CN102175986A - Meter loading and unloading device for automatic calibration of three-phase electric energy meter - Google Patents

Meter loading and unloading device for automatic calibration of three-phase electric energy meter Download PDF

Info

Publication number
CN102175986A
CN102175986A CN2011100396170A CN201110039617A CN102175986A CN 102175986 A CN102175986 A CN 102175986A CN 2011100396170 A CN2011100396170 A CN 2011100396170A CN 201110039617 A CN201110039617 A CN 201110039617A CN 102175986 A CN102175986 A CN 102175986A
Authority
CN
China
Prior art keywords
electric energy
transmission line
meter
energy meter
phase electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100396170A
Other languages
Chinese (zh)
Inventor
李敏虹
陈宇茜
陈铭杰
张彤
李媛媛
徐辉辉
郭志坤
刘慧敏
夏振超
陈宁
钟蔚
高秀娟
戴敬文
郭斌
刘金涛
余义宙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU SMS ELECTRIC CO Ltd
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
ZHENGZHOU SMS ELECTRIC CO Ltd
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU SMS ELECTRIC CO Ltd, Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical ZHENGZHOU SMS ELECTRIC CO Ltd
Priority to CN2011100396170A priority Critical patent/CN102175986A/en
Publication of CN102175986A publication Critical patent/CN102175986A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

The invention discloses a meter loading and unloading device for the automatic calibration of a three-phase electric energy meter, which comprises a rotary transmission line for transmitting electric energy meters and a calibration transmission line, as well as a guide rail spanned over the rotary transmission line and the calibration transmission line, a transplanter arranged on the guide rail and reciprocating along the guide rail, a lifting mechanism mounted on the transplanter, a capturing mechanism connected with the lifting mechanism and driven by the lifting mechanism to reciprocate up and down, wherein the capturing mechanism comprises two clamps and a stretching mechanism arranged between two clamps; the stretching mechanism is used for adjusting the distance between the two clamps. Matched with an automatic calibration pipeline, the meter loading and unloading device can be used for realizing the automatic meter loading and unloading from a transfer container to the calibration pipeline; therefore, the meter loading and unloading device can work together with detection equipment to realize the full-automatic calibration operation of three-phase electric energy meters, thereby improving the efficiency of three-phase electric energy meter calibration.

Description

A kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification
Technical field
The present invention relates to be used for the device of electric energy meter calibration, especially a kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification.
Background technology
The production of three-phase electric energy meter, install and use in the process, need examine and determine according to the relevant rules of country with industry, traditional three-phase electric energy meter calibrating installation is a kind of independently manually-operated device, it generally has one or more meter hanging frames that independently comprise a plurality of test epi-positions, need a dead lift, electric energy meter is hung on the meter hanging frame wiring, finish calibrating by calibrating installation again, also need manually to pull down and case after calibrating finishes.Verification test can have been realized the robotization processing at present, takies great amount of manpower and time, inefficiency and carry, get the vanning need of work.
Summary of the invention
The objective of the invention is to, a kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification is provided, to improve the efficient of calibrating three-phase electric energy meter.
A kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification provided by the invention, it comprises turnover transmission line and the calibrating transmission line that is used to transport electric energy meter, this turnover transmission line and this calibrating transmission line are parallel to each other, also comprise: guide rail, it is across above described turnover transmission line and described calibrating transmission line; Transplanter, it is located on the described guide rail, and can move back and forth along guide rail; Elevating mechanism, it is installed on the described transplanter; Grasping mechanism, it is connected with described elevating mechanism, and is driven by this elevating mechanism and to pump, and this grasping mechanism comprises two anchor clamps and is located at telescoping mechanism between these two anchor clamps that this telescoping mechanism is used to regulate the distance between described two anchor clamps.
Preferably, described telescoping mechanism is the bi-directional expansion cylinder or is made up of the unidirectional telescopic cylinder of two back-to-back settings.
Preferably, described two anchor clamps are along the diagonal angle setting of described electric energy meter.
Preferably, described turnover transmission line and described calibrating transmission line are provided with the retaining stop mechanism.
Preferably, described grasping mechanism comprises four described anchor clamps, is provided with a described telescoping mechanism between per two anchor clamps.
Compared with prior art, the present invention has the following advantages: by meter apparatus up and down of the present invention, cooperate the automatic Verification streamline, can realize that electric energy meter automatically goes up following table to the calibrating streamline automatically from Turnover Box, therefore, meter apparatus up and down of the present invention cooperates checkout equipment, can realize the full-automatic calibrating operation of three-phase electric energy meter, has improved the efficient of calibrating three-phase electric energy meter.
Description of drawings
Fig. 1 is the structural representation of one of them embodiment of the present invention.
Fig. 2 is the vertical view of Fig. 1.
Description of reference numerals: 1-frame; 2-examines and determine transmission line; 3-has enough to meet the need transmission line; The 4-guide rail; The 5-transplanter; The 6-elevating mechanism; The 7-mount pad; The 8-arm; 9-bi-directional expansion mechanism; The 10-expansion link; The 11-anchor clamps; 12,13-retaining stop mechanism; 14-carries the table pallet; The 15-three-phase electric energy meter; The 16-Turnover Box.
Embodiment
One of them embodiment of the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification of the present invention as shown in Figure 1, 2, meter apparatus comprises turnover transmission line 3, calibrating transmission line 2, guide rail 4, transplanter 5, elevating mechanism 6 and grasping mechanism up and down.
Turnover transmission line 3 and calibrating transmission line 2 be arranged in parallel, are provided with retaining stop mechanism 12,13 on turnover transmission line 3 and calibrating transmission line 2, are used for Turnover Box 16 and carry table pallet 14 retainings stopping.
Frame 1 comprises across the guide rail 4 above turnover transmission line 3 and calibrating transmission line 2.
Transplanter 5 is located on the guide rail 4, and can move back and forth along guide rail 4.Transplanter 5 is flute profile band transfer machines of a servo driving, is used for the three-phase electric energy meter 15 of grasping mechanism and extracting is moved to the Turnover Box position or is moved to the pallet position from Turnover Box from pallet.
Elevating mechanism 6 is installed on the transplanter 5.In the present embodiment, elevating mechanism 6 is vertically disposed cylinder, and the cylinder body of cylinder is fixed on the transplanter 5, and expansion link stretches out downwards.Elevating mechanism 6 is used for grasping mechanism is risen or falls.
Grasping mechanism is connected with elevating mechanism 6, is driven by this elevating mechanism 6 to pump.In the present embodiment, grasping mechanism is made up of mount pad 7, two arms 8, two telescoping mechanisms 9 and four anchor clamps 11, is a pair of in twos in four anchor clamps 11, is used to grasp a three-phase electric energy meter 15.Preferably, two anchor clamps 11 of every pair of anchor clamps can be located the relative position of three-phase electric energy meter 15 so automatically along the diagonal angle setting of three-phase electric energy meter 15 when grasping.Two telescoping mechanisms 9 are located at respectively between two pairs of anchor clamps 11, are used to regulate two distances between the anchor clamps 11.In the present embodiment, telescoping mechanism 9 is the bi-directional expansion cylinder, and two bi-directional expansion cylinders are located at the both sides of mount pad 7 respectively, and is connected with mount pad 7 through arm 8 respectively, and the outer end of two telescopic arms 10 of bi-directional expansion cylinder is connected with two anchor clamps 11 respectively.Telescoping mechanism 9 also can adopt the unidirectional telescopic cylinder of two back-to-back settings to form.
Be specific embodiments of the invention only below, do not limit protection scope of the present invention with this; Any replacement and the improvement done on the basis of not violating the present invention's design all belong to protection scope of the present invention.

Claims (5)

1. meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification, it comprises turnover transmission line and the calibrating transmission line that is used to transport electric energy meter, this turnover transmission line and this calibrating transmission line are parallel to each other, it is characterized in that, also comprise:
Guide rail, it is across above described turnover transmission line and described calibrating transmission line;
Transplanter, it is located on the described guide rail, and can move back and forth along guide rail;
Elevating mechanism, it is installed on the described transplanter;
Grasping mechanism, it is connected with described elevating mechanism, and is driven by this elevating mechanism and to pump, and this grasping mechanism comprises two anchor clamps and is located at telescoping mechanism between these two anchor clamps that this telescoping mechanism is used to regulate the distance between described two anchor clamps.
2. the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described telescoping mechanism is the bi-directional expansion cylinder or is made up of the unidirectional telescopic cylinder of two back-to-back settings.
3. the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described two anchor clamps are along the diagonal angle setting of described electric energy meter.
4. the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described turnover transmission line and described calibrating transmission line are provided with the retaining stop mechanism.
5. according to each described meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification of claim 1 to 4, it is characterized in that: described grasping mechanism comprises four described anchor clamps, is provided with a described telescoping mechanism between per two anchor clamps.
CN2011100396170A 2011-02-17 2011-02-17 Meter loading and unloading device for automatic calibration of three-phase electric energy meter Pending CN102175986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100396170A CN102175986A (en) 2011-02-17 2011-02-17 Meter loading and unloading device for automatic calibration of three-phase electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100396170A CN102175986A (en) 2011-02-17 2011-02-17 Meter loading and unloading device for automatic calibration of three-phase electric energy meter

Publications (1)

Publication Number Publication Date
CN102175986A true CN102175986A (en) 2011-09-07

Family

ID=44519189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100396170A Pending CN102175986A (en) 2011-02-17 2011-02-17 Meter loading and unloading device for automatic calibration of three-phase electric energy meter

Country Status (1)

Country Link
CN (1) CN102175986A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102998643A (en) * 2011-09-09 2013-03-27 华北电力科学研究院有限责任公司 Power utilization information acquisition terminal detecting system
CN103885024A (en) * 2012-12-20 2014-06-25 西安亮丽仪器仪表有限责任公司 Calibration stand for electric energy meter
CN105334486A (en) * 2015-10-27 2016-02-17 深圳市金正方科技股份有限公司 Electric meter test system
CN104155481B (en) * 2014-07-29 2017-05-31 深圳市科陆电子科技股份有限公司 Tray loading auxiliary equipment
CN113791375A (en) * 2021-10-22 2021-12-14 浙江万胜智能科技股份有限公司 Module power-on detection device based on Internet of things electric energy meter

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200995341Y (en) * 2006-12-15 2007-12-26 大连机床集团有限责任公司 Automatic linear turnover apparatus
CN201010070Y (en) * 2007-02-13 2008-01-23 格兰达技术(深圳)有限公司 Specifying grasping device for IC full-automatic tray type detecting braider
CN101417422A (en) * 2008-12-05 2009-04-29 上海耀皮康桥汽车玻璃有限公司 Automatic original-glass fetching manipulator of automobile glass pre-treatment production line
CN101458314A (en) * 2008-12-18 2009-06-17 绍兴电力局 Full automatic standard apparatus for electric energy meter
CN101819266A (en) * 2010-04-01 2010-09-01 宁波三星电气股份有限公司 Detecting and setting device on production line of electric energy meters
CN201942313U (en) * 2011-02-17 2011-08-24 广东电网公司广州供电局 Three-phase watt-hour meter loading and unloading device for automatic detection

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200995341Y (en) * 2006-12-15 2007-12-26 大连机床集团有限责任公司 Automatic linear turnover apparatus
CN201010070Y (en) * 2007-02-13 2008-01-23 格兰达技术(深圳)有限公司 Specifying grasping device for IC full-automatic tray type detecting braider
CN101417422A (en) * 2008-12-05 2009-04-29 上海耀皮康桥汽车玻璃有限公司 Automatic original-glass fetching manipulator of automobile glass pre-treatment production line
CN101458314A (en) * 2008-12-18 2009-06-17 绍兴电力局 Full automatic standard apparatus for electric energy meter
CN101819266A (en) * 2010-04-01 2010-09-01 宁波三星电气股份有限公司 Detecting and setting device on production line of electric energy meters
CN201942313U (en) * 2011-02-17 2011-08-24 广东电网公司广州供电局 Three-phase watt-hour meter loading and unloading device for automatic detection

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102998643A (en) * 2011-09-09 2013-03-27 华北电力科学研究院有限责任公司 Power utilization information acquisition terminal detecting system
CN103885024A (en) * 2012-12-20 2014-06-25 西安亮丽仪器仪表有限责任公司 Calibration stand for electric energy meter
CN104155481B (en) * 2014-07-29 2017-05-31 深圳市科陆电子科技股份有限公司 Tray loading auxiliary equipment
CN105334486A (en) * 2015-10-27 2016-02-17 深圳市金正方科技股份有限公司 Electric meter test system
CN113791375A (en) * 2021-10-22 2021-12-14 浙江万胜智能科技股份有限公司 Module power-on detection device based on Internet of things electric energy meter
CN113791375B (en) * 2021-10-22 2022-07-15 浙江万胜智能科技股份有限公司 Module power-on detection device based on Internet of things electric energy meter

Similar Documents

Publication Publication Date Title
CN201942313U (en) Three-phase watt-hour meter loading and unloading device for automatic detection
CN103659802B (en) Grabbing mechanism
CN102175986A (en) Meter loading and unloading device for automatic calibration of three-phase electric energy meter
CN106219236B (en) A kind of unmanned charging haulage equipment
CN107601028B (en) A kind of product transfer coil inserting apparatus
CN107458869A (en) A kind of dixie cup captures collection device
CN109470589A (en) A kind of grains of sand corrosion testing apparatus
CN107651449A (en) Dynamic measurement handgrip and its method with space two-freedom Telescopic
CN104944145B (en) Automatic loading/unloading lift
CN205621810U (en) Interval matching type hoisting device
CN205274680U (en) Mechanical hand of panel transport
CN208843275U (en) A kind of efficient palletizing apparatus of internal wall brick
CN104723095A (en) Container end frame assembly table
CN206537840U (en) A kind of steel plate eddy current inspection feed mechanism
CN207551347U (en) One kind takes film device
CN104908032A (en) Integrated manipulator structure
CN103879920A (en) Clamping lifting device of cable winding drum
CN207810538U (en) A kind of conveying device
CN107826733B (en) A kind of electric heating tube of water heater conveying device
CN208648105U (en) A kind of jig reflux unit
CN209242077U (en) Automatic corner device
CN204643589U (en) Multijaw round steel fixture
CN103935777A (en) Clamping stacking device with single air cylinder
CN203753955U (en) Carrying mechanism
CN202423470U (en) Transferring device of grid of lead acid storage battery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110907