CN102392460A - 一种地下室外部防水结构及其施工方法 - Google Patents
一种地下室外部防水结构及其施工方法 Download PDFInfo
- Publication number
- CN102392460A CN102392460A CN2011103030217A CN201110303021A CN102392460A CN 102392460 A CN102392460 A CN 102392460A CN 2011103030217 A CN2011103030217 A CN 2011103030217A CN 201110303021 A CN201110303021 A CN 201110303021A CN 102392460 A CN102392460 A CN 102392460A
- Authority
- CN
- China
- Prior art keywords
- basement
- grouting pipe
- backfill
- slip casting
- waterproof construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明涉及一种地下室外部防水结构及其施工方法,所述的地下室外部防水结构,包括地下室防水墙和基坑支护,其特征是:在地下室防水墙与基坑支护之间设有回填料,在所述的回填料中预设有第一注浆管;通过所述第一注浆管注入水泥浆或水泥混凝土砂浆与回填料混合、形成注浆结构填料层;所述注浆结构填料层位于在地下室防水墙与基坑支护之间,形成密实防水结构。本发明能够提高填料抗渗性能,降低地下室侧壁承担的水压,可以有效提高地下室的防水效果。
Description
技术领域
本发明涉及一种地下室外部防水结构及其施工方法,属于建筑防水技术领域。
背景技术
地下室渗水漏水是目前的工程质量通病,南方地区鲜有完全未出现渗漏的工程项目。目前,地下室防水层次主要由刚性防水和柔性防水层组成。由于混凝土刚性防水层难以避免会产生一定的微裂缝,而柔性防水层由于搭接不牢及破损等原因也事实上无法形成真正的围蔽体系。当这些微裂缝在水压作用下形成贯通渗水通道时,地下室便会发生渗漏。经相关研究,地下水实际压力并非等于自由水压,而和所处土层的渗透性密切相关。对于粉土、砂土、碎石土和节理裂隙发育的岩石等,水压基本等于自由水压。而对于节理裂隙不发育的岩石、粘土等低渗透土层,水压仅为自由水压的一半左右。地下室侧壁与基坑支护之间,一般有2米左右的空间需要地下室施工完后回填。但现有技术一般采用建筑垃圾或沙土等回填,而这些建筑垃圾或沙土均属于高渗透材料,因此经常发生地下室渗水。
综上所述,需要采取措施降低地下室外填料的渗透性,在一定程度上降低地下室侧壁承受的水压,提高地下室的防水性能。
发明内容
本发明的第一个目的,是为了解决现有技术中的地下室外填料存在抗渗性能差的缺点,提供一种地下室外部防水结构。
本发明的第二个目的,是为了提供一种地下室外部防水结构的施工方法。
本发明的第一个目的可以通过采取如下技术方案达到:
一种地下室外部防水结构,包括地下室防水墙和基坑支护,其特征是:在地下室防水墙与基坑支护之间设有回填料,在所述的回填料中预设有第一注浆管;通过所述第一注浆管注入水泥浆或水泥混凝土砂浆与回填料混合、形成注浆结构填料层;所述注浆结构填料层位于在地下室防水墙与基坑支护之间,形成密实防水结构。
本发明第一个目的还可以通过采取如下技术方案达到:
本发明的一种实施方案是:在地下室的底板下方设有预填料,在预填料中预设有第二注浆管,该第二注浆管与前述第一注浆管连通;通过第二注浆管注入水泥浆或水泥混凝土砂浆与预填料混合、形成底部注浆结构填料层;底部注浆结构填料层在地下室的底板下方,形成密实防水结构。
本发明的一种实施方案是:所述第一注浆管为专用的注浆管或自制的花管。
本发明的第二个目的可以通过采取如下技术方案达到:
一种地下室外部防水结构的施工方法,其特征在于按以下步骤进行:
1)在地下室防水墙和底板施工完毕后,在地下室防墙与基坑支护之间预置第一注浆管;
2)预置第一注浆管后,进行回填料回填,所述回填料需逐层回填逐层压实;
3)当填料回填至设计标高后,第一注浆管进行静压注浆,通过第一注浆管静压注入注入水泥浆或水泥混凝土砂浆与回填料混合形成注浆结构填料层。
本发明的第二个目的还可以通过采取如下技术方案达到:
本发明的一种实施方案是:在步骤1)中,在地下室的底板下方设有回填料,在该回填料中预设有第二注浆管,所述第二注浆管与前述第一注浆管连通,通过第二注浆管静压注入注入水泥浆或水泥混凝土砂浆与回填料混合形成底部注浆结构填料层。
本发明的一种实施方案是:在步骤2)中,在进行分层回填料回填时,每回填一层后注浆一次、即进行逐层注浆,分多次进行,直至回填至设计标高。
本发明的一种实施方案是:所述的第一注浆管和第二注浆管为专用的注浆管或自制的花管。
本发明的有益效果:
本发明通过第一注浆管注入水泥浆或水泥混凝土砂浆与回填料混合形成注浆结构填料层;在地下室防水墙与基坑支护之间形成密实防水结构;通过第二注浆管注入水泥浆或水泥混凝土砂浆与预填料混合,形成底部注浆结构填料层;在地下室的底板下方形成密实防水结构;相当于在地下室防水墙与基坑支护之间以及在地下室的底板下方形成节理裂隙不发育的岩石、粘土等低渗透土层,因此,能够降低地下室侧壁承受的水压,提高了地下室的抗渗性能,以及改善了底板抗渗透性能,具有优良的防水效果。
附图说明
图1为本发明具体实施例1所述的地下室外部防水结构采用一次回填到位注浆的结构示意图。
图2为本发明具体实施例2所述的地下室外部防水结构采用底板侧壁共同注浆的结构示意图。
图3为本发明具体实施例3所述的地下室外部防水结构采用分次回填分次注浆的结构示意图。
具体实施方式
具体实施例:
参照图1,本实施例所述的一种地下室外部防水结构,包括地下室防水墙1和基坑支护2,在地下室防水墙1与基坑支护2之间设有回填料,在所述的回填料中预设有第一注浆管4;通过所述第一注浆管4注入水泥浆或水泥混凝土砂浆与回填料混合、形成注浆结构填料层3;所述注浆结构填料层3位于在地下室防水墙1与基坑支护2之间,形成密实防水结构。所述第一注浆管4为专用的注浆管或自制的花管。
本实施例所述的一种地下室外部防水结构的施工方法,按以下步骤进行:
1)在地下室防水墙1和底板施工完毕后,在地下室防墙1与基坑支护2之间预置第一注浆管4;
2)预置第一注浆管4后,进行回填料回填,所述回填料需逐层回填逐层压实;
3)当填料3回填至设计标高后,第一注浆管4进行静压注浆,通过第一注浆管4静压注入注入水泥浆或水泥混凝土砂浆与回填料混合形成注浆结构填料层3。
本实施例中,步骤1)中所述第一注浆管4为专用的注浆管或自制的花管。
具体实施例2:
参照图2,本实施例的特点是:
在地下室外部防水结构中,在地下室的底板下方设有预填料,在预填料中预设有第二注浆管5,该第二注浆管5与前述第一注浆管4连通;通过第二注浆管5注入水泥浆或水泥混凝土砂浆与预填料混合、形成底部注浆结构填料层6;底部注浆结构填料层6在地下室的底板下方,形成密实防水结构
在地下室外部防水结构的施工方法的步骤1)中,在地下室的底板下方设有回填料,在该回填料中预设有第二注浆管5,所述第二注浆管5与前述第一注浆管4连通,通过第二注浆管5静压注入注入水泥浆或水泥混凝土砂浆与回填料混合形成底部注浆结构填料层6。其他与具体实施例1相同。
具体实施例3:
参照图3,本实施例的特点是:在步骤2)中,在进行分层回填料回填时,每回填一层后注浆一次、即进行逐层注浆,分多次进行,直至回填至设计标高。其他与具体实施例1或2相同。
本发明通过预埋在地下室外回填料内的注浆管,对回填料注浆,降低了地下室外侧回填料的渗透性,从而降低地下室侧壁承受的水压,提高了地下室的抗渗性能。本发明通过在地下室的底板下方预置水平注浆管,进行后注浆处理,从而改善了底板抗渗透性能。
以上所述,仅为本发明较佳的具体实施例,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都属于本发明的保护范围。
Claims (7)
1.一种地下室外防水结构,包括地下室防水墙(1)和基坑支护(2),其特征是:在地下室防水墙(1)与基坑支护(2)之间设有回填料,在所述的回填料中预设有第一注浆管(4);通过所述第一注浆管(4)注入水泥浆或水泥混凝土砂浆与回填料混合形成注浆结构填料层(3);所述注浆结构填料层(3)位于在地下室防水墙(1)与基坑支护(2)之间,形成密实防水结构。
2.根据权利要求1所述的一种地下室外防水结构,其特征是:在地下室的底板下方设有预填料,在预填料中预设有第二注浆管(5),该第二注浆管(5)与前述第一注浆管(4)连通;通过第二注浆管(5)注入水泥浆或水泥混凝土砂浆与预填料混合,形成底部注浆结构填料层(6);底部注浆结构填料层(6)在地下室的底板下方,形成密实防水结构。
3.根据权利要求1或2所述的一种地下室外防水结构,其特征是:所述第一注浆管(4)为专用的注浆管或自制的花管。
4.一种地下室外防水结构的施工方法,其特征在于按以下步骤进行:
1)在地下室防水墙(1)和底板施工完毕后,在地下室防墙(1)与基坑支护(2)之间预置第一注浆管(4);
2)预置第一注浆管(4)后,进行回填料回填,所述回填料需逐层回填逐层压实;
3)当填料(3)回填至设计标高后,第一注浆管(4)进行静压注浆,通过第一注浆管(4)静压注入注入水泥浆或水泥混凝土砂浆与回填料混合形成注浆结构填料层(3)。
5.根据权利要求4所述的一种地下室外防水结构的施工方法,其特征是:在步骤1)中,在地下室的底板下方设有回填料,在该回填料中预设有第二注浆管(5),所述第二注浆管(5)与前述第一注浆管(4)连通,通过第二注浆管(5)静压注入注入水泥浆或水泥混凝土砂浆与回填料混合形成底部注浆结构填料层(6)。
6.根据权利要求4或5所述的一种地下室外防水结构的施工方法,其特征是:在步骤2)中,在进行分层回填料回填时,每回填一层后注浆一次、即进行逐层注浆,分多次进行,直至回填至设计标高。
7.根据权利要求5所述的一种地下室外防水结构的施工方法,其特征是:所述的第一注浆管(4)和第二注浆管(5)为专用的注浆管或自制的花管。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110303021.7A CN102392460B (zh) | 2011-09-30 | 2011-09-30 | 一种地下室外部防水结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110303021.7A CN102392460B (zh) | 2011-09-30 | 2011-09-30 | 一种地下室外部防水结构及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102392460A true CN102392460A (zh) | 2012-03-28 |
CN102392460B CN102392460B (zh) | 2016-08-10 |
Family
ID=45859832
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110303021.7A Active CN102392460B (zh) | 2011-09-30 | 2011-09-30 | 一种地下室外部防水结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102392460B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867708A (zh) * | 2018-05-08 | 2018-11-23 | 中铁广州工程局集团有限公司 | 一种地下围护结构与主体侧墙间防渗漏的施工方法 |
CN113373936A (zh) * | 2021-06-10 | 2021-09-10 | 浙江鹏盛建设集团有限公司 | 一种装配式结构及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11336099A (ja) * | 1998-05-27 | 1999-12-07 | Yoshiro Watanabe | 地下室の構築工法 |
CN101649624A (zh) * | 2009-07-13 | 2010-02-17 | 河南省绿韵建材有限公司 | 一种治理地下室渗漏的施工方法 |
CN101701461A (zh) * | 2009-10-29 | 2010-05-05 | 上海广联建设发展有限公司 | 资源节约型地下筒体构筑物的建造方法 |
CN101718094A (zh) * | 2009-11-10 | 2010-06-02 | 朱奎 | 一种带地下室建筑物的基坑支护施工方法 |
CN101914927A (zh) * | 2010-06-22 | 2010-12-15 | 中国建筑第二工程局有限公司 | 地下室底板与墙面的防水系统及其施工方法 |
-
2011
- 2011-09-30 CN CN201110303021.7A patent/CN102392460B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11336099A (ja) * | 1998-05-27 | 1999-12-07 | Yoshiro Watanabe | 地下室の構築工法 |
CN101649624A (zh) * | 2009-07-13 | 2010-02-17 | 河南省绿韵建材有限公司 | 一种治理地下室渗漏的施工方法 |
CN101701461A (zh) * | 2009-10-29 | 2010-05-05 | 上海广联建设发展有限公司 | 资源节约型地下筒体构筑物的建造方法 |
CN101718094A (zh) * | 2009-11-10 | 2010-06-02 | 朱奎 | 一种带地下室建筑物的基坑支护施工方法 |
CN101914927A (zh) * | 2010-06-22 | 2010-12-15 | 中国建筑第二工程局有限公司 | 地下室底板与墙面的防水系统及其施工方法 |
Non-Patent Citations (3)
Title |
---|
上海铁路局: "《铁路工程建设标准化管理丛书 标准化作业》", 30 June 2009, 中国铁道出版社 * |
中国建筑工业出版社: "《一、二级注册结构工程师必备规范汇编》", 30 April 2009, 中国建筑工业出版社 * |
叶琳昌: "地下室外墙防水逆作法施工", 《建筑工人》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867708A (zh) * | 2018-05-08 | 2018-11-23 | 中铁广州工程局集团有限公司 | 一种地下围护结构与主体侧墙间防渗漏的施工方法 |
CN113373936A (zh) * | 2021-06-10 | 2021-09-10 | 浙江鹏盛建设集团有限公司 | 一种装配式结构及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102392460B (zh) | 2016-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103233454A (zh) | 湿陷性黄土地基的砂桩浸水真空预压及注浆处理方法 | |
CN104120710B (zh) | 一种真空预压联合吹填泥浆的软基加固处理方法 | |
CN104499479A (zh) | 一种穿越砂砾石回填层的挖孔桩施工方法 | |
CN102444143B (zh) | 一种取消地下室外立面操作通道的施工方法 | |
CN103225318B (zh) | 一种地下连续墙槽段接缝处防渗堵漏装置以及施工方法 | |
CN106948340B (zh) | 一种高聚物注浆防护的人工挖孔桩结构的施工方法 | |
CN100373013C (zh) | 一种深厚湿陷性黄土地基的处理方法 | |
CN103758123A (zh) | 人工挖孔灌注桩护壁衬的施工方法 | |
CN104099943A (zh) | 地下连续墙与废弃地下人防工程交会处理方法 | |
CN101200897A (zh) | 注浆帷幕结合钢筋混凝土护圈施工方法 | |
CN104480929B (zh) | 一种将咬合桩应用于永久地下室外墙的桩墙合一施工方法 | |
CN203229955U (zh) | 可随挖随护基坑围护结构 | |
CN106284434A (zh) | 一种地下建筑物的抗浮方法及其隔渗装置 | |
CN111827331A (zh) | 一种防渗结构结合地下连续墙的支护结构及其施工方法 | |
CN110485444B (zh) | 一种进行深水围堰防渗和加固的施工方法 | |
CN103147444A (zh) | 可随挖随护基坑围护结构及基坑开挖方法 | |
CN104988914A (zh) | 一种水域环境下的钻孔灌注桩断桩处理方法 | |
CN105484270B (zh) | 一种毗邻深基坑高陡老旧毛石挡土墙加固保护施工方法 | |
CN102392460A (zh) | 一种地下室外部防水结构及其施工方法 | |
CN104746506A (zh) | 软土联合预压结构和施工方法 | |
CN108331002B (zh) | 一种地基褥垫层的设计施工方法 | |
KR20130090596A (ko) | 친환경 복합형 강가시설 및 그 시공방법 | |
CN203475486U (zh) | 一种不产生水浮力的地下室 | |
CN102296618A (zh) | 一种锚杆穿越地下连续墙的套管 | |
CN111519647A (zh) | 一种适用于海相软基地基处理及加固的新型基础及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 510620 No. 3-5 East Sports street, sports east road, Guangzhou, Guangdong, Tianhe District Patentee after: Guangzhou Design Institute Group Co.,Ltd. Address before: 510620 No. 3-5 East Sports street, sports east road, Guangzhou, Guangdong, Tianhe District Patentee before: GUANGZHOU DESIGN INSTITUTE |
|
CP01 | Change in the name or title of a patent holder |