CN102400440B - Outer template - Google Patents

Outer template Download PDF

Info

Publication number
CN102400440B
CN102400440B CN201110359322.1A CN201110359322A CN102400440B CN 102400440 B CN102400440 B CN 102400440B CN 201110359322 A CN201110359322 A CN 201110359322A CN 102400440 B CN102400440 B CN 102400440B
Authority
CN
China
Prior art keywords
steel pipe
circular arc
fastener
vertical
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110359322.1A
Other languages
Chinese (zh)
Other versions
CN102400440A (en
Inventor
郭玉鹏
王爱平
林定权
孙立海
张海霞
黄峻峻
何大洋
高鹏
徐鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN201110359322.1A priority Critical patent/CN102400440B/en
Publication of CN102400440A publication Critical patent/CN102400440A/en
Application granted granted Critical
Publication of CN102400440B publication Critical patent/CN102400440B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses an outer template, comprising cross steel pipes and vertical steel pipes, wherein the cross steel pipes and the vertical steel pipes constitute a scaffold bracket. The outer template is specially characterized in that vertical angels constituted by the cross steel pipes and the vertical steel pipes are provided with longitudinal steel pipes through fasteners, the longitudinal steel pipes are arrayed from top to bottom to form a circular shape at the same side of the scaffold bracket, and circular steel pipes are fixedly connected with the longitudinal steel pipe through fasteners along a circular shape constituted by the longitudinal steel pipes. The outer template disclosed by the invention has the beneficial effects of simple structure, easiness for manufacture, convenience for dismounting and mounting, simpleness for manufacturing, convenience for material obtaining, high operation safety, high utilization ratio, less investment of mechanical equipment, economy, applicability, and suitability for bridge construction occasions.

Description

A kind of exterior sheathing
Technical field
The present invention relates to a kind of exterior sheathing.
Background technology
At present, in (reinforcing bar) concrete structure work progresss such as railway, highway, municipal all kinds of bridge engineering, need to design template, large-scale integral template is widely used, especially for the external mold of case beam.But for (reinforcing bar) concrete structure such as bridge of cast-in-situ, the large-scale steel form manufacturing cycle is long, somewhat expensive, and single form is heavier, and dismounting is complicated, potential safety hazard is comparatively large, and has enough to meet the need inconvenience after using, and vacancy rate is high.
Summary of the invention
The present invention, in order to make up the deficiencies in the prior art, provides a kind of easy accessibility, manufactures the exterior sheathing simple, processing safety is high.
The present invention includes horizontal steel pipe and vertical steel pipe, described horizontal steel pipe and vertical steel pipe form scaffold stand, its special character is: the vertical angle place that described horizontal steel pipe and vertical steel pipe are formed is fixed with longitudinal steel pipe by fastener, described longitudinal steel pipe arranges formation arc-shaped from top to bottom in the same side of scaffold stand, and the circular arc steel pipe arc-shaped that longitudinally steel tube place is formed is fixedly connected with longitudinal steel pipe by fastener.In order to strengthen the intensity of whole exterior sheathing, what can adopt two fastener is fixedly connected with mode, and circular arc steel pipe is provided with bamboo slab rubber can accommodation contour structures widely, and structure is simple, and artificial dismounting can complete.
Described circular arc steel pipe comprises Circular Steel body, the lumps of wood and bamboo slab rubber, the inner arc surface of described Circular Steel body is fixed with the lumps of wood, the described lumps of wood is fixed with bamboo slab rubber by long steel nail.Utilize the toughness of bamboo slab rubber, by bamboo slab rubber arc curved, be fixed on the lumps of wood.Because curved surface bamboo slab rubber has certain bounce, fixing bamboo slab rubber adopts trombone steel nail etc.
Normal orientation along circular arc steel pipe in the scaffold stand that described horizontal steel pipe and vertical steel pipe are formed is provided with normal direction steel pipe, one end of described normal direction steel pipe is by fastener and circular arc fastener for connection, the other end is connected with scaffold stand, and described normal direction steel pipe is arranged evenly along the external arc of circular arc steel pipe.For strengthening the integral rigidity of exterior sheathing steel pipe skeleton, reducing elastic deformation amount, on steel pipe, adding support normal (being approximately perpendicular to the tangential direction of this point of circular arc) in length and breadth.
The beneficial effect of exterior sheathing of the present invention: structure is simple, be easy to makings, easy accessibility, manufacture simply, facility of drawing materials, processing safety are high, utilization rate is high, plant equipment less investment, economic and practical, be suitable for bridge construction occasion.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of circular arc steel pipe in Fig. 1;
Fig. 3 is the structural representation of fastener and fastener for connection;
In figure: 1, horizontal steel pipe, 2, vertical steel pipe, 3, longitudinal steel pipe, 4, circular arc steel pipe, 5, Circular Steel body, 6, the lumps of wood, 7, bamboo slab rubber, 8, steel pipe, 9, fastener, 10, normal direction steel pipe.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further illustrated:
Accompanying drawing is a kind of specific embodiment of the present invention, this embodiment comprises horizontal steel pipe 1 and vertical steel pipe 2, described horizontal steel pipe 1 and vertical steel pipe 2 form scaffold stand, the vertical angle place that described horizontal steel pipe 1 and vertical steel pipe 2 are formed is fixed with longitudinal steel pipe 3 by fastener, described longitudinal steel pipe 3 arranges formation arc-shaped from top to bottom in the same side of scaffold stand, and circular arc steel pipe 4 arc-shaped that longitudinally steel pipe 3 is formed is fixedly connected with longitudinal steel pipe 3 by fastener.Described circular arc steel pipe 4 comprises Circular Steel body 5, the lumps of wood 6 and bamboo slab rubber 7, and the inner arc surface of described Circular Steel body 5 is fixed with the lumps of wood 6, and the described lumps of wood 6 is fixed with bamboo slab rubber 7 by long steel nail.Described horizontal steel pipe 1 and vertical steel pipe 2 form in scaffold stand and are provided with normal direction steel pipe 10 along the normal orientation of circular arc steel pipe 4, one end of described normal direction steel pipe 10 is connected with circular arc steel pipe 4 by fastener 9, the other end is connected with scaffold stand, and described normal direction steel pipe 10 is arranged evenly along the external arc of circular arc steel pipe 4.
The present invention in use, goes out the parameter such as length, radian of circular arc steel pipe 4 according to project organization Size calculation, prefabricated moulding bed outside the venue, and it is prefabricated to carry out arc-shaped steel tube.Suppose that design arc radius is r, the lumps of wood 6 thickness is a, and bamboo slab rubber 7 thickness is b, and the diameter of circular arc steel pipe 4 is d, then radius R=the r+a+b+d/2 of prefabricated circular arc steel pipe 4, must guard against and structure design arc radius is thought by mistake be prefabricated circular arc steel pipe radius.
After scaffold support has been set up, the elevation of longitudinal steel pipe 3 is first gone out according to project organization Size calculation, accurately made the horizontal level of longitudinal steel pipe 3 by measurement of the level, adopt fastener 9 longitudinal steel pipe 3 to be connected to securely scaffolding steel pipe and comprise on horizontal steel pipe 1 and vertical steel pipe 2; By total powerstation, adopt coordinate method accurately to make the position of prefabricated curved steel tube, and circular arc steel pipe 4 is fixed on longitudinal steel pipe 3 by fastener 9.For strengthening the integral rigidity of exterior sheathing, reducing elastic deformation amount, on steel pipe, adding the tangential direction that normal direction steel pipe 10(is approximately perpendicular to this point of circular arc in length and breadth).Simultaneously in order to strengthen the load-bearing of exterior sheathing skeleton, be connected each other by fastener 9 between steel pipe with vertical steel pipe 2 in length and breadth, in order to ensure that safety is high, suggestion adopts two clamp styles (namely to add a fastener in the below of connection fastener, prop up connection fastener), to avoid slip phenomenon.In addition, fully take into account the line style requirement of the fish-bellied type trough girder of beam body, the circular arc steel pipe 4 that exterior sheathing is provided with is provided with bamboo slab rubber 7, utilize the toughness of bamboo slab rubber 7 by bamboo slab rubber arc curved, be fixed on the lumps of wood, such exterior sheathing just can adapt to changeable contour structures, of many uses.
In addition use exterior sheathing time should be noted that several in:
(1) form cage longitudinal steel pipe 3, horizontal steel pipe 1 and the lumps of wood 6 will lay control point according to construction requirement in a pre-installation outside, and exterior sheathing processing and installation must be surveyed the control point of establishing according to scene and be constructed.Before laying exterior sheathing, absolute altitude etc. is checked.
(2) strict control section size and ceiling height, thickness when installing exterior sheathing, to take, the effective measures such as top controls the dislocation of internal mold both sides, distortion, and construction error controls within the scope of allowing in specification.The error that the factors such as stent secondary distortion cause is considered in high process control.Note built-in fitting and hole to be provided.
(3) must be firmly firm when model sheetinstallat is reinforced, seam is tight, must not spillage; Fastening to pull bar.Adopt two-sided tape to close between template, firm during in-site installation, plate stitches closely connected smooth.
(4) prefabricated curved steel tube 4 must be integral prefabricated, and carefully check whether the prefabricated circular arc steel pipe of marching into the arena has crackle or breakage.
(5) as connected with fastener 9, fastener 9 must be connected firmly, and conscientiously should check whether fastener 9 has breakage after precompressed terminates, if any the timely reinforcement of damage.
(6) bamboo slab rubber 7 is processed and is adopted (high rotating speed) alloy saw blade, notes preventing burr during sawing; Shaping template will be avoided exposing to the sun and rain as far as possible, and makes regular check on.

Claims (1)

1. the construction method for the exterior sheathing of case beam, it is characterized in that: described exterior sheathing comprises horizontal steel pipe (1) and vertical steel pipe (2), described horizontal steel pipe (1) and vertical steel pipe (2) form scaffold stand, be fixedly connected with by fastener (9) between horizontal steel pipe (1) and vertical steel pipe (2), the vertical angle place that described horizontal steel pipe (1) and vertical steel pipe (2) are formed is fixed with longitudinal steel pipe (3) by fastener (9), described longitudinal steel pipe (3) arranges formation arc-shaped from top to bottom in the same side of scaffold stand, circular arc steel pipe (4) arc-shaped that longitudinally steel pipe (3) is formed is fixedly connected with longitudinal steel pipe (3) by fastener (9), described circular arc steel pipe (4) comprises Circular Steel body (5), the lumps of wood (6) and bamboo slab rubber (7), the inner arc surface of described Circular Steel body (5) is fixed with the lumps of wood (6), the described lumps of wood (6) is fixed with bamboo slab rubber (7) by long steel nail, the normal orientation that described horizontal steel pipe (1) and vertical steel pipe (2) are formed along circular arc steel pipe (4) in scaffold stand is provided with normal direction steel pipe (10), one end of described normal direction steel pipe (10) is connected with circular arc steel pipe (4) by fastener (9), the other end is connected with scaffold stand, and described normal direction steel pipe (10) is arranged evenly along the external arc of circular arc steel pipe (4), longitudinal steel pipe (3), the position be connected by fastener between horizontal steel pipe (1) with vertical steel pipe (2) all adopt two fastener to connect, its Specific construction step is: the length, the radian that 1) first go out described circular arc steel pipe (4) according to project organization Size calculation, and prefabricated moulding bed carry out the integral prefabricated of circular arc steel pipe (4) outside the venue, the radius of prefabricated circular arc steel pipe is: r+a+b+d/2, wherein, r is design arc radius, a is lumps of wood thickness, and b is the thickness of bamboo slab rubber, and d is the diameter of circular arc steel pipe (4), 2) after scaffold stand has been set up, the horizontal level of longitudinal steel pipe (3) is determined, the vertical angle place utilizing fastener (9) longitudinal steel pipe (3) to be fixed on the corresponding horizontal steel pipe (1) of scaffold stand and vertical steel pipe (2) to form by measurement of the level, 3) by total powerstation, adopt coordinate method to make the position of circular arc steel pipe (4), and circular arc steel pipe (4) is fixed on described longitudinal steel pipe (3) by fastener (9), 4) normal orientation along circular arc steel pipe (4) is fixedly installed described normal direction steel pipe (10).
CN201110359322.1A 2011-11-14 2011-11-14 Outer template Expired - Fee Related CN102400440B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110359322.1A CN102400440B (en) 2011-11-14 2011-11-14 Outer template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110359322.1A CN102400440B (en) 2011-11-14 2011-11-14 Outer template

Publications (2)

Publication Number Publication Date
CN102400440A CN102400440A (en) 2012-04-04
CN102400440B true CN102400440B (en) 2015-03-18

Family

ID=45883051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110359322.1A Expired - Fee Related CN102400440B (en) 2011-11-14 2011-11-14 Outer template

Country Status (1)

Country Link
CN (1) CN102400440B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421238B (en) * 2015-10-28 2018-02-09 上海公路桥梁(集团)有限公司 A kind of preparation method of Urban Bridge tool palette
CN106180546B (en) * 2016-07-15 2018-04-03 烟台国冶冶金水冷设备有限公司 A kind of mold and its manufacture method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2533734A1 (en) * 1975-07-28 1977-02-10 Kunz Alfred & Co Concrete bridge construction using formwork support - has frame-like supports with transverse beams and intermediary hydraulic presses
CN101492908A (en) * 2009-02-17 2009-07-29 中冶实久建设有限公司 Construction method for improving flatness and smoothness of bridge external appearance of steel reinforced concrete
CN101666069A (en) * 2009-09-09 2010-03-10 中建三局建设工程股份有限公司 Construction technology for stretching notch by cast-in-situ prestress box beam
CN201437580U (en) * 2009-04-14 2010-04-14 上海市第一建筑有限公司 Elevated box girder formwork supporting system
CN202323724U (en) * 2011-11-14 2012-07-11 中铁十局集团有限公司 Outer template

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201254832Y (en) * 2008-09-10 2009-06-10 中国建筑第四工程局有限公司 Self-supporting template apparatus for conversion layer structure
CN201428240Y (en) * 2009-04-09 2010-03-24 温州建设集团公司 Template with arc steps
CN101736701B (en) * 2009-12-15 2011-08-03 中交路桥华北工程有限公司 Bridge steel and concrete mixing section constructing method
CN102121233A (en) * 2011-04-20 2011-07-13 天津第三市政公路工程有限公司 Construction method of bridge cast-in-place box beam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2533734A1 (en) * 1975-07-28 1977-02-10 Kunz Alfred & Co Concrete bridge construction using formwork support - has frame-like supports with transverse beams and intermediary hydraulic presses
CN101492908A (en) * 2009-02-17 2009-07-29 中冶实久建设有限公司 Construction method for improving flatness and smoothness of bridge external appearance of steel reinforced concrete
CN201437580U (en) * 2009-04-14 2010-04-14 上海市第一建筑有限公司 Elevated box girder formwork supporting system
CN101666069A (en) * 2009-09-09 2010-03-10 中建三局建设工程股份有限公司 Construction technology for stretching notch by cast-in-situ prestress box beam
CN202323724U (en) * 2011-11-14 2012-07-11 中铁十局集团有限公司 Outer template

Also Published As

Publication number Publication date
CN102400440A (en) 2012-04-04

Similar Documents

Publication Publication Date Title
CN108914965A (en) The continuous construction method of aluminum alloy mould plate for pipe gallery
CN103498523A (en) Floor system
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN201738583U (en) Combined supporting and reinforcing system for inclined shear wall template
CN204738236U (en) Pier vertical reinforcement installation mould
CN103216131A (en) Reserved hole pore-forming construction method for concrete structure
CN103255866B (en) Roof circular arc-shaped dome structure and manufacturing method
CN102400440B (en) Outer template
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN202787330U (en) Post-cast strip template
CN202323724U (en) Outer template
CN211037598U (en) Roofing photovoltaic support
CN103882840B (en) A kind of surge shaft Cast-in-place concrete assembling falsework and mounting method thereof
CN205742988U (en) The explosion-proof membrane module of template one word piece
CN204282528U (en) A kind of prefabricated balcony structure
CN203855988U (en) Post-cast strip steel pipe supporting structure
CN208266919U (en) Underground pipe gallery built-in fitting tooling
CN203022018U (en) Plant column foundation in reclamation areas
CN203346950U (en) Hidden laying structure for temporary water supply pipes of high-rise building
CN206128363U (en) Assembled shear force wall
CN209555972U (en) A kind of side's arch piping lane erection support and piping lane system
CN203755167U (en) Assistant mounting device of V-shaped steel pipe frame of tower bridge
CN201826535U (en) Connecting fastener
CN203867182U (en) Steady tubular well shaftway blocking construction formwork
CN204645646U (en) High-layer shear force wall external mold positioning auxiliaring tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150318

Termination date: 20151114

EXPY Termination of patent right or utility model