CN102425428A - Method for controlling extreme broken roof in roadway head - Google Patents

Method for controlling extreme broken roof in roadway head Download PDF

Info

Publication number
CN102425428A
CN102425428A CN2011102829044A CN201110282904A CN102425428A CN 102425428 A CN102425428 A CN 102425428A CN 2011102829044 A CN2011102829044 A CN 2011102829044A CN 201110282904 A CN201110282904 A CN 201110282904A CN 102425428 A CN102425428 A CN 102425428A
Authority
CN
China
Prior art keywords
boring
head
roof
drilling
roadway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102829044A
Other languages
Chinese (zh)
Inventor
潘立友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN2011102829044A priority Critical patent/CN102425428A/en
Publication of CN102425428A publication Critical patent/CN102425428A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a method for controlling breaking roof in roadway head. The method comprise the steps of: firstly, distributing anchor bolt support drill holes on a roadway tunneling head; then, arranging a common self-drilling anchor rod in the outermost row of vertical drill holes so as to match a steel bar belt for temporary roof protection; and finally, arranging a self-drilling grouting anchor rod in the rest rows of inclined drill holes and grouting towards the broken roof ahead. The method disclosed by the invention has the positive effects that by arranging the vertical self-drilling anchor rod by means of the tunneling head and matching with the steel bar belts with a maintenance function, an active maintenance role is played for the roof, the completeness of the head is effectively protected, and the safety of staff is ensured; and by means of inclined grouting, the undisturbed broken roof at the deep part of the head is reinforced, the roof strata strength is increased, broken and cracked rock masses deep in a roadway are reinforced into a complete rock strata, and safety guarantee is provided for the forward tunneling of the roadway.

Description

The tunnel damaged top boad control method of meeting head on
Technical field
The invention belongs to the mining technical field.
Background technology
At present in the mining; Increase the increasing (greater than 15-20 square) of (greater than 800 meters), drift section along with mining depth; In the driving face progradation, stope equipment is installed and progradation in and in the road maintenance process, often run into the heavily stressed visualization area that geological structure causes, the very big broken phenomenon of top board appears; Cause part or large tracts of land roof fall accident, potential safety hazard occurs.Measures such as artificial filling, temporary lining are mainly taked in the control of such accident at present.When the unusual region of high stress and complicated structure are met head on to exist in the tunnel, adopt present method to be difficult to achieve effective control, cause support material waste and manpower consumption.In the applying of big mining height mining machinesization; These conventional measures are owing to operating difficulties, danger are difficult to defectives such as control; Often treatment of roof collapse is untimely, often brings out secondary disaster, causes the vicious circle of Roof Control; And large-scale roof accident takes place easily, cause great loss.
Therefore need invention a kind of to breaking roof in time, maintaining method fast and effectively.
Summary of the invention
The objective of the invention is control problem to the very big breaking roof of high stress areas of present deep tunnel, proposes a kind of in time, effective control method apace.
Technical scheme of the present invention is:
The first step: meet head on to arrange bolt support boring in tunnelling
In the tunnelling process; When finding that top board cranny development, breaking small range of scale, prop unusual, damage envelope occurs and meet head on the deep when extending to the tunnel, arrange 3-4 gang drill hole, spacing of wells 0.8m at the tunnelling top board of meeting head on; Boring array pitch 0.8-1.0m, drilling depth is 3.0-5.0m; Outermost one gang drill hole direction is perpendicular to scar, all the other gang drill holes with 60-75 degree angle to oblique upper to creeping into;
Second step: install from boring common bolt cooperation reinforcing bar band and protect the top temporarily
In outermost one row vertical drilling, self drilling anchor is installed, is adopted Roofbolt drilling rig vertically to creep into, reach rock-bolt length after, the reinforcing bar band is routed on the top board tray in the anchor pole end, and fastening nut; Described solid for what use always from boring common bolt from boring common bolt;
The 3rd step: install from boring grouted anchor bar
In all the other row's inclined drills, install, adopt Roofbolt drilling rig to cooperate and carry out inclined drilling from boring grouted anchor bar from boring grouted anchor bar, reach rock-bolt length after, stop to creep into, then the reinforcing bar band is routed on the top board tray in the anchor pole end, and fastening nut; Boring grouted anchor bar outer end connection grouting device certainly, forwards carry out slip casting in the breaking roof again;
The described slurry outlet that bores grouted anchor bar certainly is located at the middle epimere of hollow rod body, forms the form of structure that the deep can be annotated, superficial part is not annotated.
Good effect of the present invention is: 1. through vertical self drilling anchor is installed at boring head, and cooperate the reinforcing bar band of maintenance function, top board is played the active maintenance effect, what effectively prevent to meet head on is complete, has guaranteed staff's safety.2. through inclination slip casting, reinforced the intact breaking roof in the deep of meeting head on, improved roof strata intensity, to the fragmentation in deep, tunnel, crack rock people for being solidified into complete rock stratum, for the driving forward in next step tunnel provides safety guarantee.
Description of drawings
Further specify embodiments of the invention below in conjunction with accompanying drawing.
Fig. 1 is driving face and self drilling anchor orientation sketch map;
Fig. 2 is the self drilling anchor structure chart;
Fig. 3 is a reinforcing bar band sketch map.
The specific embodiment
Shown in Fig. 1-3, the meet head on concrete steps of damaged top boad control method of tunnel of the present invention are:
The first step: meet head on to arrange bolt support boring in tunnelling
In the tunnelling process; When finding that top board cranny development, breaking small range of scale, prop unusual, damage envelope occurs and meet head on the deep when extending (as shown in Figure 1) to the tunnel; Arrange 3-4 gang drill hole at the tunnelling top board of meeting head on; Spacing of wells 0.8m, boring array pitch 0.8-1.0m, drilling depth is 3.0-5.0m; Outermost one gang drill hole direction is perpendicular to scar, all the other gang drill holes with 60-75 degree angle to oblique upper to creeping into;
Second step: install from boring common bolt cooperation reinforcing bar band and protect the top temporarily
In outermost one row vertical drilling, self drilling anchor is installed, is adopted Roofbolt drilling rig vertically to creep into, reach rock-bolt length after, the reinforcing bar band is routed on the top board tray in the anchor pole end, and fastening nut.Described from boring the certainly brill common bolt of common bolt for using always.Solid in boring common bolt by forming from drill bit, linkage, the solid body of rod, pallet, nut, bore the combined structural member that common bolt adopts length to cooperate certainly, choose pattern length flexibly according to the roof cracking degree of depth.
The reinforcing bar band plays the maintenance effect to breaking roof, and the effect of anti-leak-stopping cash is arranged, and working space is played effective protection.The reinforcing bar band is processed the reinforcing bar band with ¢ 8mm round steel, long 1400mm, and wide 300mm, Fig. 3 is seen in the two ends embowment.
The 3rd step: install from boring grouted anchor bar
In all the other row's inclined drills, install, adopt Roofbolt drilling rig to cooperate and carry out inclined drilling from boring grouted anchor bar from boring grouted anchor bar, reach rock-bolt length after; Stop to creep into; Then the reinforcing bar band is routed on the top board, stop grouting plug, pallet and fastening nut are installed in the anchor pole end; Boring grouted anchor bar outer end connection grouting device certainly, forwards carry out slip casting in the breaking roof again;
By forming, and on the hollow rod body of middle epimere, be provided with slurry outlet, the form of structure of formation deep slip casting, not slip casting of superficial part from the structure of boring grouted anchor bar from drill bit, linkage, hollow rod body, stop grouting plug, pallet, nut.

Claims (1)

1. tunnel damaged top boad control method of meeting head on is characterized in that step is following:
The first step: meet head on to arrange bolt support boring in tunnelling
In the tunnelling process; When finding that top board cranny development, breaking small range of scale, prop unusual, damage envelope occurs and meet head on the deep when extending to the tunnel, arrange 3-4 gang drill hole, spacing of wells 0.8m at the tunnelling top board of meeting head on; Boring array pitch 0.8-1.0m, drilling depth is 3.0-5.0m; Outermost one gang drill hole direction is perpendicular to scar, all the other gang drill holes with 60-75 degree angle to oblique upper to creeping into;
Second step: install from boring common bolt cooperation reinforcing bar band and protect the top temporarily
In outermost one row vertical drilling, self drilling anchor is installed, is adopted Roofbolt drilling rig vertically to creep into, reach rock-bolt length after, the reinforcing bar band is routed on the top board tray in the anchor pole end, and fastening nut; Described solid for what use always from boring common bolt from boring common bolt;
The 3rd step: install from boring grouted anchor bar
In all the other row's inclined drills, install, adopt Roofbolt drilling rig to cooperate and carry out inclined drilling from boring grouted anchor bar from boring grouted anchor bar, reach rock-bolt length after, stop to creep into, then the reinforcing bar band is routed on the top board tray in the anchor pole end, and fastening nut; Boring grouted anchor bar outer end connection grouting device certainly, forwards carry out slip casting in the breaking roof again;
The described middle epimere that is located at hollow rod body from the slurry outlet that bores grouted anchor bar.
CN2011102829044A 2011-09-12 2011-09-12 Method for controlling extreme broken roof in roadway head Pending CN102425428A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102829044A CN102425428A (en) 2011-09-12 2011-09-12 Method for controlling extreme broken roof in roadway head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102829044A CN102425428A (en) 2011-09-12 2011-09-12 Method for controlling extreme broken roof in roadway head

Publications (1)

Publication Number Publication Date
CN102425428A true CN102425428A (en) 2012-04-25

Family

ID=45959453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102829044A Pending CN102425428A (en) 2011-09-12 2011-09-12 Method for controlling extreme broken roof in roadway head

Country Status (1)

Country Link
CN (1) CN102425428A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877857A (en) * 2012-09-24 2013-01-16 山西晋城无烟煤矿业集团有限责任公司 Deep hole pre-grouting top plate reinforcement method for large-mining height working face under special geological conditions
CN103628897A (en) * 2013-12-06 2014-03-12 中国矿业大学 Method for passing through top-coal caving region of roadway
CN109798131A (en) * 2019-01-22 2019-05-24 淮南矿业(集团)有限责任公司 Help grouting strengthening method in a kind of three-soft seam large-mining-height working surface top
CN110513129A (en) * 2019-09-26 2019-11-29 黄祖军 A kind of loose thick coal layer roadway workface fore-support supporting construction and method for protecting support
CN114294018A (en) * 2021-12-30 2022-04-08 中国矿业大学 Method for rapid passing of advanced dense top protection layer grouting in loose slip region

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4193715A (en) * 1978-05-12 1980-03-18 The Eastern Company Mine roof support method and apparatus
CN1400378A (en) * 2002-08-28 2003-03-05 李庆才 Mine roadway steel reinforcement support anchoring method
CN1693670A (en) * 2005-05-19 2005-11-09 中国矿业大学 Three-anchor coupling supporting method for high stress tunnel break wall rock
CN1878930A (en) * 2003-11-13 2006-12-13 阿特拉斯科普科凿岩机股份公司 Method and device for installing a self-drilling expandable rock bolt and a self-drilling rock bolt
CN201170106Y (en) * 2008-03-28 2008-12-24 尚海峰 Laneway anchor rod support system
CN101871353A (en) * 2010-06-22 2010-10-27 宋彦波 Method for soft rock roadway grouting and full-length prestress baseboard anchor cable comprehensive support
CN102155247A (en) * 2011-03-15 2011-08-17 李刚 Pipe shed support device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4193715A (en) * 1978-05-12 1980-03-18 The Eastern Company Mine roof support method and apparatus
CN1400378A (en) * 2002-08-28 2003-03-05 李庆才 Mine roadway steel reinforcement support anchoring method
CN1878930A (en) * 2003-11-13 2006-12-13 阿特拉斯科普科凿岩机股份公司 Method and device for installing a self-drilling expandable rock bolt and a self-drilling rock bolt
CN1693670A (en) * 2005-05-19 2005-11-09 中国矿业大学 Three-anchor coupling supporting method for high stress tunnel break wall rock
CN201170106Y (en) * 2008-03-28 2008-12-24 尚海峰 Laneway anchor rod support system
CN101871353A (en) * 2010-06-22 2010-10-27 宋彦波 Method for soft rock roadway grouting and full-length prestress baseboard anchor cable comprehensive support
CN102155247A (en) * 2011-03-15 2011-08-17 李刚 Pipe shed support device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877857A (en) * 2012-09-24 2013-01-16 山西晋城无烟煤矿业集团有限责任公司 Deep hole pre-grouting top plate reinforcement method for large-mining height working face under special geological conditions
CN103628897A (en) * 2013-12-06 2014-03-12 中国矿业大学 Method for passing through top-coal caving region of roadway
CN109798131A (en) * 2019-01-22 2019-05-24 淮南矿业(集团)有限责任公司 Help grouting strengthening method in a kind of three-soft seam large-mining-height working surface top
CN109798131B (en) * 2019-01-22 2020-09-08 淮南矿业(集团)有限责任公司 Top slope grouting reinforcement method for large mining height working face of three-soft coal seam
CN110513129A (en) * 2019-09-26 2019-11-29 黄祖军 A kind of loose thick coal layer roadway workface fore-support supporting construction and method for protecting support
CN110513129B (en) * 2019-09-26 2024-04-02 黄祖军 Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face
CN114294018A (en) * 2021-12-30 2022-04-08 中国矿业大学 Method for rapid passing of advanced dense top protection layer grouting in loose slip region
CN114294018B (en) * 2021-12-30 2024-01-26 中国矿业大学 Quick grouting passing method for advanced dense top protection layer in loose sliding area

Similar Documents

Publication Publication Date Title
CN103821558B (en) Coal mine gob filling mining and gob side entry retaining filling process
CN101509395B (en) The roof caving and tunnel protecting method
CN111305876A (en) Deep roadway anchoring-splitting grouting-hydraulic fracturing pressure relief cooperative control method
CN107060758B (en) A kind of section fender, which stays, sets construction method
CN103032086B (en) Method for filling resin explosive cartridge in drilled hole of tunnel roof anchor rod
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN105134269B (en) Control method for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN107143338B (en) A kind of coal mine roadway driving and method for protecting support
CN111878080B (en) Method for equipment withdrawal and self-lane-forming of withdrawal channel of fully mechanized coal mining face of coal mine
CN102900449B (en) Support method for underground goaf roof of coal mine
CN104533482A (en) Reinforcing method for improving stability of gob-side entry driving small coal pillar
CN110344831B (en) Roof-cutting pressure-relief non-coal-pillar gob-side entry-forming entry retaining method
CN102704965B (en) One prevents violent mining influence back to collapse method for leakage
CN103899329A (en) Large-deformation broken surrounding rock roadway management method
CN115182729B (en) Inclined coal seam small coal pillar penetrating deep cutting shallow pouring gangue blocking roadway protection technology and top cutting position determination method
CN102587962A (en) Methods for arranging and supporting wall-expanded gas extraction drill sites
CN102839984A (en) Oversized-section underground supporting structure
CN102425428A (en) Method for controlling extreme broken roof in roadway head
CN104895072A (en) A pre-stressed anchor cable and a pre-stressed anchor cable one-time forming construction method
CN105909284B (en) A kind of high working face coal wall caving prevents control method
CN102155249A (en) Method for supporting tunnel roof below mined-out area
CN109630168A (en) Comprehensive extracting and caving face tunnel is arranged along floor strata and support pattern
CN104265294A (en) Coal pillar-free mining technology for blasting mining face of steeply dipping seam
CN110566238A (en) Mud rock roof small coal pillar gob-side roadway supporting structure and method thereof
CN109519221A (en) A kind of bump danger zone seat earth is broken water-filling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120425