CN102175986A - Meter loading and unloading device for automatic calibration of three-phase electric energy meter - Google Patents
Meter loading and unloading device for automatic calibration of three-phase electric energy meter Download PDFInfo
- Publication number
- CN102175986A CN102175986A CN2011100396170A CN201110039617A CN102175986A CN 102175986 A CN102175986 A CN 102175986A CN 2011100396170 A CN2011100396170 A CN 2011100396170A CN 201110039617 A CN201110039617 A CN 201110039617A CN 102175986 A CN102175986 A CN 102175986A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- transmission line
- meter
- energy meter
- phase electric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Wind Motors (AREA)
Abstract
The invention discloses a meter loading and unloading device for the automatic calibration of a three-phase electric energy meter, which comprises a rotary transmission line for transmitting electric energy meters and a calibration transmission line, as well as a guide rail spanned over the rotary transmission line and the calibration transmission line, a transplanter arranged on the guide rail and reciprocating along the guide rail, a lifting mechanism mounted on the transplanter, a capturing mechanism connected with the lifting mechanism and driven by the lifting mechanism to reciprocate up and down, wherein the capturing mechanism comprises two clamps and a stretching mechanism arranged between two clamps; the stretching mechanism is used for adjusting the distance between the two clamps. Matched with an automatic calibration pipeline, the meter loading and unloading device can be used for realizing the automatic meter loading and unloading from a transfer container to the calibration pipeline; therefore, the meter loading and unloading device can work together with detection equipment to realize the full-automatic calibration operation of three-phase electric energy meters, thereby improving the efficiency of three-phase electric energy meter calibration.
Description
Technical field
The present invention relates to be used for the device of electric energy meter calibration, especially a kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification.
Background technology
The production of three-phase electric energy meter, install and use in the process, need examine and determine according to the relevant rules of country with industry, traditional three-phase electric energy meter calibrating installation is a kind of independently manually-operated device, it generally has one or more meter hanging frames that independently comprise a plurality of test epi-positions, need a dead lift, electric energy meter is hung on the meter hanging frame wiring, finish calibrating by calibrating installation again, also need manually to pull down and case after calibrating finishes.Verification test can have been realized the robotization processing at present, takies great amount of manpower and time, inefficiency and carry, get the vanning need of work.
Summary of the invention
The objective of the invention is to, a kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification is provided, to improve the efficient of calibrating three-phase electric energy meter.
A kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification provided by the invention, it comprises turnover transmission line and the calibrating transmission line that is used to transport electric energy meter, this turnover transmission line and this calibrating transmission line are parallel to each other, also comprise: guide rail, it is across above described turnover transmission line and described calibrating transmission line; Transplanter, it is located on the described guide rail, and can move back and forth along guide rail; Elevating mechanism, it is installed on the described transplanter; Grasping mechanism, it is connected with described elevating mechanism, and is driven by this elevating mechanism and to pump, and this grasping mechanism comprises two anchor clamps and is located at telescoping mechanism between these two anchor clamps that this telescoping mechanism is used to regulate the distance between described two anchor clamps.
Preferably, described telescoping mechanism is the bi-directional expansion cylinder or is made up of the unidirectional telescopic cylinder of two back-to-back settings.
Preferably, described two anchor clamps are along the diagonal angle setting of described electric energy meter.
Preferably, described turnover transmission line and described calibrating transmission line are provided with the retaining stop mechanism.
Preferably, described grasping mechanism comprises four described anchor clamps, is provided with a described telescoping mechanism between per two anchor clamps.
Compared with prior art, the present invention has the following advantages: by meter apparatus up and down of the present invention, cooperate the automatic Verification streamline, can realize that electric energy meter automatically goes up following table to the calibrating streamline automatically from Turnover Box, therefore, meter apparatus up and down of the present invention cooperates checkout equipment, can realize the full-automatic calibrating operation of three-phase electric energy meter, has improved the efficient of calibrating three-phase electric energy meter.
Description of drawings
Fig. 1 is the structural representation of one of them embodiment of the present invention.
Fig. 2 is the vertical view of Fig. 1.
Description of reference numerals: 1-frame; 2-examines and determine transmission line; 3-has enough to meet the need transmission line; The 4-guide rail; The 5-transplanter; The 6-elevating mechanism; The 7-mount pad; The 8-arm; 9-bi-directional expansion mechanism; The 10-expansion link; The 11-anchor clamps; 12,13-retaining stop mechanism; 14-carries the table pallet; The 15-three-phase electric energy meter; The 16-Turnover Box.
Embodiment
One of them embodiment of the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification of the present invention as shown in Figure 1, 2, meter apparatus comprises turnover transmission line 3, calibrating transmission line 2, guide rail 4, transplanter 5, elevating mechanism 6 and grasping mechanism up and down.
Turnover transmission line 3 and calibrating transmission line 2 be arranged in parallel, are provided with retaining stop mechanism 12,13 on turnover transmission line 3 and calibrating transmission line 2, are used for Turnover Box 16 and carry table pallet 14 retainings stopping.
Frame 1 comprises across the guide rail 4 above turnover transmission line 3 and calibrating transmission line 2.
Grasping mechanism is connected with elevating mechanism 6, is driven by this elevating mechanism 6 to pump.In the present embodiment, grasping mechanism is made up of mount pad 7, two arms 8, two telescoping mechanisms 9 and four anchor clamps 11, is a pair of in twos in four anchor clamps 11, is used to grasp a three-phase electric energy meter 15.Preferably, two anchor clamps 11 of every pair of anchor clamps can be located the relative position of three-phase electric energy meter 15 so automatically along the diagonal angle setting of three-phase electric energy meter 15 when grasping.Two telescoping mechanisms 9 are located at respectively between two pairs of anchor clamps 11, are used to regulate two distances between the anchor clamps 11.In the present embodiment, telescoping mechanism 9 is the bi-directional expansion cylinder, and two bi-directional expansion cylinders are located at the both sides of mount pad 7 respectively, and is connected with mount pad 7 through arm 8 respectively, and the outer end of two telescopic arms 10 of bi-directional expansion cylinder is connected with two anchor clamps 11 respectively.Telescoping mechanism 9 also can adopt the unidirectional telescopic cylinder of two back-to-back settings to form.
Be specific embodiments of the invention only below, do not limit protection scope of the present invention with this; Any replacement and the improvement done on the basis of not violating the present invention's design all belong to protection scope of the present invention.
Claims (5)
1. meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification, it comprises turnover transmission line and the calibrating transmission line that is used to transport electric energy meter, this turnover transmission line and this calibrating transmission line are parallel to each other, it is characterized in that, also comprise:
Guide rail, it is across above described turnover transmission line and described calibrating transmission line;
Transplanter, it is located on the described guide rail, and can move back and forth along guide rail;
Elevating mechanism, it is installed on the described transplanter;
Grasping mechanism, it is connected with described elevating mechanism, and is driven by this elevating mechanism and to pump, and this grasping mechanism comprises two anchor clamps and is located at telescoping mechanism between these two anchor clamps that this telescoping mechanism is used to regulate the distance between described two anchor clamps.
2. the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described telescoping mechanism is the bi-directional expansion cylinder or is made up of the unidirectional telescopic cylinder of two back-to-back settings.
3. the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described two anchor clamps are along the diagonal angle setting of described electric energy meter.
4. the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described turnover transmission line and described calibrating transmission line are provided with the retaining stop mechanism.
5. according to each described meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification of claim 1 to 4, it is characterized in that: described grasping mechanism comprises four described anchor clamps, is provided with a described telescoping mechanism between per two anchor clamps.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100396170A CN102175986A (en) | 2011-02-17 | 2011-02-17 | Meter loading and unloading device for automatic calibration of three-phase electric energy meter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100396170A CN102175986A (en) | 2011-02-17 | 2011-02-17 | Meter loading and unloading device for automatic calibration of three-phase electric energy meter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102175986A true CN102175986A (en) | 2011-09-07 |
Family
ID=44519189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100396170A Pending CN102175986A (en) | 2011-02-17 | 2011-02-17 | Meter loading and unloading device for automatic calibration of three-phase electric energy meter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102175986A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102998643A (en) * | 2011-09-09 | 2013-03-27 | 华北电力科学研究院有限责任公司 | Power utilization information acquisition terminal detecting system |
CN103885024A (en) * | 2012-12-20 | 2014-06-25 | 西安亮丽仪器仪表有限责任公司 | Calibration stand for electric energy meter |
CN105334486A (en) * | 2015-10-27 | 2016-02-17 | 深圳市金正方科技股份有限公司 | Electric meter test system |
CN104155481B (en) * | 2014-07-29 | 2017-05-31 | 深圳市科陆电子科技股份有限公司 | Tray loading auxiliary equipment |
CN113791375A (en) * | 2021-10-22 | 2021-12-14 | 浙江万胜智能科技股份有限公司 | Module power-on detection device based on Internet of things electric energy meter |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200995341Y (en) * | 2006-12-15 | 2007-12-26 | 大连机床集团有限责任公司 | Automatic linear turnover apparatus |
CN201010070Y (en) * | 2007-02-13 | 2008-01-23 | 格兰达技术(深圳)有限公司 | Specifying grasping device for IC full-automatic tray type detecting braider |
CN101417422A (en) * | 2008-12-05 | 2009-04-29 | 上海耀皮康桥汽车玻璃有限公司 | Automatic original-glass fetching manipulator of automobile glass pre-treatment production line |
CN101458314A (en) * | 2008-12-18 | 2009-06-17 | 绍兴电力局 | Full automatic standard apparatus for electric energy meter |
CN101819266A (en) * | 2010-04-01 | 2010-09-01 | 宁波三星电气股份有限公司 | Detecting and setting device on production line of electric energy meters |
CN201942313U (en) * | 2011-02-17 | 2011-08-24 | 广东电网公司广州供电局 | Three-phase watt-hour meter loading and unloading device for automatic detection |
-
2011
- 2011-02-17 CN CN2011100396170A patent/CN102175986A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200995341Y (en) * | 2006-12-15 | 2007-12-26 | 大连机床集团有限责任公司 | Automatic linear turnover apparatus |
CN201010070Y (en) * | 2007-02-13 | 2008-01-23 | 格兰达技术(深圳)有限公司 | Specifying grasping device for IC full-automatic tray type detecting braider |
CN101417422A (en) * | 2008-12-05 | 2009-04-29 | 上海耀皮康桥汽车玻璃有限公司 | Automatic original-glass fetching manipulator of automobile glass pre-treatment production line |
CN101458314A (en) * | 2008-12-18 | 2009-06-17 | 绍兴电力局 | Full automatic standard apparatus for electric energy meter |
CN101819266A (en) * | 2010-04-01 | 2010-09-01 | 宁波三星电气股份有限公司 | Detecting and setting device on production line of electric energy meters |
CN201942313U (en) * | 2011-02-17 | 2011-08-24 | 广东电网公司广州供电局 | Three-phase watt-hour meter loading and unloading device for automatic detection |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102998643A (en) * | 2011-09-09 | 2013-03-27 | 华北电力科学研究院有限责任公司 | Power utilization information acquisition terminal detecting system |
CN103885024A (en) * | 2012-12-20 | 2014-06-25 | 西安亮丽仪器仪表有限责任公司 | Calibration stand for electric energy meter |
CN104155481B (en) * | 2014-07-29 | 2017-05-31 | 深圳市科陆电子科技股份有限公司 | Tray loading auxiliary equipment |
CN105334486A (en) * | 2015-10-27 | 2016-02-17 | 深圳市金正方科技股份有限公司 | Electric meter test system |
CN113791375A (en) * | 2021-10-22 | 2021-12-14 | 浙江万胜智能科技股份有限公司 | Module power-on detection device based on Internet of things electric energy meter |
CN113791375B (en) * | 2021-10-22 | 2022-07-15 | 浙江万胜智能科技股份有限公司 | Module power-on detection device based on Internet of things electric energy meter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201942313U (en) | Three-phase watt-hour meter loading and unloading device for automatic detection | |
CN103659802B (en) | Grabbing mechanism | |
CN102175986A (en) | Meter loading and unloading device for automatic calibration of three-phase electric energy meter | |
CN106219236B (en) | A kind of unmanned charging haulage equipment | |
CN107601028B (en) | A kind of product transfer coil inserting apparatus | |
CN107458869A (en) | A kind of dixie cup captures collection device | |
CN109470589A (en) | A kind of grains of sand corrosion testing apparatus | |
CN107651449A (en) | Dynamic measurement handgrip and its method with space two-freedom Telescopic | |
CN104944145B (en) | Automatic loading/unloading lift | |
CN205621810U (en) | Interval matching type hoisting device | |
CN205274680U (en) | Mechanical hand of panel transport | |
CN208843275U (en) | A kind of efficient palletizing apparatus of internal wall brick | |
CN104723095A (en) | Container end frame assembly table | |
CN206537840U (en) | A kind of steel plate eddy current inspection feed mechanism | |
CN207551347U (en) | One kind takes film device | |
CN104908032A (en) | Integrated manipulator structure | |
CN103879920A (en) | Clamping lifting device of cable winding drum | |
CN207810538U (en) | A kind of conveying device | |
CN107826733B (en) | A kind of electric heating tube of water heater conveying device | |
CN208648105U (en) | A kind of jig reflux unit | |
CN209242077U (en) | Automatic corner device | |
CN204643589U (en) | Multijaw round steel fixture | |
CN103935777A (en) | Clamping stacking device with single air cylinder | |
CN203753955U (en) | Carrying mechanism | |
CN202423470U (en) | Transferring device of grid of lead acid storage battery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110907 |