CN110376659A CN201910495220.9A CN201910495220A CN110376659A CN 110376659 A CN110376659 A CN 110376659A CN 201910495220 A CN201910495220 A CN 201910495220A CN 110376659 A CN110376659 A CN 110376659A
Authority
CN
China
Prior art keywords
unit
module
tunnel
forecast
geological
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910495220.9A
Other languages
Chinese (zh)
Inventor
尹玉林
李蒙
陈鹏高
王学增
董赛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Group Co Ltd
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Group Co Ltd
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Group Co Ltd, Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Group Co Ltd
Priority to CN201910495220.9A priority Critical patent/CN110376659A/en
Publication of CN110376659A publication Critical patent/CN110376659A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V11/00Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00

Abstract

The invention discloses a kind of tunnel geological forecast system, belong to construction early warning technology field, geological conditions can not comprehensively be reconnoitred and data analytical judgment by solving advance geologic prediction work at this stage, affect the problem of being normally carried out of construction;Its technical characteristic is: including advanced prediction module, conventional forecast module, data analysis module, alarm module and background monitoring module, the routine forecast module is reconnoitred for the architectonic conventional forecast of tunnel internal, the equal wireless connection information acquisition module of output end of advanced prediction module and conventional forecast module, the present invention, which can be realized, carries out forward probe to tunnel internal geology, it ensure that the progress of construction safety, it avoids because of geology unreasonable the phenomenon that causing driving speed to slow down, so as to ensure unit in charge of construction's safety, it is smoothly through Unfavorable Conditions in tunnel, guarantee the science of work progress, safety, efficiently.

Description

A kind of tunnel geological forecast device and its system
Technical field
The present invention relates to tunnel early warning technology field more particularly to a kind of tunnel geological forecast device and its systems.
Background technique
Advance geologic prediction in constructing tunnel is related to engineering safety, quality and progress, and adhering in construction will in advance Matter forecast is included in construction organization and management as a process, when construction speed conflicts with advance geologic prediction, construction It is necessary for advance geologic prediction to give way, to avoid blindly constructing, it is ensured that the implementation of advance geologic prediction work, and play guidance and apply The effect of work;
The purpose of advance geologic prediction is on the basis of constructing Geological Prospecting Achievements early period, before further finding out face The geological conditions of country rock in square a certain range, forward probe formation lithology, the position of soft layer, rock mass completeness, fracture belt Position, width, degree of crushing, watery, wait unfavorable geologies and latent big geological problem, emphasis forecast gushing water dash forward mud and Specific location, scale and the influence degree of the unfavorable geologies such as fault belt control unfavorable geology within the scope of front of tunnel heading 30m Body prediction error forecasts the prominent mud of gushing water and fault belt specific location and possible disaster degree, reduces within 1m The risk that geological disaster occurs;There is provided necessary geologic parameter such as: groundwater pressure, water yield;Before construction face is provided Square geological information further determines that the engineering measure and reasonable construction method for guaranteeing surrounding rock stability, but advanced at this stage Geologic prediction work geological conditions can not comprehensively be reconnoitred and data analytical judgment, affect construction it is normal into Row, therefore it is proposed that a kind of tunnel geological forecast device and its system.
Summary of the invention
The purpose of the present invention is to provide a kind of tunnel geological forecast device and its systems, including advanced prediction mould Block, conventional forecast module, data analysis module, alarm module and background monitoring module, the advanced prediction module are used for tunnel Middle solution cavity, underground river and high hydraulic pressure location advance geologic prediction, it is described routine forecast module for tunnel internal it is architectonic Conventional forecast is reconnoitred, and the output end of advanced prediction module and conventional forecast module is wirelessly connected for acquiring advanced prediction module It, can not to solve advance geologic prediction work at this stage with the information acquisition module of the collected data of conventional forecast module Geological conditions is comprehensively reconnoitred and data analyze and determine, affects the problem of being normally carried out of construction.
To achieve the above object, the invention provides the following technical scheme:
A kind of tunnel geological forecast system, including advanced prediction module, conventional forecast module, data analysis module, Alarm module and background monitoring module, the advanced prediction module are used for the advanced of solution cavity in tunnel, underground river and high hydraulic pressure location Geologic prediction, the routine forecast module are reconnoitred for the architectonic conventional forecast of tunnel internal, advanced prediction module and often Advise forecast module the equal wireless connection information acquisition module of output end, information acquisition module for acquire advanced prediction module and often Advise the collected data of forecast module, the output end of information acquisition module is electrically connected for analyzing advanced prediction module and often Advise the data analysis module of forecast module data collected, the two-way electric connection alarm mould of the output end of data analysis module Block, alarm module using alarm controller unit as core, alarm controller unit be electrically connected intelligent alert collector unit, Alarm signal conversion circuit, alarm address code converting unit and alarm driving unit;Alarm module can be by the alarm of acquisition Signal, alert locations signal and photoelectric sensing signal are converted, and ensure that the advanced of geologic prediction;The data analyze mould The output end of block is electrically connected the background monitoring module for monitoring geological prediction system operation.
As a further solution of the present invention: the background monitoring module includes display screen unit, power supply unit and data Power supply unit and data storage element is electrically connected in storage element, display screen unit.
As further scheme of the invention: the advanced prediction module includes advanced prediction controller, geologic survey Unit, physical detecting unit, advanced levels drilling unit and substrate Karst Exploration unit, the advanced prediction controller respectively with Geologic survey unit, physical detecting unit, advanced levels drilling unit and the two-way electric connection of substrate Karst Exploration unit, it is described Geologic survey unit is reconnoitred for tunnel earth's surface, tunnel vault and tunnel tunnel face, and geologic survey unit is digital camera.
As further scheme of the invention: the physical detecting unit is by geological radar to tunnel center and two sides Physical detecting is carried out, the advanced levels drilling unit is used for reconnoitring for the tunnel boring that depth is 30-50 meters;The fundamental rock It is molten to reconnoitre unit reconnoitring for Tunnel Base karst;The advanced levels drilling unit is TSP203 type advanced prediction instrument;Institute Stating physical detecting unit is II type geological radar of RAMAC-.
As further scheme of the invention: the routine forecast module includes that geological structure reconnoitres unit, routine in advance Report controller and formation lithology reconnoitre unit, the geological structure reconnoitres unit and formation lithology reconnoitre unit with conventional forecast The two-way electric connection of controller, conventional forecasting controlling device control geological structure reconnoitres unit and formation lithology reconnoitres the fortune of unit Row, the geological structure reconnoitre unit reconnoitring for tunnel internal tomography, joint density area and fold, and the formation lithology is surveyed Verification certificate member is reconnoitred for tunnel internal lithologic character, weak intercalated layer, broken bottom, coal seam and Special Rock.
As the present invention further scheme: the background monitoring module is also electrically connected for feedback data analysis with Processing result is fed back to construction, adjusts construction method in time by the information feedback module of constructing tunnel suggestion, information feedback module And supporting parameter.
A kind of tunnel geological forecast device based on the tunnel geological forecast system.
A kind of geological extra-forecast method based on the tunnel geological forecast system.
In conclusion the beneficial effects of the present invention are: the present invention can be realized to tunnel internal geology carry out forward probe, The progress that ensure that construction safety is avoided because of geology unreasonable the phenomenon that causing driving speed to slow down, so as to ensure to construct Unit safe is smoothly through Unfavorable Conditions in tunnel, guarantees the scientific, safe and efficient of work progress.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of tunnel geological forecast system in invention.
Fig. 2 is the schematic diagram of internal structure of advanced prediction module in invention.
Fig. 3 is the schematic diagram of internal structure of conventional forecast module in invention.
In figure: 1- advanced prediction module, 2- routine forecast module, 3- information acquisition module, 4- data analysis module, 5- report Alert module, 6- background monitoring module, 7- information feedback module, 8- advanced prediction controller, 9- geologic survey unit, 10- physics It is conventional that probe unit, 11- advanced levels drilling unit, 12- substrate Karst Exploration unit, 13- geological structure reconnoitre unit, 14- Forecasting controlling device, 15- formation lithology reconnoitre unit.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
As shown in Fig. 1~3, in the embodiment of the present invention, a kind of tunnel geological forecast system, including advanced prediction module 1, conventional forecast module 2, data analysis module 4, alarm module 5 and background monitoring module 6, the advanced prediction module 1 are used for Solution cavity in tunnel, underground river and high hydraulic pressure location advance geologic prediction, the routine forecast module 2 for tunnel internal texture The conventional forecast made is reconnoitred, the equal wireless connection information acquisition module 3 of output end of advanced prediction module 1 and conventional forecast module 2, Information acquisition module 3 is for acquiring advanced prediction module 1 and the collected data of conventional forecast module 2, information acquisition module 3 The data that are electrically connected for analyzing advanced prediction module 1 and the conventional data collected of forecast module 2 of output end analyze mould Block 4, the two-way electric connection alarm module 5 of the output end of data analysis module 4, alarm module 5 is using alarm controller unit as core The heart, alarm controller unit are electrically connected intelligent alert collector unit, alarm signal conversion circuit, alarm address code and turn Change unit and alarm driving unit;Alarm module 5 can be by the alarm signal of acquisition, alert locations signal and photoelectric sensing signal It is converted, ensure that the advanced of geologic prediction;The output end of the data analysis module 4 is electrically connected for monitoring geology The background monitoring module 6 of forecast system operation;
The background monitoring module 6 includes display screen unit, power supply unit and data storage element, display screen unit difference It is electrically connected power supply unit and data storage element;
The advanced prediction module 1 includes advanced prediction controller 8, geologic survey unit 9, physical detecting unit 10, surpasses Preceding horizontal drilling unit 11 and substrate Karst Exploration unit 12, the advanced prediction controller 8 respectively with geologic survey unit 9, Physical detecting unit 10, advanced levels drilling unit 11 and the two-way electric connection of substrate Karst Exploration unit 12, the geology tune 9 reconnoitring for tunnel earth's surface, tunnel vault and tunnel tunnel face of verification certificate member, and geologic survey unit 9 is digital camera;
The physical detecting unit 10 carries out physical detecting, the advanced water to tunnel center and two sides by geological radar The tunnel boring that flat drilling unit 11 is 30-50 meters for depth is reconnoitred;The substrate Karst Exploration unit 12 is used for tunnel Substrate karst is reconnoitred;
The advanced levels drilling unit 11 is TSP203 type advanced prediction instrument;
The physical detecting unit 10 is II type geological radar of RAMAC-;
The routine forecast module 2 is reconnoitred unit 13, conventional forecasting controlling device 14 and formation lithology including geological structure and is surveyed Verification certificate member 15, the geological structure reconnoitres unit 13 and formation lithology reconnoitre unit 15 with the two-way electricity of conventional forecasting controlling device 14 Property connection, conventional forecasting controlling device 14 controls that geological structure reconnoitres unit 13 and formation lithology reconnoitres the operation of unit 15, described Geological structure reconnoitres the reconnoitring for tunnel internal tomography, joint density area and fold of unit 13, and the formation lithology reconnoitres list Member 15 is reconnoitred for tunnel internal lithologic character, weak intercalated layer, broken bottom, coal seam and Special Rock;
The background monitoring module 6 is also electrically connected the information feedback mould for feedback data analysis and constructing tunnel suggestion Processing result is fed back to unit in charge of construction by block 7, information feedback module 7, adjusts construction method and supporting parameter in time.
Embodiment 2
A kind of tunnel geological forecast device based on tunnel geological forecast system described in embodiment 1.
Embodiment 3
A kind of geological extra-forecast method based on tunnel geological forecast system described in embodiment 1, step is such as Under:
S1, tunnel internal geology is investigated, the main contents of investigation include different lithology, stratum in tunnel earth's surface Exposure and contact relation, the attitude of rocks and its variation;Construction becomes in the exposure of tunnel earth's surface, distribution, property, scale and its occurrence Change;Top stratum development, scale and the regularity of distribution;
S2, forecast group determine the stratigraphic sequence, thickness, reference lamina position of each rock group according to the stratotype of foundation, Tune is tracked to geological structure, targeted geology is unfolded and describes, at large verification refinement prospective design data, is geology Element task is carried out in forecast;
S3, make investigation strictly according to the facts to the geological state for having excavated face, and edited and recorded in detail, acquire necessary number According to specifically including: to face formation lithology, joints development degree, detailed by carry out such as construction influence degree, adjoining rock stability states Carefully edit and record;
The method of advance geologic prediction is based on the tunnel geological forecast system, by collecting geological information, input Information processing system, carries out comprehensive analysis, judgement, and processing result is fed back to unit in charge of construction, adjust in time construction method and Supporting parameter obtains new geological information after new construction system from work progress again, updates geological information system System, after processing, feeds back to unit in charge of construction again, and so on, by timely, the accurate forecast of geology Information System, is Information-aided construction provides decision-making foundation.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description the invention and simplifies description, rather than indicate Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand For limitation of the present invention.In addition, term " first ", " second " etc. are used for description purposes only, and it should not be understood as instruction or dark Show relative importance or implicitly indicates the quantity of indicated technical characteristic.The spy of " first ", " second " etc. is defined as a result, Sign can explicitly or implicitly include one or more of the features.In the description of the present invention, unless otherwise indicated, The meaning of " plurality " is two or more.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (10)

1. a kind of tunnel geological forecast system, including advanced prediction module (1), conventional forecast module (2), data analysis mould Block (4), alarm module (5) and background monitoring module (6), the advanced prediction module (1) is for solution cavity, underground river and height in tunnel The advance geologic prediction in hydraulic pressure location, the routine forecast module (2) are reconnoitred for the architectonic conventional forecast of tunnel internal, It is characterized in that, the equal wireless connection information acquisition module (3) of output end of advanced prediction module (1) and conventional forecast module (2), The output end of information acquisition module (3) is electrically connected to be acquired for analyzing advanced prediction module (1) and conventional forecast module (2) Data data analysis module (4), the two-way electric connection alarm module (5) of the output end of data analysis module (4);
Using alarm controller unit as core, alarm controller unit is electrically connected intelligent alert and collects alarm module (5) Unit, alarm signal conversion circuit, alarm address code converting unit and alarm driving unit;The data analysis module (4) Output end be electrically connected for monitor geological prediction system operation background monitoring module (6).
2. tunnel geological forecast system according to claim 1, which is characterized in that the background monitoring module (6) Including display screen unit, power supply unit and data storage element, power supply unit and data storage is electrically connected in display screen unit Memory cell.
3. tunnel geological forecast system according to claim 2, which is characterized in that the advanced prediction module (1) Including advanced prediction controller (8), geologic survey unit (9), physical detecting unit (10), advanced levels drilling unit (11) and Substrate Karst Exploration unit (12), the advanced prediction controller (8) respectively with geologic survey unit (9), physical detecting unit (10), advanced levels drilling unit (11) and substrate Karst Exploration unit (12) two-way electric connection, the geologic survey unit (9) reconnoitring for tunnel earth's surface, tunnel vault and tunnel tunnel face, the physical detecting unit (10) pass through geological radar pair Tunnel center and two sides carry out physical detecting, and tunnel of the advanced levels drilling unit (11) for depth to be 30-50 meters bores It reconnoitres in hole;The substrate Karst Exploration unit (12) is reconnoitred for Tunnel Base karst.
4. tunnel geological forecast system according to claim 3, which is characterized in that geologic survey unit (9) is number Code camera.
5. tunnel geological forecast system according to claim 4, which is characterized in that the physical detecting unit (10) For II type geological radar of RAMAC-.
6. tunnel geological forecast system according to claim 5, which is characterized in that the advanced levels drilling unit It (11) is TSP203 type advanced prediction instrument.
7. tunnel geological forecast system according to claim 6, which is characterized in that the routine forecast module (2) Unit (13), conventional forecasting controlling device (14) and formation lithology, which are reconnoitred, including geological structure reconnoitres unit (15), described ground texture It makes and reconnoitres unit (13) and formation lithology reconnoitres unit (15) with the two-way electric connection of conventional forecasting controlling device (14), it is conventional pre- Report controller (14) control geological structure reconnoitres unit (13) and formation lithology reconnoitres the operation of unit (15), the geological structure Unit (13) reconnoitring for tunnel internal tomography, joint density area and fold is reconnoitred, the formation lithology reconnoitres unit (15) For reconnoitring for tunnel internal lithologic character, weak intercalated layer, broken bottom, coal seam and Special Rock.
8. tunnel geological forecast system according to claim 7, which is characterized in that the background monitoring module (6) It is electrically connected the information feedback module (7) for feedback data analysis and constructing tunnel suggestion.
9. a kind of tunnel geological forecast dress based on any tunnel geological forecast system of claim 1-8 It sets.
10. a kind of tunnel geological forecast side based on any tunnel geological forecast system of claim 1-8 Method.
CN201910495220.9A 2019-06-10 2019-06-10 A kind of tunnel geological forecast device and its system Pending CN110376659A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910495220.9A CN110376659A (en) 2019-06-10 2019-06-10 A kind of tunnel geological forecast device and its system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910495220.9A CN110376659A (en) 2019-06-10 2019-06-10 A kind of tunnel geological forecast device and its system

Publications (1)

Publication Number Publication Date
CN110376659A true CN110376659A (en) 2019-10-25

Family

ID=68249882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910495220.9A Pending CN110376659A (en) 2019-06-10 2019-06-10 A kind of tunnel geological forecast device and its system

Country Status (1)

Country Link
CN (1) CN110376659A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113640896A (en) * 2021-07-07 2021-11-12 中交第二公路工程局有限公司 Tunnel unfavorable geology risk early warning display system
CN115062809A (en) * 2022-01-26 2022-09-16 中国铁道科学研究院集团有限公司电子计算技术研究所 Tunnel advanced geological forecast risk early warning method, system and storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04264228A (en) * 1991-02-18 1992-09-21 Shigeki Nagatomo Underground subsidence measuring apparatus
CN101344012A (en) * 2008-08-05 2009-01-14 山东省尤洛卡自动化装备股份有限公司 Dynamic monitoring system of coal mine roof plate
CN201627604U (en) * 2010-03-26 2010-11-10 中铁十二局集团有限公司 Safety precaution escaping device for tunnel
CN102434210A (en) * 2011-11-25 2012-05-02 成都畅达通地下工程科技发展有限公司 Method and system for monitoring underground engineering portrait information and monitoring information safely
CN102587986A (en) * 2012-03-12 2012-07-18 西安建筑科技大学 Tunnel construction informatization dynamic monitoring system and monitoring method thereof
CN103174418A (en) * 2013-02-05 2013-06-26 中国矿业大学 Advanced detection system and method for excavation hazards
CN103513293A (en) * 2013-10-12 2014-01-15 广西大学 Tunnel geology comprehensive advanced forecasting expert system and implementation method thereof
CN105736050A (en) * 2014-12-08 2016-07-06 中国水利水电第四工程局有限公司 Tunnel construction safety monitor method and system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04264228A (en) * 1991-02-18 1992-09-21 Shigeki Nagatomo Underground subsidence measuring apparatus
CN101344012A (en) * 2008-08-05 2009-01-14 山东省尤洛卡自动化装备股份有限公司 Dynamic monitoring system of coal mine roof plate
CN201627604U (en) * 2010-03-26 2010-11-10 中铁十二局集团有限公司 Safety precaution escaping device for tunnel
CN102434210A (en) * 2011-11-25 2012-05-02 成都畅达通地下工程科技发展有限公司 Method and system for monitoring underground engineering portrait information and monitoring information safely
CN102587986A (en) * 2012-03-12 2012-07-18 西安建筑科技大学 Tunnel construction informatization dynamic monitoring system and monitoring method thereof
CN103174418A (en) * 2013-02-05 2013-06-26 中国矿业大学 Advanced detection system and method for excavation hazards
CN103513293A (en) * 2013-10-12 2014-01-15 广西大学 Tunnel geology comprehensive advanced forecasting expert system and implementation method thereof
CN105736050A (en) * 2014-12-08 2016-07-06 中国水利水电第四工程局有限公司 Tunnel construction safety monitor method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113640896A (en) * 2021-07-07 2021-11-12 中交第二公路工程局有限公司 Tunnel unfavorable geology risk early warning display system
CN115062809A (en) * 2022-01-26 2022-09-16 中国铁道科学研究院集团有限公司电子计算技术研究所 Tunnel advanced geological forecast risk early warning method, system and storage medium

Similar Documents

Publication Publication Date Title
Li et al. Detecting and monitoring of water inrush in tunnels and coal mines using direct current resistivity method: a review
CN102419455B (en) Interwell parallel resistivity CT (computed tomography) testing method
CN110411370A (en) A kind of the risk of tunnel construction managing and control system based on space time parameter
CN102768369A (en) Roadway drivage drilling induced polarization advance water probing forecasting method, device and probe
CN106772678A (en) A kind of wellhole many reference amounts method for surveying of rock deformation destructive characteristics
CN106156432A (en) Deformation of tunnel based on three-dimensional geological information assessment and support design method and system
CN112965136B (en) Multi-means advanced detection method for water-rich karst tunnel
CN110927821A (en) BIM + GIS-based advanced geological forecast information system for tunnel construction
CN108842821B (en) Calculation method for reasonable buried depth of submarine tunnel constructed by drilling and blasting method
CN110376659A (en) A kind of tunnel geological forecast device and its system
CN102877828A (en) CT (Computed Tomography) imaging method of three-dimensional multi-well combined well land
CN113960695A (en) Fine exploration method for water-rich karst in complex urban environment
Gao et al. Water detection within the working face of an underground coal mine using 3D electric resistivity tomography (ERT)
CN113536414B (en) Rock slope stability analysis method, system and medium based on three-dimensional modeling
CN108868837B (en) A kind of underground space building system
CN110159347A (en) A kind of deep high stress tight roof stope dynamic disaster monitoring and pre-alarming method
CN211123324U (en) BIM + GIS-based advanced geological forecast information system for tunnel construction
Wang et al. Detection of shallow buried water-filled goafs using the fixed-loop transient electromagnetic method: A case study in Shaanxi, China
Schwering et al. Deterministic discrete fracture network (DFN) model for the EGS Collab project on the 4850 level of the Sanford Underground Research Facility (SURF)
Froukh Groundwater modelling in aquifers with highly karstic and heterogeneous characteristics (KHC) in Palestine
CN114280676A (en) Coal mine gas drainage hole drilling well logging geological structure detection method
CN104636576A (en) Rapid subway construction risk evaluation method based on weighted average method
CN117372639B (en) Three-dimensional geological-geophysical modeling method combining sparse diaphysis section with auxiliary surface at any position
CN116305501B (en) Method and system for judging influence subarea of open cut tunnel near shield tunnel collaborative construction
CN114814982B (en) Method for predicting favorable ore-forming part of granite uranium ore

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Meng

Inventor after: Yin Yulin

Inventor after: Chen Penggao

Inventor after: Wang Xuezeng

Inventor after: Dong Sai

Inventor before: Yin Yulin

Inventor before: Li Meng

Inventor before: Chen Penggao

Inventor before: Wang Xuezeng

Inventor before: Dong Sai

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20191025

RJ01 Rejection of invention patent application after publication