CN102162251A - Installation method of support middle beam in foundation pit of section steel cement-soil wall - Google Patents
Installation method of support middle beam in foundation pit of section steel cement-soil wall Download PDFInfo
- Publication number
- CN102162251A CN102162251A CN 201110051352 CN201110051352A CN102162251A CN 102162251 A CN102162251 A CN 102162251A CN 201110051352 CN201110051352 CN 201110051352 CN 201110051352 A CN201110051352 A CN 201110051352A CN 102162251 A CN102162251 A CN 102162251A
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- waist rail
- soil wall
- cement soil
- foundation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 80
- 239000010959 steel Substances 0.000 title claims abstract description 80
- 239000002689 soil Substances 0.000 title claims abstract description 34
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000009434 installation Methods 0.000 title abstract description 5
- 230000008093 supporting effect Effects 0.000 claims description 41
- 239000004568 cement Substances 0.000 claims description 29
- 238000010276 construction Methods 0.000 abstract description 9
- 238000012423 maintenance Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 5
- 238000003466 welding Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100513526A CN102162251B (en) | 2011-03-03 | 2011-03-03 | Installation method of support middle beam in foundation pit of section steel cement-soil wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100513526A CN102162251B (en) | 2011-03-03 | 2011-03-03 | Installation method of support middle beam in foundation pit of section steel cement-soil wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102162251A true CN102162251A (en) | 2011-08-24 |
CN102162251B CN102162251B (en) | 2012-07-25 |
Family
ID=44463681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100513526A Expired - Fee Related CN102162251B (en) | 2011-03-03 | 2011-03-03 | Installation method of support middle beam in foundation pit of section steel cement-soil wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102162251B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107747315A (en) * | 2017-11-24 | 2018-03-02 | 绍兴文理学院 | A kind of recycling method of shaped steel component for pattern foundation pit supporting structure |
CN108755706A (en) * | 2018-08-23 | 2018-11-06 | 东莞市建筑科学研究所 | Removable internal support of foundation pit system and foundation ditch construction method |
CN110306563A (en) * | 2019-07-22 | 2019-10-08 | 中铁第一勘察设计院集团有限公司 | Steel purlin fall arrest conversion equipment |
CN111851468A (en) * | 2020-07-28 | 2020-10-30 | 上海市基础工程集团有限公司 | Underground water soil steel wall continuous inserting verticality control construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5158399A (en) * | 1991-12-27 | 1992-10-27 | Flores Raymond H | Method for erecting a below grade wall |
JP2007154413A (en) * | 2005-11-30 | 2007-06-21 | Marui Kensetsu:Kk | Soldier pile type earth retaining anchor type retaining wall and its construction method |
CN2923824Y (en) * | 2006-07-20 | 2007-07-18 | 中国京冶建设工程承包公司 | Inlaid section-steel waist-beam |
CN101280564A (en) * | 2008-06-06 | 2008-10-08 | 北京建工集团有限责任公司 | Pit pile anchor breast wall concrete breast beam structure and construction method thereof |
CN201228356Y (en) * | 2008-06-10 | 2009-04-29 | 北京六建集团公司 | Pit anchored pile-anchor breast wall concrete middle beam structure |
KR20090076688A (en) * | 2008-01-09 | 2009-07-13 | 코오롱건설주식회사 | Prestressed h-pile and soil retaining method for two rows pile using the same |
KR20100068597A (en) * | 2008-12-15 | 2010-06-24 | 유진지오 주식회사 | A shoring method using arch plate pile and h-pile |
-
2011
- 2011-03-03 CN CN2011100513526A patent/CN102162251B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5158399A (en) * | 1991-12-27 | 1992-10-27 | Flores Raymond H | Method for erecting a below grade wall |
JP2007154413A (en) * | 2005-11-30 | 2007-06-21 | Marui Kensetsu:Kk | Soldier pile type earth retaining anchor type retaining wall and its construction method |
CN2923824Y (en) * | 2006-07-20 | 2007-07-18 | 中国京冶建设工程承包公司 | Inlaid section-steel waist-beam |
KR20090076688A (en) * | 2008-01-09 | 2009-07-13 | 코오롱건설주식회사 | Prestressed h-pile and soil retaining method for two rows pile using the same |
CN101280564A (en) * | 2008-06-06 | 2008-10-08 | 北京建工集团有限责任公司 | Pit pile anchor breast wall concrete breast beam structure and construction method thereof |
CN201228356Y (en) * | 2008-06-10 | 2009-04-29 | 北京六建集团公司 | Pit anchored pile-anchor breast wall concrete middle beam structure |
KR20100068597A (en) * | 2008-12-15 | 2010-06-24 | 유진지오 주식회사 | A shoring method using arch plate pile and h-pile |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107747315A (en) * | 2017-11-24 | 2018-03-02 | 绍兴文理学院 | A kind of recycling method of shaped steel component for pattern foundation pit supporting structure |
CN107747315B (en) * | 2017-11-24 | 2019-05-14 | 绍兴文理学院 | A kind of recycling method of the fashioned iron component for pattern foundation pit supporting structure |
CN108755706A (en) * | 2018-08-23 | 2018-11-06 | 东莞市建筑科学研究所 | Removable internal support of foundation pit system and foundation ditch construction method |
CN108755706B (en) * | 2018-08-23 | 2023-12-12 | 东莞市建筑科学研究院有限公司 | Movable foundation pit inner support system and foundation pit construction method |
CN110306563A (en) * | 2019-07-22 | 2019-10-08 | 中铁第一勘察设计院集团有限公司 | Steel purlin fall arrest conversion equipment |
CN111851468A (en) * | 2020-07-28 | 2020-10-30 | 上海市基础工程集团有限公司 | Underground water soil steel wall continuous inserting verticality control construction method |
Also Published As
Publication number | Publication date |
---|---|
CN102162251B (en) | 2012-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN102162251B (en) | Installation method of support middle beam in foundation pit of section steel cement-soil wall | |
CN104032678A (en) | H-shaped tower column inner force adjustable temporary cross supporting structure and construction method thereof | |
CN103306206B (en) | A kind of construction method adopting thin-wall hollow high-pier reinforcement bar support fixing of the forming frame reinforcing bar | |
CN2804045Y (en) | Combined pole type lifter | |
CN204626411U (en) | A kind of pile foundation steel bar cage erecting device | |
CN102963798B (en) | Lifting guide and positioning device of blast furnace construction operating platform | |
CN205046825U (en) | Pier drum type fender maintenance platform | |
CN102486051A (en) | Manual demolishing method of large-area spherical net rack | |
CN206972259U (en) | A kind of movable guard rail of hydraulic pressure inverted arch trestle | |
CN201793330U (en) | Gantry hanger frame device | |
CN102815631B (en) | Plug-in tower crane support frame | |
CN204226126U (en) | The improved-type blower foundation ring of a kind of variation rigidity anchoring | |
CN204023319U (en) | For the triangular tower of cableway of constructing | |
CN202447878U (en) | Simple aligning line rack for installation centre line of detachable equipment | |
CN211169609U (en) | Portable hoisting support | |
CN202925471U (en) | Hydraulic formwork system for high pier construction | |
CN204355942U (en) | For the suspension centre adjustable carrying pole beam construction of prefabricated panel lifting | |
CN204059589U (en) | A kind of shaped steel combination formula supporting and the cantilevered structure of going along with sb. to guard him | |
CN210480572U (en) | Cantilever hoist and mount compensating beam | |
CN204038917U (en) | Detachable external hanging type operating platform | |
CN203452270U (en) | Steel reinforcement protective layer controlled horse-shaped stool | |
CN203006756U (en) | Crane track fixing device | |
CN209011132U (en) | A kind of fixed foundation pit berm structure of assembled two point | |
CN201924585U (en) | Fixed device for reinforcing bottom of upright rod of suspension scaffold for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: TIANJIN TIANYI CONSTRUCTION GROUP CO., LTD. TIANJI Free format text: FORMER OWNER: TIANJIN TIANYI CONSTRUCTION GROUP CO., LTD. Effective date: 20120704 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Han Zhenyong Inventor after: Sun Hao Inventor after: Shang Kun Inventor after: Wang Kai Inventor after: Zhang Ziqi Inventor after: Ma Qinghai Inventor after: Zhang Zhijun Inventor after: Li Jianqiang Inventor after: Han Ying Inventor after: Yuan Peng Inventor after: An Peng Inventor after: Liu Fulin Inventor after: Jie Mingjie Inventor after: Li Manyuan Inventor after: Pan Daojing Inventor after: Zhang Jianbo Inventor after: Shen Qin Inventor after: Guo Weifei Inventor after: Qi Jinrui Inventor after: Wang Lianqiao Inventor after: Sun Zhongliang Inventor after: Cui Hetao Inventor after: Tian Naiting Inventor after: Cao Wensheng Inventor after: Sun Zhongjing Inventor after: Wang Shaohua Inventor after: Gao Chengwei Inventor before: Liu Fulin Inventor before: Wang Kai Inventor before: Zhang Ziqi Inventor before: Ma Qinghai Inventor before: Zhang Zhijun Inventor before: Li Jianqiang Inventor before: Han Ying Inventor before: Yuan Peng Inventor before: An Peng Inventor before: Jie Mingjie Inventor before: Li Manyuan Inventor before: Sun Zhongliang Inventor before: Pan Daojing Inventor before: Zhang Jianbo Inventor before: Shen Qin Inventor before: Guo Weifei Inventor before: Tian Naiting Inventor before: Cao Wensheng Inventor before: Sun Zhongjing Inventor before: Wang Shaohua Inventor before: Gao Chengwei Inventor before: Sun Hao Inventor before: Shang Kun |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LIU FULIN SUN ZHONGLIANG TIAN NAITING CAO WENSHENG SUN ZHONGJING WANG SHAOHUA GAO CHENGWEI SUN HAO SHANG KUN WANG KAI ZHANG ZIQI MA QINGHAI ZHANG ZHIJUN LI JIANQIANG HAN YING YUAN PENG AN PENG JIE MINGJIE LI MANYUAN PAN DAOJING ZHANG JIANBO SHEN QIN GUO WEIFEI TO: HAN ZHENYONG LIU FULIN SUN ZHONGLIANG CUI HETAO TIAN NAITING CAO WENSHENG SUN ZHONGJING WANG SHAOHUA GAO CHENGWEI SUN HAO SHANG KUN WANG KAI ZHANG ZIQI MA QINGHAI ZHANG ZHIJUN LI JIANQIANG HAN YING YUAN PENG AN PENG JIE MINGJIE LI MANYUAN PAN DAOJING ZHANG JIANBO SHEN QIN GUO WEIFEI QI JINRUI WANG LIANQIAO Free format text: CORRECT: ADDRESS; FROM: 300074 NO.109, ZHUJIANGDAOYAZHILI, HEXI DISTRICT, TIANJIN CITY TO: 300222 NO.109, ZHUJIANGDAOYAZHILI, HEXI DISTRICT, TIANJIN CITY |
|
TR01 | Transfer of patent right |
Effective date of registration: 20120704 Address after: 300222, No. 109, elegant lane, Pearl River Road, Tianjin, Hexi District Co-patentee after: Tianjin Tianyi Construction Group Co., Ltd. Patentee after: Tianjin Huayue Civil Engineering Quality Inspection Co., Ltd. Co-patentee after: Tianjin No.4 Municipal Building Engineering Co., Ltd. Address before: 300074, No. 109, elegant lane, Pearl River Road, Tianjin, Hexi District Co-patentee before: Tianjin Tianyi Construction Group Co., Ltd. Patentee before: Tianjin Huayue Civil Engineering Quality Inspection Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120725 Termination date: 20160303 |
|
CF01 | Termination of patent right due to non-payment of annual fee |