CN102175986A - An upper and lower meter device for automatic verification of three-phase electric energy meters - Google Patents

An upper and lower meter device for automatic verification of three-phase electric energy meters Download PDF

Info

Publication number
CN102175986A
CN102175986A CN2011100396170A CN201110039617A CN102175986A CN 102175986 A CN102175986 A CN 102175986A CN 2011100396170 A CN2011100396170 A CN 2011100396170A CN 201110039617 A CN201110039617 A CN 201110039617A CN 102175986 A CN102175986 A CN 102175986A
Authority
CN
China
Prior art keywords
electric energy
transmission line
energy meter
phase electric
anchor clamps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100396170A
Other languages
Chinese (zh)
Inventor
李敏虹
陈宇茜
陈铭杰
张彤
李媛媛
徐辉辉
郭志坤
刘慧敏
夏振超
陈宁
钟蔚
高秀娟
戴敬文
郭斌
刘金涛
余义宙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU SMS ELECTRIC CO Ltd
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
ZHENGZHOU SMS ELECTRIC CO Ltd
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU SMS ELECTRIC CO Ltd, Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical ZHENGZHOU SMS ELECTRIC CO Ltd
Priority to CN2011100396170A priority Critical patent/CN102175986A/en
Publication of CN102175986A publication Critical patent/CN102175986A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

本发明公开了一种用于三相电能表自动检定的上下表装置,其包括用于运输电能表的周转传输线和检定传输线,还包括:导轨,其横跨在周转传输线和检定传输线的上方;移栽机,其设于导轨上,并能沿导轨往复移动;升降机构,其安装在移栽机上;抓取机构,其与升降机构连接,并由该升降机构带动上下往复运动,该抓取机构包括两个夹具以及设于该两个夹具之间的伸缩机构,该伸缩机构用于调节两个夹具之间的距离。通过本发明的上下表装置,配合自动检定流水线,能够实现电能表自动从周转箱中到检定流水线的自动上下表,因此,本发明的上下表装置配合检测设备,能够实现三相电能表的全自动检定作业,提高了检定三相电能表的效率。

Figure 201110039617

The invention discloses an upper and lower meter device for automatic verification of a three-phase electric energy meter, which includes a turnover transmission line and a verification transmission line for transporting the electric energy meter, and also includes: a guide rail, which spans above the turnover transmission line and the verification transmission line; The transplanting machine is set on the guide rail and can move back and forth along the guide rail; the lifting mechanism is installed on the transplanting machine; the grabbing mechanism is connected with the lifting mechanism and driven by the lifting mechanism to reciprocate up and down. The mechanism includes two clamps and a telescopic mechanism arranged between the two clamps, and the telescopic mechanism is used for adjusting the distance between the two clamps. Through the upper and lower meter device of the present invention, in conjunction with the automatic verification assembly line, the automatic upper and lower meter of the electric energy meter from the turnover box to the verification assembly line can be realized automatically. Automatic verification operation improves the efficiency of verification of three-phase electric energy meters.

Figure 201110039617

Description

A kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification
Technical field
The present invention relates to be used for the device of electric energy meter calibration, especially a kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification.
Background technology
The production of three-phase electric energy meter, install and use in the process, need examine and determine according to the relevant rules of country with industry, traditional three-phase electric energy meter calibrating installation is a kind of independently manually-operated device, it generally has one or more meter hanging frames that independently comprise a plurality of test epi-positions, need a dead lift, electric energy meter is hung on the meter hanging frame wiring, finish calibrating by calibrating installation again, also need manually to pull down and case after calibrating finishes.Verification test can have been realized the robotization processing at present, takies great amount of manpower and time, inefficiency and carry, get the vanning need of work.
Summary of the invention
The objective of the invention is to, a kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification is provided, to improve the efficient of calibrating three-phase electric energy meter.
A kind of meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification provided by the invention, it comprises turnover transmission line and the calibrating transmission line that is used to transport electric energy meter, this turnover transmission line and this calibrating transmission line are parallel to each other, also comprise: guide rail, it is across above described turnover transmission line and described calibrating transmission line; Transplanter, it is located on the described guide rail, and can move back and forth along guide rail; Elevating mechanism, it is installed on the described transplanter; Grasping mechanism, it is connected with described elevating mechanism, and is driven by this elevating mechanism and to pump, and this grasping mechanism comprises two anchor clamps and is located at telescoping mechanism between these two anchor clamps that this telescoping mechanism is used to regulate the distance between described two anchor clamps.
Preferably, described telescoping mechanism is the bi-directional expansion cylinder or is made up of the unidirectional telescopic cylinder of two back-to-back settings.
Preferably, described two anchor clamps are along the diagonal angle setting of described electric energy meter.
Preferably, described turnover transmission line and described calibrating transmission line are provided with the retaining stop mechanism.
Preferably, described grasping mechanism comprises four described anchor clamps, is provided with a described telescoping mechanism between per two anchor clamps.
Compared with prior art, the present invention has the following advantages: by meter apparatus up and down of the present invention, cooperate the automatic Verification streamline, can realize that electric energy meter automatically goes up following table to the calibrating streamline automatically from Turnover Box, therefore, meter apparatus up and down of the present invention cooperates checkout equipment, can realize the full-automatic calibrating operation of three-phase electric energy meter, has improved the efficient of calibrating three-phase electric energy meter.
Description of drawings
Fig. 1 is the structural representation of one of them embodiment of the present invention.
Fig. 2 is the vertical view of Fig. 1.
Description of reference numerals: 1-frame; 2-examines and determine transmission line; 3-has enough to meet the need transmission line; The 4-guide rail; The 5-transplanter; The 6-elevating mechanism; The 7-mount pad; The 8-arm; 9-bi-directional expansion mechanism; The 10-expansion link; The 11-anchor clamps; 12,13-retaining stop mechanism; 14-carries the table pallet; The 15-three-phase electric energy meter; The 16-Turnover Box.
Embodiment
One of them embodiment of the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification of the present invention as shown in Figure 1, 2, meter apparatus comprises turnover transmission line 3, calibrating transmission line 2, guide rail 4, transplanter 5, elevating mechanism 6 and grasping mechanism up and down.
Turnover transmission line 3 and calibrating transmission line 2 be arranged in parallel, are provided with retaining stop mechanism 12,13 on turnover transmission line 3 and calibrating transmission line 2, are used for Turnover Box 16 and carry table pallet 14 retainings stopping.
Frame 1 comprises across the guide rail 4 above turnover transmission line 3 and calibrating transmission line 2.
Transplanter 5 is located on the guide rail 4, and can move back and forth along guide rail 4.Transplanter 5 is flute profile band transfer machines of a servo driving, is used for the three-phase electric energy meter 15 of grasping mechanism and extracting is moved to the Turnover Box position or is moved to the pallet position from Turnover Box from pallet.
Elevating mechanism 6 is installed on the transplanter 5.In the present embodiment, elevating mechanism 6 is vertically disposed cylinder, and the cylinder body of cylinder is fixed on the transplanter 5, and expansion link stretches out downwards.Elevating mechanism 6 is used for grasping mechanism is risen or falls.
Grasping mechanism is connected with elevating mechanism 6, is driven by this elevating mechanism 6 to pump.In the present embodiment, grasping mechanism is made up of mount pad 7, two arms 8, two telescoping mechanisms 9 and four anchor clamps 11, is a pair of in twos in four anchor clamps 11, is used to grasp a three-phase electric energy meter 15.Preferably, two anchor clamps 11 of every pair of anchor clamps can be located the relative position of three-phase electric energy meter 15 so automatically along the diagonal angle setting of three-phase electric energy meter 15 when grasping.Two telescoping mechanisms 9 are located at respectively between two pairs of anchor clamps 11, are used to regulate two distances between the anchor clamps 11.In the present embodiment, telescoping mechanism 9 is the bi-directional expansion cylinder, and two bi-directional expansion cylinders are located at the both sides of mount pad 7 respectively, and is connected with mount pad 7 through arm 8 respectively, and the outer end of two telescopic arms 10 of bi-directional expansion cylinder is connected with two anchor clamps 11 respectively.Telescoping mechanism 9 also can adopt the unidirectional telescopic cylinder of two back-to-back settings to form.
Be specific embodiments of the invention only below, do not limit protection scope of the present invention with this; Any replacement and the improvement done on the basis of not violating the present invention's design all belong to protection scope of the present invention.

Claims (5)

1. meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification, it comprises turnover transmission line and the calibrating transmission line that is used to transport electric energy meter, this turnover transmission line and this calibrating transmission line are parallel to each other, it is characterized in that, also comprise:
Guide rail, it is across above described turnover transmission line and described calibrating transmission line;
Transplanter, it is located on the described guide rail, and can move back and forth along guide rail;
Elevating mechanism, it is installed on the described transplanter;
Grasping mechanism, it is connected with described elevating mechanism, and is driven by this elevating mechanism and to pump, and this grasping mechanism comprises two anchor clamps and is located at telescoping mechanism between these two anchor clamps that this telescoping mechanism is used to regulate the distance between described two anchor clamps.
2. the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described telescoping mechanism is the bi-directional expansion cylinder or is made up of the unidirectional telescopic cylinder of two back-to-back settings.
3. the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described two anchor clamps are along the diagonal angle setting of described electric energy meter.
4. the meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described turnover transmission line and described calibrating transmission line are provided with the retaining stop mechanism.
5. according to each described meter apparatus up and down that is used for the three-phase electric energy meter automatic Verification of claim 1 to 4, it is characterized in that: described grasping mechanism comprises four described anchor clamps, is provided with a described telescoping mechanism between per two anchor clamps.
CN2011100396170A 2011-02-17 2011-02-17 An upper and lower meter device for automatic verification of three-phase electric energy meters Pending CN102175986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100396170A CN102175986A (en) 2011-02-17 2011-02-17 An upper and lower meter device for automatic verification of three-phase electric energy meters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100396170A CN102175986A (en) 2011-02-17 2011-02-17 An upper and lower meter device for automatic verification of three-phase electric energy meters

Publications (1)

Publication Number Publication Date
CN102175986A true CN102175986A (en) 2011-09-07

Family

ID=44519189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100396170A Pending CN102175986A (en) 2011-02-17 2011-02-17 An upper and lower meter device for automatic verification of three-phase electric energy meters

Country Status (1)

Country Link
CN (1) CN102175986A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102998643A (en) * 2011-09-09 2013-03-27 华北电力科学研究院有限责任公司 Power utilization information acquisition terminal detecting system
CN103885024A (en) * 2012-12-20 2014-06-25 西安亮丽仪器仪表有限责任公司 Calibration stand for electric energy meter
CN105334486A (en) * 2015-10-27 2016-02-17 深圳市金正方科技股份有限公司 Electric meter test system
CN104155481B (en) * 2014-07-29 2017-05-31 深圳市科陆电子科技股份有限公司 Tray loading auxiliary equipment
CN113791375A (en) * 2021-10-22 2021-12-14 浙江万胜智能科技股份有限公司 Module power-on detection device based on Internet of things electric energy meter

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200995341Y (en) * 2006-12-15 2007-12-26 大连机床集团有限责任公司 Automatic linear turnover apparatus
CN201010070Y (en) * 2007-02-13 2008-01-23 格兰达技术(深圳)有限公司 Specifying grasping device for IC full-automatic tray type detecting braider
CN101417422A (en) * 2008-12-05 2009-04-29 上海耀皮康桥汽车玻璃有限公司 Automatic original-glass fetching manipulator of automobile glass pre-treatment production line
CN101458314A (en) * 2008-12-18 2009-06-17 绍兴电力局 Full automatic standard apparatus for electric energy meter
CN101819266A (en) * 2010-04-01 2010-09-01 宁波三星电气股份有限公司 Detecting and setting device on production line of electric energy meters
CN201942313U (en) * 2011-02-17 2011-08-24 广东电网公司广州供电局 An upper and lower meter device for automatic verification of three-phase electric energy meters

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200995341Y (en) * 2006-12-15 2007-12-26 大连机床集团有限责任公司 Automatic linear turnover apparatus
CN201010070Y (en) * 2007-02-13 2008-01-23 格兰达技术(深圳)有限公司 Specifying grasping device for IC full-automatic tray type detecting braider
CN101417422A (en) * 2008-12-05 2009-04-29 上海耀皮康桥汽车玻璃有限公司 Automatic original-glass fetching manipulator of automobile glass pre-treatment production line
CN101458314A (en) * 2008-12-18 2009-06-17 绍兴电力局 Full automatic standard apparatus for electric energy meter
CN101819266A (en) * 2010-04-01 2010-09-01 宁波三星电气股份有限公司 Detecting and setting device on production line of electric energy meters
CN201942313U (en) * 2011-02-17 2011-08-24 广东电网公司广州供电局 An upper and lower meter device for automatic verification of three-phase electric energy meters

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102998643A (en) * 2011-09-09 2013-03-27 华北电力科学研究院有限责任公司 Power utilization information acquisition terminal detecting system
CN103885024A (en) * 2012-12-20 2014-06-25 西安亮丽仪器仪表有限责任公司 Calibration stand for electric energy meter
CN104155481B (en) * 2014-07-29 2017-05-31 深圳市科陆电子科技股份有限公司 Tray loading auxiliary equipment
CN105334486A (en) * 2015-10-27 2016-02-17 深圳市金正方科技股份有限公司 Electric meter test system
CN113791375A (en) * 2021-10-22 2021-12-14 浙江万胜智能科技股份有限公司 Module power-on detection device based on Internet of things electric energy meter
CN113791375B (en) * 2021-10-22 2022-07-15 浙江万胜智能科技股份有限公司 Module power-on detection device based on Internet of things electric energy meter

Similar Documents

Publication Publication Date Title
CN201942313U (en) An upper and lower meter device for automatic verification of three-phase electric energy meters
CN102175986A (en) An upper and lower meter device for automatic verification of three-phase electric energy meters
CN107554874A (en) A kind of carton mechanical positioner
CN107601028B (en) A product transfer off-line device
CN105880322B (en) A kind of steel plate bending mechanism with detection means
CN107458869A (en) A kind of dixie cup captures collection device
CN108033394A (en) It is a kind of to carry the lift cart for neutralizing cuboid sheet metal in case
CN104354327A (en) Package carton three-dimensional forming nailing machine
CN205675308U (en) Pipeline packed automatically by a kind of door-plate
CN102785320A (en) Blank board feeding device for blank board pressing machine
CN202944797U (en) Book conveying device
CN105035704B (en) Steering positioning device
CN104908032A (en) Integrated manipulator structure
CN207078355U (en) The automatic band boxing apparatus of flat tube
CN103879920A (en) Clamping lifting device of cable winding drum
CN206626052U (en) Jig mechanism, pressure retaining mechanism and microcrystalline plate pressure retaining device
CN202423470U (en) Transferring device of grid of lead acid storage battery
CN202834387U (en) Pipe penetrating device
CN107826733B (en) A kind of electric heating tube of water heater conveying device
CN207596048U (en) A kind of work transfer apparatus
CN205950315U (en) Electric motor car front fork fixing device
CN208648105U (en) A kind of jig reflux unit
CN205023509U (en) Panel hoist mechanism
CN205284358U (en) Automatic change flange mechanism of sprout cultivation equipment
CN204160413U (en) The dismounting frock of centrifugal air compressor cooler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110907