CN102277898B - Drain pipe jacking construction method - Google Patents
Drain pipe jacking construction method Download PDFInfo
- Publication number
- CN102277898B CN102277898B CN 201110119467 CN201110119467A CN102277898B CN 102277898 B CN102277898 B CN 102277898B CN 201110119467 CN201110119467 CN 201110119467 CN 201110119467 A CN201110119467 A CN 201110119467A CN 102277898 B CN102277898 B CN 102277898B
- Authority
- CN
- China
- Prior art keywords
- jacking
- head
- jack
- iron
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 98
- 229910052742 iron Inorganic materials 0.000 claims abstract description 52
- 239000002002 slurry Substances 0.000 claims abstract description 17
- 238000000034 method Methods 0.000 claims abstract description 13
- 238000007789 sealing Methods 0.000 claims abstract description 7
- 239000002689 soil Substances 0.000 claims description 45
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 239000010410 layer Substances 0.000 claims description 13
- 239000011449 brick Substances 0.000 claims description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 10
- 230000002153 concerted effect Effects 0.000 claims description 9
- 239000004570 mortar (masonry) Substances 0.000 claims description 9
- 230000009974 thixotropic effect Effects 0.000 claims description 8
- 239000004567 concrete Substances 0.000 claims description 6
- 230000008878 coupling Effects 0.000 claims description 6
- 238000010168 coupling process Methods 0.000 claims description 6
- 238000005859 coupling reaction Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 6
- 239000004576 sand Substances 0.000 claims description 6
- 230000008569 process Effects 0.000 claims description 5
- 230000000694 effects Effects 0.000 claims description 4
- 229910001208 Crucible steel Inorganic materials 0.000 claims description 3
- 208000037656 Respiratory Sounds Diseases 0.000 claims description 3
- 230000002159 abnormal effect Effects 0.000 claims description 3
- 238000005266 casting Methods 0.000 claims description 3
- 239000011083 cement mortar Substances 0.000 claims description 3
- 230000000295 complement effect Effects 0.000 claims description 3
- 229920001971 elastomer Polymers 0.000 claims description 3
- 239000011229 interlayer Substances 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 3
- 239000000843 powder Substances 0.000 claims description 3
- 238000004886 process control Methods 0.000 claims description 3
- 229920006395 saturated elastomer Polymers 0.000 claims description 3
- 238000007569 slipcasting Methods 0.000 claims description 3
- 238000003756 stirring Methods 0.000 claims description 3
- 230000007306 turnover Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 239000002023 wood Substances 0.000 claims description 3
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000009412 basement excavation Methods 0.000 description 4
- 238000005520 cutting process Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000009711 regulatory function Effects 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110119467 CN102277898B (en) | 2011-04-28 | 2011-04-28 | Drain pipe jacking construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110119467 CN102277898B (en) | 2011-04-28 | 2011-04-28 | Drain pipe jacking construction method |
Related Child Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201210575941 Division CN103046638A (en) | 2011-04-28 | 2011-04-28 | Pipe jacking construction method |
CN 201210575945 Division CN103015519A (en) | 2011-04-28 | 2011-04-28 | Pipe-jacking construction of drain pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102277898A CN102277898A (en) | 2011-12-14 |
CN102277898B true CN102277898B (en) | 2013-08-07 |
Family
ID=45103598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110119467 Expired - Fee Related CN102277898B (en) | 2011-04-28 | 2011-04-28 | Drain pipe jacking construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102277898B (en) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102537517B (en) * | 2011-12-16 | 2014-03-19 | 马鞍山钢铁建设集团有限公司 | Construction technology for jacking pipe in river or lake |
CN103527202A (en) * | 2012-07-27 | 2014-01-22 | 中国有色金属工业第六冶金建设有限公司 | Method for constructing tunnel under complicated geological conditions |
CN103382842B (en) * | 2013-07-30 | 2015-08-26 | 上海交通大学 | A kind of construction method preventing push-bench and tube coupling from rotating |
CN103836257A (en) * | 2014-02-28 | 2014-06-04 | 中天建设集团有限公司 | W-type flexible anti-seismic cast iron drainage pipe construction method |
CN103883796B (en) * | 2014-04-07 | 2015-12-02 | 葛洲坝集团第一工程有限公司 | Silt particle mud district hand pick formula jacking construction device and method |
CN106150510A (en) * | 2015-04-13 | 2016-11-23 | 李青峰 | Pipeline underground horizontal direction is escaped structure construction and installation technology |
CN106313304A (en) * | 2016-08-28 | 2017-01-11 | 葫芦岛市北方金属制品有限公司 | Method for producing jacking concrete drainage pipe from prestress steel bar framework |
CN107060042A (en) * | 2017-06-28 | 2017-08-18 | 合肥市闵葵电力工程有限公司 | A kind of construction method of outdoor drainage pipeline |
CN107725892A (en) * | 2017-09-07 | 2018-02-23 | 武汉市汉阳市政建设集团公司 | The device and method in artificial jacking construction real time correction cutterhead jacking direction |
CN110388511A (en) * | 2018-04-17 | 2019-10-29 | 中电建水环境治理技术有限公司 | The method that push-bench and control push-bench exit push pipe |
CN108662283A (en) * | 2018-06-01 | 2018-10-16 | 成都金玉雄辉建筑工程有限公司 | earth pressure balance pipe jacking construction method |
CN108729925A (en) * | 2018-06-01 | 2018-11-02 | 成都金玉雄辉建筑工程有限公司 | Kidney ellipsoid push-bench and its construction method |
CN108506015A (en) * | 2018-06-07 | 2018-09-07 | 北京住总集团有限责任公司 | Excavate the construction method of artificial push pipe and application Pipe Jacking in a kind of Large Diameter Pipeline point storehouse |
CN109868883A (en) * | 2019-03-25 | 2019-06-11 | 广州市诚利建设工程有限公司 | Municipal subsoil drain pipeline construction method |
CN110185130B (en) * | 2019-06-13 | 2020-09-25 | 中铁工程装备集团有限公司 | Sewage pipeline dredging device and construction method |
CN110359540B (en) * | 2019-08-02 | 2024-04-19 | 中铁建设集团北京工程有限公司 | Manual pipe jacking construction method for shallow-covered large-pipe-diameter high-water-level existing road |
CN112982278A (en) * | 2020-09-19 | 2021-06-18 | 南京建工集团有限公司 | Construction method for large-diameter pipe jacking to penetrate through river levee |
CN113803081A (en) * | 2021-08-27 | 2021-12-17 | 中铁三局集团广东建设工程有限公司 | Pipe jacking construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19625073A1 (en) * | 1996-06-22 | 1997-01-23 | Thomas Dr Ing Daffner | Digging=free system for laying underground drain seepage pipes |
CN1560391A (en) * | 2004-02-27 | 2005-01-05 | 武汉理工大学 | Construction technology of relay jacking for glass fiber reinforced plastics sand-inclusion pipe-jacking and apparatus of device thereof |
CN101806092A (en) * | 2010-03-10 | 2010-08-18 | 沈阳市政集团有限公司 | Pipe jacking construction method capable of reducing friction resistance |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06146383A (en) * | 1992-11-17 | 1994-05-27 | Sekisui Chem Co Ltd | Pipe jacking method for egg-shaped pipe |
-
2011
- 2011-04-28 CN CN 201110119467 patent/CN102277898B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19625073A1 (en) * | 1996-06-22 | 1997-01-23 | Thomas Dr Ing Daffner | Digging=free system for laying underground drain seepage pipes |
CN1560391A (en) * | 2004-02-27 | 2005-01-05 | 武汉理工大学 | Construction technology of relay jacking for glass fiber reinforced plastics sand-inclusion pipe-jacking and apparatus of device thereof |
CN101806092A (en) * | 2010-03-10 | 2010-08-18 | 沈阳市政集团有限公司 | Pipe jacking construction method capable of reducing friction resistance |
Non-Patent Citations (2)
Title |
---|
市政道路污水管顶管施工技术;蒲吉见;《路基工程》;20070430(第4期);第142-144页 * |
李家鑫,于庭伟.顶管施工技术在市政工程中的应用.《重庆建筑》.2007,(第7期),第23-25页. * |
Also Published As
Publication number | Publication date |
---|---|
CN102277898A (en) | 2011-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102277898B (en) | Drain pipe jacking construction method | |
CN103046638A (en) | Pipe jacking construction method | |
CN103015519A (en) | Pipe-jacking construction of drain pipe | |
CN106369223B (en) | A kind of silt stratum pipe jacking construction method | |
CN100501124C (en) | Construction method for tunnel contact passage in shield section of underground railway | |
CN106402490B (en) | Silt stratum push pipe jacking construction method based on steel bushing head tool pipe | |
CN106641440B (en) | A kind of transverse crossing railway line underground piping jacking construction method | |
CN103343544B (en) | Construction method for large-scale open caisson | |
CN101781993B (en) | Shield driving construction method for bearing water-rich soil layer | |
CN110159284B (en) | Ultra-shallow soil covering and large longitudinal slope starting construction method for coastal hydraulic reclamation stratum shield machine | |
CN207777770U (en) | A kind of precast spliced pipe fitting jacking system | |
CN112012753B (en) | Shield tunneling machine starting method based on special-shaped extension steel ring | |
CN107795749A (en) | A kind of precast spliced pipe fitting jacking system and its construction method | |
CN102889428A (en) | Non-excavation correction method and apparatus of pipeline center line deviation after pipe-jacking construction | |
CN110130909B (en) | Construction method for shield to penetrate existing station in silt stratum | |
CN110055973B (en) | Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method | |
CN202852197U (en) | Non-excavation correcting device for pipeline centre line deviation after pipe-jacking construction | |
CN112855029B (en) | Goaf drilling external pipe expansion construction method | |
CN113107501B (en) | Initial tunneling construction method for tunnel portal extension steel ring | |
CN112727470B (en) | Construction reinforcing method for shield tunnel at overlapped section | |
CN104453915B (en) | Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method | |
CN204533812U (en) | A kind of slurry-water balance type jacking construction system | |
LU102928B1 (en) | Pipe jacking construction method for crossing mixed gravel layer and sandstone layer | |
CN113266019B (en) | Construction method of foundation pit steel pipe support system | |
CN115681613A (en) | Pipe jacking construction method for silt silty clay layer construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: WENZHOU JINYU CONSTRUCTION SUPERVISION + MANAGEMEN Free format text: FORMER OWNER: ZHU KUI Effective date: 20130705 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20130705 Address after: 7 building, No. 325000, CCB building, No. 1701 Airport Avenue, Longwan District, Zhejiang, Wenzhou Applicant after: Wenzhou Jinyu Construction Supervision & Management Co., Ltd. Address before: 325000 Wenzhou City, Ouhai province Jingshan Hill group of the building of the 302 room, room 11, Zhejiang Applicant before: Zhu Kui |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP02 | Change in the address of a patent holder |
Address after: Longwan Yongning road hit Street District of Wenzhou City, Zhejiang province 325000 No. 587 (Construction Headquarters Building 8 floor) Patentee after: Wenzhou Jinyu Construction Supervision & Management Co., Ltd. Address before: 7 building, No. 325000, CCB building, No. 1701 Airport Avenue, Longwan District, Zhejiang, Wenzhou Patentee before: Wenzhou Jinyu Construction Supervision & Management Co., Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20180706 Address after: 056004 No. 219 Renmin East Road, contai District, Handan, Hebei Patentee after: Hebei Sheng Chuan Municipal Engineering Co., Ltd. Address before: 325000 Yongning road 587, Yongzhong street, Longwan District, Wenzhou, Zhejiang (8 building, headquarters building) Patentee before: Wenzhou Jinyu Construction Supervision & Management Co., Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130807 Termination date: 20200428 |
|
CF01 | Termination of patent right due to non-payment of annual fee |