CN102262712A - 上下分层地质条件下盾构刀盘正面载荷的计算方法 - Google Patents

上下分层地质条件下盾构刀盘正面载荷的计算方法 Download PDF

Info

Publication number
CN102262712A
CN102262712A CN2011102353945A CN201110235394A CN102262712A CN 102262712 A CN102262712 A CN 102262712A CN 2011102353945 A CN2011102353945 A CN 2011102353945A CN 201110235394 A CN201110235394 A CN 201110235394A CN 102262712 A CN102262712 A CN 102262712A
Authority
CN
China
Prior art keywords
eta
cutterhead
arccos
delta
gamma
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102353945A
Other languages
English (en)
Other versions
CN102262712B (zh
Inventor
张茜
亢一澜
黄干云
蔡宗熙
曲传咏
候振德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN 201110235394 priority Critical patent/CN102262712B/zh
Publication of CN102262712A publication Critical patent/CN102262712A/zh
Application granted granted Critical
Publication of CN102262712B publication Critical patent/CN102262712B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种上下分层地质条件下盾构刀盘正面载荷的计算方法,该方法分为五个步骤:1.判定开挖面地质情况,开挖面分为上下两个地质层:工况1是指上层地质覆盖深度小于刀盘半径;工况2是指上层地质覆盖深度大于刀盘半径。其它四个步骤分别是:2.若属工况1,则计算工况1下的刀盘正面推力F1;3.计算工况1下的刀盘正面扭矩T1;4.若属工况2,则计算工况2下的刀盘正面推力F2;5.计算工况2下的刀盘正面扭矩T2,不同工况有不同的计算公式。本发明载荷确定方法更接近施工实际情况,与目前常用的按均匀单一地质条件近似确定载荷的方法相比,可显著提高计算精度,从而为盾构掘进过程中操作人员调整载荷参数提供更为科学的参考依据。

Description

上下分层地质条件下盾构刀盘正面载荷的计算方法
技术领域
本发明属于盾构机械施工技术,具体涉及一种在某种地质条件下预测盾构机刀盘正面载荷的计算方法。
背景技术
近年来,随着许多城市逐步发展地下交通建设,盾构施工法作为一种暗挖隧道的工程方法,以其对周围环境扰动小等优点被越来越广泛的应用于地铁工程施工。众所周知,盾构掘进是一个多因素耦合影响的复杂施工过程,刀盘与前方待开挖土体间不断发生切削、挤压、摩擦等相互作用,因此盾构刀盘正面载荷是盾构设计及施工过程中的重要参数。但由于盾构施工是一种暗挖工法,掘进过程中刀盘正面始终包围在岩土中,位置隐蔽,条件恶劣,难以实现载荷的直接测量。目前已有的盾构刀盘载荷相关计算方法只考虑了单一地质条件,而在绝大多数实际隧道工程中,刀盘前方待开挖土体自上而下分为不同地质层,按现有方法确定载荷误差较大。因此,提出一种分层地质条件下盾构刀盘正面载荷的计算方法,具有较大的实用价值,同时也是本行业之急需。
发明内容
本发明的目的是,提出一种盾构在上下分层地质条件下掘进时刀盘正面载荷的计算方法,为刀盘设计及施工参数调整提供更为准确的依据。
盾构刀盘正面载荷包括推力和扭矩,本发明的计算方法分为以下五个步骤:
(1)判定开挖面地质情况;
判定的开挖面地质情况包括地质工况1和地质工况2两种:工况1是指开挖面分上下两个地质层,上层地质覆盖深度小于刀盘半径,下层地质覆盖深度大于刀盘半径;工况2也是指开挖面分上下两个地质层,但上层地质覆盖深度大于刀盘半径,而下层地质覆盖深度小于刀盘半径。
(2)若属于地质工况1,则计算工况1下的刀盘正面推力F1
(3)计算地质工况1下的刀盘正面扭矩T1
(4)若属于地质工况2,则计算工况2下的刀盘正面推力F2
(5)计算地质工况2下的刀盘正面扭矩T2
其中所述步骤(2)中工况1的刀盘正面推力F1计算公式为:
F 1 = ( 1 - η ) [ 2 E 1 δ π ( 1 - μ 1 2 ) R + K 1 γ 1 ( H - R + a 2 ) ] [ R 2 arccos ( R - a R ) - R ( R - a ) 2 Ra - a 2 ]
+ ( 1 - η ) [ 2 E 2 δ π ( 1 - μ 2 2 ) R + K 2 γ 2 ( H + a 2 ) ] { R 2 [ π - arccos ( R - a R ) ] + ( R - a ) 2 Ra - a 2 } + pπ R 2 η
式中:a为上层土质的覆盖深度(m),E1、E2分别为上下两层土体的弹性模量(MPa),μ1,μ2分别为上下两层土体的泊松比,K1、K2分别为上下两层土体的静止土压力系数,γ1、γ2分别为上下两层土体的容重(kN/m3),δ为刀盘每转切入深度(m/r),p为密封舱平均压力(kPa),R为刀盘半径(m),η为刀盘开口率,H为地表至盾构中心轴线处埋深(m)。
其中所述步骤(3)中工况1的刀盘正面扭矩T1计算公式为:
T 1 = [ G 1 f 1 ( 1 - η ) δ 1 - μ 1 + c 1 h 2 π + 2 3 K 1 γ 1 ( H - R + a 2 ) ( 1 - η ) f 1 R ] [ R 2 arccos ( R - a R ) - R ( R - a ) 2 Ra - a 2 ]
+ [ G 2 f 2 ( 1 - η ) δ 1 - μ 2 + c 2 h 2 π + 2 3 K 2 γ 2 ( H + a 2 ) ( 1 - η ) f 2 R ] { R 2 [ π - arccos ( R - a R ) ] + ( R - a ) 2 Ra - a 2 }
式中:G1、G2分别为上下两层土体的剪切模量(MPa),c1、c2分别为上下两层土体的粘聚力(kPa),f1、f2分别为上下两层土体与刀盘间的摩擦系数,h为刀具宽度(m),其它参数定义同前。
其中所述步骤(4)中工况2的刀盘正面推力F2计算公式为:
F 2 = ( 1 - η ) [ 2 E 2 δ π ( 1 - μ 2 2 ) R + K 2 γ 2 ( H - a 2 ) ] [ R 2 arccos ( a - R R ) - R ( a - R ) 2 Ra - a 2 ]
+ ( 1 - η ) [ 2 E 1 δ π ( 1 - μ 1 2 ) R + K 1 γ 1 ( H + R - a 2 ) ] { R 2 [ π - arccos ( a - R R ) ] + ( a - R ) 2 Ra - a 2 } + pπ R 2 η
式中参数定义同前。
其中所述步骤(5)中工况2的刀盘正面扭矩T2计算公式为:
T 2 = [ G 2 f 2 ( 1 - η ) δ 1 - μ 2 + c 2 h 2 π + 2 3 K 2 γ 2 ( H - a 2 ) ( 1 - η ) f 2 R ] [ R 2 arccos ( a - R R ) - R ( a - R ) 2 Ra - a 2 ]
+ [ G 1 f 1 ( 1 - η ) δ 1 - μ 1 + c 1 h 2 π + 2 3 K 1 γ 1 ( H + R - a 2 ) ( 1 - η ) f 1 R ] { R 2 [ π - arccos ( a - R R ) ] + ( a - R ) 2 Ra - a 2 }
式中参数定义同前。
本发明的特点以及产生的积极效果是,考虑地质上下分层情况的载荷确定方法更接近施工实际情况,因此与目前常用的按均匀单一地质条件近似确定载荷的方法相比,可显著提高计算精度,从而为盾构掘进过程中操作人员调整载荷参数提供更为科学的参考依据。
具体实施方式
以下通过具体实施例对本发明的计算过程作进一步的说明,需要说明的是本实施例是叙述性的,而不是限定性的,不以此限定本发明的保护范围。
本实施例结合某地铁工程施工过程。该工程采用盾构施工法,共掘进800环,任意选取其中的第20环和第50环为例,给出盾构掘进到这两环时盾构刀盘俯仰弯矩的详细计算步骤,其他各环均可按照相同的方法进行计算。
上下分层地质条件下掘进时刀盘正面载荷的计算方法分为五个步骤:
(1)判定开挖面地质情况;
(2)若属于地质工况1,则计算工况1下的刀盘正面推力F1
(3)计算地质工况1下的刀盘正面扭矩T1
(4)若属于地质工况2,则计算工况2下的刀盘正面推力F2
(5)计算地质工况2下的刀盘正面扭矩T2
首先确定目标工程的地质情况属于地质工况1还是地质工况2:
由地质报告获取目标工程的地质分层情况及地质参数,该工程第20环处地质条件属于工况1,上层为粉质粘土下层为粉砂,上层土体厚度a1=2m。
该工程第50环处地质条件属于工况2,上层为粉质粘土下层为粉砂,上层土体厚度a2=4m。
具体地质参数为(粉质粘土对应参数下标为1,粉砂对应参数下标为2):弹性模量E1=8.2MPa,E2=18.0MPa;剪切模量G1=3.15MPa,G2=7.32MPa;泊松比μ1=0.30,μ2=0.23;粘聚力c1=42.50kPa,c2=25.30kPa;容重γ1=20.0kN/m3,γ2=24.20kN/m3;静止土压力系数K1=0.40,K2=0.30;刀盘与土体间摩擦系数f1=0.20,f2=0.15。
第二步,计算工况1下第20环处的刀盘正面推力F1
盾构机刀盘结构参数如下:刀盘直径R=3.10m,刀盘开口率η=30%,刀具宽度h=0.10m;
在掘进过程中,由盾构机自动采集到第20环处时,刀盘每转切入深度δ=0.02m/r,密封舱平均压力p=195.30kPa,刀盘中心线埋深H=11.50m,
根据
F 1 = ( 1 - η ) [ 2 E 1 δ π ( 1 - μ 1 2 ) R + K 1 γ 1 ( H - R + a 2 ) ] [ R 2 arccos ( R - a R ) - R ( R - a ) 2 Ra - a 2 ]
+ ( 1 - η ) [ 2 E 2 δ π ( 1 - μ 2 2 ) R + K 2 γ 2 ( H + a 2 ) ] { R 2 [ π - arccos ( R - a R ) ] + ( R - a ) 2 Ra - a 2 } + pπ R 2 η
计算得到F1=4476.88kN。
第三步,计算工况1下第20环处的刀盘正面扭矩T1
根据
T 1 = [ G 1 f 1 ( 1 - η ) δ 1 - μ 1 + c 1 h 2 π + 2 3 K 1 γ 1 ( H - R + a 2 ) ( 1 - η ) f 1 R ] [ R 2 arccos ( R - a R ) - R ( R - a ) 2 Ra - a 2 ]
+ [ G 2 f 2 ( 1 - η ) δ 1 - μ 2 + c 2 h 2 π + 2 3 K 2 γ 2 ( H + a 2 ) ( 1 - η ) f 2 R ] { R 2 [ π - arccos ( R - a R ) ] + ( R - a ) 2 Ra - a 2 }
计算得到T1=932.39kNm。
第四步,计算工况2下,第50环处的刀盘正面推力F2
刀盘结构参数与第二步中结构参数相同,盾构掘进到第50环处时,刀盘每转切入深度δ=0.03m/r,密封舱压力p=218.5kPa,刀盘中心线埋深H=11.80m,
根据
F 2 = ( 1 - η ) [ 2 E 2 δ π ( 1 - μ 2 2 ) R + K 2 γ 2 ( H - a 2 ) ] [ R 2 arccos ( a - R R ) - R ( a - R ) 2 Ra - a 2 ]
+ ( 1 - η ) [ 2 E 1 δ π ( 1 - μ 1 2 ) R + K 1 γ 1 ( H + R - a 2 ) ] { R 2 [ π - arccos ( a - R R ) ] + ( a - R ) 2 Ra - a 2 } + pπ R 2 η
计算得到F2=4792.72kN。
第五步,计算工况2下,第50环处的刀盘正面扭矩T2
根据
T 2 = [ G 2 f 2 ( 1 - η ) δ 1 - μ 2 + c 2 h 2 π + 2 3 K 2 γ 2 ( H - a 2 ) ( 1 - η ) f 2 R ] [ R 2 arccos ( a - R R ) - R ( a - R ) 2 Ra - a 2 ]
+ [ G 1 f 1 ( 1 - η ) δ 1 - μ 1 + c 1 h 2 π + 2 3 K 1 γ 1 ( H + R - a 2 ) ( 1 - η ) f 1 R ] { R 2 [ π - arccos ( a - R R ) ] + ( a - R ) 2 Ra - a 2 }
计算得到T2=1201.21kNm。
至此,已预先计算出该地铁工程掘进至第20环和第50环处时,盾构刀盘正面推力与扭矩,其余各环均可按照相同方法确定。由此可获得盾构在整个施工过程中的刀盘正面载荷值,为盾构施工提供快速有效的参数调整依据,可直接用于施工技术。

Claims (1)

1.上下分层地质条件下盾构刀盘正面载荷的计算方法,刀盘正面载荷包括正面推力和正面扭矩两部分,其特征在于计算需要以下几个步骤:
(1)判定开挖面地质情况;
所述步骤(1)中判定的地质情况包括两种:地质工况1是指开挖面分上下两个地质层,上层地质覆盖深度小于刀盘半径,下层地质覆盖深度大于刀盘半径;地质工况2是指开挖面分上下两个地质层,上层地质覆盖深度大于刀盘半径,下层地质覆盖深度小于刀盘半径;
(2)若属于工况1,则计算工况1下的刀盘正面推力F1
F 1 = ( 1 - η ) [ 2 E 1 δ π ( 1 - μ 1 2 ) R + K 1 γ 1 ( H - R + a 2 ) ] [ R 2 arccos ( R - a R ) - R ( R - a ) 2 Ra - a 2 ]
+ ( 1 - η ) [ 2 E 2 δ π ( 1 - μ 2 2 ) R + K 2 γ 2 ( H + a 2 ) ] { R 2 [ π - arccos ( R - a R ) ] + ( R - a ) 2 Ra - a 2 } + pπ R 2 η
式中:a为上层土质的覆盖深度(m),E1、E2分别为上下两层土体的弹性模量(MPa),μ1,μ2分别为上下两层土体的泊松比,K1、K2分别为上下两层土体的静止土压力系数,γ1、γ2分别为上下两层土体的容重(kN/m3),δ为刀盘每转切入深度(m/r),R为刀盘半径(m),η为刀盘开口率,H为地表至盾构中心轴线处埋深(m),p为密封舱平均压力(kPa);
(3)计算工况1下的刀盘正面扭矩T1
T 1 = [ G 1 f 1 ( 1 - η ) δ 1 - μ 1 + c 1 h 2 π + 2 3 K 1 γ 1 ( H - R + a 2 ) ( 1 - η ) f 1 R ] [ R 2 arccos ( R - a R ) - R ( R - a ) 2 Ra - a 2 ]
+ [ G 2 f 2 ( 1 - η ) δ 1 - μ 2 + c 2 h 2 π + 2 3 K 2 γ 2 ( H + a 2 ) ( 1 - η ) f 2 R ] { R 2 [ π - arccos ( R - a R ) ] + ( R - a ) 2 Ra - a 2 }
式中:G1、G2分别为上下两层土体的剪切模量(MPa),c1、c2分别为上下两层土体的粘聚力(kPa),f1、f2分别为上下两层土体与刀盘间的摩擦系数,h为刀具宽度(m),其它参数定义同前;
(4)若属于工况2,则计算工况2下的刀盘正面推力F2
F 2 = ( 1 - η ) [ 2 E 2 δ π ( 1 - μ 2 2 ) R + K 2 γ 2 ( H - a 2 ) ] [ R 2 arccos ( a - R R ) - R ( a - R ) 2 Ra - a 2 ]
+ ( 1 - η ) [ 2 E 1 δ π ( 1 - μ 1 2 ) R + K 1 γ 1 ( H + R - a 2 ) ] { R 2 [ π - arccos ( a - R R ) ] + ( a - R ) 2 Ra - a 2 } + pπ R 2 η
式中参数定义同前;
(5)计算工况2下的刀盘正面扭矩T2
T 2 = [ G 2 f 2 ( 1 - η ) δ 1 - μ 2 + c 2 h 2 π + 2 3 K 2 γ 2 ( H - a 2 ) ( 1 - η ) f 2 R ] [ R 2 arccos ( a - R R ) - R ( a - R ) 2 Ra - a 2 ]
+ [ G 1 f 1 ( 1 - η ) δ 1 - μ 1 + c 1 h 2 π + 2 3 K 1 γ 1 ( H + R - a 2 ) ( 1 - η ) f 1 R ] { R 2 [ π - arccos ( a - R R ) ] + ( a - R ) 2 Ra - a 2 }
式中参数定义同前。
CN 201110235394 2011-08-18 2011-08-18 上下分层地质条件下盾构刀盘正面载荷的计算方法 Active CN102262712B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110235394 CN102262712B (zh) 2011-08-18 2011-08-18 上下分层地质条件下盾构刀盘正面载荷的计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110235394 CN102262712B (zh) 2011-08-18 2011-08-18 上下分层地质条件下盾构刀盘正面载荷的计算方法

Publications (2)

Publication Number Publication Date
CN102262712A true CN102262712A (zh) 2011-11-30
CN102262712B CN102262712B (zh) 2013-03-27

Family

ID=45009333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110235394 Active CN102262712B (zh) 2011-08-18 2011-08-18 上下分层地质条件下盾构刀盘正面载荷的计算方法

Country Status (1)

Country Link
CN (1) CN102262712B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562079A (zh) * 2012-01-17 2012-07-11 天津大学 盾构掘进中沿深度方向调向时俯仰弯矩的计算方法
CN102680219A (zh) * 2012-05-04 2012-09-19 秦皇岛天业通联重工股份有限公司 一种土压平衡式盾构机幅条式刀盘结构强度验算方法
CN103899328A (zh) * 2014-03-10 2014-07-02 天津大学 曲面型土压平衡盾构刀盘正面扭矩的计算方法
CN104632239A (zh) * 2015-01-12 2015-05-20 天津大学 分层地质中盾构机推进油缸垂直分区压力配比的确定方法
CN103870677B (zh) * 2014-02-07 2017-02-15 上海交通大学 一种掘进机的掘进参数设定方法
CN106441751A (zh) * 2016-10-27 2017-02-22 中南大学 用于上软下硬地层的盾构机刀具磨损模拟试验设备及方法
CN108446418A (zh) * 2018-01-16 2018-08-24 天津大学 一种基于量纲分析的盾构掘进总推力计算方法
CN109488321A (zh) * 2019-01-03 2019-03-19 天津大学 一种盾构刀盘扭矩确定方法及系统
CN110427656A (zh) * 2019-07-10 2019-11-08 清华大学 分体式tbm刀盘结合部特性缩尺测量方法及系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11200761A (ja) * 1998-01-20 1999-07-27 Kajima Corp シールド工法における立坑の構造
CN102129499A (zh) * 2011-03-15 2011-07-20 天津大学 隧道掘进机刀盘驱动载荷计算方法
CN102147826A (zh) * 2011-03-15 2011-08-10 天津大学 隧道掘进机在不同地质下最优掘进速度的计算方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11200761A (ja) * 1998-01-20 1999-07-27 Kajima Corp シールド工法における立坑の構造
CN102129499A (zh) * 2011-03-15 2011-07-20 天津大学 隧道掘进机刀盘驱动载荷计算方法
CN102147826A (zh) * 2011-03-15 2011-08-10 天津大学 隧道掘进机在不同地质下最优掘进速度的计算方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
QIAN ZHANG 等: "Mechanical Model for Operational Loads Prediction on Shield Cutter Head during Excavation", 《2010 IEEE/ASME INTERNATIONAL CONFERENCE ON ADVANCED INTELLIGENT MECHATRONICS》, 9 July 2010 (2010-07-09), pages 1252 - 1256, XP031855744 *
刘建虎 等: "复合地层中盾构机外载荷模型研究", 《机械设计与制造》, no. 5, 31 May 2011 (2011-05-31), pages 1 - 3 *
王瑶: "复合地层大直径盾构刀盘及扭矩计算", 《城市轨道交通研究》, 31 December 2010 (2010-12-31) *
苏健行 等: "土压平衡盾构掘进总推力的计算与试验研究", 《工程机械》, vol. 39, 31 January 2008 (2008-01-31), pages 13 - 16 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562079A (zh) * 2012-01-17 2012-07-11 天津大学 盾构掘进中沿深度方向调向时俯仰弯矩的计算方法
CN102680219B (zh) * 2012-05-04 2015-01-21 秦皇岛天业通联重工股份有限公司 一种土压平衡式盾构机幅条式刀盘结构强度验算方法
CN102680219A (zh) * 2012-05-04 2012-09-19 秦皇岛天业通联重工股份有限公司 一种土压平衡式盾构机幅条式刀盘结构强度验算方法
CN103870677B (zh) * 2014-02-07 2017-02-15 上海交通大学 一种掘进机的掘进参数设定方法
CN103899328B (zh) * 2014-03-10 2015-12-02 天津大学 曲面型土压平衡盾构刀盘正面扭矩的计算方法
CN103899328A (zh) * 2014-03-10 2014-07-02 天津大学 曲面型土压平衡盾构刀盘正面扭矩的计算方法
CN104632239A (zh) * 2015-01-12 2015-05-20 天津大学 分层地质中盾构机推进油缸垂直分区压力配比的确定方法
CN104632239B (zh) * 2015-01-12 2017-05-17 天津大学 分层地质中盾构机推进油缸垂直分区压力配比的确定方法
CN106441751A (zh) * 2016-10-27 2017-02-22 中南大学 用于上软下硬地层的盾构机刀具磨损模拟试验设备及方法
CN108446418A (zh) * 2018-01-16 2018-08-24 天津大学 一种基于量纲分析的盾构掘进总推力计算方法
CN109488321A (zh) * 2019-01-03 2019-03-19 天津大学 一种盾构刀盘扭矩确定方法及系统
CN109488321B (zh) * 2019-01-03 2019-11-29 天津大学 一种盾构刀盘扭矩确定方法及系统
CN110427656A (zh) * 2019-07-10 2019-11-08 清华大学 分体式tbm刀盘结合部特性缩尺测量方法及系统
CN110427656B (zh) * 2019-07-10 2021-07-27 清华大学 分体式tbm刀盘结合部特性缩尺测量方法及系统

Also Published As

Publication number Publication date
CN102262712B (zh) 2013-03-27

Similar Documents

Publication Publication Date Title
CN102262712B (zh) 上下分层地质条件下盾构刀盘正面载荷的计算方法
Ates et al. Estimating torque, thrust and other design parameters of different type TBMs with some criticism to TBMs used in Turkish tunneling projects
CN103076119B (zh) 一种巷道底鼓主控应力测量的方法
Gui et al. Estimation of transverse ground surface settlement induced by DOT shield tunneling
Zhang et al. Ground settlement induced by tunneling crossing interface of water-bearing mixed ground: A lesson from Changsha, China
CN102129499B (zh) 隧道掘进机刀盘驱动载荷计算方法
CN108268709B (zh) 复合盾构在岩土混合地质中掘进总推力的计算方法
CN110259467A (zh) 泥水平衡盾构下穿江河施工方法
CN104100272A (zh) 一种隧道穿越不良地质的快速施工方法
CN106121662A (zh) 盾构掘削局部超挖区域同步注浆动态补偿填充控制方法
CN102289588B (zh) 上下分层地质条件下盾构刀盘俯仰弯矩的计算方法
CN103352705A (zh) 盾构机刀盘系统推力的计算方法
CN102562079B (zh) 盾构掘进中沿深度方向调向时俯仰弯矩的计算方法
CN103899328B (zh) 曲面型土压平衡盾构刀盘正面扭矩的计算方法
CN108222954B (zh) 盾构穿越砂石料回填区的施工方法
Xie et al. Quantitative Evaluation of the Adaptability of the Shield Machine Based on the Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (FAHP)
Hsiung A case record of bored tunnels in sand based on the Kaohsiung mass rapid transit system project
Liu et al. Correlation between railway subgrade settlement and shield tunneling construction
Zhang et al. Construction applicability of mechanical methods for connecting aisle in the bohai mudstone stratum with high water pressure
Guo et al. Research on shield tunnelling parameters correlation in composite strata
Zhang et al. Discussion: Challenges of earth pressure balance tunnelling in weathered granite with boulders
Gamba et al. A TBM assembly cavern in the French Alps
Ocak A new approach for estimating of settlement curve for twin tunnels
Wang et al. Shield Tunneling Treatment Technology in Boulder Stratum
Hong Shield tunneling technology in hard-soft uneven stratum and extremely-soft stratum

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant