CN102433889A - 一种高桩承台塔基的施工方法及结构 - Google Patents
一种高桩承台塔基的施工方法及结构 Download PDFInfo
- Publication number
- CN102433889A CN102433889A CN2011103202444A CN201110320244A CN102433889A CN 102433889 A CN102433889 A CN 102433889A CN 2011103202444 A CN2011103202444 A CN 2011103202444A CN 201110320244 A CN201110320244 A CN 201110320244A CN 102433889 A CN102433889 A CN 102433889A
- Authority
- CN
- China
- Prior art keywords
- pile
- foundation ditch
- cast
- piles
- anchor ear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种高桩承台塔基的施工方法,包括以下步骤:一)在基坑土方开挖前,先在基坑内施工四根混凝土灌注桩,桩顶标高位于地表面,桩底标高位于基坑底标高以下,并且所述混凝土灌注桩打入基坑底面以下的长度与其处于基坑内的长度比大于等于1.5;二)在四根所述混凝土灌注桩桩顶浇筑钢筋混凝土承台,在所述承台上安装塔吊;三)开挖基坑土方,在基坑土方开挖过程中,每往下挖2~3m,在四根所述钻孔灌注桩周围浇筑一将它们连接在一起的水平钢筋混凝土抱箍结构。本发明还公开了采用上述方法施工的一种高桩承台塔基结构。采用本发明的塔基,结构稳定、牢固、安全性较高,并且相对于其他高桩承台施工简便,成本较低。
Description
技术领域
本发明涉及一种塔基的施工方法及结构,特别是涉及一种高桩承台塔基的施工方法及结构。
背景技术
目前,大型深基坑施工方法常见的一种方式是:将土方挖到基底标高以后再进行塔吊基础的施工,塔吊在基坑支护结构和临时支撑施工期间根本就发挥不了作用,解决不了垂直运输问题,加大了施工难度,延长了工期,增大了基坑施工的危险性。后一方式是,在土方开挖前,先施工四根混凝土灌注桩,桩顶标高设于塔吊基础底板下面,待塔吊安装完毕后,再进行土方开挖,支撑塔吊基础的灌注桩随着土方开挖深度的加深将逐层裸露,形成不稳定因素,为解决这一问题,需在四根混凝土灌注桩之间用钢套管焊接增设剪刀撑,还需随时检测桩体的竖向位移。这种方式虽然解决了基坑施工阶段的垂直运输问题,但却降低了塔吊基础的稳定性,增加了施工不安全的隐患,并加大了塔吊基础加固的成本。后一方式在现场场地狭小、基坑占地面积较大且塔身位于基坑中间的深基坑施工中较为常见,有利于最大限度的提高施工功效。
发明内容
本发明为解决公知技术中存在的技术问题而提供一种结构稳定、牢固、安全性较高且施工简便,成本较低的高桩承台塔基的施工方法及结构。
本发明为解决公知技术中存在的技术问题所采取的一个技术方案是:一种高桩承台塔基的施工方法,包括以下步骤:
一)在基坑土方开挖前,先在基坑内施工四根混凝土灌注桩,桩顶标高位于地表面,桩底标高位于基坑底标高以下,并且混凝土灌注桩打入基坑底面以下的长度与其处于基坑内的长度比大于等于1.5;
二)在四根混凝土灌注桩桩顶浇筑钢筋混凝土承台,在承台上安装塔吊;
三)开挖基坑土方,在基坑土方开挖过程中,每往下挖2~3m,在四根钻孔灌注桩周围浇筑一将它们连接在一起的水平钢筋混凝土抱箍结构。
在所述步骤二)施工前,先向下开挖2~3m土方,并在四根钻孔灌注桩周围浇筑一将它们连接在一起的水平钢筋混凝土抱箍结构。
所述钢筋混凝土抱箍结构与所述钻孔灌注桩通过植筋构造连接。
所述钢筋混凝土抱箍结构为梁式结构或板式结构。
本发明为解决公知技术中存在的技术问题所采取的另一个技术方案是:采用上述方法施工的一种高桩承台塔基结构,包括设置在基坑内的四根混凝土灌注桩,每根所述混凝土灌注桩位于基坑底面以下的嵌固段长度与其处于基坑内的外露段长度比大于等于1.5;四根所述混凝土灌注桩桩顶浇筑有钢筋混凝土承台;四根所述混凝土灌注桩处于基坑内的外露段上浇筑有数个间隔设置并将它们连接在一起的水平钢筋混凝土抱箍结构。
所述钢筋混凝土抱箍结构与所述钻孔灌注桩通过植筋构造连接。
所述钢筋混凝土抱箍结构为梁式结构或板式结构。
本发明具有的优点和积极效果是:通过采用混凝土灌注桩嵌固在基坑底面以下的长度与外露在基坑内的长度比大于等于1.5的结构,并在四根混凝土灌注桩之间形成将它们连接在一起的水平钢筋混凝土抱箍结构,使本发明的塔基结构稳定、牢固、安全性较高,并且相对于其他高桩承台施工简便,成本较低。还有本发明适用性较强,不受场地条件、地质水文条件限制。本发明较好地解决了基坑施工过程中全程使用塔吊进行垂直运输,塔吊稳定性差的难题,在工程桩未施工或基坑土方开挖前就能使提前安装好的塔吊进行有效运转,基坑施工时用塔吊作为垂直运输设备,施工方便快捷、有效的缩短了晾槽时间,提高了基坑施工的工作效率,能大量缩短基坑施工工期,减小因工期延长而发生安全事故的系数,为上部结构的顺利施工提供了有利条件。
附图说明
图1为本发明塔基结构的立面图;
图2为本发明塔基结构中水平钢筋混凝土抱箍结构的平面图。
图中:1、外露段,2、嵌固段,3、承台,4、7、抱箍结构,5、塔吊标准节或地脚螺栓,6、植筋。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参阅图1~图2,一种高桩承台塔基结构,包括设置在基坑内的四根混凝土灌注桩,每根所述混凝土灌注桩位于基坑底面以下的嵌固段2长度与其处于基坑内的外露段1长度比大于等于1.5;四根所述混凝土灌注桩桩顶浇筑有钢筋混凝土承台3;四根所述混凝土灌注桩处于基坑内的外露段1上浇筑有数个间隔设置并将它们连接在一起的水平钢筋混凝土抱箍结构。
所述钢筋混凝土抱箍结构与所述钻孔灌注桩通过植筋6构造连接。可使连接更加可靠。
所述钢筋混凝土抱箍结构为如图2所示的梁式结构或板式结构。板式结构更加稳固可靠,但成本高;梁式结构,造价上,较为经济。
上述塔基的施工方法,包括以下步骤:
一)在基坑土方开挖前,先在基坑内施工四根混凝土灌注桩,桩顶标高位于地表面,桩底标高位于基坑底标高以下,并且混凝土灌注桩打入基坑底面以下的长度与其处于基坑内的长度比大于等于1.5;
二)在四根混凝土灌注桩桩顶浇筑钢筋混凝土承台3,在承台3内预埋塔吊标准节或地脚螺栓5,并完成塔吊的安装;
三)开挖基坑土方,在基坑土方开挖过程中,每往下挖2~3m,在四根钻孔灌注桩周围浇筑一将它们连接在一起的水平钢筋混凝土抱箍结构。外露段1上的所有水平钢筋混凝土抱箍结构可以在承台完工后从上至下依次完成,也可以在承台施工前,先向下开挖2~3m基坑土方,并在四根钻孔灌注桩周围浇筑一将它们连接在一起的水平钢筋混凝土抱箍结构7后,再施工承台3,并在承台3内预埋塔吊标准节或地脚螺栓5,完成塔吊的安装,然后再开挖基坑土方,在基坑土方开挖过程中,每往下挖2~3m,在四根钻孔灌注桩周围浇筑一将它们连接在一起的水平钢筋混凝土抱箍结构4。
尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以作出很多形式,这些均属于本发明的保护范围之内。
Claims (7)
1.一种高桩承台塔基的施工方法,其特征在于,包括以下步骤:
一)在基坑土方开挖前,先在基坑内施工四根混凝土灌注桩,桩顶标高位于地表面,桩底标高位于基坑底标高以下,并且所述混凝土灌注桩打入基坑底面以下的长度与其处于基坑内的长度比大于等于1.5;
二)在四根所述混凝土灌注桩桩顶浇筑钢筋混凝土承台,在所述承台上安装塔吊;
三)开挖基坑土方,在基坑土方开挖过程中,每往下挖2~3m,在四根所述钻孔灌注桩周围浇筑一将它们连接在一起的水平钢筋混凝土抱箍结构。
2.根据权利要求1所述的高桩承台塔基的施工方法,其特征在于,在所述步骤二)施工前,先向下开挖2~3m土方,并在四根所述钻孔灌注桩周围浇筑一将它们连接在一起的水平钢筋混凝土抱箍结构。
3.根据权利要求1或2所述的高桩承台塔基的施工方法,其特征在于,所述钢筋混凝土抱箍结构与所述钻孔灌注桩通过植筋构造连接。
4.根据权利要求1所述的高桩承台塔基的施工方法,其特征在于,所述钢筋混凝土抱箍结构为梁式结构或板式结构。
5.采用如权利要求1所述的方法施工的一种高桩承台塔基结构,其特征在于,包括设置在基坑内的四根混凝土灌注桩,每根所述混凝土灌注桩位于基坑底面以下的嵌固段长度与其处于基坑内的外露段长度比大于等于1.5;四根所述混凝土灌注桩桩顶浇筑有钢筋混凝土承台;四根所述混凝土灌注桩处于基坑内的外露段上浇筑有数个间隔设置并将它们连接在一起的水平钢筋混凝土抱箍结构。
6.根据权利要求5所述的高桩承台塔基结构,其特征在于,所述钢筋混凝土抱箍结构与所述钻孔灌注桩通过植筋构造连接。
7.根据权利要求5所述的高桩承台塔基结构,其特征在于,所述钢筋混凝土抱箍结构为梁式结构或板式结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103202444A CN102433889A (zh) | 2011-10-20 | 2011-10-20 | 一种高桩承台塔基的施工方法及结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103202444A CN102433889A (zh) | 2011-10-20 | 2011-10-20 | 一种高桩承台塔基的施工方法及结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102433889A true CN102433889A (zh) | 2012-05-02 |
Family
ID=45982219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103202444A Pending CN102433889A (zh) | 2011-10-20 | 2011-10-20 | 一种高桩承台塔基的施工方法及结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102433889A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103215965A (zh) * | 2013-04-10 | 2013-07-24 | 中国建筑第八工程局有限公司 | 层板式高桩承台塔吊基础结构及施工方法 |
CN109190323A (zh) * | 2018-11-09 | 2019-01-11 | 广东省建筑设计研究院 | 一种适用于狭窄基坑单层支撑条件下的嵌固稳定性分析方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1114376A (zh) * | 1994-09-07 | 1996-01-03 | 张国梁 | 地下连续墙及其施工方法 |
JP2004003179A (ja) * | 2002-05-31 | 2004-01-08 | Mitsubishi Heavy Ind Ltd | ジャケット構造体の補強構造及びジャケット構造体を用いた基礎構造物 |
CN2632135Y (zh) * | 2003-06-27 | 2004-08-11 | 北京建达道桥咨询有限公司 | 桩柱一体柱式桥墩结构 |
CN201495555U (zh) * | 2009-08-18 | 2010-06-02 | 天津二建建筑工程有限公司 | 房心立塔砼灌注高桩的承台塔基 |
CN102168428A (zh) * | 2011-03-01 | 2011-08-31 | 浙江大学宁波理工学院 | 后置横隔式建筑物工程桩群桩及施工方法 |
CN202012088U (zh) * | 2011-03-30 | 2011-10-19 | 浙江金典建设有限公司 | 一种塔吊的基础结构 |
CN202298641U (zh) * | 2011-10-20 | 2012-07-04 | 中天建设集团有限公司天津分公司 | 一种高桩承台塔基结构 |
-
2011
- 2011-10-20 CN CN2011103202444A patent/CN102433889A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1114376A (zh) * | 1994-09-07 | 1996-01-03 | 张国梁 | 地下连续墙及其施工方法 |
JP2004003179A (ja) * | 2002-05-31 | 2004-01-08 | Mitsubishi Heavy Ind Ltd | ジャケット構造体の補強構造及びジャケット構造体を用いた基礎構造物 |
CN2632135Y (zh) * | 2003-06-27 | 2004-08-11 | 北京建达道桥咨询有限公司 | 桩柱一体柱式桥墩结构 |
CN201495555U (zh) * | 2009-08-18 | 2010-06-02 | 天津二建建筑工程有限公司 | 房心立塔砼灌注高桩的承台塔基 |
CN102168428A (zh) * | 2011-03-01 | 2011-08-31 | 浙江大学宁波理工学院 | 后置横隔式建筑物工程桩群桩及施工方法 |
CN202012088U (zh) * | 2011-03-30 | 2011-10-19 | 浙江金典建设有限公司 | 一种塔吊的基础结构 |
CN202298641U (zh) * | 2011-10-20 | 2012-07-04 | 中天建设集团有限公司天津分公司 | 一种高桩承台塔基结构 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103215965A (zh) * | 2013-04-10 | 2013-07-24 | 中国建筑第八工程局有限公司 | 层板式高桩承台塔吊基础结构及施工方法 |
CN109190323A (zh) * | 2018-11-09 | 2019-01-11 | 广东省建筑设计研究院 | 一种适用于狭窄基坑单层支撑条件下的嵌固稳定性分析方法 |
CN109190323B (zh) * | 2018-11-09 | 2019-05-28 | 广东省建筑设计研究院 | 一种适用于狭窄基坑单层支撑条件下的嵌固稳定性分析方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100564700C (zh) | 格构式钢柱塔吊基础座的施工方法 | |
CN102561384A (zh) | 钢抱箍桁架式高桩承台塔吊基础的施工方法及结构 | |
CN102635120B (zh) | 圆形深基坑无支撑施工结构和施工方法 | |
CN102162258B (zh) | 一种塔吊钢管混凝土高桩塔基结构及构建方法 | |
CN202519697U (zh) | 钢抱箍桁架式高桩承台塔吊基础结构 | |
CN205024712U (zh) | 一种组合式塔吊基础 | |
CN104532868A (zh) | 高陡变形斜坡区桥梁锚拉式高承台群桩基础修建方法 | |
CN110106919A (zh) | 一种盖挖车站的围护结构及其施工方法 | |
CN111560962A (zh) | 一种回填区基坑支护结构及其施工方法 | |
CN104047222A (zh) | 一种傍山临水桥梁结构及其施工方法 | |
CN108867723B (zh) | 框架结构建筑物纠倾并地下增层的方法 | |
CN105155602A (zh) | 一种多支点地基加固综合纠倾方法 | |
CN103758132B (zh) | 一种结合放坡的悬臂排桩支护结构的施工工艺 | |
CN203716156U (zh) | 一种深基坑内设坑中坑城门洞式出土施工结构 | |
CN107700519A (zh) | 一种举升塔吊基础安装方法 | |
CN202298641U (zh) | 一种高桩承台塔基结构 | |
CN103215965A (zh) | 层板式高桩承台塔吊基础结构及施工方法 | |
CN201991013U (zh) | 一种塔吊钢管混凝土高桩塔基结构 | |
CN110847047B (zh) | 一种外海裸岩栈桥施工方法 | |
CN109577322A (zh) | 一种用于土体内部既有桩基接桩的施工装置 | |
CN209779640U (zh) | 一种基坑支护桩顶冠梁施工结构 | |
CN102433889A (zh) | 一种高桩承台塔基的施工方法及结构 | |
CN106013174A (zh) | 一种基坑支护斜向支撑方法及斜向支撑结构 | |
CN111851510B (zh) | 土岩基坑爆破开挖体系及应用其的施工方法 | |
CN201722700U (zh) | 塔式起重机基础结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120502 |