CN102108678A - 高空冬季施工成套装置及方法 - Google Patents

高空冬季施工成套装置及方法 Download PDF

Info

Publication number
CN102108678A
CN102108678A CN2011100205455A CN201110020545A CN102108678A CN 102108678 A CN102108678 A CN 102108678A CN 2011100205455 A CN2011100205455 A CN 2011100205455A CN 201110020545 A CN201110020545 A CN 201110020545A CN 102108678 A CN102108678 A CN 102108678A
Authority
CN
China
Prior art keywords
brooder
construction
winter
group
altitude
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100205455A
Other languages
English (en)
Other versions
CN102108678B (zh
Inventor
关荣财
王海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longjian Road and Bridge Co Ltd
Original Assignee
Longjian Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longjian Road and Bridge Co Ltd filed Critical Longjian Road and Bridge Co Ltd
Priority to CN201110020545.5A priority Critical patent/CN102108678B/zh
Publication of CN102108678A publication Critical patent/CN102108678A/zh
Application granted granted Critical
Publication of CN102108678B publication Critical patent/CN102108678B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

高空冬季施工成套装置及方法。在我国北方高寒地区施工期短,冬季长达6个月,冬季温度在零下30℃以下,斜拉桥主塔塔身施工周期长,高塔塔身冬季施工成套技术,避免塔身的跨年度施工。本发明其组成包括:劲性钢骨架(1),所述的一组劲性钢骨架四周围包裹连接移动暖棚墙(2),所述的移动暖棚墙上方连接暖棚盖(3),所述的暖棚盖下方装有一组热风幕(4),所述的移动暖棚墙下部连接液压自动爬模器(5),所述的移动暖棚墙2内装有一组蒸汽排管(6)和一组温水排管(7)。发明用于我国北方高寒地区冬季建桥。

Description

高空冬季施工成套装置及方法
技术领域
发明涉及一种用于高寒地区高塔柱冬季施工成套装置及方法;具体涉及一种高空冬季施工成套装置及方法。
背景技术
在我国北方高寒地区施工期短,冬季长达6个月,冬季温度在零下30℃以下,斜拉桥主塔塔身施工周期长,高塔塔身冬季施工成套技术,避免塔身的跨年度施工。
发明内容
发明的目的是提供一种利用整体暖棚来保证北方高寒地区冬季施工浇筑混凝土的工作。
 上述的目的通过以下的技术方案实现:
一种高空冬季施工成套装置,其组成包括:劲性钢骨架,所述的一组劲性钢骨架四周围包裹移动暖棚墙,所述的移动暖棚墙上方连接暖棚盖,所述的暖棚盖下方装有一组热风幕,所述的移动暖棚墙下部装有液压自动爬模器,所述的移动暖棚墙内装有一组蒸汽排管和一组温水排管。
所述的高空冬季施工成套装置,所述的移动暖棚墙包括模板,所述的模板连接内层阻燃保温板,所述的阻燃保温板连接空气夹层,所述的空气夹层连接外层阻燃保温板,所述的外层阻燃保温板连接镀锌铁皮。
一种高空冬季施工成套的方法,在施工的空中设置移动暖棚,暖棚将一个施工节段严密包裹,在外模板外侧、暖棚上盖及内模底部均采用保温阻燃材料进行保温,采用循环热水管为接茬混凝土预热,通过蒸汽排管、热风幕、循环热水管为暖棚提供热源;当一个施工节段施工完成后,利用液压自动爬模器带动暖棚同步向上爬升,开始下一节段的施工,直至封顶。
所述的高空冬季施工成套的方法,所述的暖棚整体爬升;施工中所述的混凝土的温度控制根据设计要求确定;所述的暖棚内的温度控制15-20℃。
有益效果:
1.发明高空冬季施工成套技术,避免了高寒地区高塔柱的跨年度施工。
发明能够使暖棚整体爬升;依托液压自爬模体系,实现保温暖棚的整体爬升,减少了暖棚搭设次数,加快了施工进度。
发明在施工中混凝土的温度根据技术要求进行控制,采用预埋于混凝土中温度传感件,适时监测混凝土温度,调整大棚温度。
发明采用保温阻燃材料作为棚体,加设镀锌铁皮,即防风、又阻燃。
发明的保温棚温度控制通过蒸汽排管、循环热水管、热风幕等多种方式为保温棚提供热源。
发明利用液压自爬模系统带动暖棚整体提升,减少暖棚重复搭建次数,加快了施工进度,降低了施工成本。
附图说明:
附图1是本产品的结构示意图。
具体实施方式:
实施例1:
一种高空冬季施工成套装置,其组成包括:劲性钢骨架1,所述的一组劲性钢骨架1四周围包裹连接移动暖棚墙2,所述的移动暖棚墙2上方连接暖棚盖3,所述的暖棚盖3下方装有一组热风幕4,所述的移动暖棚墙2下部连接液压自动爬模器5,所述的移动暖棚墙2内装有一组蒸汽排管6和一组温水排管7。
所述的高空冬季施工成套装置,所述的移动暖棚墙2包括模板8,所述的模板8连接内层阻燃保温板9,所述的阻燃保温板9连接空气夹层10,所述的空气夹层10连接外层阻燃保温板11,所述的外层阻燃保温板11连接镀锌铁皮12。
实施例2:
一种高空冬季施工成套的方法,在将要施工的空中设置移动暖棚,通过暖棚将一个施工节段严密包裹,在外模板外侧、暖棚上盖及内模底部均采用保温阻燃材料进行保温,采用循环热水管为接茬混凝土预热,通过蒸汽排管、热风幕、循环热水管为暖棚提供热源;当一个施工节段施工完成后,利用液压自动爬模器带动暖棚同步向上爬升,开始下一节段的施工,直至封顶。
所述的高空冬季施工成套的方法,所述的暖棚整体爬升;施工中所述的混凝土的温度控制根据设计要求确定;所述的暖棚内的温度控制15-20℃。
实施例3:
以上实施例所述的高空冬季施工成套的方法,在外界温度-25~-30℃条件下,塔柱施工采用阻燃保温材料搭建的活动暖棚,利用液压自爬模系统带动暖棚整体提升,减少暖棚重复搭建次数,加快了施工进度,降低了施工成本。暖棚采用蒸汽排管、循环热水管、热风幕等多种方式提供热源,满足了混凝土冬季施工对环境温度的要求。混凝土的拌合、运输、浇筑和养生除采用有效保温措施外,还利用温度传感器控制技术,适时监控混凝土温度,确保混凝土冬季施工质量。混凝土塔柱节段连接处采取预热处理的方法来保证连接段混凝土质量。

Claims (4)

1.一种高空冬季施工成套装置,其组成包括:劲性钢骨架,其特征是:所述的一组劲性钢骨架四周围包裹移动暖棚墙,所述的移动暖棚墙上方连接暖棚盖,所述的暖棚盖下方装有一组热风幕,所述的移动暖棚墙下部装有液压自动爬模器,所述的移动暖棚墙内装有一组蒸汽排管和一组温水排管。
2.根据权利要求1所述的高空冬季施工成套装置,其特征是:所述的移动暖棚墙包括模板,所述的模板连接内层阻燃保温板,所述的阻燃保温板连接空气夹层,所述的空气夹层连接外层阻燃保温板,所述的外层阻燃保温板连接镀锌铁皮。
3.一种高空冬季施工成套的方法,其特征是:在施工的空中设置移动暖棚,所述的暖棚将一个施工节段严密包裹,在外模板外侧、暖棚上盖及内模底部均采用保温阻燃材料进行保温,采用循环热水管为接茬混凝土预热,通过蒸汽排管、热风幕、循环热水管为暖棚提供热源;当一个施工节段施工完成后,利用液压自动爬模器带动暖棚同步向上爬升,开始下一节段的施工,直至封顶。
4.根据权利要求3所述的高空冬季施工成套的方法,其特征是:所述的暖棚整体爬升;施工中所述的混凝土的温度控制根据设计要求确定;所述的暖棚内的温度控制15-20℃。
CN201110020545.5A 2011-01-18 2011-01-18 高空冬季施工成套装置及方法 Active CN102108678B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110020545.5A CN102108678B (zh) 2011-01-18 2011-01-18 高空冬季施工成套装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110020545.5A CN102108678B (zh) 2011-01-18 2011-01-18 高空冬季施工成套装置及方法

Publications (2)

Publication Number Publication Date
CN102108678A true CN102108678A (zh) 2011-06-29
CN102108678B CN102108678B (zh) 2014-09-17

Family

ID=44172951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110020545.5A Active CN102108678B (zh) 2011-01-18 2011-01-18 高空冬季施工成套装置及方法

Country Status (1)

Country Link
CN (1) CN102108678B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345388A (zh) * 2011-07-12 2012-02-08 中国十七冶集团有限公司 一种低温条件下筒体滑模混凝土保温养护的施工方法
CN103410164A (zh) * 2013-08-07 2013-11-27 国家电网公司 输变电线路基础的冬季混凝土养护方法
CN103437287A (zh) * 2013-07-16 2013-12-11 中铁十三局集团第五工程有限公司 应用于桥梁施工的整孔箱梁节段拼装方法
CN103437288A (zh) * 2013-07-16 2013-12-11 中铁十三局集团第五工程有限公司 应用于桥梁施工的高墩浇筑成型方法
CN106592430A (zh) * 2016-11-14 2017-04-26 中建三局基础设施工程有限公司 一种挂篮悬臂现浇冬季施工方法
CN108678400A (zh) * 2018-06-11 2018-10-19 中建局集团建设发展有限公司 高寒地区建筑结构上的自动爬升暖棚系统及其施工方法
CN112248183A (zh) * 2020-09-16 2021-01-22 绍兴中亚工贸园有限公司 一种管片冬季浇注工艺
CN113482259A (zh) * 2021-06-30 2021-10-08 上海宝冶集团有限公司 一种低温环境下外墙真石漆喷涂施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2908103Y (zh) * 2006-05-26 2007-06-06 中交第二航务工程局有限公司 开启式空调暖棚养护房
CN101545246A (zh) * 2009-05-05 2009-09-30 中国铁道科学研究院铁道建筑研究所 一种支座灌浆材料冬季施工方法
CN101722573A (zh) * 2009-11-25 2010-06-09 中交一航局第四工程有限公司 严寒地区箱梁架设支座灌浆蒸养箱及其养护方法
CN101851897A (zh) * 2009-03-30 2010-10-06 上海市城市建设设计研究院 混凝土高塔的水养护与保温循环系统
CN201991234U (zh) * 2011-01-18 2011-09-28 龙建路桥股份有限公司 高空冬季施工成套装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2908103Y (zh) * 2006-05-26 2007-06-06 中交第二航务工程局有限公司 开启式空调暖棚养护房
CN101851897A (zh) * 2009-03-30 2010-10-06 上海市城市建设设计研究院 混凝土高塔的水养护与保温循环系统
CN101545246A (zh) * 2009-05-05 2009-09-30 中国铁道科学研究院铁道建筑研究所 一种支座灌浆材料冬季施工方法
CN101722573A (zh) * 2009-11-25 2010-06-09 中交一航局第四工程有限公司 严寒地区箱梁架设支座灌浆蒸养箱及其养护方法
CN201991234U (zh) * 2011-01-18 2011-09-28 龙建路桥股份有限公司 高空冬季施工成套装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘爱 赵丽芳: "移动式暖棚在冬季大梁预制中的应用", 《山西交通科技》 *
吴登银: "李子沟特大桥超百米高墩冬期快速施工技术", 《铁道标准设计》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345388A (zh) * 2011-07-12 2012-02-08 中国十七冶集团有限公司 一种低温条件下筒体滑模混凝土保温养护的施工方法
CN103437287A (zh) * 2013-07-16 2013-12-11 中铁十三局集团第五工程有限公司 应用于桥梁施工的整孔箱梁节段拼装方法
CN103437288A (zh) * 2013-07-16 2013-12-11 中铁十三局集团第五工程有限公司 应用于桥梁施工的高墩浇筑成型方法
CN103437288B (zh) * 2013-07-16 2015-12-02 中铁建大桥工程局集团第五工程有限公司 应用于桥梁施工的高墩浇筑成型方法
CN103437287B (zh) * 2013-07-16 2015-12-02 中铁建大桥工程局集团第五工程有限公司 应用于桥梁施工的整孔箱梁节段拼装方法
CN103410164A (zh) * 2013-08-07 2013-11-27 国家电网公司 输变电线路基础的冬季混凝土养护方法
CN106592430A (zh) * 2016-11-14 2017-04-26 中建三局基础设施工程有限公司 一种挂篮悬臂现浇冬季施工方法
CN108678400A (zh) * 2018-06-11 2018-10-19 中建局集团建设发展有限公司 高寒地区建筑结构上的自动爬升暖棚系统及其施工方法
CN108678400B (zh) * 2018-06-11 2023-12-01 中建一局集团建设发展有限公司 高寒地区建筑结构上的自动爬升暖棚系统及其施工方法
CN112248183A (zh) * 2020-09-16 2021-01-22 绍兴中亚工贸园有限公司 一种管片冬季浇注工艺
CN113482259A (zh) * 2021-06-30 2021-10-08 上海宝冶集团有限公司 一种低温环境下外墙真石漆喷涂施工方法

Also Published As

Publication number Publication date
CN102108678B (zh) 2014-09-17

Similar Documents

Publication Publication Date Title
CN102108678B (zh) 高空冬季施工成套装置及方法
CN201991234U (zh) 高空冬季施工成套装置
CN107396836B (zh) 一种全装配式猪舍
CN102162301A (zh) 冬季混凝土施工保温保湿防护方法及装置
CN205990776U (zh) 冬季施工成套移动暖棚
NZ599094A (en) Method for producing prefabricated compound tower-segment units for a tower of a wind plant, and formwork unit for producing prefabricated compound units
CN105672562B (zh) 蒸压加气混凝土整体保温墙板及其生产工艺
CN209958534U (zh) 一种低能耗节能建筑体系
CN103009474A (zh) 箱梁预制蒸汽养生设备及养生方法
CN208183550U (zh) 一种多层氨酯保温结构的墩身模板
CN103004525A (zh) 一种高寒区sf型日光温室
CN108005233A (zh) 一种组合式建筑及施工方法
CN205189270U (zh) 一种融雪保温屋面砼板
CN106939555A (zh) 一种短线匹配法箱梁施工的冬季养护方法
CN204691792U (zh) 一种寒区隧道防冻保温系统
CN202958310U (zh) 一种高寒区sf型日光温室
CN206999270U (zh) 干旱地区低温季节墩柱混凝土保温养生设备
CN103556764A (zh) 一种自平衡超大面积屋面蓄水池及其建造方法
CN206428875U (zh) 一种钢结构屋脊结构
CN206418841U (zh) 一种高气密性一次成型平房仓拱板屋盖
CN203531205U (zh) 一种自平衡超大面积屋面蓄水池
CN101509286B (zh) 整体水泥复合保温外墙生产安装工艺及相配套的摊抹板机
CN114776337A (zh) 一种基于远红外线加热的隧道二衬混凝土智能养护台车
CN102763577A (zh) 冬夏两用拆装式日光温室
CN208152323U (zh) 一种整体式组合保温外墙体

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Guan Rongcai

Inventor after: Wang Haibo

Inventor after: Jiang Yueping

Inventor after: Wang Yan

Inventor after: Ma Yong

Inventor before: Guan Rongcai

Inventor before: Wang Haibo

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GUAN RONGCAI WANG HAIBO TO: GUAN RONGCAI WANG HAIBO JIANG YUEPING WANG YANMA YONG

C14 Grant of patent or utility model
GR01 Patent grant