Embodiment
With reference to figure 1, be a kind of path reservation planning system synoptic diagram of realizing the path reservation planing method of embodiment of the present invention.
In the said path reservation planning system, comprise access device 101, server 102 and map data base 103, path planning database 104, customer account management database 105, amalgamation database 106 and road condition data storehouse 107.
Wherein, can connect through diverse network between access device 101 and the server 102, realize data communication.Said network can adopt existing diverse network technology to implement, and this does not give unnecessary details.During practical implementation, can adopt B/S (Browse/Server) or C/S (Client/Server) framework between said access device 101 and the server 102.
Said map data base 103, path planning database 104, customer account management database 105, amalgamation database 106 and road condition data storehouse 107 are respectively server 102 provides map datum, historical path planning record data, customer data, fusion traffic information data and other traffic information data, with auxiliary said server 102 realizing routes reservation planning.
In the embodiment of the present invention; The reservation planning of said path is meant; Access device 101 is through server 102 authentications success back login system, and to server 102 transmit paths reservation planning request, server 102 is after the path reservation planning request that receives from access device 101; Based on relevant map datum, historical path planning record, customer data and the traffic information data of said path reservation planning acquisition request, generation pass reservation program results.
Access device 101 is used to realize receive mutual with the user user's operational order and present the result to the user; Realize with server 102 between communicate by letter, send request to server 102, the data that processing receives from server 102.
In concrete the realization, access device 101 can be the electronic equipment that possesses data processing and communication function, in-vehicle navigation apparatus terminal for example, PC terminal and portable terminal etc.
Server 102 realizations are mutual with access device 101, are responsible for receiving the request that access device 101 sends; Realizing route reservation planning; From map data base 103, path planning database 104, customer account management database 105, amalgamation database 106 and road condition data storehouse 107, obtain relevant map datum, historical path planning information, client PRI information and various traffic information based on the correlation parameter in the described request; Calculate required path based on the correlation parameter in the described request and the institute data message that obtains and preengage program results; Program results is preengage in the path beamed back access device 101; Program results is preengage in the path deposited in path planning database 104, program results is preengage or its relevant information deposits customer account management database 105 in the path.
The operations such as inquiry, deletion, interpolation, statistics and backup of server 102 can be accepted in map data base 103, path planning database 104, customer account management database 105, amalgamation database 106 and road condition data storehouse 107.The operator that said each database can be a server 102 is owned, can be deployed in this locality of server 102, also can be deployed in far-end, and can realize mutual between the server 102 through network.
Wherein, map data base 103 is used for store map data.Said map datum can be that the operator of server 102 is owned, also can be to be provided to the operator of server 102 by map datum provider.Provide in map datum provider under the situation of map datum, the operator of server 102 can further put in order and process map datum, to adapt to demand for services.
The path reservation program results that generates before the storage in the path planning database 104.In concrete the realization, can adopt the mode of path planning record to store said path reservation program results.For saving resource, improve data processing efficiency, can only store the current path planning record that remains valid.
Usually, in the paths plan record, information such as starting point, destination, zero-time can be comprised, information such as running time, average velocity and expense can also be comprised.In addition; The multistage route programming result information that can also comprise intermediate point in the path planning record; Comprise interim point information, segmentation speed per hour, segmentation running time and sectional charge etc., segmentation speed per hour, segmentation running time and sectional charge are that item is informed in optional requirement.
The deletion of path planning record can be adopted automatic mode, also can adopt manual type.For example, path planning record path plan record lost efficacy to after date in its planning time, can automatic or manual it be deleted from database; The user also can initiatively cancel and delete current effective path planning record.
The interpolation of path planning record can be carried out when generation pass is preengage program results in real time, also can after the user confirms, carry out at this path reservation program results.
The client manages database 105 and is used to deposit the relevant information that program results is preengage in client identity information, client PRI information and the path related with the client; For the reservation planning of server 102 enforcement paths provides precedence information, also user inquiring, backup and statistics can be provided.
Usually, in customer data record, can include but not limited to the information etc. of the mobile unit of user name, password, priority, historical paths record, general routes record, current effective paths record, correspondence; Wherein, can store complete route programming result, also can be one with the path planning database in the related simple record of corresponding record, and concrete route programming result leaves in the path planning database.
Amalgamation database 106 is used to store the traffic information of fusion, and the traffic information of fusion is to merge arrangement by the data in path planning database 104 and the road condition data storehouse 107 to form.Can periodically carry out traffic information and merge, regularly upgrade, can regularly merge the traffic information in the traffic database after the renewal according to its update cycle like real-time traffic database.Also can irregularly carry out traffic information and merge, like the traffic information sudden change that is caused by accident, and then the traffic information that triggers merges.
Usually, in the traffic information of the fusion record, can comprise starting point, destination, zero-time, interim point information, segment information and each segmentation and preengage flow and traffic information etc., can also comprise information such as running time, average velocity and expense.
Road condition data storehouse 107 comprises a road condition data storehouse at least; Be used to store at least a road condition data; Can include but not limited to real time traffic data storehouse, historical traffic database and incident and weather data storehouse etc.; Related data can be obtained through sensor acquisition terminal and other data collection stations (being primarily aimed at real-time traffic or accident), also can obtain through the data server of partner, can also be imported by the user.
The overall procedure of a kind of embodiment that path reservation program results is set up is that the data in server 102 periodicity or irregular (Event triggered) path blend planning database 104 and the road condition data storehouse 107 also deposit in the amalgamation database 106; Access device 101 carries out authentication through server 102; After the success login system, interactive instruction and data necessary between access device 101 and the server 102, the instruction manipulation map data base 103, customer account management database 105 and the amalgamation database 106 that receive by server 102 bases; Obtain the traffic information of correlation map data, client PRI information, fusion; Carry out computing based on the instruction of receiving and the data message that obtains, generation pass reservation program results is to access device 101 return paths reservation program results; Access device 101 presents path reservation program results to the user; And send to server 102 and to confirm that server 102 deposits the path reservation program results write paths planning database of confirming 104 in customer account management database 105 with path reservation program results or its related information confirmed.
With reference to figure 2, a kind of embodiment of said path reservation planing method comprises:
Step S101, server be traffic information record in the historical path planning record in the query path planning database 104 and the road condition data storehouse 107 termly, obtains and merges all traffic informations, and the traffic information of fusion is deposited in the amalgamation database 106.
Traffic information record in historical path planning record in all right irregular query path planning database 104 (Event triggered mode) of server and the road condition data storehouse 107; Obtain and merge all traffic informations, the traffic information that merges is deposited in the amalgamation database 106.When for example path planning database 104 changes or road condition data storehouse 107 changes, trigger and implement above-mentioned traffic information fusion process.
Step S102, access device 101 sends user's logging request to server.
Carry necessary username and password information in the said logging request.
Step S103, whether server lookup customer account management database 105 has the username and password coupling in the logging request that information recorded and the access device that receives 101 send, if the record of coupling is arranged, authentication success, otherwise authentication failure.
Step S104, server 102 sends the authentication result to access device 101, and buffer memory checking result and identity information.
After access device 101 is received the checking result, judge whether authentication is successful.If authentication is unsuccessful, then execution in step S102, S103 and S104 again initiate authentication once more.If the authentication success, execution in step S105.
Step S105, access device 101 is sent out 102 to server and is sent path reservation planning request.
Can carry information such as necessary destination, starting point, start time in the reservation planning request of said path.
Said path reservation planning information requested all can be imported by the user; When access device 101 is that the information of starting point also can be the various satellite navigation standard information of navigator, like standard information such as GPS, Galileo and the Big Dippeves when possessing the equipment of satellite navigation receiving function.
After step S106, server 102 received path reservation planning request, according to the information in the path reservation planning request that receives, the traffic information record that inquiry is merged from amalgamation database 106 obtained necessary relevant traffic information data.
When the traffic information that inquiry is merged write down, the information of foundation comprised information such as destination, starting point, start time.
Step S107, server 102 is according to the information in the path reservation planning request that receives, the relevant map datum of inquiry from map data base 103.
The information of foundation comprises destination and starting point during the inquiry map datum.
Step S108, server 102 are according to the identity information of buffer memory, and inquiry customer account management database 105 obtains the relative clients data.
If relative clients data owner client's priority.
Step S109, server 102 are according to the traffic information record, map datum and the customer data that merge, and calculating path generates current path reservation program results.
In step S109, flow, the traffic information after the fusion and client's precedence information etc. that the main parameter of considering has the total flow in subscription time, this highway section, the flow that has used at present, residue supply to plan.
A kind of mode that realizes can be, obtains the total flow that starting point can be born on the possible path of destination and this path according to map datum, when choosing every possible path, can take all factors into consideration the traffic information on the path.To every possible path, obtain the flow of having preengage on subscription time point on this path according to the data in the traffic information record after merging, calculate the flow that the residue on this path can supply be planned then.If the flow that has residue supply to plan then can be selected this path for use.Otherwise, judge that the priority whether other reservation clients are arranged on this path is lower than current client's priority.If have other reservation clients' priority to be lower than current client's priority, then can seize and select for use this path; Otherwise, abandon this path.
Step S110, server 102 is preengage program results to the path that access device 101 returns current generation, waits for effective affirmation of access device 101.
Step S111, access device 101 present current path reservation program results to the user after receiving the path reservation program results that server 102 returns, and wait for user's affirmation.
Wherein, can also present the traffic information in this highway section in the lump, for reference.The user selects for use according to actual needs, and sends confirmation to server 102.
Step S112 after server 102 is received acknowledge message, deposits path planning database 104 in confirming as the mode of effective path planning with the path planning record, deposits relevant information in customer account management database 105 simultaneously.
If deposit complete road strength plan record in the customer data record, deposit in the record of corresponding current client identity in the customer account management database 105 confirming as effective path planning record.
If in the customer data record only the side's of depositing path planning be recorded in the memory location in the path planning database 104, deposit in the record of corresponding current client identity in the customer account management database 105 confirming as the position that effective path planning is recorded in the path planning database 104.
Can also carry receiving equipment information in the reservation planning request of said path.Corresponding therewith, in step S110, server 102 is preengage program results with the path and is sent to this receiving equipment (figure does not show); In step S111, present current path reservation program results by receiving equipment (figure does not show) to the user, wait for user's affirmation.
Can also carry optional requirements such as receiving end information, running time, average velocity and expense in the reservation planning request of said path and inform item.At this moment, in said step S109, server 102 need obtain and/or calculate corresponding data, and result of calculation is carried in the path reservation program results.
Can also carry optional requirements such as interim point information, segmentation speed per hour, segmentation running time and sectional charge in the reservation planning request of said path and inform item.Corresponding with it, can also comprise the multistage route programming result information of intermediate point in the said path reservation program results, comprise that optional requirements such as interim point information, segmentation speed per hour, segmentation running time and sectional charge inform association.In the case, in said step S109, server 102 also need obtain and/or calculate corresponding data, and result of calculation is carried in the path reservation program results.
In said implementation, when obtaining the total flow that starting point can bear on the possible path of destination and this path according to map datum, possible path must be through the intermediate point in the path reservation planning solicited message.
Server 102 also can without the user confirm directly will be current path reservation program results deposit path planning database 104 in, path planning is preengage program results or its information of being correlated with deposits customer account management database 105 in.Unidentified path reservation program results is deleted in the affirmation of then sending according to access device 101.At this moment, in step S110, increase and program results is preengage in the path deposited in the path planning database 104 and and deposit the operation in the customer account management database 105 in relevant information; In step S112, server 102 is deleted unidentified path reservation program results from path planning database 104, unidentified associated pathway reservation program results information in the deletion relative clients data recording from customer data planning database 105.
Before the user begins path reservation planning,, can also stipulate that the user must download the route programming result of being correlated with earlier, otherwise new path planning record will cover former record if user oneself needs to keep relevant route programming result in the past.
The overall procedure that path reservation program results is set up the another kind of embodiment of implementing is; Access device 101 carries out authentication through server 102; After the success login system, interactive instruction and data necessary between access device 101 and the server 102, by server 102 according to instruction query path planning database that receives 104 and amalgamation database 106; The traffic information that obtains relevant historical path planning record and merge; Merge relevant traffic information once more, inquiry map data base 103 and customer account management database 105 obtain correlation map data and client PRI information; And based on the instruction of obtaining and traffic information, map datum and customer data after merging carry out computing; Generation pass reservation program results, server 102 is preengage program results with the path and is sent to access device 101 subsequently, and according to the affirmation of access device; Deposit the path reservation program results of confirming in path planning database 104, deposit path reservation program results or its relevant information confirmed in customer account management database 105.
With reference to figure 3, the another kind of embodiment of said path reservation planing method comprises:
Step S201, access device 101 sends user's logging request to server.
Carry necessary username and password information in the said logging request.
Step S202, whether server lookup customer account management database 105 has the username and password coupling in the logging request that information recorded and the access device that receives 101 send, if the record of coupling is arranged, authentication success, otherwise authentication failure.
Step S203, server 102 sends the authentication result to access device 101, and buffer memory checking result and identity information.
After access device 101 is received the checking result, judge whether authentication is successful.If authentication is unsuccessful, then execution in step S201, S202 and S203 again initiate authentication once more.If the authentication success, execution in step S204.
Step S204, access device 101 is sent out 102 to server and is sent path reservation planning request.
Can carry information such as necessary destination, starting point, start time in the reservation planning request of said path.
Said path reservation planning information requested all can be imported by the user; When access device 101 is that the information of starting point also can be the various satellite navigation standard information of navigator, like standard information such as GPS, Galileo and the Big Dippeves when possessing the equipment of satellite navigation receiving function.
After step S205, server 102 received path reservation planning request, according to the information in the path reservation planning request that receives, query history path planning record from path planning database 104 obtained necessary historical path planning data.
During query history path planning record, the information of foundation comprises information such as destination, starting point, start time.
Step S206, server 102 is according to the information in the path reservation planning request that receives, and the relevant traffic information record of inquiry obtains relevant road condition data from other road conditions application data bases 107.
When the traffic information that inquiry is merged write down, the information of foundation comprised information such as destination, starting point, start time.
Step S207, server merges historical path planning data and the relevant traffic information of obtaining, and generates the traffic information that merges.
Step S208, server 102 is according to the information in the path reservation planning request that receives, the relevant map datum of inquiry from map data base 103.
The information of foundation comprises destination and starting point during the inquiry map datum.
Step S209, server 102 are according to the identity information of buffer memory, and inquiry customer account management database 105 obtains the relative clients data.
If relative clients data owner client's priority.
Step S210, server 102 are according to the traffic information record, map datum and the client PRI information that merge, and calculating path generates current path reservation program results.
In step S210, flow, the traffic information after the fusion and client PRI information etc. that the main parameter of considering has the total flow in subscription time, this highway section, the flow that has used at present, residue supply to plan.
A kind of mode that realizes can be, obtains the total flow that starting point can be born on the possible path of destination and this path according to map datum, when choosing every possible path, can take all factors into consideration the traffic information on the path.To every possible path, obtain the flow of having preengage on subscription time point on this path according to the data in the traffic information record after merging, calculate the flow that the residue on this path can supply be planned then.If the flow that has residue supply to plan then can be selected this path for use.Otherwise, judge that the priority whether other reservation clients are arranged on this path is lower than current client's priority.If have other reservation clients' priority to be lower than current client's priority, then can seize and select for use this path; Otherwise, abandon this path.
Step S211, server 102 is preengage program results to the path that access device 101 returns current generation, waits for effective affirmation of access device 101.
Step S212, access device 101 present current path reservation program results to the user after receiving the path reservation program results that server 102 returns, and wait for user's affirmation.
Wherein, can present the traffic information in this highway section in the lump, for reference.The user selects for use according to actual needs, and sends confirmation to server 102.
Step S213 after server 102 is received acknowledge message, deposits path planning database 104 in confirming as the mode of effective path planning with the path planning record, deposits relevant information in customer account management database 105 simultaneously.
If deposit complete road strength plan record in the customer data record, deposit in the record of corresponding current client identity in the customer account management database 105 confirming as effective path planning record.
If in the customer data record only the side's of depositing path planning be recorded in the memory location in the path planning database 104, deposit in the record of corresponding current client identity in the customer account management database 105 confirming as the position that effective path planning is recorded in the path planning database 104.
Can also carry receiving equipment information in the reservation planning request of said path.Corresponding therewith, in step S211, server 102 is preengage program results with the path and is sent to this receiving equipment (figure does not show); In step S212, present current path reservation program results by receiving equipment (figure does not show) to the user, wait for user's affirmation.
Can also carry optional requirements such as receiving end information, running time, average velocity and expense in the reservation planning request of said path and inform item.At this moment, in said step S210, server 102 need obtain and/or calculate corresponding data, and result of calculation is carried in the path reservation program results.
Can also carry optional requirements such as interim point information, segmentation speed per hour, segmentation running time and sectional charge in the reservation planning request of said path and inform item.Corresponding with it, can also comprise the multistage route programming result information of intermediate point in the said path reservation program results, comprise that optional requirements such as interim point information, segmentation speed per hour, segmentation running time and sectional charge inform association.In the case, in said step S210, server 102 also need obtain and/or calculate corresponding data, and result of calculation is carried in the path reservation program results.
In said implementation, when obtaining the total flow that starting point can bear on the possible path of destination and this path according to map datum, possible path must be through the intermediate point in the path reservation planning solicited message.
Server 102 also can without the user confirm directly will be current path reservation program results deposit path planning database 104 in, path planning is preengage program results or its information of being correlated with deposits customer account management database 105 in.Unidentified path reservation program results is deleted in the affirmation of then sending according to access device 101.At this moment, in step S211, increase and program results is preengage in the path deposited in the path planning database 104 and and deposit the operation in the customer account management database 105 in relevant information; In step S213, server 102 is deleted unidentified path reservation program results from path planning database 104, unidentified associated pathway reservation program results information in the deletion relative clients data recording from customer data planning database 105.
Before the user begins path reservation planning,, can also stipulate that the user must download the route programming result of being correlated with earlier, otherwise new path planning record will cover former record if user oneself needs to keep relevant route programming result in the past.
The overall procedure of the another kind of embodiment that path reservation program results is set up is that the data in server 102 periodicity or irregular path blend planning database 104 and the road condition data storehouse 107 also deposit in the amalgamation database 106.Access device 101 carries out authentication through server 102; After the success login system; Interactive instruction and data necessary between access device 101 and the server 102;, obtain the traffic information and the Real-time Traffic Information of correlation map data, client PRI information, fusion, and carry out computing according to the real time traffic data storehouse in the instruction manipulation map data base 103, customer account management database 105, amalgamation database 106 and other road conditions application datas 107 that receive by server 102 based on the instruction and data that obtains; Generation pass reservation program results; To access device 101 return paths reservation program results, access device 101 presents path reservation program results to the user, and sends affirmation to server 102; Server 102 deposits the path reservation program results write paths planning database of confirming 104 in customer account management database 105 with path reservation program results or its related information confirmed.
With reference to figure 4, a kind of embodiment of said path reservation planing method comprises:
Step S301; Server is traffic information record in the historical path planning record in the query path planning database 104 and the road condition data storehouse 107 regularly or aperiodically; Obtain and merge all traffic informations, the traffic information that merges is deposited in the amalgamation database 106.
The said Event triggered mode that irregularly is meant when when for example path planning database 104 changes or road condition data storehouse 107 changes, triggers and implements above-mentioned traffic information fusion process.
Step S302, access device 101 sends user's logging request to server.
Carry necessary username and password information in the said logging request.
Step S303, whether server lookup customer account management database 105 has the username and password coupling in the logging request that information recorded and the access device that receives 101 send, if the record of coupling is arranged, authentication success, otherwise authentication failure.
Step S304, server 102 sends the authentication result to access device 101, and buffer memory checking result and identity information.
After access device 101 is received the checking result, judge whether authentication is successful.If authentication is unsuccessful, then execution in step S302, S303 and S304 again initiate authentication once more.If the authentication success, execution in step S305.
Step S305, access device 101 is sent out 102 to server and is sent path reservation planning request.
Can carry information such as necessary destination, starting point, start time in the reservation planning request of said path.
Said path reservation planning information requested all can be imported by the user; When access device 101 is that the information of starting point also can be the various satellite navigation standard information of navigator, like standard information such as GPS, Galileo and the Big Dippeves when possessing the equipment of satellite navigation receiving function.
After step S306, server 102 received path reservation planning request, according to the information in the path reservation planning request that receives, the traffic information record that inquiry is merged from amalgamation database 106 obtained necessary related data.
When the traffic information that inquiry is merged write down, the information of foundation comprised information such as destination, starting point, start time.
Step S307, server 102 be according to the information in the path reservation planning request that receives, and query-relevant data record in the real time traffic data storehouse from road condition data storehouse 107 obtains the road condition data of real-time traffic.
During the inquiry real time traffic data, the information of foundation comprises information such as destination, starting point, start time.
Step S308, the real-time traffic data that server 102 fusion query arrive and the traffic information of fusion generate the traffic information of new fusion.
Step S309, server 102 is according to the information in the path reservation planning request that receives, the relevant map datum of inquiry from map data base.
The information of foundation comprises destination and starting point during the inquiry map datum.
Step S310, server 102 are according to the identity information of buffer memory, and inquiry customer account management database obtains the relative clients data.
If relative clients data owner client's priority.
Step S311, server 102 are according to the traffic information, map datum and the client PRI information that merge, and calculating path generates current path reservation program results.
In step S311, flow, the traffic information after the fusion and client's precedence information etc. that the main parameter of considering has the total flow in subscription time, this highway section, the flow that has used at present, residue supply to plan.
A kind of mode that realizes can be, obtains the total flow that starting point can be born on the possible path of destination and this path according to map datum, when choosing every possible path, can take all factors into consideration the traffic information on the path.To every possible path, obtain the flow of having preengage on subscription time point on this path according to the data in the traffic information record after merging, calculate the flow that the residue on this path can supply be planned then.If the flow that has residue supply to plan then can be selected this path for use.Otherwise, judge that the priority whether other reservation clients are arranged on this path is lower than current client's priority.If have other reservation clients' priority to be lower than current client's priority, then can seize and select for use this path; Otherwise, abandon this path.
Step S312, server 102 is preengage program results to the path that access device 101 returns current generation, waits for effective affirmation of access device 101.
Step S313, access device 101 present current path reservation program results to the user after receiving the path reservation program results that server 102 returns, and wait for user's affirmation.
Wherein, can present the traffic information in this highway section in the lump, for reference, the user selects for use according to actual needs, and sends confirmation to server 102.
Step S314 after server 102 is received acknowledge message, deposits path planning database 104 in confirming as the mode of effective path planning with the path planning record, deposits relevant information in customer account management database 105 simultaneously.
If deposit complete road strength plan record in the customer data record, deposit in the record of corresponding current client identity in the customer account management database 105 confirming as effective path planning record.
If in the customer data record only the side's of depositing path planning be recorded in the memory location in the path planning database 104, deposit in the record of corresponding current client identity in the customer account management database 105 confirming as the position that effective path planning is recorded in the path planning database 104.
Can also carry receiving equipment information in the reservation planning request of said path.Corresponding therewith, in step S110, server 102 is preengage program results with the path and is sent to this receiving equipment (figure does not show); In step S111, present current path reservation program results by receiving equipment (figure does not show) to the user, wait for user's affirmation.
Can also carry optional requirements such as receiving end information, running time, average velocity and expense in the reservation planning request of said path and inform item.At this moment, in said step S311, server 102 need obtain and/or calculate corresponding data, and result of calculation is carried in the path reservation program results.
Can also carry optional requirements such as interim point information, segmentation speed per hour, segmentation running time and sectional charge in the reservation planning request of said path and inform item.Corresponding with it, can also comprise the multistage route programming result information of intermediate point in the said path reservation program results, comprise that optional requirements such as interim point information, segmentation speed per hour, segmentation running time and sectional charge inform association.In the case, in said step S311, server 102 also need obtain and/or calculate corresponding data, and result of calculation is carried in the path reservation program results.
In the mode of said realization, when obtaining the total flow that starting point can bear on the possible path of destination and this path according to map datum, possible path must be through the intermediate point in the path reservation planning solicited message.
Server 102 also can without the user confirm directly will be current the path preengage program results and deposit path planning database 104 in, path planning is preengage program results or its relevant information deposits customer account management database 105 in.Unidentified path reservation program results is deleted in the affirmation of then sending according to access device 101.At this moment, in step S312, increase and program results is preengage in the path deposited in the path planning database 104 and and deposit the operation in the customer account management database 105 in relevant information; In step S314, server 102 is deleted unidentified path reservation program results from path planning database 104, unidentified associated pathway reservation program results information in the deletion relative clients data recording from customer data planning database 105.
Before the user begins path reservation planning,, can also stipulate that the user must download the route programming result of being correlated with earlier, otherwise new path planning record will cover former record if user oneself needs to keep relevant route programming result in the past.
With reference to figure 5, be the another kind of path reservation planning system synoptic diagram of realizing the path reservation planing method of embodiment of the present invention.
In the said path reservation planning system, comprise call center system 201, server 202 and map data base 203, path planning database 204, customer account management database 205, amalgamation database 206 and road condition data storehouse 207.
Wherein, Server 202 and map data base 203, path planning database 204, customer account management database 205, amalgamation database 206 and road condition data storehouse 207 on function, mutual relation and implementation all with Fig. 1 in server 102 and map data base 103, path planning database 104, customer account management database 105, amalgamation database 106 and road condition data storehouse 107 basic identical, this does not give unnecessary details.
Call center system 201 realizations and customer provided equipment (figure do not show) mutual according to the instruction of customer provided equipment, send instruction to server 202, and the result that server 202 is returned feeds back to customer provided equipment.
In the embodiment of the present invention, the reservation planning of said path is meant that call center system 201 is according to the customer provided equipment instruction of (figure does not show), and authentication success back login system is to server 202 transmit paths reservation planning request; Server 202 is after the path reservation planning request that receives from call center system 201; Based on relevant map datum, historical path planning record, traffic information and the client PRI information of said path reservation planning acquisition request; Generation pass reservation program results sends to call center system 201 with it; Call center system 201 is perhaps preengage program results through voice mode to client's feedback path to customer provided equipment (figure does not show) feedback path reservation program results.
With reference to figure 6, the another kind of embodiment of said path reservation planing method comprises:
Step S401; Server is traffic information record in the historical path planning record in the query path planning database 204 and the road condition data storehouse 207 regularly or aperiodically; Obtain and merge all traffic informations, the traffic information that merges is deposited in the amalgamation database 206.
The said Event triggered mode that irregularly is meant when when for example path planning database 204 changes or road condition data storehouse 207 changes, triggers and implements above-mentioned traffic information fusion process.
Step S402, call center system 201 is sent user's logging request according to the instruction of customer provided equipment to server.
Carry necessary username and password information in the said logging request.
Step S403, whether server lookup customer account management database 205 has the username and password coupling in information recorded and the logging request that receives, if the record of coupling is arranged, authentication success, otherwise authentication failure.
Step S404, server 202 buffer memorys checking result and identity information send the authentication result to call center system 201.Call center system 201 is to customer provided equipment feedback authentication result.
After call center system 201 is received the checking result, judge whether authentication is successful.If authentication is unsuccessful, then execution in step S402, S403 and S404 again initiate authentication once more.If the authentication success, execution in step S405.
Step S405, call center system 201 is sent out 202 to server and is sent path reservation planning request according to the instruction of customer provided equipment.
Can carry information such as necessary destination, starting point, start time in the reservation planning request of said path.
After step S406, server 202 received path reservation planning request, according to the information in the path reservation planning request that receives, the traffic information record that inquiry is merged from amalgamation database 206 obtained necessary relevant traffic information data.
When the traffic information that inquiry is merged write down, the information of foundation comprised information such as destination, starting point, start time.
Step S407, server 202 is according to the information in the path reservation planning request that receives, the relevant map datum of inquiry from map data base 203.
The information of foundation comprises destination and starting point during the inquiry map datum.
Step S408, server 202 are according to the identity information of buffer memory, and inquiry customer account management database 205 obtains the relative clients data.
If relative clients data owner client's priority.
Step S409, server 202 are according to the traffic information record, map datum and the customer data that merge, and calculating path generates current path reservation program results.
In step S409, flow, the traffic information after the fusion and client's precedence information etc. that the main parameter of considering has the total flow in subscription time, this highway section, the flow that has used at present, residue supply to plan.
A kind of mode that realizes can be, obtains the total flow that starting point can be born on the possible path of destination and this path according to map datum, when choosing every possible path, can take all factors into consideration the traffic information on the path.To every possible path, obtain the flow of having preengage on subscription time point on this path according to the data in the traffic information record after merging, calculate the flow that the residue on this path can supply be planned then.If the flow that has residue supply to plan then can be selected this path for use.Otherwise, judge that the priority whether other reservation clients are arranged on this path is lower than current client's priority.If have other reservation clients' priority to be lower than current client's priority, then can seize and select for use this path; Otherwise, abandon this path.
Step S410, program results is preengage in the path that server 202 returns current generation to call center system 201, and call center system 201 is to customer provided equipment feedback, wait acknowledge.
Step S411, customer provided equipment presents path reservation program results to the client, waits for client's affirmation.
Wherein, can also present the traffic information in this highway section in the lump, client's reference.
After the client confirmed, customer provided equipment sent to call center system 201 with client's affirmation, and call center system 201 is sent to server 202 and confirmed.
Step S412 after server 202 is received acknowledge message, deposits path planning database 204 in confirming as the mode of effective path planning with the path planning record, deposits relevant information in customer account management database 205 simultaneously.
If deposit complete road strength plan record in the customer data record, deposit in the record of corresponding current client identity in the customer account management database 205 confirming as effective path planning record.
If in the customer data record only the side's of depositing path planning be recorded in the memory location in the path planning database 204, deposit in the record of corresponding current client identity in the customer account management database 205 confirming as the position that effective path planning is recorded in the path planning database 204.
Can also carry receiving equipment information in the reservation planning request of said path.Corresponding therewith, in step S410, server 202 is preengage program results with the path and is sent to this receiving equipment (figure does not show); In step S411, present current path reservation program results by receiving equipment (figure does not show) to the user, wait for user's affirmation.
Can also carry optional requirements such as receiving end information, running time, average velocity and expense in the reservation planning request of said path and inform item.At this moment, in said step S409, server 202 need obtain and/or calculate corresponding data, and result of calculation is carried in the path reservation program results.
Can also carry optional requirements such as interim point information, segmentation speed per hour, segmentation running time and sectional charge in the reservation planning request of said path and inform item.Corresponding with it, can also comprise the multistage route programming result information of intermediate point in the said path reservation program results, comprise that optional requirements such as interim point information, segmentation speed per hour, segmentation running time and sectional charge inform association.In the case, in said step S409, server 202 also need obtain and/or calculate corresponding data, and result of calculation is carried in the path reservation program results.
In said implementation, when obtaining the total flow that starting point can bear on the possible path of destination and this path according to map datum, possible path must be through the intermediate point in the path reservation planning solicited message.
Server 202 also can without the user confirm directly will be current path reservation program results deposit path planning database 204 in, path planning is preengage program results or its information of being correlated with deposits customer account management database 205 in.Unidentified path reservation program results is deleted in the affirmation of then sending according to customer provided equipment (figure does not show).At this moment, in step S410, increase and program results is preengage in the path deposited in the path planning database 204 and and deposit the operation in the customer account management database 205 in relevant information; In step S412, server 202 is deleted unidentified path reservation program results from path planning database 204, unidentified associated pathway reservation program results information in the deletion relative clients data recording from customer data planning database 205.
Before the user begins path reservation planning,, can also stipulate that the user must download the route programming result of being correlated with earlier, otherwise new path planning record will cover former record if user oneself needs to keep relevant route programming result in the past.
It will be appreciated by those skilled in the art that; Similar with above-mentioned embodiment; When adopting call center system as a kind of access approach; Server also can merge relevant traffic information again after RX path is preengage the request of planning, also can carry out path reservation planning based on the traffic information after map datum and the fusion according to client PRI information with reference to relevant real-time traffic information.Server also can obtain and/or calculate other optional information of informing in the lump, and this does not give unnecessary details.
Though the present invention through the preferred embodiment explanation as above, these preferred embodiments are not in order to limit the present invention.Those skilled in the art is not breaking away from the spirit and scope of the present invention, should have the ability various corrections and additional are made in this preferred embodiment, and therefore, protection scope of the present invention is as the criterion with the scope of claims.And the implication of the term of using among the present invention, words and claim can not only limit to its literal and common implication and go to understand, and also should comprise the implication and the notion that conform to technology of the present invention.