CN105334486A - Electric meter test system - Google Patents

Electric meter test system Download PDF

Info

Publication number
CN105334486A
CN105334486A CN201510705303.8A CN201510705303A CN105334486A CN 105334486 A CN105334486 A CN 105334486A CN 201510705303 A CN201510705303 A CN 201510705303A CN 105334486 A CN105334486 A CN 105334486A
Authority
CN
China
Prior art keywords
slide rail
electric energy
energy meter
measured
test system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510705303.8A
Other languages
Chinese (zh)
Other versions
CN105334486B (en
Inventor
车磊
朱奎
文先峰
黄远辉
张建成
范俊
谢伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen jinzhengfang Technology Co.,Ltd.
Original Assignee
SHENZHEN GOLDEN SQUARE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN GOLDEN SQUARE TECHNOLOGY Co Ltd filed Critical SHENZHEN GOLDEN SQUARE TECHNOLOGY Co Ltd
Priority to CN201510705303.8A priority Critical patent/CN105334486B/en
Publication of CN105334486A publication Critical patent/CN105334486A/en
Application granted granted Critical
Publication of CN105334486B publication Critical patent/CN105334486B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

本发明涉及一种电能表测试系统,所述电能表测试系统包括:滑轨线、接驳板及测试机构,其中,滑轨线包括滑轨线主体以及设置在所述滑轨线主体上的至少一滑轨基板,多个所述待测电能表能够在所述滑轨基板上滑动;接驳板与所述滑轨线相连,用于使待测电能表在流水线与所述滑轨线之间周转;及测试机构用于测试位于预设的测试工位上的所述待测电能表,所述待测电能表通过所述滑轨基板滑动到所述测试工位。本发明能够解决现有技术中电能表测试系统的测试效率低的问题。

The present invention relates to a test system for an electric energy meter. The electric energy meter test system includes: a slide rail, a connecting plate and a testing mechanism, wherein the slide rail includes a slide rail main body and a At least one slide rail substrate, a plurality of the electric energy meters to be measured can slide on the slide rail substrate; the connecting plate is connected with the slide rail line, and is used to make the electric energy meter to be measured be connected between the assembly line and the slide rail line and the testing mechanism is used to test the electric energy meter to be tested on the preset test station, and the electric energy meter to be tested slides to the test station through the slide rail base plate. The invention can solve the problem of low test efficiency of the electric energy meter test system in the prior art.

Description

Electric energy meter test system
Technical field
The present invention relates to electric energy meter field tests, particularly relate to a kind of electric energy meter test system.
Background technology
Along with manufacturing fast development, the aggravation competed between industry, each enterprise proposes urgent requirement to the control of production cost and the lifting of efficiency, and product lifting of efficiency in batch production process becomes the emphasis of each enterprises pay attention.
But in actual production, especially electric energy meter manufactures field, based on layout and the operating type of conventional production lines, when causing electric energy meter to produce test in batches, there is following defect:
1, have enough to meet the need the invalid operation caused too much: in the function examination stage, usually adopt the mode of unit turnover, single machine test, which causes test station operating efficiency very low.
2, process step design is unreasonable: carry out overall throughput when promoting, be ensure the balance of production line, test station needs the test station arranging multiple repetition, causes increasing considerably of human cost and equipment cost thus.
3, testing scheme is unreasonable: the test station of repetition brings difficulty to the quality management and control of product and reviewing of defective products, causes certain quality hidden danger.
4, product turnover order is uncontrollable: different product causes needs to make different testing tools for different product in the difference of design proposal.
Therefore, also there is the low problem of testing efficiency in existing electric energy meter test system.
Summary of the invention
The object of the present invention is to provide a kind of electric energy meter test system, for solving the problem that in prior art, the testing efficiency of electric energy meter test system is low.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:
A kind of electric energy meter test system comprises: slide rail line, plug into plate and mechanism for testing, wherein, slide rail line comprises slide rail line main body and is arranged at least one slide rail substrate in described slide rail line main body, and multiple described electric energy meter to be measured can slide on described slide rail substrate; Plate of plugging into is connected with described slide rail line, has enough to meet the need between streamline and described slide rail line for making electric energy meter to be measured; And mechanism for testing is for testing the electric energy meter described to be measured be positioned in default test station, described electric energy meter to be measured slides into described test station by described slide rail substrate.
Further, described plate of plugging into comprises plug into plate and outlet of entrance and to plug into plate, described entrance plugs into plate for described electric energy meter to be measured is gone to described slide rail line from described streamline week, and described outlet plugs into plate for described electric energy meter to be measured is gone to described streamline from described slide rail line week.
Further, described slide rail line also comprises the slide rail back up pad be arranged on below described slide rail substrate, for supporting described slide rail substrate.
Further, described slide rail line also comprises two railway limit plates and at least one station division board, described two railway limit plates erect at described slide rail substrate two ends in the width direction respectively, and described station division board erects on described slide rail substrate along the Width of described slide rail substrate.
Further, the quantity of described slide rail substrate is multiple, and described multiple slide rail substrate is removably connected to form described slide rail line.
Further, the test board that described mechanism for testing comprises pneumatic unit and is connected with described pneumatic unit, drives described test board to rise by described pneumatic unit or declines, to test described electric energy meter to be measured.
Further, described test board comprises multiple removable epi-position, to test the electric energy meter described to be measured of different model.
Further, described mechanism for testing also comprises one and is arranged on gauge tap in described slide rail line main body, for controlling the start and stop of described pneumatic unit.
Further, described mechanism for testing also comprises auxiliary unit, for the test result of electric energy meter to be measured described in assistant analysis.
Further, described auxiliary unit comprise display module, communication module, signal detection module, signal output module one or several.
Compared with prior art, the present invention has following beneficial effect:
By arranging slide rail line in electric energy meter test system, plug into plate and mechanism for testing, plate of plugging into can make electric energy meter to be measured have enough to meet the need between streamline and slide rail line, slide rail line comprises slide rail substrate, multiple electric energy meter to be measured can slide into default test station by slide rail substrate, tests the electric energy meter to be measured put in place for mechanism for testing.That is, by the operating type that online slide rail is tested, namely slide rail is adopted to carry out all transfer to tests to multiple electric energy meter to be measured, compared with picking and placeing the operating type of test with traditional electric energy meter single to be measured, significantly reduce the activity duration, improve the testing efficiency of electric energy meter test system, thus solve the problem that in prior art, the testing efficiency of electric energy meter test system is low.
Accompanying drawing explanation
Fig. 1 is the structural representation of the electric energy meter test system of an embodiment.
Embodiment
Below with reference to accompanying drawing, elaboration is further given to various embodiments of the present invention.
Refer to Fig. 1, in one embodiment, a kind of electric energy meter test system comprise slide rail line, plug into plate and mechanism for testing 6.Wherein, slide rail line comprises slide rail line main body and is arranged at least one slide rail substrate 9 in slide rail line main body, and multiple electric energy meter to be measured can slide on slide rail substrate 9.In the present embodiment, the quantity of slide rail substrate 9 is multiple, and multiple slide rail substrate 9 is removably connected to form slide rail line, is beneficial to maintenance and the preservation of slide rail line.
Further, slide rail line also comprises the slide rail back up pad be arranged on below slide rail substrate 9, for supporting slide rail substrate 9.Meanwhile, this slide rail back up pad also can be adjustment and the signal wire cabling headspace of track of sliding track width.
Slide rail line also comprises two railway limit plate 3, two railway limit plates 3 and erects respectively at slide rail substrate 9 two ends in the width direction.By the railway limit plate 3 arranged, the width of track of sliding track is controlled, to adapt to the electric energy meter to be measured of different size.
Slide rail line also comprises at least one station division board 8, and station division board 8 erects on slide rail substrate 9 along the Width of slide rail substrate 9.Meanwhile, station division board is also position electric energy meter to be measured, makes electric energy meter to be measured in the sliding process of slide rail substrate 9, can slide into default test station exactly.In the present embodiment, the quantity of station division board 8 is multiple, for carrying out mutually isolated to multiple test station, to ensure the monomer absolute construction of the mechanism for testing 6 in test station.
In the present embodiment, smooth and easy in order to ensure the slip of electric energy meter to be measured, the making material of slide rail line can select bakelite material, and lays one deck wear-resistant metal material on the surface of slide rail substrate, such as, and alloy sheets.
Plate of plugging into is connected with slide rail line, has enough to meet the need between streamline and slide rail line for making electric energy meter to be measured.
Further, plate of plugging into comprises plug into plate 5 and outlet of entrance and to plug into plate 11, entrance plug into plate 5 for by electric energy meter week to be measured from streamline week going to slide rail line, outlet plugs into plate 11 for electric energy meter to be measured is gone to streamline from slide rail line week.
By making electric energy meter to be measured unidirectional turnover mode in slide rail, efficiently avoid multistation in traditional work mode and test simultaneously and cause undetected situation.
Mechanism for testing 6 is for testing the electric energy meter to be measured be positioned in default test station, and electric energy meter to be measured slides into test station by slide rail substrate 9.
Further, the test board 2 that mechanism for testing 6 comprises pneumatic unit 1 and is connected with pneumatic unit 1, drives test board 2 to rise or decline by pneumatic unit 1, to test electric energy meter to be measured.In the present embodiment, test board 2 and pneumatic unit 1, for removably connecting, are beneficial to maintenance and the preservation of electric energy meter test system.
Further, pneumatic unit 1 is pneumatic fixture cylinder, and its material is bakelite material.The material of test board 2 is acrylic material.
By arranging the mechanism for testing of pneumatic type, significantly reduce the labour intensity of tester, meanwhile, pneumatic lifting contact reliably solves the problem of the repeated test caused because of loose contact in traditional work mode, thus further increasing the testing efficiency of electric energy meter test system.
Mechanism for testing 6 also comprises one and is arranged on gauge tap 7 in slide rail line main body, for controlling the start and stop of pneumatic unit 1.
Test board 2 comprises multiple removable epi-position, to test the electric energy meter to be measured of different model.
By arranging separate pneumatic unit 1 and test board 2, and the track of sliding track of engages adjustable width, slide rail line is made to be applicable to the electric energy meter to be measured of different model, there is very strong versatility, efficiently solve the problem needing to make different testing tools in traditional work mode for the electric energy meter to be measured of different model.
Mechanism for testing 6 also comprises auxiliary unit 10, for the test result of assistant analysis electric energy meter to be measured.Further, auxiliary unit 10 comprise display module 4, communication module, signal detection module, signal output module one or several.At different test scenes, those modules can be configured according to the testing requirement of reality, to meet the testing requirement of different user all sidedly.
In sum, by adopting electric energy meter test system of the present invention, considerably reduce activity duration and the labour intensity of tester, effectively improve operating efficiency, make the time of invalid operation to reduce 50%-60%, production capacity promotes 20%-30%, manpower reduces about 25%, meanwhile, considerably reduces the input cost of testing apparatus, instrument etc., ensure that the consistance of test, and ensure that the quality of product in production run.
Foregoing; be only preferred embodiment of the present invention; not for limiting embodiment of the present invention; those of ordinary skill in the art are according to central scope of the present invention and spirit; can carry out corresponding flexible or amendment very easily, therefore protection scope of the present invention should be as the criterion with the protection domain required by claims.

Claims (10)

1. an electric energy meter test system, is characterized in that, comprising:
Slide rail line, comprise slide rail line main body and be arranged at least one slide rail substrate in described slide rail line main body, multiple described electric energy meter to be measured can slide on described slide rail substrate;
To plug into plate, being connected with described slide rail line, having enough to meet the need between streamline and described slide rail line for making electric energy meter to be measured; And
Mechanism for testing, for testing the electric energy meter described to be measured be positioned in default test station, described electric energy meter to be measured slides into described test station by described slide rail substrate.
2. electric energy meter test system as claimed in claim 1, it is characterized in that, described plate of plugging into comprises plug into plate and outlet of entrance and to plug into plate, described entrance plugs into plate for described electric energy meter to be measured is gone to described slide rail line from described streamline week, and described outlet plugs into plate for described electric energy meter to be measured is gone to described streamline from described slide rail line week.
3. electric energy meter test system as claimed in claim 1, it is characterized in that, described slide rail line also comprises the slide rail back up pad be arranged on below described slide rail substrate, for supporting described slide rail substrate.
4. electric energy meter test system as claimed in claim 1, it is characterized in that, described slide rail line also comprises two railway limit plates and at least one station division board, described two railway limit plates erect at described slide rail substrate two ends in the width direction respectively, and described station division board erects on described slide rail substrate along the Width of described slide rail substrate.
5. electric energy meter test system as claimed in claim 1, it is characterized in that, the quantity of described slide rail substrate is multiple, and described multiple slide rail substrate is removably connected to form described slide rail line.
6. electric energy meter test system as claimed in claim 1, it is characterized in that, the test board that described mechanism for testing comprises pneumatic unit and is connected with described pneumatic unit, drives described test board to rise by described pneumatic unit or declines, to test described electric energy meter to be measured.
7. electric energy meter test system as claimed in claim 6, it is characterized in that, described test board comprises multiple removable epi-position, to test the electric energy meter described to be measured of different model.
8. electric energy meter test system as claimed in claim 6, is characterized in that, described mechanism for testing also comprises one and is arranged on gauge tap in described slide rail line main body, for controlling the start and stop of described pneumatic unit.
9. electric energy meter test system as claimed in claim 6, it is characterized in that, described mechanism for testing also comprises auxiliary unit, for the test result of electric energy meter to be measured described in assistant analysis.
10. electric energy meter test system as claimed in claim 9, is characterized in that, described auxiliary unit comprise display module, communication module, signal detection module, signal output module one or several.
CN201510705303.8A 2015-10-27 2015-10-27 Electric energy meter test system Active CN105334486B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510705303.8A CN105334486B (en) 2015-10-27 2015-10-27 Electric energy meter test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510705303.8A CN105334486B (en) 2015-10-27 2015-10-27 Electric energy meter test system

Publications (2)

Publication Number Publication Date
CN105334486A true CN105334486A (en) 2016-02-17
CN105334486B CN105334486B (en) 2019-01-25

Family

ID=55285128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510705303.8A Active CN105334486B (en) 2015-10-27 2015-10-27 Electric energy meter test system

Country Status (1)

Country Link
CN (1) CN105334486B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106383331A (en) * 2016-10-27 2017-02-08 宁波三星医疗电气股份有限公司 Single-phase watt-hour meter debugging and inspecting integrated device and method thereof
CN108254714A (en) * 2018-04-10 2018-07-06 南京电力自动化设备三厂有限公司 Integral three-phase dial framework and three-phase electric energy meter metering calibration equipment and verification mode of connection
CN110068788A (en) * 2018-01-24 2019-07-30 郑州三晖电气股份有限公司 The flexible intelligent calibrating installation and method of compatible a variety of electric energy meter calibrations

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102175986A (en) * 2011-02-17 2011-09-07 广东电网公司广州供电局 An upper and lower meter device for automatic verification of three-phase electric energy meters
CN102967782A (en) * 2012-11-23 2013-03-13 大连运明自动化技术有限公司 PCB (Printed Circuit Board) automatic detector module for PCB flexible full-automatic detection production line
CN202939302U (en) * 2012-11-29 2013-05-15 郑州三晖电气股份有限公司 Automated electric energy meter verification system
CN202948100U (en) * 2012-08-27 2013-05-22 深圳市科陆电子科技股份有限公司 Voltage-withstanding testing apparatus for three-phase electric energy meter
CN104049198A (en) * 2014-05-17 2014-09-17 杨玉峰 PCBA online fully-automatic unmanned testing system
JP2015011022A (en) * 2013-07-02 2015-01-19 デンソクテクノ株式会社 Automatic connection device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102175986A (en) * 2011-02-17 2011-09-07 广东电网公司广州供电局 An upper and lower meter device for automatic verification of three-phase electric energy meters
CN202948100U (en) * 2012-08-27 2013-05-22 深圳市科陆电子科技股份有限公司 Voltage-withstanding testing apparatus for three-phase electric energy meter
CN102967782A (en) * 2012-11-23 2013-03-13 大连运明自动化技术有限公司 PCB (Printed Circuit Board) automatic detector module for PCB flexible full-automatic detection production line
CN202939302U (en) * 2012-11-29 2013-05-15 郑州三晖电气股份有限公司 Automated electric energy meter verification system
JP2015011022A (en) * 2013-07-02 2015-01-19 デンソクテクノ株式会社 Automatic connection device
CN104049198A (en) * 2014-05-17 2014-09-17 杨玉峰 PCBA online fully-automatic unmanned testing system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106383331A (en) * 2016-10-27 2017-02-08 宁波三星医疗电气股份有限公司 Single-phase watt-hour meter debugging and inspecting integrated device and method thereof
CN110068788A (en) * 2018-01-24 2019-07-30 郑州三晖电气股份有限公司 The flexible intelligent calibrating installation and method of compatible a variety of electric energy meter calibrations
CN110068788B (en) * 2018-01-24 2024-01-30 郑州三晖电气股份有限公司 Flexible intelligent calibrating device and method compatible with calibration of various electric energy meters
CN108254714A (en) * 2018-04-10 2018-07-06 南京电力自动化设备三厂有限公司 Integral three-phase dial framework and three-phase electric energy meter metering calibration equipment and verification mode of connection

Also Published As

Publication number Publication date
CN105334486B (en) 2019-01-25

Similar Documents

Publication Publication Date Title
CN103424623A (en) Resistivity measurement device
CN201555909U (en) Automatic detection equipment for detecting transformer
CN201438214U (en) Multi-meter parallel testing system for testing kilowatt-hour meters
CN107037301A (en) A kind of automatic p-wire of probe interface class product multistation
CN105334486A (en) Electric meter test system
CN207051433U (en) Automatic burning detection machine
CN102607437A (en) Movable online detection device and detection method of enamelled wire diameter
CN203825110U (en) Electric connector plugging service life test board
CN204740125U (en) A pressure relief valve pressure automatic detection and sorting device
CN207369137U (en) A kind of online mobile phone double wire test equipment
CN104198822B (en) Equipment for rapidly testing amorphous magnetic ring and testing method thereof
CN105136599A (en) Wear-resisting property testing device for nylon conveyer belt
CN205271191U (en) Welding bead intellectual detection system machine imaging system
CN202661549U (en) Resistivity measuring device
CN205280893U (en) Automatic location initial workpiece detecting system
CN204777784U (en) Be applied to PCB test carrying platform's belt group
CN205879067U (en) High -voltage ceramic capacitor porcelain medium rod chip thickness detection device
CN209559150U (en) A flatness detection device with material distribution function
CN204065141U (en) Pressure resistant test tool
CN202360508U (en) Movable experiment platform for testing hydraulic system
CN205249253U (en) Automatic testing arrangement of distributing type LIN bus based on CAN communication
CN203870195U (en) Comprehensive test fixture
CN208239752U (en) A kind of liquid crystal display electrical measurement frame
CN206430702U (en) The optical measurement device in gap
CN205580515U (en) Connecting wire integrated test system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 518000 Guangdong city of Shenzhen province Nanshan District South Road seven No. 007 Shenzhen Digital Technology Park A3 Building 5 floor C District

Patentee after: Shenzhen jinzhengfang Technology Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Nanshan District South Road seven Digital Technology Park A3 Building 5 floor C District

Patentee before: SHENZHEN GOLDEN SQUARE TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address
PP01 Preservation of patent right

Effective date of registration: 20250506

Granted publication date: 20190125

PP01 Preservation of patent right