CN102426679A - workshop cost management control method based on short message - Google Patents
workshop cost management control method based on short message Download PDFInfo
- Publication number
- CN102426679A CN102426679A CN2011103385445A CN201110338544A CN102426679A CN 102426679 A CN102426679 A CN 102426679A CN 2011103385445 A CN2011103385445 A CN 2011103385445A CN 201110338544 A CN201110338544 A CN 201110338544A CN 102426679 A CN102426679 A CN 102426679A
- Authority
- CN
- China
- Prior art keywords
- record
- production material
- control method
- method based
- management control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000004519 manufacturing process Methods 0.000 claims abstract description 36
- 238000007726 management method Methods 0.000 claims description 19
- 238000012550 audit Methods 0.000 claims description 7
- 238000005516 engineering process Methods 0.000 description 2
- 230000002860 competitive effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a workshop cost management control method based on short messages, which comprises the following implementation steps: 1) establishing a user authority database comprising employees and managers; 2) before the production materials are received by the staff, the staff logs in a user authority database in advance and generates a production material receiving application record; 3) generating a corresponding record to be checked according to the application record for receiving the production materials, outputting the record to be checked to a corresponding manager through a short message, and checking the record to be checked through the short message reply of the manager; 4) and the staff receives the production materials according to the auditing result of the manager. The invention can reduce the enterprise cost and has the advantages of complete record, clear authority and convenient use.
Description
Technical field
The present invention relates to enterprise cost management control field, be specifically related to a kind of workshop cost management control method based on note.
Background technology
Along with constant development of economy, the competition more and more fierce of similar business unit.Under identical pricing system; The price that different enterprises are in other product of same quality level is basic identical; If therefore the relative cost of enterprise is low more; The profit that then obtains will be high more, thereby can in competition, have more powerful competitive power, guarantees that enterprise is in the invincible position in the competition of more and more fierce.
The cost of enterprise comprises three aspects: become to produce cost, cost of human resources and consumables cost.Production material is as the important composition of consumables cost; Owing to directly belong to consuming cost; Because prior art generally all can't be based on the control of system level, thus make production material receive that often record is complete, control is not clear, thereby greatly increased the consuming cost of enterprise.
Summary of the invention
The purpose of this invention is to provide and a kind ofly can reduce enterprise cost, record is complete, authority is clear and definite, easy to use workshop cost management control method based on note.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: a kind of workshop cost management control method based on note, and implementation step is following:
1) sets up the user rights database that comprises employee and managerial personnel;
2) before the employee receives production material, login user rights database and generate production material and receive application record in advance;
3) receive application record according to said production material and generate corresponding pending record, and export to corresponding managerial personnel through note, managerial personnel treat audit logging through message reply and examine;
4) employee gets production material according to managerial personnel's auditing result.
Further improvement as technique scheme:
The user rights database of setting up in the said step 1) comprises personal management table and production material record sheet.
Said personal management table comprises user name, password, three fields of Permission Levels; Said step 2) the login user rights database specifically is meant through inputing user name, password in; And verify with user name, password in the personal management table, if verify successfully then obtain corresponding Permission Levels information.
Said generation production material is received application record and is meant new record of generation in the production material record sheet, and whether the field of said new record comprises production material numbering, production material title, application quantity, application employee user name, application time, examines, examines through state, person approving and audit time.
The present invention has following advantage: before employee of the present invention receives production material; Login user rights database and generate production material and receive application record in advance; Receive application record according to production material and generate corresponding pending record, and export to corresponding managerial personnel through note, managerial personnel treat audit logging through message reply and examine; Can reduce enterprise cost, have the advantage that record is complete, authority is clear and definite, easy to use.
Description of drawings
Fig. 1 is the implementing procedure synoptic diagram of the embodiment of the invention.
Embodiment
As shown in Figure 1, the embodiment of the invention is following based on the implementation step of the workshop cost management control method of note:
1) sets up the user rights database that comprises employee and managerial personnel;
2) before the employee receives production material, login user rights database and generate production material and receive application record in advance;
3) receive application record according to production material and generate corresponding pending record, and export to corresponding managerial personnel through note, managerial personnel treat audit logging through message reply and examine;
4) employee gets production material according to managerial personnel's auditing result.
In the present embodiment, the user rights database of setting up in the step 1) comprises personal management table and production material record sheet.
In the present embodiment; The personal management table comprises user name, password, three fields of Permission Levels; Step 2) the login user rights database specifically is meant through inputing user name, password in; And verify with user name, password in the personal management table, if verify successfully then obtain corresponding Permission Levels information.
In the present embodiment; The generation production material is received application record and is meant new record of generation in the production material record sheet, and whether the field of new record comprises production material numbering, production material title, application quantity, application employee user name, application time, examines, examines through state, person approving and audit time.
The above is merely preferred implementation of the present invention, and protection scope of the present invention is not limited in above-mentioned embodiment, and every technical scheme that belongs to the principle of the invention all belongs to protection scope of the present invention.For a person skilled in the art, some improvement and the retouching under the prerequisite that does not break away from principle of the present invention, carried out, these improvement and retouching also should be regarded as protection scope of the present invention.
Claims (4)
1. workshop cost management control method based on note is characterized in that implementation step is following:
1) sets up the user rights database that comprises employee and managerial personnel;
2) before the employee receives production material, login user rights database and generate production material and receive application record in advance;
3) receive application record according to said production material and generate corresponding pending record, and export to corresponding managerial personnel through note, managerial personnel treat audit logging through message reply and examine;
4) employee gets production material according to managerial personnel's auditing result.
2. the workshop cost management control method based on note according to claim 1 is characterized in that: the user rights database of setting up in the said step 1) comprises personal management table and production material record sheet.
3. the workshop cost management control method based on note according to claim 2; It is characterized in that: said personal management table comprises user name, password, three fields of Permission Levels; Said step 2) the login user rights database specifically is meant through inputing user name, password in; And verify with user name, password in the personal management table, if verify successfully then obtain corresponding Permission Levels information.
4. the workshop cost management control method based on note according to claim 3; It is characterized in that: said generation production material is received application record and is meant new record of generation in the production material record sheet, and whether the field of said new record comprises production material numbering, production material title, application quantity, application employee user name, application time, examines, examines through state, person approving and audit time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103385445A CN102426679A (en) | 2011-11-01 | 2011-11-01 | workshop cost management control method based on short message |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103385445A CN102426679A (en) | 2011-11-01 | 2011-11-01 | workshop cost management control method based on short message |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102426679A true CN102426679A (en) | 2012-04-25 |
Family
ID=45960658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103385445A Pending CN102426679A (en) | 2011-11-01 | 2011-11-01 | workshop cost management control method based on short message |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102426679A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1798361A (en) * | 2004-12-24 | 2006-07-05 | 华为技术有限公司 | Paying off method and system through short message based on intelligent network |
CN101051372A (en) * | 2006-04-06 | 2007-10-10 | 北京易富金川科技有限公司 | Method for safety verifying financial business information in electronic business |
CN101350806A (en) * | 2007-12-28 | 2009-01-21 | 曾里 | Authorization and management system for laboratory instrument |
-
2011
- 2011-11-01 CN CN2011103385445A patent/CN102426679A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1798361A (en) * | 2004-12-24 | 2006-07-05 | 华为技术有限公司 | Paying off method and system through short message based on intelligent network |
CN101051372A (en) * | 2006-04-06 | 2007-10-10 | 北京易富金川科技有限公司 | Method for safety verifying financial business information in electronic business |
CN101350806A (en) * | 2007-12-28 | 2009-01-21 | 曾里 | Authorization and management system for laboratory instrument |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lu et al. | Next big thing in big data: the security of the ICT supply chain | |
CN104851037A (en) | Method for signing electronic contract at mobile terminal | |
CN110069637A (en) | Online way of invitation for bid and system based on block chain | |
CN102376045A (en) | Office management system-based office cost management control method | |
Tang et al. | Sustainable building development in China–A system thinking study | |
CN102376044A (en) | Office cost management control method | |
CN102368321A (en) | Office cost management control method based on office management system supported by short message | |
CN102509188A (en) | Office cost management control method based on short messages | |
CN102376038A (en) | Short message supporting office management system-based workshop cost management control method | |
CN102376037A (en) | Office management system-based workshop cost management control method | |
CN102426679A (en) | workshop cost management control method based on short message | |
CN109740902A (en) | A kind of patent application distribution auditing system and method | |
CN113177799B (en) | Block chain-based steel anti-counterfeiting traceability system and method | |
Al Sadawi et al. | Blockchain-based carbon trading mechanism to elevate governance and smartness | |
CN102368322A (en) | Control method for workshop cost management | |
CN102419837A (en) | Workshop cost management and control method based on intelligent short message supported office management system | |
Changhuo et al. | The developing Chinese competitive intelligence profession | |
Valderrama | A New Wind Change in Direct Taxation | |
CN102393933A (en) | Office cost management control method based on intelligent message supporting office management system | |
Ogasawara et al. | Proposal and practice of software process improvement framework–Toshiba's software process improvement history since 2000 | |
Kuechler et al. | Misconceptions and Barriers to Adoption of FOSS in the US Energy Industry | |
Qi | Operation maintenance and management model on informationization system of small and medium enterprises | |
CN111723151A (en) | Manuscript delivery system based on block chain | |
CN109345093A (en) | Networking data total management system | |
Meyerholt et al. | Bringing sustainability to the daily business: The oepi project |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120425 |