CN201722700U - 塔式起重机基础结构 - Google Patents
塔式起重机基础结构 Download PDFInfo
- Publication number
- CN201722700U CN201722700U CN201020272627XU CN201020272627U CN201722700U CN 201722700 U CN201722700 U CN 201722700U CN 201020272627X U CN201020272627X U CN 201020272627XU CN 201020272627 U CN201020272627 U CN 201020272627U CN 201722700 U CN201722700 U CN 201722700U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- piling bar
- cushion cap
- pile body
- foundation structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 7
- 239000010959 steel Substances 0.000 claims abstract description 7
- 210000003205 muscle Anatomy 0.000 claims description 9
- 238000007789 sealing Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 10
- 238000009412 basement excavation Methods 0.000 abstract description 9
- 238000010586 diagram Methods 0.000 description 6
- 230000032258 transport Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 238000004078 waterproofing Methods 0.000 description 3
- 238000005065 mining Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Foundations (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201020272627XU CN201722700U (zh) | 2010-07-27 | 2010-07-27 | 塔式起重机基础结构 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201020272627XU CN201722700U (zh) | 2010-07-27 | 2010-07-27 | 塔式起重机基础结构 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201722700U true CN201722700U (zh) | 2011-01-26 |
Family
ID=43491015
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201020272627XU Expired - Fee Related CN201722700U (zh) | 2010-07-27 | 2010-07-27 | 塔式起重机基础结构 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201722700U (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102839684A (zh) * | 2012-07-30 | 2012-12-26 | 河南省电力公司信阳供电公司 | 变压器基础 |
| CN103255779A (zh) * | 2013-05-19 | 2013-08-21 | 上海庞源机械租赁股份有限公司 | 一种塔式起重机混凝土基础 |
| CN110512640A (zh) * | 2019-07-31 | 2019-11-29 | 中国一冶集团有限公司 | 一种塔吊止水装置、塔吊基础布置结构及塔吊止水方法 |
-
2010
- 2010-07-27 CN CN201020272627XU patent/CN201722700U/zh not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102839684A (zh) * | 2012-07-30 | 2012-12-26 | 河南省电力公司信阳供电公司 | 变压器基础 |
| CN103255779A (zh) * | 2013-05-19 | 2013-08-21 | 上海庞源机械租赁股份有限公司 | 一种塔式起重机混凝土基础 |
| CN110512640A (zh) * | 2019-07-31 | 2019-11-29 | 中国一冶集团有限公司 | 一种塔吊止水装置、塔吊基础布置结构及塔吊止水方法 |
| CN110512640B (zh) * | 2019-07-31 | 2021-05-18 | 中国一冶集团有限公司 | 一种塔吊止水装置、塔吊基础布置结构及塔吊止水方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203145038U (zh) | 格构柱式塔吊基础 | |
| CN102322269B (zh) | 一种盾构机超早接收支护结构及超早接收方法 | |
| CN205024712U (zh) | 一种组合式塔吊基础 | |
| CN101240550A (zh) | 格构式钢柱塔吊基础座的施工方法 | |
| CN102561384A (zh) | 钢抱箍桁架式高桩承台塔吊基础的施工方法及结构 | |
| CN201679147U (zh) | 高层建筑地下逆作时上部结构剪力墙托换结构 | |
| CN203654294U (zh) | 一种逆作法中基坑的支护结构 | |
| CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
| CN201053123Y (zh) | 深基坑塔吊平台基座 | |
| CN103103988A (zh) | 利用中心岛楼板水平支撑结构的基坑施工方法 | |
| CN103114595A (zh) | 支护桩预留核心土双支墩斜内撑基坑支护方法及装置 | |
| CN110593269A (zh) | 一种可周转式结构换撑体系及其施工方法 | |
| CN105421477A (zh) | 一种塔吊基础的施工方法 | |
| CN207294093U (zh) | 一种大跨度钢桁架整体提升装置 | |
| CN104631469B (zh) | 用于深大基坑的无柱钢筋混凝土支撑构架及其搭建方法 | |
| CN205296206U (zh) | 塔吊基础 | |
| CN202519697U (zh) | 钢抱箍桁架式高桩承台塔吊基础结构 | |
| CN219732023U (zh) | 一种围护桩和钢斜撑围护结构 | |
| CN201495555U (zh) | 房心立塔砼灌注高桩的承台塔基 | |
| CN103215965A (zh) | 层板式高桩承台塔吊基础结构及施工方法 | |
| CN202298641U (zh) | 一种高桩承台塔基结构 | |
| CN203821399U (zh) | 一种深基坑支护结构 | |
| CN212052780U (zh) | 一种斜支式深基坑支护结构 | |
| CN201176597Y (zh) | 一种沉井结构 | |
| CN216194967U (zh) | 一种保护既有塔柱的挡土结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: China Construction Industrial Equipment Installation Co., Ltd. Assignor: China Construction Eighth Engineering Division Co., Ltd. Contract record no.: 2011310000061 Denomination of utility model: Steel lattice framework tower-type crane foundation structure Granted publication date: 20110126 License type: Exclusive License Record date: 20110509 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110126 Termination date: 20160727 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |