CN102198691B - 一种节段梁箱梁液压内模 - Google Patents

一种节段梁箱梁液压内模 Download PDF

Info

Publication number
CN102198691B
CN102198691B CN2011101231387A CN201110123138A CN102198691B CN 102198691 B CN102198691 B CN 102198691B CN 2011101231387 A CN2011101231387 A CN 2011101231387A CN 201110123138 A CN201110123138 A CN 201110123138A CN 102198691 B CN102198691 B CN 102198691B
Authority
CN
China
Prior art keywords
girder
template
walking rails
rails frame
internal mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011101231387A
Other languages
English (en)
Other versions
CN102198691A (zh
Inventor
王祥军
谢亮
杨波
夏仙桃
张悟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wuxin Intelligent Technology Co ltd
Original Assignee
China Railway Wuxin Steel Formwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Wuxin Steel Formwork Co Ltd filed Critical China Railway Wuxin Steel Formwork Co Ltd
Priority to CN2011101231387A priority Critical patent/CN102198691B/zh
Publication of CN102198691A publication Critical patent/CN102198691A/zh
Application granted granted Critical
Publication of CN102198691B publication Critical patent/CN102198691B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

一种节段梁箱梁液压内模,其包括主梁(2),在主梁(2)上安装有模板系统(1),主梁(2)通过导套(15)与导柱装置(3)连接,在导柱装置(3)与主梁(2)之间安装有顶升油缸(14),导柱装置(3)安装在走行轨道架(7)上,模板系统(1)包括有安装在主梁(2)上的顶模板(19),在顶模板(19)的左右依次对称安装有上动模板(18)、下动模板(12),顶模板(19)与上动模板(18)和上动模板(18)与下动模板(12)之间分别采用铰链方式连接且在其两者之间安装有侧向油缸(17),在走行轨道架(7)的一端连接有可拆卸的移模支架,本发明使用安全方便,模板安装和脱模容易,整体稳定性好,拆卸和移模容易。

Description

一种节段梁箱梁液压内模
技术领域
本发明涉及一种节段梁箱梁液压内模。
背景技术
目前,预制节段梁箱梁的内模多采用活动内模结构,由形成箱梁内腔的模板和模板支撑系统构成,传统内模模板支撑系统多采用机械式支撑方式,模板安装和拆除困难且效率低,使用不安全;中国专利申请201010519858.0公开了一种组合箱梁液压内模,与传统的机械式内模模板支撑系统相比,使用安全、模板安装和脱模容易且效率高,但存在以下不足:1、模板系统的稳定性不足,原因是:申请文件中的顶板11安装在顶板纵梁14上,顶板纵梁14安装在调节柱2上,模板系统通过调节柱2和导柱3之间的相对滑动安装到位,模板系统和砼的大部分重量通过调节柱2到导柱3再到主梁4,这样就有可能因调节柱2和导柱3本身的刚性及组合后的承载能力等因素导致变形,影响模板系统的稳定性;2、移模困难,a、模板系统和模板支撑系统组成的内模需要整体从箱梁内腔中移出,虽然内模在箱梁内腔中移动时,可以利用主梁4底部的导轨42与支撑底座5上的反滚轮51移动,但是当内模的一部份移出箱梁内腔时,需要吊起才能安全移出,并且要将其移到下一个制梁位置时,也需要吊移; b、在内模移出箱梁内腔后,支撑底座需要吊起才能从梁体内腔移出。
发明内容
本发明的目的是提供一种使用安全方便、模板安装和脱模容易、整体的稳定性好且效率高的节段梁箱梁液压内模。
为实现上述目的,本发明节段梁箱梁液压内模,包括有主梁,在主梁上安装有模板系统,在主梁上固定安装导套,在导套内安装有导柱装置,导柱装置包括有安装在导套内且可以滑动的导柱和安装在导柱下端的反滚轮组,在导柱与主梁之间安装有顶升油缸,反滚轮组安装在导轨上,导轨安装在走行轨道架上,模板系统包括有安装在主梁上的顶模板,顶模板以主梁的中心线为对称轴左右对称,在顶模板的左右依次对称安装有上动模板、下动模板,顶模板与上动模板之间采用铰链方式连接且在其两者之间安装有侧向油缸,上动模板与下动模板之间采用铰链方式连接且在其两者之间安装有侧向油缸。
所述的节段梁箱梁液压内模,在主梁与走行轨道架之间设有可拆卸的伸缩撑杆。
所述的节段梁箱梁液压内模,在走行轨道架的下方设有可调节高度的中部支腿和走行装置,走行装置采用可收放的连接方式安装在走行轨道架上。
所述的节段梁箱梁液压内模,在走行轨道架的下方设有马凳。
所述的节段梁箱梁液压内模,在走行轨道架的端部设有限位座。
所述的节段梁箱梁液压内模,在导柱上安装有泵站平台,在泵站平台上安装有液压系统。
所述的节段梁箱梁液压内模,在走行轨道架的一端设有可拆卸的移模支架。
由于本发明节段梁箱梁液压内模采用液压调节主梁和各个模板的位置,实现了液压自动立模和收模,模板安装和脱模容易、效率高、使用安全方便。
由于本发明节段梁箱梁液压内模的顶模板直接安装在主梁上,模板系统和砼的大部分重量直接压在主梁上,主梁的刚性是非常高的,不会产生大的变形,这样就保证了模板系统稳定;由于本发明节段梁箱梁液压内模的导柱装置可以两两相连,导柱装置通过导套与主梁连接,且在主梁与导柱装置之间安装有可拆卸的伸缩撑杆,这样就保证了导柱装置和其与主梁连接的稳定性;由于承载导柱装置的走行轨道架由马凳支撑,这样就保证了走行轨道架的稳定性,因此本发明节段梁箱梁液压内模的整体稳定性好。
由于本发明节段梁箱梁液压内模走行轨道架下面安装有走行装置,这样就能方便地将走行轨道架推到需要的位置且能方便地将其从箱梁内腔中推出;由于走行轨道架的中部支腿可以置于箱梁底部的泄水孔位置,这样拆卸方便;又因中部支腿是可以调节高度的,这样就可以方便地调节控制走行轨道架的高度位置,然后再用马凳支撑走行轨道架,因此走行轨道架的安装、拆卸和移动方便。由于本发明节段梁箱梁液压内模的走行轨道架上安装有导轨,在导柱装置的下端安装有与导轨配套的反滚轮组,在立模时可以用于移动主梁和模板系统,将其调整到需要的位置,在脱模后可以用于将其从梁体内腔中移出;由于设有移模支架,在需要将主梁和模板系统移出箱梁内腔时,可以在走行轨道架一端安装移模支架,这样就能方便地将主梁和模板系统拖移到移模支架上,完成脱离箱梁的移模工作;在与移模支架另一端配套的位置可以安装走行轨道架,制成下一个制梁台座,然后将主梁和模板系统从移模支架上直接拖移到下一个制梁台座中,这样就进一步提高了效率,适用节段梁箱梁预制连续性的特点。
综上所述,本发明之节段梁箱梁液压内模使用安全方便,模板安装和脱模容易,整体的稳定性好,安装、拆卸和移模容易。
附图说明
图1所示为本发明节段梁箱梁液压内模实施例结构及工作状态示意图。
图2所示为本发明节段梁箱梁液压内模的收模状态示意图。
图3为图1所示的A—A截面去掉中间连接件后的模板示意图。
图4为图1所示的B—B截面图示意图。
图5为本发明节段梁箱梁液压内模移模过程示意图。
1、模板系统,2、主梁,3、导柱装置,4、导柱连接件,5、液压系统,6、泵站平台,7、走行轨道架,8、反滚轮组,9、马凳,10、走行装置,11、中部支腿,12、下动模板,13、导柱,14、顶升油缸,15、导套,16、伸缩撑杆,17、侧向油缸,18、上动模板,19、顶模板,20、端连接角钢,21、导轨,22、限位座,23、第一制梁台座,24、第二制梁台座,25、移模支架,26、活动块。
具体实施方式
下面结合附图和实施例对本发明节段梁箱梁液压内模作进一步说明。
如图所示,在内模底模上设有马凳9,在马凳9上支撑有走行轨道架7,在走行轨道架7下面安装有中部支腿11,中部支腿11为可调节高度的结构形式,用于调节走行轨道架7的高度,例如采用螺旋结构形式调节高度,在走行轨道架7下面还安装有走行装置10,走行装置10采用可收放的结构形式与走行轨道架7连接,用于移动走行轨道架7,在走行轨道架7上安装有导轨21,在导轨21的端头设有限位座22,防止导柱13在移动时从走行轨道架7上滚落下来,在导轨21上放置有与其配套的反滚轮组8,反滚轮组8安装在导柱13的下端,导柱13的上端安装在导套15内并组成滑动连接,导柱装置3包括导柱13和反滚轮组8,在导柱13上安装有泵站平台6,在泵站平台6上安装有液压系统5,两两导柱13利用导柱连接件4连接,导套15固定在主梁2上,在导柱13与主梁2之间安装有顶升油缸14,在主梁2与走行轨道架7之间安装有伸缩撑杆16,在主梁2上安装有顶模板19,顶模板19以主梁2的中心线为对称轴左右对称,在顶模板19的左右依次对称安装有上动模板18、下动模板12,顶模板19与上动模板18之间采用铰链方式连接且在其两者之间安装有侧向油缸17,上动模板18与下动模板12之间采用铰链方式连接且在其两者之间安装有侧向油缸17,上动模板18与主梁2和下动模板12与主梁2之间都安装有伸缩撑杆16,顶模板19、上动模板18和下动模板12组成模板系统1,模板系统1与端连接角钢20连接。在走行轨道架7的一端设有移模支架25,在移模支架25与走行轨道架7的连接处设有活动块26。
本发明节段梁箱梁液压内模立模时,通过调节中部支腿11调整好走行轨道架7到底模的距离,将马凳9安装在走行轨道架7和底模之间,以保证走行轨道架7的稳定性,将内模移到走行轨道架7上的导轨21上,首先操作液压系统5控制顶升油缸14,将模板系统1和主梁2顶升到施工要求的位置,然后操作液压系统5控制侧向油缸17,推动上动模板18直至其撑开到施工要求的位置,再操作液压系统5控制侧向油缸17,推动下动模板12直至其撑开到施工要求的位置,之后安装走行轨道架7、下动模板12、上动模板18分别与主梁2之间的伸缩撑杆16,加强刚度;最后安装端连接角钢20,以固定模板位置。此时内模处于完全伸张的状态,保持这个状态即可以进行混凝土浇注。如图1所示。
本发明节段梁箱梁液压内模脱模时,先拆除伸缩撑杆16和端连接角钢20,然后通过液压系统5控制侧向油缸17依次收缩下动模板12、上动模板18到位,再通过液压系统5控制顶升油缸14,将模板系统1和主梁2收缩到位,使整个模板系统1下降至设计高度,完成模板的收缩,如图2所示。安装移模支架25,调整移模支架25的高度,使其与走行轨道架7的高度相配套,安装活动块26,将移模支架25与走行轨道架7连接成整体。通过外部卷杨机牵引,将内模从第一制梁台座23上已浇注好的预制箱梁内腔中拖到移模支架25上,拆除走行轨道架7将其安装到第二制梁台座24上,调整走行轨道架7的高度使其与移模支架25相配套,安装活动块26,将移模支架25与第二制梁台座24中的走行轨道架7连接成整体。通过外部卷杨机牵引,将内模从移模支架25上拖移到第二制梁台座24中的走行轨道架7上,即可以进行下一片节段梁箱梁的预制。

Claims (5)

1.一种节段梁箱梁液压内模,包括主梁(2),在主梁(2)上安装有模板系统(1),在主梁(2)上固定安装有导套(15),在导套(15)内安装有导柱装置(3),导柱装置(3)包括安装在导套(15)内且可以滑动的导柱(13)和安装在导柱(13)下端的反滚轮组(8),在导柱(13)与主梁(2)之间安装有顶升油缸(14),反滚轮组(8)安装在导轨(21)上,导轨(21)安装在走行轨道架(7)上,其特征是:模板系统(1)包括有安装在主梁(2)上的顶模板(19),顶模板(19)以主梁(2)的中心线为对称轴左右对称,在顶模板(19)的左右依次对称安装有上动模板(18)、下动模板(12),顶模板(19)与上动模板(18)之间采用铰链方式连接且在其两者之间安装有侧向油缸(17),上动模板(18)与下动模板(12)之间采用铰链方式连接且在两者之间安装有侧向油缸(17);在走行轨道架(7)的下方设有可调节高度的中部支腿(11)和走行装置(10),走行装置(10)采用可收放的连接方式安装在走行轨道架(7)上,在走行轨道架(7)的一端连接有可拆卸的移模支架。
2.根据权利要求1所述的节段梁箱梁液压内模,其特征是:在主梁(2)与走行轨道架(7)之间设有可拆卸的伸缩撑杆(16)。
3.根据权利要求1或2所述的节段梁箱梁液压内模,其特征是:在走行轨道架(7)的下方设有马凳(9)。
4.根据权利要求1或2所述的节段梁箱梁液压内模,其特征是:在走行轨道架(7)的端部设有限位座(22),在走行轨道架(7)的一端连接有可拆卸的移模支架。
5.根据权利要求1或2所述的节段梁箱梁液压内模,其特征是:在导柱(13)上安装有泵站平台(6),在泵站平台(6)上安装有液压系统(5)。
CN2011101231387A 2011-05-13 2011-05-13 一种节段梁箱梁液压内模 Active CN102198691B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101231387A CN102198691B (zh) 2011-05-13 2011-05-13 一种节段梁箱梁液压内模

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101231387A CN102198691B (zh) 2011-05-13 2011-05-13 一种节段梁箱梁液压内模

Publications (2)

Publication Number Publication Date
CN102198691A CN102198691A (zh) 2011-09-28
CN102198691B true CN102198691B (zh) 2012-11-07

Family

ID=44659808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101231387A Active CN102198691B (zh) 2011-05-13 2011-05-13 一种节段梁箱梁液压内模

Country Status (1)

Country Link
CN (1) CN102198691B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442454A (zh) * 2015-12-24 2016-03-30 湖南中铁五新钢模有限责任公司 一种分节自走行式现浇梁液压内模及其立模脱模方法
CN105965675B (zh) * 2016-07-26 2018-06-19 湖南五新模板有限公司 混凝土箱梁的液压内模装置
CN106426525A (zh) * 2016-11-15 2017-02-22 湖南三筑工有限公司 预制管廊模具
CN115723226B (zh) * 2022-12-09 2024-07-02 江苏月生达机械制造有限公司 一种预制液压箱梁内模多段式可调节结构

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102001127A (zh) * 2010-10-26 2011-04-06 湖南中铁五新钢模有限责任公司 组合箱梁液压内模
CN201816126U (zh) * 2010-10-26 2011-05-04 湖南中铁五新钢模有限责任公司 组合箱梁液压内模
CN202021679U (zh) * 2011-05-13 2011-11-02 湖南中铁五新钢模有限责任公司 节段梁箱梁液压内模

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1294441B1 (it) * 1997-06-17 1999-03-24 Sacmi Impianto per il colaggio in pressione di articoli sanitari
CN100563964C (zh) * 2007-08-09 2009-12-02 湖南中铁五新钢模有限责任公司 铰链四杆机构液压箱梁内模

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102001127A (zh) * 2010-10-26 2011-04-06 湖南中铁五新钢模有限责任公司 组合箱梁液压内模
CN201816126U (zh) * 2010-10-26 2011-05-04 湖南中铁五新钢模有限责任公司 组合箱梁液压内模
CN202021679U (zh) * 2011-05-13 2011-11-02 湖南中铁五新钢模有限责任公司 节段梁箱梁液压内模

Also Published As

Publication number Publication date
CN102198691A (zh) 2011-09-28

Similar Documents

Publication Publication Date Title
CN203768814U (zh) 高墩小半径曲线现浇箱梁新型移动模架
CN105155423A (zh) 用于连续箱梁施工的上行式移动模架
CN103074854A (zh) 后支点三角托架挂篮及应用该挂篮的桥梁施工方法
CN102198691B (zh) 一种节段梁箱梁液压内模
CN208380591U (zh) 自动送轨式隧道液压二衬台车
CN102022123B (zh) 一种多变径模板台车整体衬砌方法
CN201202122Y (zh) 自动开合收放式沉箱或深井钢模板
CN102660925B (zh) 一种变幅宽曲线桥移动模架
CN202658533U (zh) 一种变幅宽曲线桥移动模架
CN108103945A (zh) 一种现浇箱梁用整体落地模架
CN202021679U (zh) 节段梁箱梁液压内模
CN102828758A (zh) 一种隧道中心水沟和侧沟的成型设备及其成型工艺
CN202227365U (zh) 地下连续墙导墙移动模架
CN205997128U (zh) 混凝土箱梁的浇筑内模
CN1970264A (zh) 全自动液压预制箱梁内模系统
CN203049471U (zh) 后支点三角托架挂篮
CN106050271B (zh) 一种隧道用水沟模架装置及其施工方法
CN102268858A (zh) 一种悬浇拱桥的挂篮
CN202954823U (zh) 一种隧道中心水沟和侧沟的成型设备
CN108005114A (zh) 一种管廊浇筑模具
CN108098979A (zh) 一种pk断面混凝土箱梁节段预制模板
CN205935678U (zh) 装配式楼梯模具拆装装置
CN201913700U (zh) 可调节内模支撑装置
CN111042835B (zh) 一种隧道线缆沟和水沟施工台车及其施工方法
CN215164807U (zh) 一种钢管拱肋外包混凝土挂篮施工的模板安装结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Hydraulic inner die for segmented box girder

Effective date of registration: 20140826

Granted publication date: 20121107

Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch

Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

Registration number: 2014430000015

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20150917

Granted publication date: 20121107

Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch

Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

Registration number: 2014430000015

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Hydraulic inner die for segmented box girder

Effective date of registration: 20150923

Granted publication date: 20121107

Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch

Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

Registration number: 2015430000025

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161110

Address after: 418000 Industrial Economy Bureau of China County, Hunan Province, room 114

Patentee after: HUNAN WUXIN FORMWORK Co.,Ltd.

Address before: 410100 Huaihua City, Hunan province Hecheng District Liyuan Road No. 85

Patentee before: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20171128

Granted publication date: 20121107

Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch

Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

Registration number: 2015430000025

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Hydraulic inner die for segmented box girder

Effective date of registration: 20191211

Granted publication date: 20121107

Pledgee: China Co. truction Bank Corp Huaihua branch

Pledgor: HUNAN WUXIN FORMWORK Co.,Ltd.

Registration number: Y2019980000993

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230427

Granted publication date: 20121107

Pledgee: China Co. truction Bank Corp Huaihua branch

Pledgor: HUNAN WUXIN FORMWORK Co.,Ltd.

Registration number: Y2019980000993

PC01 Cancellation of the registration of the contract for pledge of patent right
TR01 Transfer of patent right

Effective date of registration: 20240221

Address after: 418000 Xiangshang culture and Technology Industrial Park in Zhongfang County, Huaihua City, Hunan Province (east of Huaiqian Road, west of Ziyang Road, south of Wuxi East Road, north of Fengxiang Road)

Patentee after: Hunan Wuxin Intelligent Technology Co.,Ltd.

Country or region after: China

Address before: 418000 Room 114, Industrial and Economic Bureau of Zhongfang County, Hunan Province

Patentee before: HUNAN WUXIN FORMWORK Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right