CN102175199A CN 201110029903 CN201110029903A CN102175199A CN 102175199 A CN102175199 A CN 102175199A CN 201110029903 CN201110029903 CN 201110029903 CN 201110029903 A CN201110029903 A CN 201110029903A CN 102175199 A CN102175199 A CN 102175199A
Authority
CN
China
Prior art keywords
submodules
submodule
construction
reference coordinate
reference coordinates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110029903
Other languages
English (en)
Inventor
杨公升
章青
周学仲
单吉华
李金龙
郭志农
潘德峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN 201110029903 priority Critical patent/CN102175199A/zh
Publication of CN102175199A publication Critical patent/CN102175199A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Length Measuring Devices With Unspecified Measuring Means (AREA)

Abstract

本发明公开了非滑道多模块建造测量方法,它包括以下步骤:建立整体结构物建造模块的建造场地基准坐标;(2)确定各个子模块的基准坐标;(3)根据各个子模块在各个子模块的基准坐标中的位置,确定各个子模块在建造场地基准坐标中的相对坐标以得到各个子模块中部件在建造场地基准坐标中的坐标位置信息;(4)按照整体结构物设计尺寸和误差要求,根据各个子模块中部件坐标位置的信息,确定各个部件的误差要求。采用本方法可以在各个子模块的基准坐标中,获得该模块的建造允许误差,在整体安装后,达到整体的装配精度要求。

Description

非滑道多模块建造测量方法
技术领域
本发明涉及一种测量方法,尤其涉及非滑道多模块建造测量方法。
背景技术
在海上石油开发工程中,需要在海上建造采油平台、生活平台、中心处理平台等各种平台。平台一般主要包括:海洋工程组块、水下支撑结构-导管架、单点等海洋结构物。海洋工程组块、导管架、单点等通称为海洋结构物。海洋结构物一般体积重量庞大,建造过程中通常采用模块化的设计建造方式。在此前提下,结构物的建造需要对结构物进行划分,分层,分区同时施工,达到缩短工期,提高效率的目的。由于结构物的重量尺寸不断扩大,原有的滑道区建造场地面积有限,为了更好的进行工程施工,保证施工进度,在非滑道区域进行模块建造逐步推广开来。
目前,对海洋结构物进行模块化建造的过程中,仅仅是对单个的模块进行简单的尺寸和精度的控制,没有考虑到整体尺寸精度的问题,完全依靠单个模块自身的误差分析来进行建造。在单个模块建造完成后,对于整个结构物的尺寸精度,没有统一的规划,往往造成整体结构物的精度偏差。而且,由于单个模块的精度与其他模块相互影响,在没有统一的测量基准的情况下,各个模块的组合衔接,安装配合可能存在偏差,严重时,甚至影响各个模块的组合安装。
发明内容
本发明的目的在于克服现有技术的不足,提供一种结构物的各个模块在独立建造的同时又受到整体基准的约束,使最后完成的各个模块在装配过程中能够基准统一,安装顺利进行的非滑道多模块建造测量方法。
本发明的非滑道多模块建造测量方法,它包括以下步骤:
(1)建立整体结构物建造模块的建造场地基准坐标;
(2)确定各个子模块的基准坐标;
(3)根据各个子模块在各个子模块的基准坐标中的位置,确定各个子模块在建造场地基准坐标中的相对坐标以得到各个子模块中部件在建造场地基准坐标中的坐标位置信息;
(4)按照整体结构物设计尺寸和误差要求,根据各个子模块中部件坐标位置的信息,确定各个部件的误差要求。
本发明的突出优点是:采用本方法可以通过对大型海洋结构物的各个分割的独立建造模块进行测量基准的设定,建立起一整套坐标关系,一整套尺寸控制关系并进行测定,在各个子模块的基准坐标中,获得该模块的建造允许误差,在整体安装后,达到整体的装配精度要求。从而在进行模块化建造的过程中实现分块建造,整体控制。同时把各个模块的建造区域扩展到了非滑道区域,为大型结构物的建造,开辟了新的建造方式。
附图说明
附图是本发明的非滑道多模块建造测量方法的测量工作原理图。
具体实施方式
下面结合具体的实施例,并参照附图,对本发明做进一步的说明:
本发明的非滑道多模块建造测量方法,它包括以下步骤:(1)建立整体结构物建造模块的建造场地基准坐标;(2)确定各个子模块的基准坐标;(3)根据各个子模块在各个子模块的基准坐标中的位置,确定各个子模块在建造场地基准坐标中的相对坐标以得到各个子模块中部件在建造场地基准坐标中的坐标位置信息;(4)按照整体结构物设计尺寸和误差要求,根据各个子模块中部件坐标位置的信息,确定各个部件的误差要求。
如图所示,通过场地基准坐标1(x,y),确定好各个子模块2的基准坐标(xn,yn),根据各个子模块2(No1,No2..  No5)等在整体结构物中的位置,确定好各个模块儿的相对坐标(xnn,ynn);按照整体结构物设计尺寸和误差要求,可以确定每个部件尺寸误差的范围,完成了模块化建造过程中的整体尺寸误差的控制。
实施例1
对一个整体结构分解为多模块建造过程中,采用以下步骤:
(1)建立整体结构物建造模块的建造场地基准坐标;(2)确定各个子模块的基准坐标;(3)根据各个子模块在各个子模块的基准坐标中的位置,确定各个子模块在建造场地基准坐标中的相对坐标以得到各个子模块中部件在建造场地基准坐标中的坐标位置信息;(4)按照整体结构物设计尺寸和误差要求,根据各个子模块中部件坐标位置的信息,确定各个部件的误差要求。
经检测:在各个子模块的基准坐标中,获得该模块的建造允许误差,在整体安装后,达到整体的装配精度要求。

Claims (1)

1.非滑道多模块建造测量方法,其特征在于它包括以下步骤:
(1)建立整体结构物建造模块的建造场地基准坐标;
(2)确定各个子模块的基准坐标;
(3)根据各个子模块在各个子模块的基准坐标中的位置,确定各个子模块在建造场地基准坐标中的相对坐标以得到各个子模块中部件在建造场地基准坐标中的坐标位置信息;
(4)按照整体结构物设计尺寸和误差要求,根据各个子模块中部件坐标位置的信息,确定各个部件的误差要求。
CN 201110029903 2011-01-31 2011-01-31 非滑道多模块建造测量方法 Pending CN102175199A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110029903 CN102175199A (zh) 2011-01-31 2011-01-31 非滑道多模块建造测量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110029903 CN102175199A (zh) 2011-01-31 2011-01-31 非滑道多模块建造测量方法

Publications (1)

Publication Number Publication Date
CN102175199A true CN102175199A (zh) 2011-09-07

Family

ID=44518410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110029903 Pending CN102175199A (zh) 2011-01-31 2011-01-31 非滑道多模块建造测量方法

Country Status (1)

Country Link
CN (1) CN102175199A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080279A (zh) * 2019-05-16 2019-08-02 中冶东方工程技术有限公司 一种用于非滑道模块设备建造的装配式组合垫墩
CN110284529A (zh) * 2018-03-19 2019-09-27 天津大学(青岛)海洋工程研究院有限公司 大型油气平台建造中地基变形测量方法及装置
CN115717383A (zh) * 2022-11-29 2023-02-28 中海福陆重工有限公司 深水导管架分体式建造方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3736756A (en) * 1971-11-03 1973-06-05 Exxon Co Method and apparatus for assembling an offshore structure
US4630968A (en) * 1983-10-17 1986-12-23 Institut Francais Du Petrole Realization procedure of a modular system particularly suitable for use off coasts
CN101525945A (zh) * 2009-03-27 2009-09-09 中建钢构有限公司 铸钢件空间位置的安装定位方法
CN101324428B (zh) * 2008-07-25 2010-07-21 北京城建集团有限责任公司 建筑钢结构异形构件三维坐标测量方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3736756A (en) * 1971-11-03 1973-06-05 Exxon Co Method and apparatus for assembling an offshore structure
US4630968A (en) * 1983-10-17 1986-12-23 Institut Francais Du Petrole Realization procedure of a modular system particularly suitable for use off coasts
CN101324428B (zh) * 2008-07-25 2010-07-21 北京城建集团有限责任公司 建筑钢结构异形构件三维坐标测量方法
CN101525945A (zh) * 2009-03-27 2009-09-09 中建钢构有限公司 铸钢件空间位置的安装定位方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《中国修船》 20100630 咸泰洪 海洋石油结构模块拖拉装船和海上安装 第23卷, 第3期 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284529A (zh) * 2018-03-19 2019-09-27 天津大学(青岛)海洋工程研究院有限公司 大型油气平台建造中地基变形测量方法及装置
CN110080279A (zh) * 2019-05-16 2019-08-02 中冶东方工程技术有限公司 一种用于非滑道模块设备建造的装配式组合垫墩
CN115717383A (zh) * 2022-11-29 2023-02-28 中海福陆重工有限公司 深水导管架分体式建造方法
CN115717383B (zh) * 2022-11-29 2023-09-22 中海福陆重工有限公司 深水导管架分体式建造方法

Similar Documents

Publication Publication Date Title
CN105888317A (zh) 中央制冷机房模块化预制及装配化施工方法
CN109680615B (zh) 短线法节段梁的三维坐标测量施工方法
CN104499714B (zh) 基于bim平台及测量机器人的机电安装工程施工方法
CN101413348B (zh) 钢结构三维扫描测控方法
CN103084806B (zh) 一种大型曲线钢箱梁制作方法
KR101408349B1 (ko) 선박 리세팅 방법 및 리세팅 선박의 좌표 측정 시스템
CN101324428B (zh) 建筑钢结构异形构件三维坐标测量方法
CN105731262A (zh) 基于bim技术的塔吊平面布置系统及方法
CN102175199A (zh) 非滑道多模块建造测量方法
CN103523169A (zh) 一种双壳体船舶制造方法
CN103144109A (zh) 一种用于附加外部轴的机器人系统分站式精度补偿方法
CN113374282A (zh) 采用假定坐标系控制预埋螺栓的方法
CN102896446A (zh) 海上石油平台精密切割控制系统
CN113844611B (zh) 一种基于数字化船坞的连续模拟和快速搭载的造船方法
CN102023005B (zh) 支撑柱实时调垂系统及其调垂方法
CN104318030A (zh) 基于变形等效的拱坝坝基综合变形模量自动化计算方法
CN104864906A (zh) 海洋油气水下设备重量测量和重心检测方法
CN204849720U (zh) 海上对接平台对接定位施工结构
CN110864625A (zh) 施工现场设备安装定位与检测的方法及系统
CN104021266A (zh) 一种适用于海洋工程船的风载荷计算方法
CN202517087U (zh) 一种钻削工装中长圆孔衬套安装孔的钻模
CN204536546U (zh) 一种水下管道膨胀弯法兰的测量装置
CN201858973U (zh) 支撑柱实时调垂系统
CN102750423B (zh) 一种大型海洋平台关联系统模块配合精度的设计方法
CN105606080A (zh) 一种超大型组合型钢箱形钢柱、钢板剪力墙尺寸检测方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110907