CN102142110A - 一种适用于电力系统的资产报废处置控制方法 - Google Patents

一种适用于电力系统的资产报废处置控制方法 Download PDF

Info

Publication number
CN102142110A
CN102142110A CN2010101052132A CN201010105213A CN102142110A CN 102142110 A CN102142110 A CN 102142110A CN 2010101052132 A CN2010101052132 A CN 2010101052132A CN 201010105213 A CN201010105213 A CN 201010105213A CN 102142110 A CN102142110 A CN 102142110A
Authority
CN
China
Prior art keywords
control module
equipment
project
module
assets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010101052132A
Other languages
English (en)
Inventor
徐宛容
沈丽菁
穆广平
虞跃
陆爽
钟志华
夏晓荣
张炯平
杨鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SHINE ENERGY INFO-TECH Co Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
SHANGHAI SHINE ENERGY INFO-TECH Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SHINE ENERGY INFO-TECH Co Ltd, Shanghai Municipal Electric Power Co filed Critical SHANGHAI SHINE ENERGY INFO-TECH Co Ltd
Priority to CN2010101052132A priority Critical patent/CN102142110A/zh
Publication of CN102142110A publication Critical patent/CN102142110A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及一种适用于电力系统的资产报废处置控制方法,该方法包括以下步骤:(1)立项控制模块根据客户端的输入改造项目信息,自动生成项目编号,并向运行管理模块发送项目编号;(2)运行管理模块接受到项目编号,生成设备选择池,客户端将待报废设备加入设备选择池;(3)运行管理模块根据设备选择池中的待报废设备,向立项控制模块发送待报废设备信息;(4)立项控制模块接收到待报废设备信息后向资产管理模块发送待报废设备编号,资产管理模块根据待报废设备编号计算待报废资产数据,并将其发送给立项控制模块等步骤。与现有技术相比,本发明具有缩短了资产报废处置周期、提高了残值回收率等优点。

Description

一种适用于电力系统的资产报废处置控制方法
技术领域
本发明涉及一种资产报废处置控制方法,尤其是涉及一种适用于电力系统的资产报废处置控制方法。
背景技术
电网公司是典型的资产密集型企业,资产分布地域广、变动频繁,以上海市电力公司为例,资产总值已达千亿级。随着社会经济对电力需求不断增长,供电可靠性要求逐步提高,老旧设备面临更新换代,也就产生了大量的待报废资产。作为资产全寿命周期管理的重要一环,如何高效地对这些资产进行报废处置,提高残值回收率,已成为各电网公司当前面临的一个重要课题。现有的资产报废处置控制方法是粗放型的,各相关系统互相独立,流程不清晰,数据传递多依赖人工方式,前后不能衔接,处置效率低下,整个处置过程无法有效监控。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种缩短资产报废处置周期、提高残值回收率的适用于电力系统的资产报废处置控制方法。
本发明的目的可以通过以下技术方案来实现:
一种适用于电力系统的资产报废处置控制方法,其特征在于,该方法包括以下步骤:
(1)立项控制模块根据客户端的输入改造项目信息,自动生成项目编号,并向运行管理模块发送项目编号;
(2)运行管理模块接受到项目编号,生成设备选择池,客户端将待报废设备加入设备选择池;
(3)运行管理模块根据设备选择池中的待报废设备,向立项控制模块发送待报废设备信息;
(4)立项控制模块接收到待报废设备信息后向资产管理模块发送待报废设备编号,资产管理模块根据待报废设备编号计算待报废资产数据,并将其发送给立项控制模块;
(5)立项控制模块将项目编号发送给计划控制模块,同时将待报废资产数据发送给库存控制模块,生成预拆除库;
(6)计划控制模块将项目计划下达后,将项目编号发送至库存控制模块,库存控制模块根据项目编号将该项目对应的待报废资产清单从预拆除库存发送至审批控制模块;
(7)审批控制模块判断待报废资产是否需要报废,若为是,审批控制模块发送报废资产编号至库存控制模块,库存控制模块根据报废资产编号将报废资产数据发送至报废处置模块;
(8)报废处置模块将报废资产的回收残值反馈给财务数据处理模块,财务数据处理模块自动在对应财务数据库上储存。
所述的步骤(3)中的待报废设备信息包括设备编号、设备参数。
与现有技术相比,本发明具有以下优点:
(1)从项目立项阶段即进行资产的预报废,做到了资产报废管理工作的事前计划。
(2)立项控制模块与运行管理模块,资产管理模块的集成,做到设备资产数据的准确性和唯一性。
(3)通过计划控制模块集中调度,保证了设备现场拆除、报废审批、待报废资产入库操作的合理有序进行,实现了多个流程的并行。
(4)库存控制模块设置资产预拆除库,实现了对项目待拆除设备的集中管理,并为计划控制模块的集中调度提供了基础数据。
(5)资产的实际报废处置由审批控制模块触发,杜绝了资产的违规处置,同时也保证了资产处置的及时性。
(6)报废资产回收残值通过资产编号反馈到审批控制模块、库存控制模块和财务分摊模块,实现了资产报废处置的闭环管理,保证了财务数据与流程控制数据的一致性。
(7)本发明通过多个业务模块的集成,实现了资产报废处置全过程的数据互联,缩短了资产报废处置周期,提高了残值回收率,为资产报废处置的事前计划、事中监控、事后评估提供了一个有效的技术手段。
附图说明
图1为本发明的流程图;
图2为本发明的硬件结构图;
图3为本发明的应用服务器结构示意图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
如图1、图2所示,一种适用于电力系统的资产报废处置控制方法,以改造一个10kV变电站为例具体阐述本发明具体过程:
(1)某供电公司生技部申请改造一个10kV变电站(更换一台变压器,原变压器预计要报废),立项控制模块1根据客户端的输入改造一个10kV变电站,自动生成项目编号0001,并向运行管理模块3发送项目编号;
(2)运行管理模块3通过接口获得项目编号0001后,自动创建一个设备任务池,客户端a在设备台帐中找到要更换的变压器,选中加入设备池;
(3)运行管理模块3向立项控制模块1发送设备数据(包括变压器的编号、容量、电压等级等设备参数等)。
(4)立项控制模块1获得变压器数据后,自动将变压器编号发送给资产管理模块2,资产管理模块2根据变压器编号查询设备对应的资产数据(资产价值等),再通过接口反馈给立项控制模块1。
(5)立项控制模块1将项目编号发送给计划控制模块4,同时将该预计报废的变压器的资产数据发送给库存控制模块5,形成预拆除库;
(6)计划控制模块4中,项目计划下达后,发送项目编号给库存控制模块5,库存控制模块5自动将该项目对应的资产数据(变压器)发送给审批控制模块6,审批控制模块6确认这台变压器的报废申请;与此同时现场人员拆除变压器后运至仓库,客户端根据计划控制模块1的指令进行入库操作;
(7)审批控制模块6中,审批通过后,即发送变压器资产编号给库存控制模块5,库存控制模块5自动将变压器数据发送至报废处置模块7,进行报废处置,库存客户端也可主动请求审批控制模块的指令,若未通过则重复请求。
(8)报废处置完成后,报废处置模块7将该变压器的回收残值发送至财务数据处理模块8,财务数据处理模块8自动在对应财务数据库服务器b上储存;同时将变压器资产号反馈给审批控制模块6、库存控制模块7,实现流程闭环。
如图2、图3所示,本发明的硬件结构包括客户端a、应用服务器b、数据库服务器c,所述的客户端a、应用服务器b、数据库服务器c之间相互连接,所述的应用服务器b包括立项控制模块1、资产管理模块2、生产运行模块3、计划控制模块4、库存控制模块5、审批控制模块6、报废处置模块7、财务数据处理模块8,所述的立项控制模块1分别与资产管理模块2、生产运行模块3、计划控制模块4、库存控制模块5连接,所述的库存控制模块5分别与计划控制模块4、审批控制模块6、报废处置模块7连接,所述的报废处置模块7分别与审批控制模块6、财务数据处理模块8连接。

Claims (2)

1.一种适用于电力系统的资产报废处置控制方法,其特征在于,该方法包括以下步骤:
(1)立项控制模块根据客户端的输入改造项目信息,自动生成项目编号,并向运行管理模块发送项目编号;
(2)运行管理模块接受到项目编号,生成设备选择池,客户端将待报废设备加入设备选择池;
(3)运行管理模块根据设备选择池中的待报废设备,向立项控制模块发送待报废设备信息;
(4)立项控制模块接收到待报废设备信息后向资产管理模块发送待报废设备编号,资产管理模块根据待报废设备编号计算待报废资产数据,并将其发送给立项控制模块;
(5)立项控制模块将项目编号发送给计划控制模块,同时将待报废资产数据发送给库存控制模块,生成预拆除库;
(6)计划控制模块将项目计划下达后,将项目编号发送至库存控制模块,库存控制模块根据项目编号将该项目对应的待报废资产清单从预拆除库存发送至审批控制模块;
(7)审批控制模块判断待报废资产是否需要报废,若为是,审批控制模块发送报废资产编号至库存控制模块,库存控制模块根据报废资产编号将报废资产数据发送至报废处置模块;
(8)报废处置模块将报废资产的回收残值反馈给财务数据处理模块,财务数据处理模块自动在对应财务数据库上储存。
2.根据权利要求1所述的一种适用于电力系统的资产报废处置控制方法,其特征在于,所述的步骤(3)中的待报废设备信息包括设备编号、设备参数。
CN2010101052132A 2010-02-03 2010-02-03 一种适用于电力系统的资产报废处置控制方法 Pending CN102142110A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101052132A CN102142110A (zh) 2010-02-03 2010-02-03 一种适用于电力系统的资产报废处置控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101052132A CN102142110A (zh) 2010-02-03 2010-02-03 一种适用于电力系统的资产报废处置控制方法

Publications (1)

Publication Number Publication Date
CN102142110A true CN102142110A (zh) 2011-08-03

Family

ID=44409601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101052132A Pending CN102142110A (zh) 2010-02-03 2010-02-03 一种适用于电力系统的资产报废处置控制方法

Country Status (1)

Country Link
CN (1) CN102142110A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104574002A (zh) * 2015-02-09 2015-04-29 国网上海市电力公司 基于大数据分析的资产管理信息处理方法及装置
CN111260088A (zh) * 2020-01-17 2020-06-09 大亚湾核电运营管理有限责任公司 核电站报废备件处理方法、装置、计算机设备及存储介质
CN111639768A (zh) * 2020-04-26 2020-09-08 国网安徽省电力有限公司 一种电网实物资产退役管控系统
CN111680808A (zh) * 2020-06-15 2020-09-18 江苏电力信息技术有限公司 一种基于rpa机器人的固定资产报废自动化方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1591435A (zh) * 2003-08-28 2005-03-09 鸿富锦精密工业(深圳)有限公司 数字神经库存管理系统及方法
CN1716298A (zh) * 2004-06-28 2006-01-04 鸿富锦精密工业(深圳)有限公司 制程报废品库存管理系统及方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1591435A (zh) * 2003-08-28 2005-03-09 鸿富锦精密工业(深圳)有限公司 数字神经库存管理系统及方法
CN1716298A (zh) * 2004-06-28 2006-01-04 鸿富锦精密工业(深圳)有限公司 制程报废品库存管理系统及方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104574002A (zh) * 2015-02-09 2015-04-29 国网上海市电力公司 基于大数据分析的资产管理信息处理方法及装置
CN104574002B (zh) * 2015-02-09 2018-04-24 国网上海市电力公司 基于大数据分析的资产管理信息处理方法及装置
CN111260088A (zh) * 2020-01-17 2020-06-09 大亚湾核电运营管理有限责任公司 核电站报废备件处理方法、装置、计算机设备及存储介质
CN111639768A (zh) * 2020-04-26 2020-09-08 国网安徽省电力有限公司 一种电网实物资产退役管控系统
CN111680808A (zh) * 2020-06-15 2020-09-18 江苏电力信息技术有限公司 一种基于rpa机器人的固定资产报废自动化方法
CN111680808B (zh) * 2020-06-15 2022-03-11 江苏电力信息技术有限公司 一种基于rpa机器人的固定资产报废自动化方法

Similar Documents

Publication Publication Date Title
Jamil et al. Condition-based maintenance decision making support system (DSS) of hydropower plant
Alshammari et al. Improving operational procedures in Riyadh’s (Saudi Arabia) water treatment plants using quality tools
CN101645148A (zh) 一种应用于运营支撑系统中的施工单管理方法及管理系统
CN102142110A (zh) 一种适用于电力系统的资产报废处置控制方法
CN104050529A (zh) 电网调度智能检修票和操作票系统
CN108206586A (zh) 一种电力线路智能运维检修系统
CN105631598A (zh) 基于群集类缺陷的电力设备缺陷分析方法
CN102142108A (zh) 适用于电力系统的物料与设备对应关系信息的处理方法
CN107025601A (zh) 数据核对方法、装置及设备
Peng et al. Analysis of double-resource flexible job shop scheduling problem based on genetic algorithm
CN109167684A (zh) 一种通信网络状态故障监控系统及检修方法
CN102111508A (zh) 一种故障处理方法、系统及故障调度设备
CN110909068B (zh) 应急柴油发电机组大数据采集处理方法、系统及存储介质
CN102663566A (zh) 适用于电力系统的资产管理决策分析信息处理方法
CN113537921A (zh) 一种智能安全防误校验系统及其防误校验系统
CN111815182A (zh) 一种基于深度学习的电网停电检修计划编排方法
CN106651113A (zh) 一种基于超前n‑1分析的调度员操作风险评估方法
CN107122834B (zh) 一种智能派单系统及方法
CN104680423A (zh) 一种电费异常侦测系统及方法
CN201732392U (zh) 适用于电力系统物料与设备对应关系信息的处理装置
CN111639768A (zh) 一种电网实物资产退役管控系统
Wang et al. Construction of CPROMS under the Background of Internet of Things
Ayalew et al. Generator maintenance scheduling in power system by using artificial intelligent techniques: a review
CN114243682B (zh) 基于多源信息的配电网智能复电研判方法及系统
Yang et al. Modeling supply chain network design problem with joint service level constraint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI XINNENG I

Free format text: FORMER OWNER: SHANGHAI XINNENG INFORMATION TECHNOLOGY DEVELOPMENT CO., LTD.

Effective date: 20121210

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121210

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Shanghai Shine Energy Info-Tech Co., Ltd.

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai Shine Energy Info-Tech Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110803