CN208266919U - Underground pipe gallery built-in fitting tooling - Google Patents
Underground pipe gallery built-in fitting tooling Download PDFInfo
- Publication number
- CN208266919U CN208266919U CN201820824549.6U CN201820824549U CN208266919U CN 208266919 U CN208266919 U CN 208266919U CN 201820824549 U CN201820824549 U CN 201820824549U CN 208266919 U CN208266919 U CN 208266919U
- Authority
- CN
- China
- Prior art keywords
- built
- fitting
- band steel
- template
- standing screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a kind of underground pipe gallery built-in fitting toolings, this tooling includes template, band steel, standing screw, fastening buckle and anchor fluke, band steel is bonded with template, standing screw passes through template and is vertical at band steel both ends, fastening buckle is twisted in standing screw with formboard fastening and band steel, and anchor fluke interval vertical is set to band steel side.This tooling overcomes the defect of traditional built-in fitting construction, efficiently and effectively realizes built-in fitting positioning, installation and molding, it is ensured that built-in fitting position precision reduces construction cost, shortens the construction period, and improves built-in fitting Forming Quality.
Description
Technical field
The utility model relates to a kind of underground pipe gallery built-in fitting toolings.
Background technique
Underground pipe gallery as the term suggests i.e. various pipelines corridor, generally refer in particular to underground build tunnel when, by electric power,
Communication, the pipeline corridor that the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one realizes various pipelines with intensive side
Formula laying, makes Underground Space Resource be effectively used.To realize laying that various utilities pipelines are integrated in one, inevitably
All piping lanes, which will spatially form stratification, all must be provided with bracket, and the overwhelming majority is that setting built-in fitting is used in work progress
In the fixation of bracket.It fixes in order to facilitate the installation of built-in fitting, usually built-in fitting is fixed on framework of steel reinforcement, the disadvantage is that
In concreting process, framework of steel reinforcement is caused slightly to be displaced, causes embedded part part molding effect poor;Or by built-in fitting iron nail
It is fixed on plank sheathing, the disadvantage is that location difficulty, consumption of materials is big, it is not easy to demoulding.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of underground pipe gallery built-in fitting tooling, this toolings gram
The defect for taking traditional built-in fitting construction, efficiently and effectively realizes built-in fitting positioning, installation and molding, it is ensured that built-in fitting position essence
Degree reduces construction cost, shortens the construction period, and improves built-in fitting Forming Quality.
In order to solve the above technical problems, the utility model underground pipe gallery built-in fitting tooling includes template, band steel, fixation
Screw rod, fastening buckle and anchor fluke, the band steel fit in the template back surface, and the standing screw passes through the template and vertically sets
In the band steel both ends, the fastening buckle center be equipped with screw hole and twist in the standing screw with fasten the template with it is flat
Steel, the anchor fluke interval vertical are set to the band steel side.
Further, the anchor fluke free end is equipped with aduncate crotch.
Since the utility model underground pipe gallery built-in fitting tooling uses above-mentioned technical proposal, i.e. this tooling includes mould
Plate, band steel, standing screw, fastening buckle and anchor fluke, band steel are bonded with template, and standing screw passes through template and is vertical at band steel two
End, fastening buckle are twisted in standing screw with formboard fastening and band steel, and anchor fluke interval vertical is set to band steel side.This tooling overcomes biography
The defect that built-in fitting of uniting is constructed efficiently and effectively realizes built-in fitting positioning, installation and molding, it is ensured that built-in fitting position precision drops
Low construction cost, shortens the construction period, and improves built-in fitting Forming Quality.
Detailed description of the invention
The utility model is described in further detail with embodiment with reference to the accompanying drawing:
Fig. 1 is the utility model underground pipe gallery built-in fitting tool structure schematic diagram;
Fig. 2 is the connection schematic diagram of band steel, anchor fluke, standing screw and fastening buckle in this tooling.
Specific embodiment
Embodiment is as depicted in figs. 1 and 2, the utility model underground pipe gallery built-in fitting tooling include template 1, band steel 2,
Standing screw 3, fastening buckle 4 and anchor fluke 5, the band steel 2 fit in 1 back side of template, and the standing screw 3 passes through described
Template 1 is vertical at 2 both ends of band steel, and 4 center of fastening buckle is equipped with screw hole and twists in the standing screw 3 with tight
Gu the template 1 and band steel 2,5 interval vertical of anchor fluke are set to 2 side of band steel.
Preferably, 5 free end of anchor fluke is equipped with aduncate crotch 51.Set crotch is convenient for and piping lane reinforcing bar
Connection, so that built-in fitting reliable arrangement is in piping lane side wall wall.
The construction method of above-mentioned underground pipe gallery built-in fitting tooling includes the following steps:
Step 1: determining the type, size and position and processing and fabricating of piping lane built-in fitting according to construction drawing, template is carried out
Preassembling determines template in the layout position of piping lane side wall;
Step 2: finished and after acceptance(check) in the binding of piping lane reinforcing bar, according to template piping lane side wall layout position with
And built-in fitting tooling size carries out aperture to template, the standing screw for connecting band steel penetrates institute's hole-opening, and fastening buckle is screwed into solid
Determining screw rod makes template and band steel constitute entirety;
Step 3: checking that template axis position and verticality meet construction drawing requirement, by template in piping lane side wall
Anchor fluke is connected piping lane reinforcing bar by layout position, realizes the fixation of built-in fitting tooling;
Step 4: concreting, the inner cavity casting concrete between template and piping lane side wall form piping lane side wall wall
Body;
Step 5: demoulding screws off fastening buckle after the structural strength of concrete reaches requirement, lower template is unloaded, using sand
Turbine cuts off standing screw from piping lane side wall wall root, completes the construction of built-in fitting tooling.
This tooling realizes positioning molding of installation of embedded parts, and technique is asked caused by reducing the subsequent position deviation because of built-in fitting
Topic, can effectively save cost, shorten the construction period, and improve built-in fitting Forming Quality, prevent to return caused by because of built-in fitting position deviation
Work, and built-in fitting molding effect is beautiful, improves engineering image on the whole, fabulous working face is provided for subsequent handling.
Claims (2)
1. a kind of underground pipe gallery built-in fitting tooling, it is characterised in that: including template, band steel, standing screw, fastening buckle and
Anchor fluke, the band steel fit in the template back surface, and the standing screw passes through the template and is vertical at the band steel both ends,
The fastening buckle center is equipped with screw hole and twists in the standing screw to fasten the template and band steel, the anchor fluke interval
It is vertical at the band steel side.
2. underground pipe gallery built-in fitting tooling according to claim 1, it is characterised in that: the anchor fluke free end is equipped with
Aduncate crotch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820824549.6U CN208266919U (en) | 2018-05-30 | 2018-05-30 | Underground pipe gallery built-in fitting tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820824549.6U CN208266919U (en) | 2018-05-30 | 2018-05-30 | Underground pipe gallery built-in fitting tooling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208266919U true CN208266919U (en) | 2018-12-21 |
Family
ID=64685104
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820824549.6U Expired - Fee Related CN208266919U (en) | 2018-05-30 | 2018-05-30 | Underground pipe gallery built-in fitting tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208266919U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532632A (en) * | 2018-05-30 | 2018-09-14 | 上海宝冶集团有限公司 | Underground pipe gallery built-in fitting tooling and construction method |
-
2018
- 2018-05-30 CN CN201820824549.6U patent/CN208266919U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532632A (en) * | 2018-05-30 | 2018-09-14 | 上海宝冶集团有限公司 | Underground pipe gallery built-in fitting tooling and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103216044B (en) | The cement grouting steel bar connecting structure of precast unit | |
CN103174166B (en) | A kind of recreation facility built-in fitting of complete integral installation and mounting method thereof | |
CN204826426U (en) | Grout sleeve for steel bar connection | |
CN105064619A (en) | Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method | |
CN104963461A (en) | Connection method of steel bars between prefabricated parts by adopting steel fiber mortar grouting sleeve | |
CN207044389U (en) | A kind of prefabricated post reserves anchor bar positioner | |
CN105064625A (en) | Grout sleeve for reinforcement connection and reinforcement connecting method | |
CN204826423U (en) | Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member | |
CN204826429U (en) | Cast member reinforcing bar grout connecting piece | |
CN103670452A (en) | Installation structure and method for accurately positioning tunnel arch wall lining buried type water-stop belt | |
CN105019606A (en) | Precast concrete unit steel bar grouting connecting piece and connecting method | |
CN208266919U (en) | Underground pipe gallery built-in fitting tooling | |
CN207240471U (en) | A kind of wallboard hanging piece device detachably reused | |
CN108532632A (en) | Underground pipe gallery built-in fitting tooling and construction method | |
CN207549035U (en) | A kind of precast beam molding die | |
CN210888078U (en) | Embedded box for hyperboloid structural veneer and hyperboloid veneer construction structure | |
CN204252322U (en) | Carry the precast concrete wall reinforcing bar pin joint connecting elements of template | |
CN110238963A (en) | Double-tube type steel bar connecting structure and its construction method between precast concrete | |
CN206503159U (en) | A kind of effective typified form for reducing piping lane haunch area concrete formation bubble | |
CN103882840B (en) | A kind of surge shaft Cast-in-place concrete assembling falsework and mounting method thereof | |
CN201671339U (en) | Fixing device for wall bodies and beam column templates of buildings | |
CN205171839U (en) | Reinforcing bar grout connecting sleeve | |
CN214658767U (en) | Bamboo tube fair-faced concrete template | |
CN210500792U (en) | Double-tube type steel bar connecting structure between precast concrete components | |
CN209585295U (en) | A kind of tower crane attached wall built-in fitting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181221 Termination date: 20210530 |