CN102251480B - 一种小墩顶施工三角挂篮 - Google Patents

一种小墩顶施工三角挂篮 Download PDF

Info

Publication number
CN102251480B
CN102251480B CN 201110110958 CN201110110958A CN102251480B CN 102251480 B CN102251480 B CN 102251480B CN 201110110958 CN201110110958 CN 201110110958 CN 201110110958 A CN201110110958 A CN 201110110958A CN 102251480 B CN102251480 B CN 102251480B
Authority
CN
China
Prior art keywords
truss
hanging basket
trusses
purlin
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110110958
Other languages
English (en)
Other versions
CN102251480A (zh
Inventor
王祥军
谢亮
张敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wuxin Intelligent Technology Co ltd
Original Assignee
China Railway Wuxin Steel Formwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Wuxin Steel Formwork Co Ltd filed Critical China Railway Wuxin Steel Formwork Co Ltd
Priority to CN 201110110958 priority Critical patent/CN102251480B/zh
Publication of CN102251480A publication Critical patent/CN102251480A/zh
Application granted granted Critical
Publication of CN102251480B publication Critical patent/CN102251480B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种小墩顶施工三角挂篮,包括桁架、走行轨、底篮,所述桁架包括左桁架和右桁架,左桁架横向间距排列形成狭长的中空通道;右桁架间距排列形成箱型,右桁架的最大断面宽度小于所述左桁架中空通道内的最大净空宽度;右桁架中部节点下侧铰接的右桁滑座和后部节点下侧铰接的可拆卸的右桁滚轮架分别高于所述左桁架中部节点下侧铰接的一个左桁滑座和后部节点下侧铰接的一个左桁滚轮架;右桁架的后部水平穿插到左桁架后部中空通道内。本发明缩短了挂篮安装空间,使挂篮能直接安装在连续梁0#节段上进行施工,有效解决了小墩顶挂篮悬灌施工时挂篮安装空间受限的问题。

Description

一种小墩顶施工三角挂篮
技术领域
本发明涉及一种桥梁连续梁悬灌施工设备,尤其是涉及一种小墩顶施工三角挂篮。 
背景技术
随着我国交通基础建设的突飞猛进地发展,作为传统的预应力钢筋混凝土箱型梁采用挂篮悬臂浇筑施工的方法仍然广泛应用于桥梁建设中,其采用的施工设备——挂篮已经非常普遍,应用技术也已非常成熟,而且结构形式多种多样,三角形挂篮就是常用的结构形式之一。因设计单位及地理条件的原因,桥梁的结构形式也是各有不同,小墩顶连续梁桥便是其中一种。因其墩顶节段长度过短导致挂篮安装空间受到限制,使用现有三角形挂篮施工,施工单位通常只能采用1#节段和0#节段一同现浇的方式来增大挂篮安装空间,采用这种施工方法除耗费大量施工成本外,临时支架的搭设还受到桥墩周围环境因素限制。
发明内容
本发明要解决的技术问题,是提供一种新型小墩顶施工三角挂篮,以解决现有技术存在的在小墩顶挂篮悬灌施工时挂篮安装空间受限的问题。
本发明的技术方案是:一种小墩顶施工三角挂篮,包括桁架、走行轨、底篮,其特征在于,所述桁架包括:
左桁架,横向间距排列形成狭长的中空通道;
右桁架,间距排列形成箱型,所述右桁架的最大断面宽度小于所述左桁架中空通道内的最大净空宽度;
所述右桁架中部节点下侧铰接的一个右桁滑座和后部节点下侧铰接的一个可拆卸的右桁滚轮架分别高于所述左桁架中部节点下侧铰接的一个左桁滑座和后部节点下侧铰接的一个左桁滚轮架;
所述右桁架的后部水平穿插到所述左桁架后部中空通道内。
进一步,所述左桁架或右桁架底边朝下大致成三角形,横向排列为两榀以上。
进一步,所述左桁架或右桁架横向各榀之间通过前端部连接的前横梁、前部上斜面和下部底面连接的剪刀撑及中部竖向连接的桁架系形成整体结构,对称置于连续梁0#节段两端。
Figure 678047DEST_PATH_IMAGE001
进一步,所述走行轨为可接长的型钢组件,通过锚栓锚固在所述连续梁0#阶段上面;所述左桁滚轮架或可拆卸的右桁滚轮架的滚子位于所述型钢上翼缘的下侧。
进一步,还包括一个后锚压梁和跨墩,所述后锚压梁通过锚固在所述连续梁0#节段上的锚杆压在右桁架的下弦杆后部上侧面;所述跨墩下部开槽,跨骑在所述右桁架的下弦杆上并相对于左桁架下弦杆后部上平面位置,所述后锚压梁通过锚固在所述连续梁0#节段上的锚杆压在所述跨墩的上平面。
根据本发明的技术方案,左桁架横向间距排列形成狭长的中空通道,右桁架间距排列形成箱型,右桁架的最大断面宽度小于所述左桁架中空通道内的最大净空宽度,右桁架中部节点下侧铰接的一个右桁滑座和后部节点下侧铰接的一个可拆卸的右桁滚轮架分别高于左桁架中部节点下侧铰接的一个左桁滑座和后部节点下侧铰接的一个左桁滚轮架,这种结构可以使右桁架的后部水平穿插到左桁架后部中空通道内,缩短了挂篮安装空间,使挂篮可以直接在0#节段上进行施工。
附图说明
图1为本发明小墩顶施工三角挂篮实施例及施工使用时在连续梁0#节段拼装状态示意图。
图2为图1所示实施例及施工使用拼装状态左视图。
图3为图1所示实施例及施工使用拼装状态俯视图。
图4为图1中跨墩位置示意图。
图5为图1中左桁架准备前移状态示意图。
图6为图1中右桁架后锚后锚压梁位置调整后挂篮状态示意图。
图7为图1中左桁架前移到位状态示意图。
图8为图1中右桁架前移到位状态示意图。
具体实施方式
以下结合附图及实施例对本发明作进一步详细说明。
如图1至3所示,本实施例包括左桁架1,横向间距排列形成狭长的中空通道10,右桁架2,间距排列形成箱型,其中右桁架2的最大断面宽度小于左桁架1中空通道10内的最大净空宽度;右桁架2中部节点下侧铰接一个右桁滑座4,后部节点下侧铰接的一个可拆卸的右桁滚轮架6;左桁架2中部节点下侧铰接一个右桁滑座3,后部节点下侧铰接的一个可拆卸的右桁滚轮架5;其中右桁滑座4和可拆卸的右桁滚轮架6分别高于左桁滑座3和左桁滚轮架5,使其后右桁架2 的下悬杆21底部高于左桁架1下悬杆23的上平面,这样右桁架2的后部就可以水平穿插到左桁架1后部的中空通道10内;
左桁架1、右桁架2底边朝下大致成三角形,横向排列为两榀,当然,根据连续梁的梁宽还可以是两榀以上;左桁架1、右桁架2横向各榀之间是由前端部连接的前横梁11,前部上斜面和下部底面连接的剪刀撑14,中部竖向连接的桁架13形成整体结构;对称置于连续梁0#节段两端。
Figure 21566DEST_PATH_IMAGE001
走行轨9为可接长的工字钢组件,为加强受力,分散压力,走行轨9采用双拼工字钢结构,通过锚栓锚固在连续梁0#阶段20上面;左桁滚轮架5或可拆卸的右桁滚轮架6的滚子16反扣在工字钢上,沿着所述工字钢上翼缘的下侧滚动。
此外,还包括一个后锚压梁7和跨墩8,如图1、图4所示,后锚压梁7通过锚固在所述连续梁0#节段上的锚杆22压在右桁架2的下弦杆21后部上侧面;跨墩8下部开有一个竖向长槽,长糟两边的平面正好压在左桁架1下悬杆23的后部上侧壁,跨墩8通过该槽跨骑在右桁架2的下弦杆21上,后锚压梁7通过锚固在所述连续梁0#节段上的锚杆22压在所述跨墩8的上平面。
施工方法:
参照图1,1#节段浇筑状态下,右桁滚轮架6先不进行安装,右桁架2的后部穿插到左桁架后部中空通道10内,一方面,后锚压梁7通过锚固在连续梁0#节段上的锚杆22压在右桁架2的下弦杆21后部上侧面,另一方面,后锚压梁7通过锚固在所述连续梁0#节段上的锚杆22压在所述跨墩8的上平面。
如图5所示,1#节段浇筑完毕后,在1#节段梁体表面铺设好走行轨道9,松除左桁架1上的后锚压梁7和跨墩8,左桁滚轮架5的滚子16反扣在走行轨9上,左桁架1在外界动力驱动下向前移动。
如图6所示,待左桁架1上的后锚节点接近右桁架2上的后锚压梁7时,将右桁架2上的后锚压梁7的位置向前调整,为左桁架1继续前移让开空间。
如图7所示,左桁架1继续前移到指定位置,此时左侧挂篮前移到位,安装右桁滚轮架6,松除右桁架2上的后锚压梁7,右桁滚轮架6的滚子16反扣在走行轨9上。
如图8所示,右桁架2在外界动力驱动下向前移动到指定位置,此时左、右挂篮分离并走行到位,等待下一节段梁体浇筑。
从以上的描述中,可以看出,本发明上述的实施例实现了如下技术效果:
由于左、右桁采用穿插错位拼装方式,不改变桁架结构,不对桁架进行临时改装,挂篮分离时操作步骤简单,更好地保证了挂篮分离时的安全性。滚轮架和后锚压梁与主桁架间采用可拆卸式连接,可灵活调整拼装空间。挂篮在小墩顶上完全实现正常拼装,节省了连续梁1#节段采用支架现浇的施工成本,避免了小墩顶挂篮采用异形拼装的复杂操作过程,有效的解决现有技术存在的在小墩顶挂篮悬灌施工时挂篮安装空间受限的问题。
以上仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。总之,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (5)

1. 一种小墩顶施工三角挂篮,包括桁架、走行轨、底篮,其特征在于:所述桁架包括:
左桁架(1),由底边朝下成三角形的两片组件间隔排列构成,其中间形成狭长的中空通道(10);
右桁架(2),由底边朝下成三角形的两片组件间隔排列构成箱型结构,所述箱型结构的最大断面宽度小于所述左桁架(1)中空通道(10)内的最大净空宽度;
所述右桁架(2)的后部水平穿插到所述左桁架(1)后部中空通道(10)内;
所述右桁架(2)底边中部节点下侧铰接的一个右桁滑座(4)和底边后部节点下侧铰接的一个可拆卸的右桁滚轮架(6)分别高于所述左桁架(1)底边中部节点下侧铰接的一个左桁滑座(3)以及底边后部节点下侧铰接的一个左桁滚轮架(5)。
2.根据权利要求1所述的小墩顶施工三角挂篮,其特征在于:所述左桁架(1)和右桁架(2)构成单拼构件,并沿连续梁的梁宽方向排列为两榀以上。
3.根据权利要求1所述的小墩顶施工三角挂篮,其特征在于:所述左桁架(1)和右桁架(2)的各榀之间通过前端部连接的前横梁(11)、前部上斜面和下部底面连接的剪刀撑(14)和中部竖向连接的桁架系(13)形成整体结构,对称置于连续梁0#节段浇注方向的两端。
4.
Figure DEST_PATH_IMAGE002
根据权利要求3所述的小墩顶施工三角挂篮,其特征在于:所述走行轨(9)为可接长的工字钢组件,通过锚栓锚固在所述连续梁0#阶段(20)上面;所述左桁滚轮架(5)和可拆卸的右桁滚轮架(6)的滚子(16)位于所述工字钢上翼缘的下侧。
5.根据权利要求1至4任意一项所述的小墩顶施工三角挂篮,其特征在于:还包括一个后锚压梁(7)和跨墩(8);所述跨墩(8)下部开槽,跨骑在位于所述右桁架(2)的下弦杆(21)中后部位置,在所述跨墩(8)的上面通过锚固在所述连续梁0#节段上的锚杆(22)压有所述后锚压梁(7)。
CN 201110110958 2011-04-29 2011-04-29 一种小墩顶施工三角挂篮 Active CN102251480B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110110958 CN102251480B (zh) 2011-04-29 2011-04-29 一种小墩顶施工三角挂篮

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110110958 CN102251480B (zh) 2011-04-29 2011-04-29 一种小墩顶施工三角挂篮

Publications (2)

Publication Number Publication Date
CN102251480A CN102251480A (zh) 2011-11-23
CN102251480B true CN102251480B (zh) 2013-05-29

Family

ID=44979025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110110958 Active CN102251480B (zh) 2011-04-29 2011-04-29 一种小墩顶施工三角挂篮

Country Status (1)

Country Link
CN (1) CN102251480B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114790705A (zh) * 2022-04-22 2022-07-26 山东交通学院 一种短零号块预应力混凝土连续梁桥挂篮结构及施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006077521A (ja) * 2004-09-13 2006-03-23 Oriental Construction Co Ltd 橋梁構築装置
CN201169749Y (zh) * 2008-03-26 2008-12-24 中铁四局集团有限公司 简装销接三角形挂篮
CN201560400U (zh) * 2009-09-17 2010-08-25 南昌市创新钢结构有限公司 一种斜拉式挂篮
CN201770945U (zh) * 2010-08-02 2011-03-23 广东省长大公路工程有限公司 连续刚构桥施工挂篮的同步移篮装置
JP2011069164A (ja) * 2009-09-28 2011-04-07 Nippon Sharyo Seizo Kaisha Ltd 橋桁送出し工法
CN201794030U (zh) * 2010-07-22 2011-04-13 中国建筑第二工程局有限公司 连续梁挂篮前移牵引装置
CN202047374U (zh) * 2011-04-29 2011-11-23 湖南中铁五新钢模有限责任公司 小墩顶施工三角挂篮

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006077521A (ja) * 2004-09-13 2006-03-23 Oriental Construction Co Ltd 橋梁構築装置
CN201169749Y (zh) * 2008-03-26 2008-12-24 中铁四局集团有限公司 简装销接三角形挂篮
CN201560400U (zh) * 2009-09-17 2010-08-25 南昌市创新钢结构有限公司 一种斜拉式挂篮
JP2011069164A (ja) * 2009-09-28 2011-04-07 Nippon Sharyo Seizo Kaisha Ltd 橋桁送出し工法
CN201794030U (zh) * 2010-07-22 2011-04-13 中国建筑第二工程局有限公司 连续梁挂篮前移牵引装置
CN201770945U (zh) * 2010-08-02 2011-03-23 广东省长大公路工程有限公司 连续刚构桥施工挂篮的同步移篮装置
CN202047374U (zh) * 2011-04-29 2011-11-23 湖南中铁五新钢模有限责任公司 小墩顶施工三角挂篮

Also Published As

Publication number Publication date
CN102251480A (zh) 2011-11-23

Similar Documents

Publication Publication Date Title
CN103572708B (zh) 大跨度混凝土连续梁桥边跨合拢装置及方法
CN204690605U (zh) 大跨度梁桥的自行式三角桁架挂篮
CN109868755B (zh) 一种菱形桁架挂篮及悬臂梁的挂篮施工方法
CN107905124B (zh) 一种对称式刚构连续梁施工工艺
CN106638314A (zh) 索塔横梁无落地支架及索塔横梁施工方法
CN110792028B (zh) 无背索斜拉桥的施工方法
CN108103945A (zh) 一种现浇箱梁用整体落地模架
CN102367653A (zh) 大跨度连续梁施工支架结构
CN101929126B (zh) 低位悬拼步履式架桥机的自助吊装机构
CN207315404U (zh) 市政地道大断面涵洞及管廊台车
CN108487098A (zh) 一种箱涵内侧模板支撑系统
CN215631780U (zh) 大跨度预应力管桁架高空拼装用支撑架
CN209686443U (zh) 一种可早拆模廊道内支模组合台车
CN102251480B (zh) 一种小墩顶施工三角挂篮
CN207362705U (zh) 一种梁体用稳定支撑装置
CN202047374U (zh) 小墩顶施工三角挂篮
CN205063965U (zh) 一种用于铁路隧道仰拱施工的模架
CN208618275U (zh) 无轨式三角挂篮
CN203684102U (zh) 匝道桥与主线桥交接跨架设预制梁支撑系统
CN105648908A (zh) 一种用于跨既有线或跨河桥梁装修小车及施工方法
CN205259417U (zh) 一种新型钢结构住宅楼板与钢梁的连接结构
CN106351123B (zh) 一种单索多箱波形钢腹板主梁施工挂篮
CN202482766U (zh) 大跨度连续梁施工支架结构
CN214613620U (zh) 现浇横梁支撑架
CN206189848U (zh) 一种早拆水平模板组合支撑结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Small pier top construction triangular hanging basket

Effective date of registration: 20140826

Granted publication date: 20130529

Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch

Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

Registration number: 2014430000015

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20150917

Granted publication date: 20130529

Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch

Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

Registration number: 2014430000015

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Small pier top construction triangular hanging basket

Effective date of registration: 20150923

Granted publication date: 20130529

Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch

Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

Registration number: 2015430000025

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20171128

Granted publication date: 20130529

Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch

Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

Registration number: 2015430000025

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Small pier top construction triangular hanging basket

Effective date of registration: 20171204

Granted publication date: 20130529

Pledgee: Bank of Changsha Limited by Share Ltd. Liuyang branch

Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

Registration number: 2017430000091

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200508

Granted publication date: 20130529

Pledgee: Bank of Changsha Limited by Share Ltd. Liuyang branch

Pledgor: HUNAN CHINA RAILWAY WUXIN STEEL MOULD Co.,Ltd.

Registration number: 2017430000091

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Small pier top construction triangular hanging basket

Effective date of registration: 20200608

Granted publication date: 20130529

Pledgee: Bank of Changsha Limited by Share Ltd. Liuyang branch

Pledgor: HUNAN CHINA RAILWAY WUXIN STEEL MOULD Co.,Ltd.

Registration number: Y2020980002866

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220111

Granted publication date: 20130529

Pledgee: Bank of Changsha Limited by Share Ltd. Liuyang branch

Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

Registration number: Y2020980002866

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 85, Liyuan Road, Hecheng District, Huaihua City, Hunan Province 410100

Patentee after: Hunan Wuxin Intelligent Technology Co.,Ltd.

Address before: No. 85, Liyuan Road, Hecheng District, Huaihua City, Hunan Province 410100

Patentee before: Hunan China Railway Wuxin Steel Mould Co.,Ltd.