CN101492908A - Construction method for improving flatness and smoothness of bridge external appearance of steel reinforced concrete - Google Patents

Construction method for improving flatness and smoothness of bridge external appearance of steel reinforced concrete Download PDF

Info

Publication number
CN101492908A
CN101492908A CNA2009100607687A CN200910060768A CN101492908A CN 101492908 A CN101492908 A CN 101492908A CN A2009100607687 A CNA2009100607687 A CN A2009100607687A CN 200910060768 A CN200910060768 A CN 200910060768A CN 101492908 A CN101492908 A CN 101492908A
Authority
CN
China
Prior art keywords
bridge
glass
reinforced concrete
construction method
glass fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100607687A
Other languages
Chinese (zh)
Inventor
范华猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Shijiu Construction Co Ltd
Original Assignee
MCC Shijiu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shijiu Construction Co Ltd filed Critical MCC Shijiu Construction Co Ltd
Priority to CNA2009100607687A priority Critical patent/CN101492908A/en
Publication of CN101492908A publication Critical patent/CN101492908A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a construction method capable of improving appearance flatness and glossiness of a reinforced concrete bridge. The method comprises the following steps: treating a foundation, chocking a sleeper, setting up an upper box girder structural bearing scaffold, arranging combined steel templates at the bottom and the lateral part of the constructed bridge, laying a layer of glass fiber board on and inside the steel templates respectively, anchoring, arranging an upper box girder structural steel bar and a corrugated pipe on and inside the glass fiber board respectively, arranging an internal mold, casting concrete and maintaining, and dismounting the combined steel templates, the glass fiber boards and the upper box girder structural bearing scaffold. The appearance flatness and the glossiness of the reinforced concrete bridge constructed by the method are changed greatly compared with the prior construction method, and the effect of mirror concrete is generated. The construction method is adopted for constructing Hubei section of Beijing-Zhuhai expressway in which 10 bridges are fully intercommunicated and Wuhan outer ring in which 4 bridges are intercommunicated, obtains excellent effects, and wins the praises from owners and supervisors.

Description

Improve the job practices of Reinforced Concrete Bridge flat appearance degree and fineness
Technical field
The present invention relates to a kind of job practices that can improve Reinforced Concrete Bridge flat appearance degree and fineness.
Background technology
Reinforced concrete construction technology has been ripe construction technology in China, for many years, how the science and technology constructor improves and has spent great energy and financial resources aspect the Surface Quality of Concrete, fast development along with Modern High-Speed highway, railway, Urban Bridge steel concrete, when improving inherent quality, more and more overcritical Surface Quality of Concrete, promptly the appearance template engine request to concrete structure is more and more higher.
Conventional and traditional method of appearance template engineering construction has three kinds: a wooden form method, a veneer method and a combined steel formwork method.
Prop up the shortcoming of wooden form method: because of it is to use timber as template and support system basically, wasted a large amount of timber resources of China, greatly destroyed ecological environment, and presentation quality has been poor.
The shortcoming of veneer method: use Strength of Plywood poor, utilize number of times few, support system will be with a large amount of timber, and Surface Quality of Concrete is poor.
Propping up the combined steel formwork method is present general mold method, but template size is less, and slit, assembling back is many, and steel form is as easy as rolling off a log simultaneously gets rusty, influenced greatly by the environment rainwater, when using, eliminate rust at every turn, brush oil and stripper plate, working procedure is many, also causes Surface Quality of Concrete undesirable.
Therefore, need seek to improve the method for Surface Quality of Concrete.
Summary of the invention
The objective of the invention is at above-mentioned present situation, aim to provide a kind of job practices of improving Reinforced Concrete Bridge flat appearance degree and fineness that can make the Reinforced Concrete Bridge outward appearance produce the effect of mirror surface concrete.
The implementation of the object of the invention is, improves the job practices of Reinforced Concrete Bridge flat appearance degree and fineness, adopts following job step:
1) carry out ground earlier and handle, bolster wood, the upper tank girder construction load-bearing scaffold of the building operations scaffold building bridge that utilization is conventional,
2) utilize conventional construction techniques to install combined steel formwork at the bottom and the sidepiece of institute's bridge construction beam,
3) on steel form and in place mat layer of glass fiber dimension plate, adopt and draw the holdfast anchoring, cleaning totally,
4) on the glass fiberboard and in installation top box-beam structure reinforcing bar, glass stria tube, install internal mold, water is rinsed the impurity on the glass fiberboard well,
5) fluid concrete and carry out maintenance outside upper tank girder construction reinforcing bar, glass stria tube, internal mold,
6) remove combined steel formwork, glass fiberboard and upper tank girder construction load-bearing scaffold.
Adopt the Reinforced Concrete Bridge appearance flatness and the fineness of the present invention's construction to obtain great change, produced the effect of mirror surface concrete than traditional job practices.
Built Jingzhu express way highway Hubei section with the present invention: 10 bridge blocks of all one's effort intercommunication; Wuhan outer shroud: 4 bridge blocks of leopard Creek intercommunication.Obtain fabulous effect, obtained the favorable comment of owner and management.
Description of drawings
Accompanying drawing is the present invention's schematic diagram of constructing
The specific embodiment
With reference to accompanying drawing, the present invention adopts following job step:
1) carry out ground 1 earlier and handle, bolster wood 2, the upper tank girder construction load-bearing scaffold 3 of the building operations scaffold building bridge that utilization is conventional, the building operations scaffolding steel pipe (¢ 48*3.5) that load-bearing scaffold 3 usefulness are conventional,
2) utilize conventional construction techniques, according to the needs of the outward appearance bed die of bridge superstructure and side form at installing combined steel formwork 4,
3) on steel form 4 and in place mat layer of glass fiber dimension plate 5, adopt and draw the holdfast anchoring, cleaning totally,
4) on glass fiberboard 5 and in installation top box-beam structure reinforcing bar, glass stria tube, install internal mold 6, water is rinsed the impurity on the glass fiberboard well,
5) fluid concrete 7 and carry out maintenance outside upper tank girder construction reinforcing bar, glass stria tube, internal mold,
6) remove combined steel formwork 4, glass fiberboard 5 and upper tank girder construction load-bearing scaffold 3, the Reinforced Concrete Bridge outward appearance with mirror surface concrete effect presents.
The glass fiberboard that adopts because of the present invention is to be soaked with the hot pressing of tung oil resin drying by the wooden oar paper of bleaching to form, have very high insulating properties, high temperature resistant, the punching performance is good, can repeatedly recycle, so can save production cost.

Claims (1)

1, improve the job practices of Reinforced Concrete Bridge flat appearance degree and fineness, it is characterized in that adopting following job step:
1) carry out ground earlier and handle, bolster wood, the upper tank girder construction load-bearing scaffold of the building operations scaffold building bridge that utilization is conventional,
2) utilize conventional construction techniques to install combined steel formwork at the bottom and the sidepiece of institute's bridge construction beam,
3) on steel form and in place mat layer of glass fiber dimension plate, adopt and draw the holdfast anchoring, cleaning totally,
4) on the glass fiberboard and in installation top box-beam structure reinforcing bar, glass stria tube, install internal mold, water is rinsed the impurity on the glass fiberboard well,
5) fluid concrete and carry out maintenance outside upper tank girder construction reinforcing bar, glass stria tube, internal mold,
6) remove combined steel formwork, glass fiberboard and upper tank girder construction load-bearing scaffold.
CNA2009100607687A 2009-02-17 2009-02-17 Construction method for improving flatness and smoothness of bridge external appearance of steel reinforced concrete Pending CN101492908A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100607687A CN101492908A (en) 2009-02-17 2009-02-17 Construction method for improving flatness and smoothness of bridge external appearance of steel reinforced concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100607687A CN101492908A (en) 2009-02-17 2009-02-17 Construction method for improving flatness and smoothness of bridge external appearance of steel reinforced concrete

Publications (1)

Publication Number Publication Date
CN101492908A true CN101492908A (en) 2009-07-29

Family

ID=40923693

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100607687A Pending CN101492908A (en) 2009-02-17 2009-02-17 Construction method for improving flatness and smoothness of bridge external appearance of steel reinforced concrete

Country Status (1)

Country Link
CN (1) CN101492908A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400440A (en) * 2011-11-14 2012-04-04 中铁十局集团有限公司 Outer template
CN102409619A (en) * 2011-11-11 2012-04-11 浙江大学 Method for improving cross integrity of bridge deck structure of multi-girder type combined small box girder bridge
CN102733297A (en) * 2012-07-13 2012-10-17 福州大学 Steel pipe concrete continuous girder bridge with no need for welding support joints and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409619A (en) * 2011-11-11 2012-04-11 浙江大学 Method for improving cross integrity of bridge deck structure of multi-girder type combined small box girder bridge
CN102409619B (en) * 2011-11-11 2013-09-04 浙江大学 Method for improving cross integrity of bridge deck structure of multi-girder type combined small box girder bridge
CN102400440A (en) * 2011-11-14 2012-04-04 中铁十局集团有限公司 Outer template
CN102400440B (en) * 2011-11-14 2015-03-18 中铁十局集团有限公司 Outer template
CN102733297A (en) * 2012-07-13 2012-10-17 福州大学 Steel pipe concrete continuous girder bridge with no need for welding support joints and construction method thereof
CN102733297B (en) * 2012-07-13 2015-10-14 福州大学 A kind of concrete filled steel tube continuous girder bridge exempts from welding support node and construction method thereof

Similar Documents

Publication Publication Date Title
CN104480922B (en) Space truss formwork system and construction method thereof
CN202090605U (en) Tool type floor evenness and floor slab negative reinforcement protecting layer control device
CN102146731A (en) Supporting structure for floor formwork of steel structure building and construction method
CN102493647B (en) Construction method for high-rise concrete structure
CN101769072B (en) Method for making composite beam with composite beam die
CN101492908A (en) Construction method for improving flatness and smoothness of bridge external appearance of steel reinforced concrete
CN204510650U (en) A kind of precast splice type stringer type stairway
CN206256363U (en) A kind of two-fold shape combined beam structure
CN101298796A (en) Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof
CN204876055U (en) Building foundation
CN203782577U (en) Template assembly for anti-collision wall settlement joint construction
CN201620598U (en) Combined beam mould
CN103437494A (en) Combined beam of engineered wood, profiled steel sheet and light-weight aggregate concrete and production and installation method of combined beam
CN203238950U (en) Concrete beam formwork supported by trusses suspended in air
CN201279830Y (en) Low-height prefabricated case beam internal mold
CN203947493U (en) Assembling type device for detecting manhole
CN204212407U (en) A kind of plug-in type extensible canopy
CN102127965B (en) Composite precast stressed template
CN201627361U (en) FRP glass fiber reinforced plastic-wood composite formwork system
CN209099602U (en) A kind of removable steel bar truss floor template in UHPC ultra-high performance concrete bottom
CN104612394B (en) A kind of multi-purpose type Combined formwork
CN107795121B (en) Main structure increases a layer aluminum alloy mould plate jack-up construction method
CN208777519U (en) A kind of high-strength profiled sheet-fiber reinforcement regeneration concrete compoboard
CN203640154U (en) Engineered wood-pressed steel plate-lightweight aggregate concrete composite beam
CN202012196U (en) U-shaped reinforcing device for side beam mold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090729