CN102310873A - Flat shunting operation hook planning system - Google Patents

Flat shunting operation hook planning system Download PDF

Info

Publication number
CN102310873A
CN102310873A CN201110253812A CN201110253812A CN102310873A CN 102310873 A CN102310873 A CN 102310873A CN 201110253812 A CN201110253812 A CN 201110253812A CN 201110253812 A CN201110253812 A CN 201110253812A CN 102310873 A CN102310873 A CN 102310873A
Authority
CN
China
Prior art keywords
module
station
shunting
information
car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110253812A
Other languages
Chinese (zh)
Inventor
张伯敏
孙焰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sun Yan
Zhang Bomin
Zhang Yingbo
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110253812A priority Critical patent/CN102310873A/en
Publication of CN102310873A publication Critical patent/CN102310873A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention relates to a flat shunting operation hook planning system, which is in a modularized structure. Each module comprises a hook plan pattern automatic planning module, a parameter setting module, a train reception and starting module, a shunting operation simulation module, a shunting operation executing pushback and play-back module, an information dynamic inquiry and display module and an in-site operation mark module. A system formed by the modules is connected with a transportation management information system (TMIS) of the existing station, the data of the train list information after departure of a TIMS database can be automatically read and written, train units are clicked by a mouse on a lane chart and are dragged to the required position after the grouping by planning personnel according to station sending and taking operation tasks, and one batch of shunting operation plans can be planed and completed.

Description

Flat shunting operation hooking plan establishment system
Technical field
The present invention relates to a kind of railway train arrangement operation hooking plan and work out system, establishment system on particularly a kind of railway intermediate station flat shunting operation hooking plan figure.
Background technology
Station operating plan is the important component part of railway traffic organization work, and the establishment level of shunting operation plan has determined the conveying efficiency at station to a great extent.The China railways station has 80% for intermediate station, and the field structure type of stand is many, respectively station mode difference of shunting.Shunting trip plan is worked out after obtaining train list information after departure in the station; Be input to again in TMIS (transportation administration information system) system; And dynamically import and revise the relevant information of shunting by manual work in the process of implementation, and the position of station cars on hand and the variation of state are upgraded in dependence " frosted glass " by hand.The lorry of the existing most of intermediate station task of shunting is accomplished by the one's own job machine, and high to the establishment requirements for quality of shunting plan, the establishment rate request is fast.
But intermediate station flat shunting operation hooking plan still leans on artificial establishment at present, and many with the personal experience during establishment, preparation method, quality, efficient vary with each individual, and can't guarantee high establishment quality and fast establishment speed.
Summary of the invention
The objective of the invention is to design a kind of flat shunting operation hooking plan and work out system.
What the present invention will solve is that existing intermediate station flat shunting operation hooking plan still leans on artificial establishment, can't guarantee to work out the problem of quality and establishment speed.
Technical scheme of the present invention is: flat shunting operation hooking plan establishment of the present invention system is a modular construction, and main modular comprises:
A, parameter are provided with module: be used for system's desired parameters is carried out unified setting; The selection that comprises current station is provided with change; Station structure is provided with, and vehicle changes setting long and the maximum traction of an accent machine number setting, chopping machine and paper type, and screen format and size are provided with;
B, information dynamic queries display module: the bicycle parking state that is used to stand (vehicle class, weight car, the thing of freighting, send out the station and arrive at a station, loading and unloading state, the time of advent) the dynamic demonstration of information and inquiry, overtime standing car (old brand car), the car of closing the door, specially mark car information inquiry etc.; And as required picture is amplified dwindle, color settings, and the full screen display;
C, the automatic compiling module of hooking plan figure: destination information that this module moves through manual work input vehicle or the dilatory operation through mouse, by computer recording with translate into the hooking plan job ticket, work out out optimum station shunting trip plan automatically;
D, sending and receiving car module: this module system, can be accomplished the station rapidly easily and connect car and the operation of dispatching a car to the breath of really notifying according to the station freight train, is both the existing car data storehouse, station of upgrading TMIS, and on screen, is shown to the organizational information of sending out train; It is also according to upgrade in time each item attribute of vehicle of vehicle loading and unloading operation process;
E, shunting service analog module: can accomplish the operation process real simulation of shunting at the station rapidly easily and on screen, clearly show;
F, shunting service are carried out and pushed back and playback module: the function of this module is by hook or by batch execution with the hooking plan of finishing; And can push back or playback executed hooking plan; Can consult the information of station, an execution front and back interior station bicycle parking of Ben Ban or historical hooking plan, the while writes data bank with execution information automatically;
G, field operation Sign module: on screen, can indicate various field operation state symbols on request, comprise red card, rim brake, various wheel skid;
Relation between above-mentioned each module is: be connected with parameter on the automatic compiling module of hooking plan figure and module, sending and receiving car module, shunting service analog module, shunting service are set carry out and push back and playback module, shunting service is carried out to push back with playback module and is connected with information dynamic queries display module, field operation Sign module.
The system that above-mentioned each module constitutes is connected with existing station TMIS; Automatically read and write the train list information after departure data of TIMS data bank; After the planning personnel fetch and deliver the job task grouping according to the station; On the figure of station track, using click car group to be dragged to needs the position, can work out a collection of shunting operation plan.
After complete this batch plan, system of the present invention deposits execution result and the renewal of cars on hand information real-time in the TMIS data bank automatically, and through true reporting system transmission " train consist list " to next operation post information service is provided.Simultaneously the information of real-time update and external communication protocol software curtain on the electronics large-size screen monitors are shown.
Advantage of the present invention is: the one, and the present invention is dragged to the optimum position through click car group, can work out shunting operation plan list by the gross, and makes total hooking plan number and locomotive running gear apart from the shortest; The 2nd, operation process visual.System module is monitoring task process in real time both, can last one class execution production plan be pushed back operation again, and the playback of historical hooking plan can be understood the cars on hand information of grasping in the station and intuitively show; The 3rd, large-size screen monitors show in real time.Can car status information (empty wagons divides car type, loaded vehicle branch whereabouts) and operation process be displayed in full screen on giant-screen, replace traditional frosted glass and hand-kept.And it is dynamic to simulate station operation, implements the analog simulation teaching, training.The 4th, the system that realized reads and writes TMIS system data informational function in real time; Shunting service to native system establishment hooking plan and enforcement can upgrade with the TMIS system data synchronization; Not only make the operation of system practical more, also expand the function of TMIS station system simultaneously.The 5th, added pushing back and historical hooking plan playback function of shunting trip plan.Wherein push back function and can executed hooking plan before relieving be cancelled operation; Hooking plan operation playback function can enough show the historical hooking plan implementation of native system enforcement and the station bicycle parking information change process in the station intuitively, inquiry and analysis to arbitrary process are provided.
Description of drawings
Fig. 1 is a block diagram of the present invention.
The specific embodiment
Combine the accompanying drawing and the specific embodiment that the present invention is further described at present.
As shown in the figure, flat shunting operation hooking plan establishment system of the present invention is a modular construction, and main modular comprises:
A, parameter are provided with module: be used for system's desired parameters is carried out unified setting; The selection that comprises current station is provided with change; Station structure is provided with, and vehicle changes setting long and the maximum traction of an accent machine number setting, chopping machine and paper type, and screen format and size are provided with;
B, information dynamic queries display module: the bicycle parking state that is used to stand (vehicle class, weight car, the thing of freighting, send out the station and arrive at a station, loading and unloading state, the time of advent) the dynamic demonstration of information and inquiry, overtime standing car (old brand car), the car of closing the door, specially mark car information inquiry etc.; And as required picture is amplified dwindle, color settings, and the full screen display;
C, the automatic compiling module of hooking plan figure: destination information that this module moves through manual work input vehicle or the dilatory operation through mouse, by computer recording with translate into the hooking plan job ticket, work out out optimum station shunting trip plan automatically;
D, sending and receiving car module: this module system, can be accomplished the station rapidly easily and connect car and the operation of dispatching a car to the breath of really notifying according to the station freight train, is both the existing car data storehouse, station of upgrading TMIS, and on screen, is shown to the organizational information of sending out train; It is also according to upgrade in time each item attribute of vehicle of vehicle loading and unloading operation process;
E, shunting service analog module: can accomplish the operation process real simulation of shunting at the station rapidly easily and on screen, clearly show;
F, shunting service are carried out and pushed back and playback module: the function of this module is by hook or by batch execution with the hooking plan of finishing; And can push back or playback executed hooking plan; Can consult the information of station, an execution front and back interior station bicycle parking of Ben Ban or historical hooking plan, the while writes data bank with execution information automatically;
G, field operation Sign module: on screen, can indicate various field operation state symbols on request, comprise red card, rim brake, various wheel skid;
Relation between above-mentioned each module is: be connected with parameter on the automatic compiling module of hooking plan figure and module, sending and receiving car module, shunting service analog module, shunting service are set carry out and push back and playback module, shunting service is carried out to push back with playback module and is connected with information dynamic queries display module, field operation Sign module.
Said parameter is provided with the underlying parameter that module is a shunting trip plan optimization establishment system, must carry out unified setting to system's desired parameters and define.
Information dynamic queries display module is the original data of shunting trip plan optimization establishment system, and it obtains to the final figure certificate through reading TMIS system train, and for working out the shunting trip plan actv. real time data is provided.
The automatic compiling module of hooking plan figure is the nucleus module of shunting trip plan optimization establishment system; Under the fixed condition of a collection of job task; According to factors such as the line construction at station, vehicle location, various production time requirements; In time work out out the shunting service order of locomotive, guaranteeing that each vehicle finally moves under the condition of its appointed positions, make total shunting trip number and locomotive total distance travelled few more good more.Because the feasible scheme of shunting is many, different staff planners will work out the diverse scheme of shunting, and the establishment quality also differs bigger, and easy error.The Optimization Model and the algoritic module of the built-in hooking plan establishment of this module; Read and put in order the related data of TIMS system; Optimization limiting condition according to setting is worked out the shunting trip plan automatically, and can implement artificial adjustment to the gained hooking plan according to actual needs, and intelligence is added remarks column information.
Sending and receiving car module is the initial information of shunting trip plan optimization establishment system; Module according to the station freight train to the breath of really notifying; The station be can accomplish rapidly easily and car and the operation of dispatching a car connect; Be both the existing car data storehouse, station of upgrading TMIS, and on screen, be shown to the organizational information of sending out train, wherein information of vehicles can also be according to upgrade in time each item attribute of vehicle of vehicle loading and unloading operation process.
Shunting service is carried out and to be pushed back with playback module is the subitem of shunting trip plan optimization establishment system, is consistent for making screen display content and on-the-spot information of vehicles, needs the shunting service at execution station, mainly comprise hooking plan execution, simulate, push back.
The shunting service analog module is the executive subsystem of shunting trip plan optimization establishment system, can carry out the on-the-spot process of shunting of mobility type analogy to specifying hooking plan, system is not upgraded the basic data such as actual of vehicle location.
The field operation Sign module is the subsystem of shunting trip plan optimization establishment system, and the loading and unloading operation of the setting of the various working signals in station and existing car etc. can indicate on request that on screen various field operation state symbols show.
The system that above-mentioned each module constitutes is connected with existing station TMIS; Automatically read and write the train list information after departure data of TIMS data bank; After the planning personnel fetch and deliver the job task grouping according to the station; On the figure of station track, using click car group to be dragged to needs the position, can work out a collection of shunting operation plan.
After complete this batch plan, system of the present invention deposits execution result and the renewal of cars on hand information real-time in the TMIS data bank automatically, and through true reporting system transmission " train consist list " to next operation post information service is provided.Simultaneously the information of real-time update and external communication protocol software curtain on the electronics large-size screen monitors are shown.
Of the present invention have a following function:
The one, to cars on hand information dynamic queries and statistical function.Native system can be realized and being connected of TMIS system, automatic time reading database system data, and can show different details as required.As the information inquiry of the bicycle parking state of standing and screen display, overtime standing car (old brand car), close the door car information inquiry and demonstration etc.; Can show on-the-spot anti-slide measure; Station, the station track bicycle parking query function of native system not only can substitute the function of " frosted glass " fully; The details such as weight, car type, the name of an article, tonnage, consignee that also can show each vehicle on request, and statistics can carry out vehicle number and stop existing car the time.
The 2nd, the automatic programmed function of hooking plan.The Optimization Model and the algorithm of the built-in hooking plan establishment of native system; Read and put in order the related data of TIMS system; Optimization limiting condition according to setting is worked out the shunting trip plan automatically, and can implement artificial adjustment to the gained hooking plan according to actual needs, and intelligence is added remarks column information.
The 3rd, graphics preparation hooking plan (establishment of man machine communication formula) function.Operating personal can be worked out hooking plan through mouse drag car group position through the station bicycle parking figure of each station track that system showed, by computing machine the mouse action of manual work is translated into the hooking plan job ticket automatically, makes establishment shunting trip planning process visualize.
The 4th, shunting service mobility type analogy function.Shunting and train reception and departure operation that native system takes place in can standing realize the simulated operation function, can through simulation show bicycle parking situation in station in the field, station of observing day part, each caused by operations variation, before operation, operation is got information about.
The 5th, the large screen display function.The Presentation Function of native system can be realized full screen display, and can mouse draws the amplification that realizes picture and dwindle, and realizes the effect that present frosted glass can be realized, simultaneously also can be as required to color settings.
The 6th, operation review and historical operation playback function.Native system can push back operation to the executed hooking plan of this class operation, promptly to executed hooking plan cancellation.Native system also can carry out the station bicycle parking situation that playback shows field, station, every hook operation front and back to accomplishing hooking plan simultaneously, and the Historical Jobs process is followed the tracks of and analyzed.
The 7th, production plan singles print output function.Intelligent printing hooking plan job ticket can be according to print paper size automatic typesetting.

Claims (1)

1. a flat shunting operation hooking plan is worked out system, and it is a modular construction, it is characterized in that described main modular comprises:
A, parameter are provided with module: be used for system's desired parameters is carried out unified setting; The selection that comprises current station is provided with change; Station structure is provided with, and vehicle changes setting long and the maximum traction of an accent machine number setting, chopping machine and paper type, and screen format and size are provided with;
B, information dynamic queries display module: the dynamic demonstration of information of the bicycle parking state that is used to stand and inquiry, overtime standing car, the car of closing the door, the information inquiry of special mark car; And as required picture is amplified dwindle, color settings, and the full screen display;
C, the automatic compiling module of hooking plan figure: destination information that this module moves through manual work input vehicle or the dilatory operation through mouse, by computer recording with translate into the hooking plan job ticket, work out out optimum station shunting trip plan automatically;
D, sending and receiving car module: this module system, can be accomplished the station rapidly easily and connect car and the operation of dispatching a car to the breath of really notifying according to the station freight train, is both the existing car data storehouse, station of upgrading TMIS, and on screen, is shown to the organizational information of sending out train; It is also according to upgrade in time each item attribute of vehicle of vehicle loading and unloading operation process;
E, shunting service analog module: can accomplish the operation process real simulation of shunting at the station rapidly easily and on screen, clearly show;
F, shunting service are carried out and pushed back and playback module: the function of this module is by hook or by batch execution with the hooking plan of finishing; And can push back or playback executed hooking plan; Can consult the information of station, an execution front and back interior station bicycle parking of Ben Ban or historical hooking plan, the while writes data bank with execution information automatically;
G, field operation Sign module: on screen, can indicate various field operation state symbols on request, comprise red card, rim brake, various wheel skid;
Relation between above-mentioned each module is: be connected with parameter on the automatic compiling module of hooking plan figure and module, sending and receiving car module, shunting service analog module, shunting service are set carry out and push back and playback module, shunting service is carried out to push back with playback module and is connected with information dynamic queries display module, field operation Sign module.
CN201110253812A 2011-08-31 2011-08-31 Flat shunting operation hook planning system Pending CN102310873A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110253812A CN102310873A (en) 2011-08-31 2011-08-31 Flat shunting operation hook planning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110253812A CN102310873A (en) 2011-08-31 2011-08-31 Flat shunting operation hook planning system

Publications (1)

Publication Number Publication Date
CN102310873A true CN102310873A (en) 2012-01-11

Family

ID=45424522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110253812A Pending CN102310873A (en) 2011-08-31 2011-08-31 Flat shunting operation hook planning system

Country Status (1)

Country Link
CN (1) CN102310873A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103507836A (en) * 2013-08-13 2014-01-15 张伯敏 Plane switching operation hook planning compilation method
CN105787616A (en) * 2014-12-24 2016-07-20 常熟市盛铭信息技术有限公司 Design method for designing intelligent and informationalized vehicle dispatching and scheduling software
CN106131218A (en) * 2016-08-24 2016-11-16 中国神华能源股份有限公司 A kind of true reporting device of railway and system
CN106741019A (en) * 2017-01-18 2017-05-31 四川高新轨道交通产业技术研究院 A kind of system and method for automatic establishment metro depot train departure plan
CN109219018A (en) * 2018-09-06 2019-01-15 天津七二通信广播股份有限公司 A kind of configurable railway Heibei provincial opera shunting operation sheet display methods
CN110949459A (en) * 2019-12-05 2020-04-03 北京京天威科技发展有限公司 Railway wagon vehicle section shunting operation system
CN112046556A (en) * 2020-09-22 2020-12-08 大连交通大学 Bidirectional synchronization system for planning contents of present-car and shunting operation in graphical scene
CN112606882A (en) * 2021-01-27 2021-04-06 广西柳州钢铁集团有限公司 Automatic hook clearing method for railway shunting operation plan
CN113071540A (en) * 2021-03-23 2021-07-06 上海瀚所信息技术有限公司 Station vehicle scheduling method based on Beidou differential positioning
CN113283633A (en) * 2021-04-15 2021-08-20 北京交通大学 Railway station operation plan compiling method and application
CN114379621A (en) * 2022-01-04 2022-04-22 北京全路通信信号研究设计院集团有限公司 Confirmed information processing method, system, device, equipment and medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1555998A (en) * 2004-01-05 2004-12-22 北京全路通信信号研究设计院 Marshalling station comprehensive integrated automation system
CN1817711A (en) * 2006-03-24 2006-08-16 北京全路通信信号研究设计院 Device and method for making dispatch plan of railway
FR2909348A1 (en) * 2006-11-30 2008-06-06 Alstom Transport Sa Shunting movement management method for e.g. carriage train, involves validating modified parameter as non modifiable control after manual intervention, till another intervention is performed to change parameter
WO2008116794A1 (en) * 2007-03-27 2008-10-02 Siemens Aktiengesellschaft Device for supporting rail operation processes

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1555998A (en) * 2004-01-05 2004-12-22 北京全路通信信号研究设计院 Marshalling station comprehensive integrated automation system
CN1817711A (en) * 2006-03-24 2006-08-16 北京全路通信信号研究设计院 Device and method for making dispatch plan of railway
FR2909348A1 (en) * 2006-11-30 2008-06-06 Alstom Transport Sa Shunting movement management method for e.g. carriage train, involves validating modified parameter as non modifiable control after manual intervention, till another intervention is performed to change parameter
WO2008116794A1 (en) * 2007-03-27 2008-10-02 Siemens Aktiengesellschaft Device for supporting rail operation processes

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103507836A (en) * 2013-08-13 2014-01-15 张伯敏 Plane switching operation hook planning compilation method
CN105787616A (en) * 2014-12-24 2016-07-20 常熟市盛铭信息技术有限公司 Design method for designing intelligent and informationalized vehicle dispatching and scheduling software
CN106131218A (en) * 2016-08-24 2016-11-16 中国神华能源股份有限公司 A kind of true reporting device of railway and system
CN106741019A (en) * 2017-01-18 2017-05-31 四川高新轨道交通产业技术研究院 A kind of system and method for automatic establishment metro depot train departure plan
CN106741019B (en) * 2017-01-18 2019-02-22 四川高新轨道交通产业技术研究院 It is a kind of for working out the system and method for metro depot train departure plan automatically
CN109219018A (en) * 2018-09-06 2019-01-15 天津七二通信广播股份有限公司 A kind of configurable railway Heibei provincial opera shunting operation sheet display methods
CN110949459A (en) * 2019-12-05 2020-04-03 北京京天威科技发展有限公司 Railway wagon vehicle section shunting operation system
CN110949459B (en) * 2019-12-05 2022-02-15 北京京天威科技发展有限公司 Railway wagon vehicle section shunting operation system
CN112046556A (en) * 2020-09-22 2020-12-08 大连交通大学 Bidirectional synchronization system for planning contents of present-car and shunting operation in graphical scene
CN112046556B (en) * 2020-09-22 2022-02-22 大连交通大学 Bidirectional synchronization system for planning contents of present-car and shunting operation in graphical scene
CN112606882A (en) * 2021-01-27 2021-04-06 广西柳州钢铁集团有限公司 Automatic hook clearing method for railway shunting operation plan
CN113071540A (en) * 2021-03-23 2021-07-06 上海瀚所信息技术有限公司 Station vehicle scheduling method based on Beidou differential positioning
CN113283633A (en) * 2021-04-15 2021-08-20 北京交通大学 Railway station operation plan compiling method and application
CN114379621A (en) * 2022-01-04 2022-04-22 北京全路通信信号研究设计院集团有限公司 Confirmed information processing method, system, device, equipment and medium
CN114379621B (en) * 2022-01-04 2023-06-27 北京全路通信信号研究设计院集团有限公司 Method, system, device, equipment and medium for processing confirmed report information

Similar Documents

Publication Publication Date Title
CN102310873A (en) Flat shunting operation hook planning system
CN108595610B (en) Electric forklift working condition visualization system based on Internet of things
CN100372720C (en) Device and method for making dispatch plan of railway
CN103258424B (en) Intelligent public transport service system and control method
CN104537511A (en) Novel logistics management and control system
CN201220675Y (en) Station yard integrated monitoring system of railway station
CN105607598A (en) Driver advisory system and method for train
CN107831713A (en) A kind of locomotive based on more yards/railcar Dynamic Tracking and system
CN105046961B (en) The method and system of the long short distance automatic shunt of taxi in the station of transport hub port
CN105469665A (en) High-speed railway onboard signal simulation training system and method
CN103693080B (en) A kind of electronic motor-car section technical operation chart implementation method and system
CN102140930A (en) Management system of production and transportation measuring information of underground ores and using method thereof
CN103507836A (en) Plane switching operation hook planning compilation method
CN106503334A (en) A kind of method for building intersection channelization model and showing clearance phase place
CN110949459B (en) Railway wagon vehicle section shunting operation system
CN105644594B (en) A kind of MTU depot based on statistics/institute's sending and receiving vehicle operation station track auto-allocation method
CN108791368A (en) Rail traffic crewing management system
CN105335823A (en) Automobile body tracing system for automobile production workshop
CN106339835A (en) Railway freight transportation ticket making management system
CN207097048U (en) Logistics real time inquiry system based on GPS location Yu big data analytical technology
CN104648411B (en) Locomotive EMS and method
CN202351947U (en) Full-automatic operating vehicle queuing and calling management system combined with radio frequency identification (RFID)
CN102419872A (en) Locomotive axial velocity recording, idle running diagnosing and forecasting device
CN204087257U (en) Subway crewing management system
CN206515655U (en) A kind of environmental sanitation vehicles work monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SUN YAN ZHANG YINGBO

Free format text: FORMER OWNER: SUN YAN

Effective date: 20120904

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Bomin

Inventor after: Sun Yan

Inventor after: Zhang Yingbo

Inventor before: Zhang Bomin

Inventor before: Sun Yan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG BOMIN SUN YAN TO: ZHANG BOMIN SUN YAN ZHANG YINGBO

TA01 Transfer of patent application right

Effective date of registration: 20120904

Address after: Jiaxing City, Zhejiang Province, 314000 East Road No. 65 Jiaxing branch

Applicant after: Zhang Bomin

Applicant after: Sun Yan

Applicant after: Zhang Yingbo

Address before: Jiaxing City, Zhejiang Province, 314000 East Road No. 65 Jiaxing branch

Applicant before: Zhang Bomin

Applicant before: Sun Yan

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120111