CN102116052A - Method for pouring reinforced concrete beam of operating platform - Google Patents
Method for pouring reinforced concrete beam of operating platform Download PDFInfo
- Publication number
- CN102116052A CN102116052A CN200910312641XA CN200910312641A CN102116052A CN 102116052 A CN102116052 A CN 102116052A CN 200910312641X A CN200910312641X A CN 200910312641XA CN 200910312641 A CN200910312641 A CN 200910312641A CN 102116052 A CN102116052 A CN 102116052A
- Authority
- CN
- China
- Prior art keywords
- steel
- operating platform
- preformed hole
- reinforced concrete
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention relates to a method for pouring a reinforced concrete beam of an operating platform, comprising a short column (1) used as a foundation for a steel column and a platform beam (4), wherein the short column (1) used as the foundation for the steel column is provided with preformed holes (2) in which steel dowels (3) are arranged in advance; the preformed holes (2) are used as a hinged support for the platform beam (4); steel bars in the platform beam (4)are caused to extend into the preformed holes (2); and the operation of pouring concrete is carried out. The invention avoids high difficulty in construction, which is generated due to the adoption of the traditional design method, and the design method achieves considerably simple and convenient construction.
Description
Technical field
The present invention relates to a kind of casting method of steel concrete operating platform beam.
Background technology
In the steel work industrial premises, because the needs on using often need be established one deck cast-in-situ steel reinforced concrete operating platform.
Fig. 1 is the schematic diagram of available technology adopting conventional method design, 1 ' is the short column on steel column basis, workshop among the figure, 2 ' is the vertical reinforcing bar of short column on steel column basis, 3 ' is steel column, 4 ' is the steel column foot crab-bolt, 5 ' is steel column foot shear key preformed hole, and 6 ' is cast-in-situ steel reinforced concrete operating platform beam, and 7 ' is the negative muscle of landing beam back.As can be seen, adopt this method because landing beam is fixed the connection with the short column on steel column basis, so the negative muscle of landing beam back is more, easily make the negative muscle of landing beam back bump the vertical reinforcing bar of short column, steel column foot crab-bolt and the steel column foot shear key on steel column basis, need bar bending is escaped for the negative muscle of back can be passed, increased difficulty of construction like this.
Summary of the invention
Technical problem to be solved by this invention provides a kind of casting method of steel concrete operating platform beam, and this method makes construction more convenient, and landing beam is stressed clear and definite.Weak point such as cause constructional difficulties to overcome traditional design method, waste time and energy.
In order to solve the problems of the technologies described above, the present invention has taked following technical scheme: preformed hole on the short column on steel column basis, workshop, in preformed hole, reserve joint bar, and preformed hole is as steel concrete operating platform beam pivoting support, reinforcing bar stretches into preformed hole and satisfies anchorage length, concreting in the beam.
The width of preformed hole is the width of landing beam.
Compared with prior art, the present invention has avoided adopting the big shortcoming of traditional design method difficulty of construction, adopts the construction of the design's method convenient.
Description of drawings
Fig. 1 is the schematic diagram of traditional design method;
Fig. 2 is a floor map of the present invention;
Fig. 3 is the A-A sectional view among Fig. 2;
The specific embodiment:
Embodiment 1: the casting method of steel concrete operating platform beam of the present invention is as follows:
The first, on the short column 1 on steel column basis, workshop, establish preformed hole 2, the preformed hole width is the width of operating platform beam 4, and length is 300mm, and the degree of depth is a deck-molding.In preformed hole 2, reserve joint bar 3, is reinforcing bar 2? 8mm, Fig. 2 is seen in its plane signal;
The second, preformed hole 2 is as steel concrete operating platform beam 4 pivoting supports, and reinforcing bar stretches into preformed hole 2 and satisfies anchorage length, concreting in the landing beam 4.Schematic diagram is seen Fig. 3;
By above steps, promptly finished the method for designing that use is articulated and connected in the cast-in-situ steel reinforced concrete operating platform beam of portal frame structure workshop, as can be seen, entire method is very simple and direct.
Claims (2)
1. the casting method of a cast-in-situ steel reinforced concrete operating platform beam, it is characterized in that: on the short column (1) on steel column basis, preformed hole (2) is set, in preformed hole (2), reserve joint bar (3), preformed hole (2) is as the pivoting support of landing beam (4), the interior reinforcing bar of landing beam (4) stretches in the preformed hole (2), concreting.
2. the casting method of steel concrete operating platform beam according to claim 1 is characterized in that: the width of preformed hole (2) is the width of landing beam (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910312641XA CN102116052A (en) | 2009-12-30 | 2009-12-30 | Method for pouring reinforced concrete beam of operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910312641XA CN102116052A (en) | 2009-12-30 | 2009-12-30 | Method for pouring reinforced concrete beam of operating platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102116052A true CN102116052A (en) | 2011-07-06 |
Family
ID=44214964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910312641XA Pending CN102116052A (en) | 2009-12-30 | 2009-12-30 | Method for pouring reinforced concrete beam of operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102116052A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102777034A (en) * | 2012-06-28 | 2012-11-14 | 广东中城建设集团有限公司 | Concrete pouring method for combined structural steel and concrete structure of high-rise building |
CN103437285A (en) * | 2013-07-05 | 2013-12-11 | 中交二公局第一工程有限公司 | Full framing cast-in-situ box girder construction process |
CN108643355A (en) * | 2018-03-19 | 2018-10-12 | 北京工业大学 | Assembled H profile steel column-isolated footing-concrete collar tie beam T shape connecting nodes |
-
2009
- 2009-12-30 CN CN200910312641XA patent/CN102116052A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102777034A (en) * | 2012-06-28 | 2012-11-14 | 广东中城建设集团有限公司 | Concrete pouring method for combined structural steel and concrete structure of high-rise building |
CN102777034B (en) * | 2012-06-28 | 2014-06-25 | 广东中城建设集团有限公司 | Concrete pouring method for combined structural steel and concrete structure of high-rise building |
CN103437285A (en) * | 2013-07-05 | 2013-12-11 | 中交二公局第一工程有限公司 | Full framing cast-in-situ box girder construction process |
CN103437285B (en) * | 2013-07-05 | 2016-04-13 | 中交二公局第一工程有限公司 | Full space support cast-in-place box beam construction technology |
CN108643355A (en) * | 2018-03-19 | 2018-10-12 | 北京工业大学 | Assembled H profile steel column-isolated footing-concrete collar tie beam T shape connecting nodes |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101906754B (en) | Rigid connection method for steel beam and concrete pier | |
CN104594561A (en) | Prefabricated reinforced concrete column with high-performance concrete frame and construction method | |
CN207863507U (en) | A kind of vertical member displacement apparatus for skyscraper floor | |
CN104695979B (en) | A kind of method using tall and big chassis whole lateral moving high and big die plate | |
CN103726586A (en) | H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method | |
CN110792164A (en) | Transverse assembling device and method for assembled shear wall | |
CN104612120A (en) | Integrated construction method related to in-water steel pipe pile establishing platform | |
CN205501843U (en) | Consolidate rigid framed arch bridge | |
CN102002953A (en) | Method for changing support of foundation pit enclosing rib plates | |
CN102116052A (en) | Method for pouring reinforced concrete beam of operating platform | |
CN103510458B (en) | Pile type continuous rigid frame bridge and construction method thereof | |
CN203034353U (en) | Connection structure of bridge support padstone and abutment | |
CN105019645A (en) | Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method | |
CN205024719U (en) | Pile foundation and integrated reverse construction vertical braces system of underground continuous wall | |
CN101979777B (en) | Construction method of combined underground continuous wallboard of cast-in-place hollow square pile | |
CN202000368U (en) | Crane foundation in building basement | |
CN204780635U (en) | Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures | |
CN104005475A (en) | Hollow column assembling type frame system easy to mount and construction method | |
CN212129882U (en) | Prefabricated construction outrigger drawknot structure | |
CN205296821U (en) | Oblique roofing formwork system of heavy grade cast in situ concrete | |
CN103255721A (en) | High-level bridge construction method | |
CN212249192U (en) | Reinforced structure of board side form is encorbelmented to super thick | |
CN203947419U (en) | A kind of high-speed railway bridge pinner template | |
CN103243691A (en) | Prefabricated steel formwork for gallery top arch of dam absorption basin | |
CN103485350B (en) | The method of attachment of the steel supporting system raised and the collar tie beam that bears down on one |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110706 |