CN102363259B CN 201110283392 CN201110283392A CN102363259B CN 102363259 B CN102363259 B CN 102363259B CN 201110283392 CN201110283392 CN 201110283392 CN 201110283392 A CN201110283392 A CN 201110283392A CN 102363259 B CN102363259 B CN 102363259B
Authority
CN
China
Prior art keywords
forging
casting
blank
strand
stainless steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110283392
Other languages
Chinese (zh)
Other versions
CN102363259A (en
Inventor
曲荣生
孙永恒
刘玉新
林超
刘放顺
崔春阳
王艺
张作家
赵文举
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Hafei Industry Co Ltd
Original Assignee
Harbin Hafei Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Hafei Industry Co Ltd filed Critical Harbin Hafei Industry Co Ltd
Priority to CN 201110283392 priority Critical patent/CN102363259B/en
Publication of CN102363259A publication Critical patent/CN102363259A/en
Application granted granted Critical
Publication of CN102363259B publication Critical patent/CN102363259B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The invention provides a molding method for casting and forging a structure piece of a wheelchair frame, which comprises the steps of: sawing and cutting an aluminum cast ingot with the outer circle of phi 200mm with a material trade mark of 6061 into blank with the length of 800mm; smelting; pouring; modeling; cutting a dead head; charging a casting blank, heating and fixing the temperature at 530 DEG C; forging and pressing the casting blank by a 5000-ton oil press and a forging mould; forging and pressing to obtain a forged piece; etching and washing; treating with solid solution; and manually correcting the specific deformation degree of the forged piece. The precast blank is cast and molded by the method, the shape of the blank is good in consistency, the shape of a curved surface is easy to control, a casting material can be cyclically utilized, and the material utilization can be furthest improved; and the batch production practice proves that the finished forged piece produced by a casting and forging technological process has no forging defects, the thermal treatment performance meets the demand, and the final status of the forged piece completely accords with user demand.

Description

Wheelchair frame structural member casting and forging molding method
(1) technical field
The present invention relates to casting and forge process technology, is exactly a kind of wheelchair frame structural member casting and forging molding method specifically.
(2) background technology
Forging is widely used in important force structure position on the various device with its superior mechanical performance, wherein aluminum alloy forge piece becomes the maximum forging of application in the non-ferrous metal forging with its lightweight, corrosion-resistant advantage such as good again, in fields such as automobile, Aero-Space, locomotive, shipbuildings very widely application is arranged, its output is only second to the ferrous metal forging.The wheelchair frame structural member is the important stress members on a kind of wheelchair, the former employing steel-pipe welding of offshore company forms, but weight is heavier, profile is common not to have sight, there are the material use problems such as rate is low, and operation is loaded down with trivial details in the structural parts whole forging molding process of domestic research and development and the forging that Technology for Heating Processing is produced.
(3) summary of the invention
The object of the present invention is to provide a kind of wheelchair frame structural member casting and forging molding method.
The object of the present invention is achieved like this: step is as follows:
Step 1: blanking: be that 6061 cylindrical φ 200mm aluminium ingot casting sawing becomes the long blank of 800mm with material trademark;
Step 2: melting: place crucible to heat blank, 650 ℃ of constant temperatures are heated to fusing;
Step 3: mould assembly: rising head and mold cavity surface smearing release agent at casting mould, close tight casting mould, the fastening clamp;
Step 4: cast: contain 4.5 kilograms of the liquid aluminium get after the blank fusing with crucible, be poured into die cavity to die cavity from the sprue gate and be full of fully;
Step 5: removing from mould: open geometrical clamp, molded blank is taken out in the casting mould die sinking;
Step 6: cut rising head: utilize toothless saw excision rising head, obtain strand;
Step 7: cleaning defective: cleaning finishing strand emits port part and blemish;
Step 8: homogenizing annealing: 530 ℃ of strand shove charge heating constant temperatures; Insulation: 4 hours, can carry out mold pressing production after strand was cooled to 470 ℃ with stove after insulation finished;
Step 9: forging mold preheating: heating constant temperature: 400 ℃; Insulation: 4 hours;
Step 10: mold pressing: utilize 5000 tons of hydraulic presses and forging mold that the strand that step 8 obtains is forged and pressed, obtain forging after the forging and pressing;
Step 11: cut edge: utilize 800 tons of punch presses and edger that forging is carried out cold-trim(ming) after the forging cooling;
Step 12: erosion is washed: 1: ungrease treatment: with the forging stock stainless steel framework of packing into, immersed the alkali groove 10-15 minute, tank liquor temperature: 50-60 ℃; 2: the warm water washing: the stainless steel framework that forging stock will be housed immersed warm water tank 1-4 minute, water temperature: 50-60 ℃; 3: cold water washing: the stainless steel framework that forging stock will be housed immersed cold rinse bank 1-4 minute, water temperature: room temperature; 4: pickling: the stainless steel framework that forging stock will be housed immerses nitric acid groove 0.5-3min till the light; 5: cold water washing: the stainless steel framework that forging stock will be housed immerses cold rinse bank flushing 1-4 minute, water temperature: room temperature; 6: naturally oven dry;
Step 13: cleaning defective: cleaning polishing forging blemish;
Step 14: solution treatment: heating constant temperature: 530 ℃; Insulation: 1.5 hours; Immediately entry after forging is come out of the stove, forging time of staying in water is not less than 15 minutes, is not more than 17 seconds transfer time; Water temperature: 30-50 ℃;
Step 15: proofread and correct: the forging after utilizing 5000 tons of hydraulic presses and straightening die to solution treatment is proofreaied and correct;
Step 10 six: artificial aging: forging shove charge heating, constant temperature: 155 ℃; Insulation: 10 hours;
Step 10 seven: manual synchronizing: carry out manual synchronizing for the concrete deformation extent of forging;
Step 10 eight: erosion is washed: forging is lost wash the surface that obtains cleaning, operate same step 12;
Step 10 nine: cleaning defective: forging is carried out monolithic finish eliminate burr or the defective of colliding with.
A kind of wheelchair frame structural member of the present invention casting and forging molding method, for solving the production problem of pre-roughcast, adopt casting and forging molding, be that pre-roughcast adopts casting, then obtain the finished product forging through compression molding, the such shape high conformity of blank, curve form is easy to control, the casting process material can be recycling simultaneously, improved to greatest extent stock utilization; In order to eliminate forging defect, adopt at twice compression molding, certain under-voltage amount is reserved in for the first time mold pressing, thoroughly repaiies wound after the mold pressing; The forging warpage is serious in the forging process, adopts twice correcting process to eliminate the forging buckling deformation here.Batch production facts have proved that the finished product forging of producing does not have forging defect under this cast forging process flow process, heat treatment performance meets the requirements, and the forging end-state meets user's request fully.
(4) description of drawings:
Fig. 1 is wheelchair frame structural member forging profile schematic diagram;
Fig. 2 is wheelchair frame structural member forging strand profile schematic diagram;
Fig. 3 is that wheelchair frame structural member forging model cavity is arranged schematic diagram;
Fig. 4 is that wheelchair frame structural member forging straightening die die cavity is arranged schematic diagram;
Fig. 5 is wheelchair frame structural member forging edger structural representation;
Fig. 6 is wheelchair frame structural member forging strand casting mould structure schematic diagram.
(5) specific embodiment
The invention will be further described for example below in conjunction with accompanying drawing.
Embodiment 1: in conjunction with Fig. 1-Fig. 6, and a kind of wheelchair frame structural member of the present invention casting and forging molding method, step is as follows:
Step 1: blanking: be that 6061 cylindrical φ 200mm aluminium ingot casting sawing becomes the long blank of 800mm with material trademark;
Step 2: melting: place crucible to heat blank, 650 ℃ of constant temperatures are heated to fusing;
Step 3: mould assembly: rising head and mold cavity surface smearing release agent at casting mould, close tight casting mould, the fastening clamp;
Step 4: cast: contain 4.5 kilograms of the liquid aluminium get after the blank fusing with crucible, be poured into die cavity to die cavity from the sprue gate and be full of fully;
Step 5: removing from mould: open geometrical clamp, molded blank is taken out in the casting mould die sinking;
Step 6: cut rising head: utilize toothless saw excision rising head, obtain strand;
Step 7: cleaning defective: cleaning finishing strand emits port part and blemish;
Step 8: homogenizing annealing: 530 ℃ of strand shove charge heating constant temperatures; Insulation: 4 hours, can carry out mold pressing production after strand was cooled to 470 ℃ with stove after insulation finished;
Step 9: forging mold preheating: heating constant temperature: 400 ℃; Insulation: 4 hours;
Step 10: mold pressing: utilize 5000 tons of hydraulic presses and forging mold that the strand that step 8 obtains is forged and pressed, obtain forging after the forging and pressing;
Step 11: cut edge: utilize 800 tons of punch presses and edger that forging is carried out cold-trim(ming) after the forging cooling;
Step 12: erosion is washed: 1: ungrease treatment: with the forging stock stainless steel framework of packing into, immersed the alkali groove 10-15 minute, tank liquor temperature: 50-60 ℃; 2: the warm water washing: the stainless steel framework that forging stock will be housed immersed warm water tank 1-4 minute, water temperature: 50-60 ℃; 3: cold water washing: the stainless steel framework that forging stock will be housed immersed cold rinse bank 1-4 minute, water temperature: room temperature; 4: pickling: the stainless steel framework that forging stock will be housed immerses nitric acid groove 0.5-3min till the light; 5: cold water washing: the stainless steel framework that forging stock will be housed immerses cold rinse bank flushing 1-4 minute, water temperature: room temperature; 6: naturally oven dry;
Step 13: cleaning defective: cleaning polishing forging blemish;
Step 14: solution treatment: heating constant temperature: 530 ℃; Insulation: 1.5 hours; Immediately entry after forging is come out of the stove, forging time of staying in water is not less than 15 minutes, is not more than 17 seconds transfer time; Water temperature: 30-50 ℃;
Step 15: proofread and correct: the forging after utilizing 5000 tons of hydraulic presses and straightening die to solution treatment is proofreaied and correct;
Step 10 six: artificial aging: forging shove charge heating, constant temperature: 155 ℃; Insulation: 10 hours;
Step 10 seven: manual synchronizing: carry out manual synchronizing for the concrete deformation extent of forging;
Step 10 eight: erosion is washed: forging is lost wash the surface that obtains cleaning, operate same step 12;
Step 10 nine: cleaning defective: forging is carried out monolithic finish eliminate burr or the defective of colliding with.
Embodiment 2: in conjunction with Fig. 1-Fig. 6, and a kind of wheelchair frame structural member of the present invention casting and forging molding method, step is as follows:
Step 1: blanking: be that 6061 cylindrical φ 200mm ingot casting sawing becomes the long blank of 800mm with material trademark;
Step 2: melting: place crucible to heat constant temperature blank: 650 ℃, be heated to fully fusing;
Step 3: mould assembly: at casting mould (Fig. 6) rising head and mold cavity surface smearing release agent, close tight casting mould, the fastening clamp;
Step 4: cast: contain 4.5 kilograms of the liquid aluminium get after the blank fusing from sprue gate 1(Fig. 6 with crucible) is poured into die cavity and is full of fully, be poured into the rising head die cavity from rising head 2,3 successively again and be full of liquid aluminium;
Step 5: removing from mould: open geometrical clamp, slowly with the casting mould upper and lower mould separately, take out molded blank;
Step 6: cut rising head: utilize toothless saw to cut the redundance acquisition strands (Fig. 2) such as rising head;
Step 7: cleaning defective: cleaning finishing strand rising head cutting part and surface defect of bloom;
Step 8: homogenizing annealing: constant temperature is heated in the strand shove charge: 530 ℃, insulation: 4 hours, can carry out mold pressing production after strand was cooled to 470 ℃ with stove after insulation finished;
Step 9: forging mold preheating: with forging mold shove charge heating, constant temperature: 400 ℃, be incubated 4 hours;
Step 10: mold pressing: utilize 5000 tons of hydraulic presses and forging die (Fig. 6) to carry out mold pressing, mold pressing front mold die cavity and forging surface spraying oil base graphitic lubricant, lubricated namely need the spraying evenly obtains the forging with burr after the mold pressing;
Step 11: cut edge: after the forging with burr at room temperature cools off, utilize 800 tons of punch presses and edger (Fig. 5) to cut edge;
Step 12: erosion is washed: 1: ungrease treatment: with the forging stock stainless steel framework of packing into, immerse alkali groove (composition: NaOH concentration: 80-120g/L, Na 2CO 3Concentration: 25-30g/L), soak time 10-15 minute, tank liquor temperature: 50-60 ℃; 2: the warm water washing: the stainless steel framework that forging stock will be housed immerses warm water tank (composition: water for industrial use), soaked water temperature: 50-60 ℃ 1-4 minute; 3: cold water washing: the stainless steel framework that forging stock will be housed immerse cold rinse bank (composition: mobile water for industrial use), washing time 1-4 minute, water temperature: room temperature; 4: pickling: the stainless steel framework that forging stock will be housed immerses nitric acid groove (composition: HNO 3, concentration: 200-300g/L), soak time: 0.5-3min is till the light; 5: cold water washing: the stainless steel framework that forging stock will be housed immerse cold rinse bank (composition: mobile water for industrial use), washing time 1-4 minute, water temperature: room temperature; 6: naturally oven dry;
Step 13: cleaning defective: remaining burr and forging blemish when polishing finishing forging is cut edge;
Step 14: solution treatment: heating constant temperature: 530 ℃; Insulation: 1.5 hours; Immediately entry after forging is come out of the stove moves up and down in water and is no less than 6 times,, forging can not surface in the whipping process, and forging time of staying in water is not less than 15 minutes, is not more than 17 seconds transfer time; Water temperature: 30-50 ℃;
Step 15: proofread and correct: utilize 5000 tons of hydraulic presses and straightening die (Fig. 4) that forging is proofreaied and correct to eliminate part torsional deformation and buckling deformation;
Step 10 six: artificial aging: forging shove charge heating, constant temperature: 155 ℃; Insulation: 10 hours;
Step 10 seven: manual synchronizing: proofread and correct to eliminate residual deformation after straightening die is proofreaied and correct for the different deformation extent of each forging, obtain to meet the forging of customer requirements;
Step 10 eight: erosion is washed: forging is lost wash the acquisition clean surface, operate same step 12;
Step 10 nine: cleaning defective: forging is carried out monolithic finish eliminate burr or the defective of colliding with, and polishing forging surface.

Claims (1)

1. wheelchair frame structural member casting and forging molding method, it is characterized in that: step is as follows:
Step 1: blanking: be that 6061 cylindrical φ 200mm aluminium ingot casting sawing becomes the long blank of 800mm with material trademark;
Step 2: melting: place crucible to heat blank, 650 ℃ of constant temperatures are heated to fusing;
Step 3: mould assembly: rising head and mold cavity surface smearing release agent at casting mould, close tight casting mould, the fastening clamp;
Step 4: cast: contain 4.5 kilograms of the liquid aluminium get after the blank fusing with crucible, be poured into die cavity to die cavity from the sprue gate and be full of fully;
Step 5: removing from mould: open geometrical clamp, molded blank is taken out in the casting mould die sinking;
Step 6: cut rising head: utilize toothless saw excision rising head, obtain strand;
Step 7: cleaning defective: cleaning finishing strand emits port part and blemish;
Step 8: homogenizing annealing: 530 ℃ of strand shove charge heating constant temperatures; Insulation: 4 hours, can carry out mold pressing production after strand was cooled to 470 ℃ with stove after insulation finished;
Step 9: forging mold preheating: heating constant temperature: 400 ℃; Insulation: 4 hours;
Step 10: mold pressing: utilize 5000 tons of hydraulic presses and forging mold that the strand that step 8 obtains is forged and pressed, obtain forging after the forging and pressing;
Step 11: cut edge: utilize 800 tons of punch presses and edger that forging is carried out cold-trim(ming) after the forging cooling;
Step 12: erosion is washed: 1: ungrease treatment: with the forging stock stainless steel framework of packing into, immersed the alkali groove 10-15 minute, tank liquor temperature: 50-60 ℃; 2: the warm water washing: the stainless steel framework that forging stock will be housed immersed warm water tank 1-4 minute, water temperature: 50-60 ℃; 3: cold water washing: the stainless steel framework that forging stock will be housed immersed cold rinse bank 1-4 minute, water temperature: room temperature; 4: pickling: the stainless steel framework that forging stock will be housed immerses nitric acid groove 0.5-3min till the light; 5: cold water washing: the stainless steel framework that forging stock will be housed immerses cold rinse bank flushing 1-4 minute, water temperature: room temperature; 6: naturally oven dry;
Step 13: cleaning defective: cleaning polishing forging blemish;
Step 14: solution treatment: heating constant temperature: 530 ℃; Insulation: 1.5 hours; Immediately entry after forging is come out of the stove, forging time of staying in water is not less than 15 minutes, is not more than 17 seconds transfer time; Water temperature: 30-50 ℃;
Step 15: proofread and correct: the forging after utilizing 5000 tons of hydraulic presses and straightening die to solution treatment is proofreaied and correct;
Step 10 six: artificial aging: forging shove charge heating, constant temperature: 155 ℃; Insulation: 10 hours;
Step 10 seven: manual synchronizing: carry out manual synchronizing for the concrete deformation extent of forging;
Step 10 eight: erosion is washed: forging is lost wash the surface that obtains cleaning, operate same step 12;
Step 10 nine: cleaning defective: forging is carried out monolithic finish eliminate burr or the defective of colliding with.
CN 201110283392 2011-09-22 2011-09-22 Molding method for casting and forging structure piece of wheelchair frame Expired - Fee Related CN102363259B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110283392 CN102363259B (en) 2011-09-22 2011-09-22 Molding method for casting and forging structure piece of wheelchair frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110283392 CN102363259B (en) 2011-09-22 2011-09-22 Molding method for casting and forging structure piece of wheelchair frame

Publications (2)

Publication Number Publication Date
CN102363259A CN102363259A (en) 2012-02-29
CN102363259B true CN102363259B (en) 2013-01-23

Family

ID=45689867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110283392 Expired - Fee Related CN102363259B (en) 2011-09-22 2011-09-22 Molding method for casting and forging structure piece of wheelchair frame

Country Status (1)

Country Link
CN (1) CN102363259B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699636B (en) * 2012-06-18 2015-08-19 西南大学 The liquid forging Rolling compund manufacturing process of 6082 aluminium alloy different cross section large rings
CN104694857B (en) * 2013-12-05 2016-08-24 北京航星机器制造有限公司 Thin-walled inlets structure Cast aluminium alloy gold cabin section method for controlling heat treatment deformation
CN104741592B (en) * 2015-03-19 2020-02-11 新荣株式会社 Continuous casting and forging device for manufacturing aluminum automobile parts and manufacturing method using same
CN105234634A (en) * 2015-10-22 2016-01-13 苏州胜利精密制造科技股份有限公司 Machining method of liquid crystal television set support
CN105401018B (en) * 2015-11-14 2018-05-15 合肥市易远新材料有限公司 A kind of high-strength tenacity ultrafine crystal deformed aluminium alloy and preparation method thereof
CN107697855A (en) * 2017-08-30 2018-02-16 宁波韧霸货叉有限公司 A kind of high rigidity fork of forklift truck
CN108746469B (en) * 2018-05-17 2020-05-15 湖北三环锻造有限公司 Cold and hot combined trimming process for aluminum alloy forging
CN115194083A (en) * 2022-06-29 2022-10-18 中国第一汽车股份有限公司 Production method of aluminum alloy rear steering knuckle of casting and forging combined passenger car

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050512A (en) * 1989-09-29 1991-04-10 天津大学机电分校 Al-Zn-Mg is an alloy casting-die forging assembling process
CN1861288A (en) * 2005-05-10 2006-11-15 徐名钧 Procedure for processing aluminium alloy products
CN101486087A (en) * 2009-02-11 2009-07-22 江苏大学 Casting and forging combined technique of aluminum alloy linkage rod

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11286758A (en) * 1998-04-02 1999-10-19 Nippon Light Metal Co Ltd Production of forged product using aluminum casting material
JP2002361399A (en) * 2001-06-07 2002-12-17 Aisin Seiki Co Ltd Casting and forging method for aluminum alloy, and aluminum alloy for casting and forging

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050512A (en) * 1989-09-29 1991-04-10 天津大学机电分校 Al-Zn-Mg is an alloy casting-die forging assembling process
CN1861288A (en) * 2005-05-10 2006-11-15 徐名钧 Procedure for processing aluminium alloy products
CN101486087A (en) * 2009-02-11 2009-07-22 江苏大学 Casting and forging combined technique of aluminum alloy linkage rod

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开2002-361399A 2002.12.17
JP特开平11-286758A 1999.10.19

Also Published As

Publication number Publication date
CN102363259A (en) 2012-02-29

Similar Documents

Publication Publication Date Title
CN102363259B (en) Molding method for casting and forging structure piece of wheelchair frame
CN106756334B (en) A kind of production method of aero-engine labyrinth precision die forgings
CN104439219B (en) A kind of casting technique of steel loop base based on casting and rolling composite forming
CN100453206C (en) Process of making oil cylinder body and cover with aluminium alloy
CN103266238B (en) High-zinc-copper alloy cutting bus and processing method thereof
CN107186139B (en) The H profile steel manufacturing method of nuclear fusion stack magnet support
CN102019353A (en) Precision casting molding method for complex thin-walled member
CN104131202B (en) The short process making method of 6061 aluminum alloy die forgings
CN103769532B (en) A kind ofly utilize the water-soluble waxed method making hollow wax matrix
CN102335704B (en) Method for forging and forming structural parts of wheel chair rack
CN103157692A (en) Preparation method for zinc-based alloy specially-shaped tube
CN107523707A (en) The founding aluminium bar smelting technology of aluminium section bar
CN103088266A (en) Forging method for foundation bolt
CN102689156A (en) GH4169 high-temperature alloy special-cross-section large annular piece liquid forging and rolling composite forming method
CN104015012A (en) Manufacturing method of Al-Mg-Si alloy hub
CN105202275A (en) Titanium alloy TC4 hot-rolled pipe and preparation method thereof
CN110614287A (en) Method for reducing extrusion bubbles of 7XXX series aluminum alloy bar
CN102689159A (en) Liquid die forging and rolling compound formation method for 6061 aluminum alloy irregular-section large ring piece
CN115815500A (en) Free forging method of I-shaped short shaft forging
CN108994272A (en) A kind of pressure casting method of die casting
CN104476128A (en) Method of manufacturing high-temperature alloy pipe blanks
CN108098279A (en) A kind of imitative forged hub manufacturing process
CN104972029A (en) Forging method of wire clamp body for high voltage iron tower
CN101817073B (en) Process for manufacturing cadmium plate and cadmium alloy plate
CN108580574B (en) Three-dimensional near-solid pressure forming method for tee part blank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130123