CN102181306A - 一种改进的气化炉头煤浆管线 - Google Patents

一种改进的气化炉头煤浆管线 Download PDF

Info

Publication number
CN102181306A
CN102181306A CN2011100790730A CN201110079073A CN102181306A CN 102181306 A CN102181306 A CN 102181306A CN 2011100790730 A CN2011100790730 A CN 2011100790730A CN 201110079073 A CN201110079073 A CN 201110079073A CN 102181306 A CN102181306 A CN 102181306A
Authority
CN
China
Prior art keywords
coal slurry
pipe
valve
steam
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100790730A
Other languages
English (en)
Other versions
CN102181306B (zh
Inventor
吴纯马
王涛
常东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WANBEI COAL-ELECTRICITY GROUP Co.,Ltd.
Original Assignee
Anhui Huaihua Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huaihua Co Ltd filed Critical Anhui Huaihua Co Ltd
Priority to CN 201110079073 priority Critical patent/CN102181306B/zh
Publication of CN102181306A publication Critical patent/CN102181306A/zh
Application granted granted Critical
Publication of CN102181306B publication Critical patent/CN102181306B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种改进的气化炉头煤浆管线(10),其包括蒸汽总管(12),与蒸汽总管(12)连通的吹扫氧管的蒸汽管(14),煤浆管(18),连通煤浆管(18)的氮气管(16),连通蒸汽总管(12)、吹扫氧管的蒸汽管(14)与煤浆管(18)、氮气管(16)的第一连接管(15),在第一连接管(15)中依次串联设置蒸汽吹扫煤浆手动阀(21)、蒸汽吹扫煤浆管线单向阀(23)和蒸汽吹扫煤浆管线盲板(25)。改变了蒸汽吹扫煤浆管线手动阀(21)、蒸汽吹扫煤浆管线单向阀(23)和蒸汽吹扫煤浆管线盲板(25)设置顺序后,煤浆管线(10)不再被堵塞。

Description

一种改进的气化炉头煤浆管线
技术领域
本发明涉及一种改进的气化炉头煤浆管线。
背景技术
在现有技术中,水煤浆加压气化技术迅速发展,其中德士古水煤浆加压气化,即GE气化工艺具有技术成熟,生产能力高和操作相对简单等特点,被广泛应用于化肥和甲醇工业。图1描绘了现有技术中气化炉头煤浆管线的示意图,其中包括蒸汽总管12,与蒸汽总管12连通的吹扫氧管的蒸汽管14。还设有煤浆管18,连通煤浆管18的氮气管16,连通蒸汽总管12、吹扫氧管的蒸汽管14与煤浆管18、氮气管16的第一连接管15。在第一连接管15中由上游方至下游方,依次串联设置蒸汽煤浆吹扫手动阀21、蒸汽吹扫煤浆管线盲板25和蒸汽吹扫煤浆管线单向阀23。
下面对照图1说明蒸汽吹扫的过程:
当管线被泄压完毕后,将高压蒸汽总管12去吹扫氧管的蒸汽管14上的盲板11和去煤浆管18的第一连接管15中的盲板25倒“通”。打开蒸汽调节阀24,并手动开启蒸汽吹扫阀22,将蒸汽总管12内的冷凝水从蒸汽吹扫调节阀24后的排液阀(未图示)彻底排尽。随后进行氧气管吹扫,打开蒸汽总管12中去吹扫氧管的蒸汽管14的蒸汽吹扫氧管手动阀26,控制蒸汽量吹扫氧管。接着对煤浆管18进行吹扫,通过蒸汽总管12将蒸汽送入氧管后,打开煤浆管18中的煤浆调节阀33,控制蒸汽量,吹扫煤浆管18后,关闭蒸汽吹扫煤浆管线手动阀21。然后,再关闭吹扫氧管的蒸汽管14中的蒸汽氧气管吹扫阀26。接着,关闭蒸汽管12中的蒸汽吹扫调节阀24及蒸汽吹扫手动总阀22,打开蒸汽吹扫调节阀24后的排液阀(未图示),排出蒸汽总管12内的冷凝水后,将吹扫氧管的蒸汽管14中的蒸汽吹扫氧管盲板11和第一连接管15中的盲板25倒“盲”。待确认煤浆管18吹通后,关闭煤浆管18中的入炉前的煤浆手动阀35,准备煤浆管线清洗。
这种设备中出现的缺点是在系统停车后,煤浆管线在蒸汽吹扫前管道易堵。通常在每次计划停车或系统跳车后,都按停车步骤处理。降压、切水、处理炉头阀门及倒盲板都需要一定时间,当压力降到预定指标后,就可以打开蒸汽阀门进行炉头煤浆管及氧气管的吹扫。然而,每次打开煤浆管吹扫时都发现吹不通,蒸汽至煤浆管以及蒸汽管及蒸汽单向阀都充满了煤浆,管线被严重堵死。而疏通这段管线往往需要花费二~三个小时、甚至更长时间。有时计划需要气化炉连续投料,却因为管线堵处理时间过长,使气化炉炉温不具备连投条件而被迫放弃投料。若气化炉不连续投料,也因处理此管线时间过长,而煤浆管的清洗也不能在短时间内进行,导致煤浆管局部堵塞,因而造成一系列设备故障,对设备的正常运行产生危害。
本发明内容
针对上述现有的技术问题,本发明的目的在于提供一种既消除煤浆管线堵塞又检修安全的技术。为实现上述目的,本发明提供一种改进的气化炉头煤浆管线,其包括蒸汽管,与蒸汽管连通的吹扫氧管的蒸汽管,煤浆管,连通煤浆管的氮气管,连通蒸汽管、吹扫氧管的蒸汽管与煤浆管、氮气管的第一连接管,在第一连接管中由上游方至下游方,依次串联设置蒸汽煤浆吹扫阀、单向阀和蒸汽煤浆管盲板。
按照本发明提供的另一种气化炉头煤浆管线,其中所述蒸汽管中设有串联的蒸汽吹扫阀和蒸汽调节阀,所述吹扫氧管的蒸汽管中设有串联的蒸汽氧气管吹扫阀和氧气管盲板,所述氮气管中设有串联的氮气调节阀、氮气闸阀和氮气单向阀,所述煤浆管中设有串联的煤浆调节阀、煤浆闸阀和煤浆单向阀。
按照本发明提供的另一种气化炉头煤浆管线,其中所述煤浆管在煤浆调节阀的上游端连通第一煤浆循环管,在所述第一煤浆循环管中设有循环调节阀,所述第一连接管的一端连接点位于蒸汽调节阀与蒸汽吹扫氧管盲板之间,第一连接管的另一端连接点位于煤浆调节阀和煤浆闸阀之间,在第一连接管的另一端连接点和煤浆闸阀之间煤浆管与第二循环管连通,在所述第二循环管中设有闸阀。
按照本发明提供的另一种气化炉头煤浆管线,其中所述蒸汽煤浆吹扫阀、蒸汽吹扫阀、蒸汽吹扫氧管中的阀、氮气煤浆吹扫阀、煤浆入炉手动阀35是手动阀。
在本发明提供的经过改进的气化炉头煤浆管线中,将原先由上游方至下游方第一连接管中依次串联设置的蒸汽煤浆吹扫阀、蒸汽煤浆管盲板和单向阀的这种设置顺序改为串联设置的蒸汽煤浆吹扫阀、单向阀和蒸汽煤浆管盲板后,煤浆管线就不再被堵塞。设备运行可靠,从而保证了煤浆管线的长周期安全运行,为连续向气化炉投料及停车处理煤浆管线清洗保证了时间。
附图说明
图1是现有技术中的气化炉头煤浆管线的示意图。
图2是改进的气化炉头煤浆管线的示意图,其中将现有技术中第一连接管中由上游方至下游方依次串联设置的蒸汽煤浆吹扫阀、蒸汽煤浆管盲板和单向阀的设置顺序改为串联设置的蒸汽煤浆吹扫阀、单向阀和蒸汽煤浆管盲板。
具体实施方式
如图2所示,在本发明提供的一种改进的气化炉头煤浆管线10中,其包括蒸汽总管12,与蒸汽总管12连通的吹扫氧管的蒸汽管14。还设有煤浆管18,连通煤浆管18的氮气管16,连通蒸汽总管12、吹扫氧管的蒸汽管14与煤浆管18、氮气管16的第一连接管15。在第一连接管15中由上游方至下游方依次串联设置蒸汽吹扫煤浆管线手动阀21、蒸汽吹扫煤浆管线单向阀23和蒸汽吹扫煤浆管盲板25。在所述蒸汽总管12中,设有串联的蒸汽吹扫手动总阀22和蒸汽吹扫调节阀24,所述吹扫氧管的蒸汽管14中设有串联的蒸汽吹扫氧管手动阀26和蒸汽吹扫氧管盲板11,所述氮气管16中设有串联的氮气吹扫煤浆管线调节阀27、氮气吹扫煤浆管线手动阀28和氮气吹扫煤浆管线单向阀29,所述煤浆管18中设有串联的煤浆切断阀33、煤浆入炉手动手动阀35和煤浆入炉单向阀37。在所述煤浆管18中,在煤浆切断阀33的上游端,连通第一煤浆循环管13,在所述第一煤浆循环管13中,设有煤浆循环阀31,所述第一连接管15的一端连接点2位于蒸汽吹扫调节阀24与蒸汽吹扫氧管盲板11之间,第一连接管15的另一端连接点4位于煤浆切断阀33和煤浆入炉手动手动阀35之间,在第一连接管15的另一端连接点4和煤浆入炉手动手动阀35之间煤浆管18与煤浆清洗管线17连通。在所述煤浆清洗管线17中设有煤浆清洗管线第二道手动闸阀39。
下面参照图2说明采用本发明提供的改进的气化炉头煤浆管线10的操作过程:
当煤浆管线10被泄压完毕后,关闭煤浆管线10中入气化炉40前的煤浆入炉手动手动阀35,此时要防止热气倒窜,烧伤检修倒盲板的操作者。将吹扫氧管的蒸汽管14中的蒸汽吹扫氧管盲板11和第一连接管15中的盲板25倒“通”,上述盲板11、25倒通后,再打开煤浆管18中入气化炉40前的煤浆入炉手动阀35。然后,打开蒸汽吹扫调节阀24,及蒸汽吹扫手动总阀22,将蒸汽管12内的冷凝水从蒸汽吹扫调节阀24的排液阀(未图示)彻底排尽。
接着进行吹扫氧管的蒸汽管14吹扫步骤,打开蒸汽总管12中的蒸汽吹扫手动总阀22,控制蒸汽量,吹扫氧气管线。
随后对煤浆管18进行吹扫,将蒸汽总管12中的蒸汽送入氧气管后,打开第一连接管15中的蒸汽吹扫煤浆管线手动阀21,控制蒸汽量,执行吹扫步骤后关闭蒸汽吹扫煤浆管线手动阀21。然后,再关闭蒸汽吹扫氧管手动阀26。接着,关闭蒸汽总管12中的蒸汽吹扫调节阀24,及蒸汽吹扫手动总阀22。打开蒸汽吹扫调节阀24的排液阀(未图示),排出管内冷凝水后,将吹扫氧管的蒸汽管14中的蒸汽吹扫氧管盲板11和第一连接管中的盲板25倒“盲”。
待确认气化炉头煤浆管线10被吹通后,关闭煤浆管18中进入气化炉40之前的煤浆入炉手动手动阀35,准备对煤浆管线10进行清洗。
采用本发明提供的改进的气化炉头煤浆管线10后,气化炉头煤浆管线的堵塞现象被消除。
上述实施例是对本发明提供的改进的气化炉头煤浆管线的具体实施方式进行说明,并非进行限定。本发明要求保护的内容和范围记载在权利要求书中。

Claims (4)

1.一种改进的气化炉头煤浆管线(10),其包括蒸汽总管(12),与蒸汽总管(12)连通的吹扫氧管的蒸汽管(14),煤浆管(18),连通煤浆管(18)的氮气管(16),连通蒸汽总管(12)、吹扫氧管的蒸汽管(14)与煤浆管(18)、氮气管(16)的第一连接管(15),其特征是:在第一连接管(15)中由上游方至下游方,依次串联设置蒸汽煤浆吹扫阀(21)、蒸汽吹扫煤浆管线单向阀(23)和蒸汽吹扫煤浆管线盲板(25)。
2.按照权利要求1所述的气化炉头煤浆管线(10),其特征是:所述蒸汽管(12)中设有串联的蒸汽吹扫阀(22)和蒸汽调节阀(24),所述吹扫氧管的蒸汽管(14)中设有串联的阀(26)和盲板(11),所述氮气管(16)中设有串联的氮气煤浆吹扫调节阀(27)、氮气煤浆吹扫阀(28)和氮气吹扫煤浆单向阀(29),所述煤浆管(18)中设有串联的煤浆切断阀(33)、煤浆入炉手动阀(35)和煤浆入炉单向阀(37)。
3.按照权利要求2所述的气化炉头煤浆管线(10),其特征是:所述煤浆管(18)在煤浆切断阀(33)的上游端连通煤浆循环管(13),在所述煤浆循环管(13)中设有煤浆循环阀(31),所述第一连接管(15)的一端连接点(2)位于蒸汽吹扫调节阀(24)与蒸汽吹扫氧管盲板(11)之间,第一连接管(15)的另一端连接点(4)位于煤浆切断阀(33)和煤浆入炉手动阀(35)之间,在第一连接管(15)的另一端连接点(4)和煤浆入炉手动阀(35)之间煤浆管(18)与清洗煤浆管线(17)连通,在所述清洗煤浆管线(17)中设有阀(39)。
4.按照权利要求1~3之一所述的气化炉头煤浆管线(10),其特征是:所述蒸汽煤浆吹扫阀(21)、蒸汽吹扫阀(22)、蒸汽吹扫氧管中的阀(26)、氮气煤浆吹扫阀(28)、煤浆入炉手动阀(35)是球阀。
CN 201110079073 2011-03-30 2011-03-30 一种改进的气化炉头煤浆管线 Expired - Fee Related CN102181306B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110079073 CN102181306B (zh) 2011-03-30 2011-03-30 一种改进的气化炉头煤浆管线

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110079073 CN102181306B (zh) 2011-03-30 2011-03-30 一种改进的气化炉头煤浆管线

Publications (2)

Publication Number Publication Date
CN102181306A true CN102181306A (zh) 2011-09-14
CN102181306B CN102181306B (zh) 2013-08-21

Family

ID=44567596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110079073 Expired - Fee Related CN102181306B (zh) 2011-03-30 2011-03-30 一种改进的气化炉头煤浆管线

Country Status (1)

Country Link
CN (1) CN102181306B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103409169A (zh) * 2013-06-14 2013-11-27 水煤浆气化及煤化工国家工程研究中心 气化装置及以水煤浆或粉煤为原料的在线投料方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61155493A (ja) * 1984-12-03 1986-07-15 ゼネラル・エレクトリツク・カンパニイ 総合複合サイクル・システム
JP2855874B2 (ja) * 1991-04-11 1999-02-10 石川島播磨重工業株式会社 高温cwm供給装置
EP1959002A1 (en) * 2007-02-14 2008-08-20 Yankuang Group Corporation Limited Method of gasification burner online feeding
CN101665724A (zh) * 2008-09-05 2010-03-10 绿色煤电有限公司 水煤浆气化方法及气化炉
CN201485430U (zh) * 2008-12-30 2010-05-26 湖北双环科技股份有限公司 一种间歇式气流床煤气化装置
CN202039034U (zh) * 2011-03-30 2011-11-16 安徽淮化股份有限公司 一种改进的气化炉头煤浆管线

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61155493A (ja) * 1984-12-03 1986-07-15 ゼネラル・エレクトリツク・カンパニイ 総合複合サイクル・システム
JP2855874B2 (ja) * 1991-04-11 1999-02-10 石川島播磨重工業株式会社 高温cwm供給装置
EP1959002A1 (en) * 2007-02-14 2008-08-20 Yankuang Group Corporation Limited Method of gasification burner online feeding
CN101665724A (zh) * 2008-09-05 2010-03-10 绿色煤电有限公司 水煤浆气化方法及气化炉
CN201485430U (zh) * 2008-12-30 2010-05-26 湖北双环科技股份有限公司 一种间歇式气流床煤气化装置
CN202039034U (zh) * 2011-03-30 2011-11-16 安徽淮化股份有限公司 一种改进的气化炉头煤浆管线

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103409169A (zh) * 2013-06-14 2013-11-27 水煤浆气化及煤化工国家工程研究中心 气化装置及以水煤浆或粉煤为原料的在线投料方法

Also Published As

Publication number Publication date
CN102181306B (zh) 2013-08-21

Similar Documents

Publication Publication Date Title
US20110289927A1 (en) Method for Flushing a Section of a Fuel System of a Gas Turbine
CN203668323U (zh) 水煤浆气化炉的进料系统及其煤气化系统
CN102181306B (zh) 一种改进的气化炉头煤浆管线
CN202039034U (zh) 一种改进的气化炉头煤浆管线
CN109550750B (zh) 一种石灰水管道的清理方法
CN1563791A (zh) 处理循环流化床锅炉返料器事故的高压风吹扫方法
CN102953813B (zh) 用于在气化器起动期间切换燃料供给的系统和方法
CN104854249A (zh) 从高炉风口吹入氧气的设备和高炉操作方法
EP2379944B1 (en) Method for supplying a gas turbine plant and gas turbine plant
CN102620145A (zh) 焦炉煤气管道低压自动保护系统
CN103185340B (zh) 防堵焦油的烧嘴系统及采用上述系统的烧嘴焦油处理方法
TWI477721B (zh) 供限制廢熱鍋爐中煙灰沉積之方法及裝置
EP3017157A1 (en) Arrangement for and method of feeding ammonia containing fluid into the exhaust gas passage of a combustion plant
CN113083013B (zh) 一种适用于尿素制氨工艺的喷氨格栅防堵方法及系统
CN205535790U (zh) 一种燃烧器的双吹扫系统、燃烧器及沥青搅拌站
CN203750507U (zh) 气相进料管线防堵吹扫装置
CN103980919B (zh) 一种锅炉焦炉煤气管道及其清理方法
CN103277808A (zh) 一种小型工业锅炉煤粉储供系统及控制方法
CN207452035U (zh) 一种碎煤气化提高灰锁运行周期的装置
CN206607201U (zh) 粉煤气化装置
JP7087534B2 (ja) Pciを安定的に行う方法
CN105271121A (zh) 一种合成炉联锁保护系统
CN110824114A (zh) 一种燃气氧含量的分析系统
CN204325279U (zh) 一种煤气化激冷系统
CN204661622U (zh) 粉体锁斗充压系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210409

Address after: 234000 No. 157, Xichang Road, Suzhou, Anhui

Patentee after: WANBEI COAL-ELECTRICITY GROUP Co.,Ltd.

Address before: 232038 Anhui Huainan Tian Jia An District Quanshan Anhui Huaihua Limited by Share Ltd technology research and Development Center

Patentee before: ANHUI HUAIHUA CHEMICAL GROUP Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210506

Address after: 234000 No. 157, Xichang Road, Suzhou, Anhui

Patentee after: WANBEI COAL-ELECTRICITY GROUP Co.,Ltd.

Address before: 232038 Anhui Huainan Tian Jia An District Quanshan Anhui Huaihua Limited by Share Ltd technology research and Development Center

Patentee before: ANHUI HUAIHUA CHEMICAL GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20210330