CN102230367A - 一种采油树井口穿越延长密封总成 - Google Patents
一种采油树井口穿越延长密封总成 Download PDFInfo
- Publication number
- CN102230367A CN102230367A CN2011101516517A CN201110151651A CN102230367A CN 102230367 A CN102230367 A CN 102230367A CN 2011101516517 A CN2011101516517 A CN 2011101516517A CN 201110151651 A CN201110151651 A CN 201110151651A CN 102230367 A CN102230367 A CN 102230367A
- Authority
- CN
- China
- Prior art keywords
- sealing
- pressure hose
- pressure
- pipeline
- button
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Pipeline Systems (AREA)
Abstract
一种采油树井口穿越延长密封总成,由高压密封变扣、高压软管快速接头一、高压软管、高压软管快速接头二、密封延长变扣和高压密封堵头顺序连接组成,在控制管线穿越采油树后,将控制管线包入高压软管内部,前端由高压密封变扣与采油树管线穿越口密封,后端用高压密封堵头封堵并密封。本发明可以实现在初次安装采油树后,保证井下控制管线穿越井口的密封性,在更换采油树时无需起出井下生产管柱便可再次做控制管线穿越井口密封,可大大节约油田维护操作成本,同时具有结构简单、制造成本低、适用性广泛、可操作性强等优点。
Description
技术领域
本发明属于油田修完井技术领域,特别是一种采油树井口穿越延长密封总成。
背景技术
在目前公知的修完井作业中,油气井完井作业结束后需进行及时清井排液投产。在海上钻完井作业中往往由于工程建造等原因,不具备作业结束后直接安装井口采油树的条件,只能安装临时采油树进行清井排液投产,待工程施工条件成熟后再安装正式采油树。而安装临时采油树时必须做1/4″压力计电缆、1/4″井下安全阀控制管线、1/4″放气阀控制管线、3/8″化学药剂注入管线等穿越密封。但做完管线穿越密封后,拆掉临时采油树安装正式采油树时管线出现磨损、挤压及变形,剪掉后由于管线长度较短不足以再次做密封,同时对于3/8″管线,由于太硬也无法在采油树与油管挂之间的空隙处缠绕留足管线做二次密封。所以常规情况下,油气田钻完井作业更换采油树时,必须压井起出井下生产管柱,重新延长各类管线密封。这种方法周期长,费用高,作业过程中存在各种井控风险,容易造成储层二次污染,导致再次清井排液困难、封隔器密封失效、产能降低等后果。
发明内容
本发明提供的采油树井口穿越延长密封总成,解决了再次安装采油树时控制管线的密封难题,实现了在拆掉采油树后不动管柱即可再次安装采油树并且能实现与控制管线的密封。
本发明的技术解决方案提供了一种采油树井口穿越延长密封总成,由高压密封变扣、高压软管快速接头一、高压软管、高压软管快速接头二、密封延长变扣和高压密封堵头顺序连接,管线包入高压软管内部。
高压密封变扣、高压软管快速接头一、高压软管、高压软管快速接头二、密封延长变扣之间采用丝扣和密封圈连接。密封延长变扣后端做穿越密封,并用高压密封堵头将管线堵住。高压软管长度大于1米,能够包裹控制管线,外径为1/2~1″之间,耐压级别14MPa~105MPa。高压密封变扣为NPT P型。
在控制管线穿越临时采油树后,将原本在采油树下法兰处的控制管线井口穿越密封延长至高压软管末端。将控制管线包入高压软管内部,使延长的控制管线受到保护。高压软管两端通过高压密封变扣、密封延长变扣分别与采油树管线穿越口、内部控制管线密封,使得控制管线不直接与采油树密封而与高压软管延伸密封。试压合格后即可实现地面控制开关井下安全阀,注入化学药剂及读取地层温度压力等功能,并可开井排液生产。
待工程条件成熟后,拆临时采油树,安装正式采油树时,只需要剪掉与高压软管密封的一小段控制管线即可,剩余的延长控制管线即可与正式采油树穿越孔进行密封。
本发明的主要有益效果有:
1)填补了不起出井下生产管柱即可更换临时采油树的技术空白,极大地降低了作业风险,提高了作业时效,具有较高的经济效益。
2)结构简单,投资成本低,需要更换采油树时可减少或代替各种管线专用密封件的使用。
3)该发明的应用使得完井结束后可立即排液,解决了油井临时排液的生产需求,最大限度的减少了油层污染,保护了储层,提高了生产井的产量。
4)可根据需要对各种尺寸的穿越管线实现密封,且压力等级可适应性强,只需选择不同压力等级的密封配件即可实现105MPa以内的密封要求,且操作简单方便,在井口采油树需要更换的领域可广泛应用。
附图说明
图1是本发明的组装结构示意图;
图2是本发明的内部结构剖视图。
具体实施方式
实施例13/8″化学药剂注入管线穿越密封的实现
将3/8″化学药剂注入管线直接穿过临时采油树法兰,座临时井口于油管四通,对角上紧螺栓。管线留足长度,分别穿过3/8″NPT P型高压密封变扣1、高压软管快速接头一2、延长密封高压软管3、高压软管快速接头二4、密封延长变扣5。这四个部件之间采用丝扣及密封圈连接。管线穿越延长密封变扣5后,在其后端与其做SWAGELOK穿越密封,并用堵头6把管线堵住,确保控制管线与高压软管环空及控制管线内部密封。
对临时采油树法兰端面及高压软管3进行试压21MPa,稳压10分钟后合格即可。在更换井口采油树时,拆除高压软管3时仅损耗一段液控管线,剩余的管线长度仍可以在采油树法兰穿越处重新做密封。
实施例21/4″控制管线穿越密封的实现
在进行1/4″压力计电缆、1/4″井下安全阀控制管线、1/4″放气阀控制管线的穿越密封时,具体实施方式同3/8″化学药剂注入管线的方法、结构相似。不同之处在于1/4″控制管线穿越密封扣型均采用1/4″NPT P。
Claims (6)
1.一种采油树井口穿越延长密封总成,其特征在于:所述穿越延长密封总成由高压密封变扣(1)、高压软管快速接头一(2)、高压软管(3)、高压软管快速接头二(4)、密封延长变扣(5)和高压密封堵头(6)顺序连接,管线包入高压软管(3)内部。
2.根据权利要求1所述采油树井口穿越延长密封总成,其特征在于:所述高压软管(3)长度大于1米,外径为1/2-1″。
3.根据权利要求1所述采油树井口穿越延长密封总成,其特征在于:所述高压密封变扣(1)、高压软管快速接头一(2)、高压软管(3)、高压软管快速接头二(4)、密封延长变扣(5)之间采用丝扣和密封圈连接。
4.根据权利要求1所述采油树井口穿越延长密封总成,其特征在于:密封延长变扣(5)后端做穿越密封,并用高压密封堵头(6)将管线堵住。
5.根据权利要求1所述采油树井口穿越延长密封总成,其特征在于:在1/4″管线穿越密封时,所述高压密封变扣(1)扣型为1/4″NPT P,耐压级别14MPa~105MPa。
6.根据权利要求1所述采油树井口穿越延长密封总成,其特征在于:在3/8″管线穿越密封时,所述高压密封变扣(1)扣型为3/8″NPT P,耐压级别14MPa~105MPa。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101516517A CN102230367A (zh) | 2011-06-02 | 2011-06-02 | 一种采油树井口穿越延长密封总成 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101516517A CN102230367A (zh) | 2011-06-02 | 2011-06-02 | 一种采油树井口穿越延长密封总成 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102230367A true CN102230367A (zh) | 2011-11-02 |
Family
ID=44842966
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011101516517A Pending CN102230367A (zh) | 2011-06-02 | 2011-06-02 | 一种采油树井口穿越延长密封总成 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102230367A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102926693A (zh) * | 2012-10-26 | 2013-02-13 | 中国石油化工股份有限公司 | 利用油管封堵器封堵换装井口的方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2303081Y (zh) * | 1997-01-10 | 1999-01-06 | 东营市东营区万华工业发展公司 | 一种用于热采井口的高压软连接装置 |
US6919512B2 (en) * | 2001-10-03 | 2005-07-19 | Schlumberger Technology Corporation | Field weldable connections |
CN1808812A (zh) * | 2005-12-29 | 2006-07-26 | 国家海洋局第一海洋研究所 | 水下电缆的密封构件 |
CN202348199U (zh) * | 2011-06-02 | 2012-07-25 | 中国海洋石油总公司 | 一种采油树井口穿越延长密封总成 |
-
2011
- 2011-06-02 CN CN2011101516517A patent/CN102230367A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2303081Y (zh) * | 1997-01-10 | 1999-01-06 | 东营市东营区万华工业发展公司 | 一种用于热采井口的高压软连接装置 |
US6919512B2 (en) * | 2001-10-03 | 2005-07-19 | Schlumberger Technology Corporation | Field weldable connections |
CN1808812A (zh) * | 2005-12-29 | 2006-07-26 | 国家海洋局第一海洋研究所 | 水下电缆的密封构件 |
CN202348199U (zh) * | 2011-06-02 | 2012-07-25 | 中国海洋石油总公司 | 一种采油树井口穿越延长密封总成 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102926693A (zh) * | 2012-10-26 | 2013-02-13 | 中国石油化工股份有限公司 | 利用油管封堵器封堵换装井口的方法 |
CN102926693B (zh) * | 2012-10-26 | 2015-03-18 | 中国石油化工股份有限公司 | 利用油管封堵器封堵换装井口的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205100930U (zh) | 一种井口多级防喷器试压系统及其试压装置 | |
CN105804735A (zh) | 一种三塞式水压致裂法地应力测试系统 | |
CN107956459B (zh) | 一种泡沫注入装置及其使用方法和安装方法 | |
CN103470229A (zh) | 一种高通量滤砂管防砂配套管柱 | |
CN103422845A (zh) | 一种y型异径双通道高压酸化压裂井口装置 | |
CN108049836B (zh) | 带压更换sagd井口装置及其更换方法 | |
CN202348199U (zh) | 一种采油树井口穿越延长密封总成 | |
CN102230367A (zh) | 一种采油树井口穿越延长密封总成 | |
CN203594868U (zh) | 一种带压更换阀门装置 | |
CN110219610B (zh) | 一种页岩气水平井高压泵送桥塞装置 | |
CN206636537U (zh) | 采油井井口防倒灌装置 | |
CN203499618U (zh) | 气驱采油环空测试偏心井口装置 | |
CN210798899U (zh) | 一种页岩气水平井高压泵送桥塞装置 | |
CN104295243A (zh) | 油气井完井管柱及完井工艺 | |
CN201943663U (zh) | 一种抽油杆防喷刮油器 | |
CN201320747Y (zh) | 井口装置套压闸阀更换工具 | |
CN108051288A (zh) | 一种pe管道加压装置及方法 | |
CN105587284B (zh) | 抽油机井井口防喷装置及开启井口作业时的防喷方法 | |
CN105507866B (zh) | 一种压裂井口装置 | |
CN201730553U (zh) | 一种石油钻采用膨胀管柱 | |
CN209483229U (zh) | 完井管柱以及生产系统 | |
CN208184697U (zh) | 一种高压充填防砂施工井口装置 | |
CN109958405B (zh) | 油井井口不停产更换流程装置 | |
CN220379459U (zh) | 一种天然气井口水合物抑制剂均分装置 | |
CN103161408B (zh) | 液压式接箍报警装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20111102 |