Electric energy meter test system
Technical field
The present invention relates to electric energy meter field tests, particularly relate to a kind of electric energy meter test system.
Background technology
Along with manufacturing fast development, the aggravation competed between industry, each enterprise proposes urgent requirement to the control of production cost and the lifting of efficiency, and product lifting of efficiency in batch production process becomes the emphasis of each enterprises pay attention.
But in actual production, especially electric energy meter manufactures field, based on layout and the operating type of conventional production lines, when causing electric energy meter to produce test in batches, there is following defect:
1, have enough to meet the need the invalid operation caused too much: in the function examination stage, usually adopt the mode of unit turnover, single machine test, which causes test station operating efficiency very low.
2, process step design is unreasonable: carry out overall throughput when promoting, be ensure the balance of production line, test station needs the test station arranging multiple repetition, causes increasing considerably of human cost and equipment cost thus.
3, testing scheme is unreasonable: the test station of repetition brings difficulty to the quality management and control of product and reviewing of defective products, causes certain quality hidden danger.
4, product turnover order is uncontrollable: different product causes needs to make different testing tools for different product in the difference of design proposal.
Therefore, also there is the low problem of testing efficiency in existing electric energy meter test system.
Summary of the invention
The object of the present invention is to provide a kind of electric energy meter test system, for solving the problem that in prior art, the testing efficiency of electric energy meter test system is low.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:
A kind of electric energy meter test system comprises: slide rail line, plug into plate and mechanism for testing, wherein, slide rail line comprises slide rail line main body and is arranged at least one slide rail substrate in described slide rail line main body, and multiple described electric energy meter to be measured can slide on described slide rail substrate; Plate of plugging into is connected with described slide rail line, has enough to meet the need between streamline and described slide rail line for making electric energy meter to be measured; And mechanism for testing is for testing the electric energy meter described to be measured be positioned in default test station, described electric energy meter to be measured slides into described test station by described slide rail substrate.
Further, described plate of plugging into comprises plug into plate and outlet of entrance and to plug into plate, described entrance plugs into plate for described electric energy meter to be measured is gone to described slide rail line from described streamline week, and described outlet plugs into plate for described electric energy meter to be measured is gone to described streamline from described slide rail line week.
Further, described slide rail line also comprises the slide rail back up pad be arranged on below described slide rail substrate, for supporting described slide rail substrate.
Further, described slide rail line also comprises two railway limit plates and at least one station division board, described two railway limit plates erect at described slide rail substrate two ends in the width direction respectively, and described station division board erects on described slide rail substrate along the Width of described slide rail substrate.
Further, the quantity of described slide rail substrate is multiple, and described multiple slide rail substrate is removably connected to form described slide rail line.
Further, the test board that described mechanism for testing comprises pneumatic unit and is connected with described pneumatic unit, drives described test board to rise by described pneumatic unit or declines, to test described electric energy meter to be measured.
Further, described test board comprises multiple removable epi-position, to test the electric energy meter described to be measured of different model.
Further, described mechanism for testing also comprises one and is arranged on gauge tap in described slide rail line main body, for controlling the start and stop of described pneumatic unit.
Further, described mechanism for testing also comprises auxiliary unit, for the test result of electric energy meter to be measured described in assistant analysis.
Further, described auxiliary unit comprise display module, communication module, signal detection module, signal output module one or several.
Compared with prior art, the present invention has following beneficial effect:
By arranging slide rail line in electric energy meter test system, plug into plate and mechanism for testing, plate of plugging into can make electric energy meter to be measured have enough to meet the need between streamline and slide rail line, slide rail line comprises slide rail substrate, multiple electric energy meter to be measured can slide into default test station by slide rail substrate, tests the electric energy meter to be measured put in place for mechanism for testing.That is, by the operating type that online slide rail is tested, namely slide rail is adopted to carry out all transfer to tests to multiple electric energy meter to be measured, compared with picking and placeing the operating type of test with traditional electric energy meter single to be measured, significantly reduce the activity duration, improve the testing efficiency of electric energy meter test system, thus solve the problem that in prior art, the testing efficiency of electric energy meter test system is low.
Accompanying drawing explanation
Fig. 1 is the structural representation of the electric energy meter test system of an embodiment.
Embodiment
Below with reference to accompanying drawing, elaboration is further given to various embodiments of the present invention.
Refer to Fig. 1, in one embodiment, a kind of electric energy meter test system comprise slide rail line, plug into plate and mechanism for testing 6.Wherein, slide rail line comprises slide rail line main body and is arranged at least one slide rail substrate 9 in slide rail line main body, and multiple electric energy meter to be measured can slide on slide rail substrate 9.In the present embodiment, the quantity of slide rail substrate 9 is multiple, and multiple slide rail substrate 9 is removably connected to form slide rail line, is beneficial to maintenance and the preservation of slide rail line.
Further, slide rail line also comprises the slide rail back up pad be arranged on below slide rail substrate 9, for supporting slide rail substrate 9.Meanwhile, this slide rail back up pad also can be adjustment and the signal wire cabling headspace of track of sliding track width.
Slide rail line also comprises two railway limit plate 3, two railway limit plates 3 and erects respectively at slide rail substrate 9 two ends in the width direction.By the railway limit plate 3 arranged, the width of track of sliding track is controlled, to adapt to the electric energy meter to be measured of different size.
Slide rail line also comprises at least one station division board 8, and station division board 8 erects on slide rail substrate 9 along the Width of slide rail substrate 9.Meanwhile, station division board is also position electric energy meter to be measured, makes electric energy meter to be measured in the sliding process of slide rail substrate 9, can slide into default test station exactly.In the present embodiment, the quantity of station division board 8 is multiple, for carrying out mutually isolated to multiple test station, to ensure the monomer absolute construction of the mechanism for testing 6 in test station.
In the present embodiment, smooth and easy in order to ensure the slip of electric energy meter to be measured, the making material of slide rail line can select bakelite material, and lays one deck wear-resistant metal material on the surface of slide rail substrate, such as, and alloy sheets.
Plate of plugging into is connected with slide rail line, has enough to meet the need between streamline and slide rail line for making electric energy meter to be measured.
Further, plate of plugging into comprises plug into plate 5 and outlet of entrance and to plug into plate 11, entrance plug into plate 5 for by electric energy meter week to be measured from streamline week going to slide rail line, outlet plugs into plate 11 for electric energy meter to be measured is gone to streamline from slide rail line week.
By making electric energy meter to be measured unidirectional turnover mode in slide rail, efficiently avoid multistation in traditional work mode and test simultaneously and cause undetected situation.
Mechanism for testing 6 is for testing the electric energy meter to be measured be positioned in default test station, and electric energy meter to be measured slides into test station by slide rail substrate 9.
Further, the test board 2 that mechanism for testing 6 comprises pneumatic unit 1 and is connected with pneumatic unit 1, drives test board 2 to rise or decline by pneumatic unit 1, to test electric energy meter to be measured.In the present embodiment, test board 2 and pneumatic unit 1, for removably connecting, are beneficial to maintenance and the preservation of electric energy meter test system.
Further, pneumatic unit 1 is pneumatic fixture cylinder, and its material is bakelite material.The material of test board 2 is acrylic material.
By arranging the mechanism for testing of pneumatic type, significantly reduce the labour intensity of tester, meanwhile, pneumatic lifting contact reliably solves the problem of the repeated test caused because of loose contact in traditional work mode, thus further increasing the testing efficiency of electric energy meter test system.
Mechanism for testing 6 also comprises one and is arranged on gauge tap 7 in slide rail line main body, for controlling the start and stop of pneumatic unit 1.
Test board 2 comprises multiple removable epi-position, to test the electric energy meter to be measured of different model.
By arranging separate pneumatic unit 1 and test board 2, and the track of sliding track of engages adjustable width, slide rail line is made to be applicable to the electric energy meter to be measured of different model, there is very strong versatility, efficiently solve the problem needing to make different testing tools in traditional work mode for the electric energy meter to be measured of different model.
Mechanism for testing 6 also comprises auxiliary unit 10, for the test result of assistant analysis electric energy meter to be measured.Further, auxiliary unit 10 comprise display module 4, communication module, signal detection module, signal output module one or several.At different test scenes, those modules can be configured according to the testing requirement of reality, to meet the testing requirement of different user all sidedly.
In sum, by adopting electric energy meter test system of the present invention, considerably reduce activity duration and the labour intensity of tester, effectively improve operating efficiency, make the time of invalid operation to reduce 50%-60%, production capacity promotes 20%-30%, manpower reduces about 25%, meanwhile, considerably reduces the input cost of testing apparatus, instrument etc., ensure that the consistance of test, and ensure that the quality of product in production run.
Foregoing; be only preferred embodiment of the present invention; not for limiting embodiment of the present invention; those of ordinary skill in the art are according to central scope of the present invention and spirit; can carry out corresponding flexible or amendment very easily, therefore protection scope of the present invention should be as the criterion with the protection domain required by claims.