CN102251535A - 大跨度混凝土桩梁板结构的施工方法 - Google Patents

大跨度混凝土桩梁板结构的施工方法 Download PDF

Info

Publication number
CN102251535A
CN102251535A CN2011101327534A CN201110132753A CN102251535A CN 102251535 A CN102251535 A CN 102251535A CN 2011101327534 A CN2011101327534 A CN 2011101327534A CN 201110132753 A CN201110132753 A CN 201110132753A CN 102251535 A CN102251535 A CN 102251535A
Authority
CN
China
Prior art keywords
slab
stake
span
construction method
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101327534A
Other languages
English (en)
Inventor
柳忠林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011101327534A priority Critical patent/CN102251535A/zh
Publication of CN102251535A publication Critical patent/CN102251535A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了大跨度混凝土桩梁板结构的施工方法,包括如下具体步骤:1)打若干个横向和纵向排列的桩,纵向跨度为6-36m;2)在两个横向桩之间架设横梁;3)在横梁上架设梁板;4)在梁板的顶部浇注叠合层;所述梁板为预应力梁、双T板、单T梁板、空心板、空心矩形梁、槽形板和桥梁板中的任意一种;所述梁板上设有孔洞。本发明取得的有益效果是:减少了75-90%的桩,降低了建筑费用,同时也节约了地面处理的费用。

Description

大跨度混凝土桩梁板结构的施工方法
技术领域
本发明属于建筑工程结构技术领域,涉及大跨度混凝土桩梁板结构的施工方法。
背景技术
我国东南沿海,内陆大江大河畔或在大江大河入海口附近,大部为软基,在上部搞建筑需打桩,桩距比较密集,费用昂贵,且地面处理费用较大。
发明内容
本发明针对以上问题,本发明的桩梁板结构,提出以下技术方案:
本发明的大跨度混凝土桩梁板结构的施工方法,包括如下具体步骤:
第一步,打若干个横向和纵向排列的桩,桩与桩之间的纵向跨度为6-36m;
第二步,在两个横向桩之间架设横梁;
第三步,在横梁上架设梁板;
第四步,在梁板的顶部浇注叠合层。
本发明的大跨度混凝土桩梁板结构的施工方法,所述梁板为预应力梁、双T板、单T梁板、空心板、空心矩形梁、槽形板和桥梁板中的任意一种。
本发明的大跨度混凝土桩梁板结构的施工方法,所述梁板上设有孔洞。
本发明取得的有益效果是:减少了75-90%的桩,降低了建筑费用,同时也节约了地面处理的费用。
附图说明
图1是大跨度混凝土桩梁板结构的结构示意图。
图中:1、桩,2、横梁,3、梁板。
具体实施方式
如图1所示,本发明的大跨度混凝土桩梁板结构的施工方法,按照以下步骤实施:
第一步,根据需要打若干个横向和纵向排列的桩,其中,纵向跨度为6-36m;
第二步,在两个横向桩之间架设横梁;
第三步,在横梁上架设梁板;
第四步,在梁板的顶部浇注叠合层。
施工的过程中,如遇安装设备,还要在双T板、单T板、槽形板、桥梁板上开孔洞。
本发明的大跨度混凝土桩梁板结构的施工方法,所述桩与桩之间的纵向距离为6-36m,所述两个横向桩之间设有横梁,所述横梁上设有梁板。因此节省了75%∽90%左右的桩,但同时需把余下的桩强度增大,即把截面加大或把配筋加大或混凝土标号加大,有的还需增加深度。把两个平行的横向桩之间用梁连接,再在梁上设置梁板,所述梁板为预应力梁、双T板、单T梁板、空心板、空心矩形梁、槽形板和桥梁板中的任意一种。再在其上作叠合层、现浇层,或把横纵向都加大,现场设置双向或单向预应力钢筋、张拉后浇混凝土而成。如遇安装设备,可在双T板、单T板、槽形板、桥梁板上开孔洞。如果桩距比常规作法加大幅度较小,或地面荷载较小时可以在桩之间的梁上断上非预应力板或现场桩上设置非预应力钢筋浇混凝土而成。

Claims (2)

1.大跨度混凝土桩梁板结构的施工方法,其特征在于包括如下具体步骤:
1)打若干个横向和纵向排列的桩,桩与桩之间的纵向跨度为6-36m;
2)在两个横向桩之间架设横梁;
3)在横梁上架设梁板;
4)在梁板的顶部浇注叠合层或现浇层,形成楼房、工业车间、广场、仓库等建筑的地面。
2.根据权利要求1所述的大跨度大荷载混凝土桩梁板结构的施工方法,其特征在于:所述梁板为梁、双T板、单T梁板、空心板、现浇板、空心矩形梁、槽形板和桥梁板中的任意一种。
CN2011101327534A 2010-08-11 2011-05-19 大跨度混凝土桩梁板结构的施工方法 Pending CN102251535A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101327534A CN102251535A (zh) 2010-08-11 2011-05-19 大跨度混凝土桩梁板结构的施工方法

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201010258525 2010-08-11
CN201010258525.7 2010-08-11
CN2011101327534A CN102251535A (zh) 2010-08-11 2011-05-19 大跨度混凝土桩梁板结构的施工方法

Publications (1)

Publication Number Publication Date
CN102251535A true CN102251535A (zh) 2011-11-23

Family

ID=44979079

Family Applications (3)

Application Number Title Priority Date Filing Date
CN2011201707064U Expired - Fee Related CN202227360U (zh) 2010-08-11 2011-05-19 用作楼房车间等地面的大跨度预应力混凝土桩梁板结构
CN2011101327534A Pending CN102251535A (zh) 2010-08-11 2011-05-19 大跨度混凝土桩梁板结构的施工方法
CN2011101327407A Pending CN102304925A (zh) 2010-08-11 2011-05-19 用作楼房车间等地面的大跨度预应力混凝土桩梁板结构

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN2011201707064U Expired - Fee Related CN202227360U (zh) 2010-08-11 2011-05-19 用作楼房车间等地面的大跨度预应力混凝土桩梁板结构

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN2011101327407A Pending CN102304925A (zh) 2010-08-11 2011-05-19 用作楼房车间等地面的大跨度预应力混凝土桩梁板结构

Country Status (1)

Country Link
CN (3) CN202227360U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535503A (zh) * 2011-12-29 2012-07-04 中国一冶集团有限公司 软弱土层地区利用缓粘结预应力砼梁预防大面积地坪沉降、开裂的方法
CN102561381A (zh) * 2011-12-29 2012-07-11 中国一冶集团有限公司 软弱土层地区利用有粘结预应力砼梁预防大面积地坪沉降、开裂的方法
CN102561380A (zh) * 2011-12-29 2012-07-11 中国一冶集团有限公司 软弱土层地区利用无粘结预应力砼梁预防大面积地坪沉降、开裂的方法
CN103711201A (zh) * 2013-09-13 2014-04-09 柳忠林 一种大跨度预应力混凝土梁板框架结构体系
CN103806708A (zh) * 2012-09-21 2014-05-21 柳忠林 一种大跨度反向预应力梁地下室底板系统
CN105862914A (zh) * 2016-04-18 2016-08-17 西南交通大学 一种隔断地面附加荷载对下部近接隧道影响的方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2600488Y (zh) * 2002-12-02 2004-01-21 葛勇芹 深水大型墩式码头的框箱式高桩承台结构件
CN201125355Y (zh) * 2007-11-23 2008-10-01 中铁二院工程集团有限责任公司 深厚湿陷性黄土路基地基结构

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581115B (zh) * 2009-06-08 2010-11-10 清华大学 一种混合式钢-混凝土组合框架体系
CN201485969U (zh) * 2009-08-04 2010-05-26 华侨大学 一种新型钢-混凝土组合结构
CN101691783B (zh) * 2009-10-09 2011-08-10 马文旭 钢筋混凝土结构或钢-混凝土组合结构体系

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2600488Y (zh) * 2002-12-02 2004-01-21 葛勇芹 深水大型墩式码头的框箱式高桩承台结构件
CN201125355Y (zh) * 2007-11-23 2008-10-01 中铁二院工程集团有限责任公司 深厚湿陷性黄土路基地基结构

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
交通部第三航务工程勘察设计院: "《码头新型结构》", 28 February 1999 *
肖秀凤: "营口航运码头选型及桩、梁板设计要点", 《水运科技信息》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535503A (zh) * 2011-12-29 2012-07-04 中国一冶集团有限公司 软弱土层地区利用缓粘结预应力砼梁预防大面积地坪沉降、开裂的方法
CN102561381A (zh) * 2011-12-29 2012-07-11 中国一冶集团有限公司 软弱土层地区利用有粘结预应力砼梁预防大面积地坪沉降、开裂的方法
CN102561380A (zh) * 2011-12-29 2012-07-11 中国一冶集团有限公司 软弱土层地区利用无粘结预应力砼梁预防大面积地坪沉降、开裂的方法
CN102535503B (zh) * 2011-12-29 2014-05-07 中国一冶集团有限公司 软弱土层地区利用缓粘结预应力砼梁预防大面积地坪沉降、开裂的方法
CN102561380B (zh) * 2011-12-29 2014-09-17 中国一冶集团有限公司 软弱土层地区利用无粘结预应力砼梁预防大面积地坪沉降、开裂的方法
CN103806708A (zh) * 2012-09-21 2014-05-21 柳忠林 一种大跨度反向预应力梁地下室底板系统
CN103711201A (zh) * 2013-09-13 2014-04-09 柳忠林 一种大跨度预应力混凝土梁板框架结构体系
CN103711201B (zh) * 2013-09-13 2019-02-19 柳承志 一种大跨度预应力混凝土梁板框架结构体系
CN105862914A (zh) * 2016-04-18 2016-08-17 西南交通大学 一种隔断地面附加荷载对下部近接隧道影响的方法
CN105862914B (zh) * 2016-04-18 2018-03-09 西南交通大学 一种隔断地面附加荷载对下部近接隧道影响的方法

Also Published As

Publication number Publication date
CN202227360U (zh) 2012-05-23
CN102304925A (zh) 2012-01-04

Similar Documents

Publication Publication Date Title
CN102251535A (zh) 大跨度混凝土桩梁板结构的施工方法
CN204662235U (zh) 一种钢板组合t梁桥
CN102966050B (zh) 钢-混凝土组合梁和既有钢筋混凝土t梁的纵向连接方法
CN105672532B (zh) 一种装配式剪力墙及其安装方法
CN107327019A (zh) 一种免模板现浇钢筋混凝土圈梁结构及其施工方法
CN105421210A (zh) 一种快速拼装的钢箱-预制混凝土板桥梁结构及其施工方法
CN103046645A (zh) 一种大跨度预制整浇结构及施工方法
CN103498569A (zh) 旧厂房内部加层改造钢架混凝土结构及其施工方法
CN108104284B (zh) 剪力墙钢臂嵌入楼板的墙板连接结构及装配方法
CN105064200A (zh) 预制拼装的鱼腹桁架预应力钢混组合简支梁桥及其施工方法
CN205875394U (zh) 一种干法连接的抗震混凝土梁柱
CN111335334A (zh) 一种预制拼装锚杆框格梁膨胀性边坡支护系统
CN107268417A (zh) 一种基于装配化的公路钢混组合梁结构
CN109403465B (zh) 一种钢-混凝土组合节点及其制作方法
CN108643429B (zh) 一种可调节高度的装配式叠合楼板
CN112342915B (zh) 架空轨道龙门吊运梁施工方法
CN106121110A (zh) 大跨度窄长型混凝土蜂窝状空腹夹层板楼盖及制造方法
CN113463664A (zh) 一种干连接蜂窝状装配式格梁护坡结构
CN109680833B (zh) 自承式预制钢骨混凝土墙板构件、墙、结构体系及制作方法
CN106499211A (zh) 新增挑梁框架包钢锚拉法结构及工艺
CN216920899U (zh) 网格梁加双向受力的压型钢板楼板结构
CN203603073U (zh) 高架车站钢混格构式组合站台梁
CN202831219U (zh) 一种大跨度预制整浇结构
CN214996417U (zh) 混凝土灌注桩钢筋笼制作的装配式厂棚
CN113279423B (zh) 一种预制柱墩及后浇条形基础梁装配整体施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111123