxiliary review method and system based on power transmission and transformation model technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201201

RJ01 Rejection of invention patent application after publication