CN102094391B - 铁路桥梁承台中顶层钢筋网片的定位施工方法 - Google Patents
铁路桥梁承台中顶层钢筋网片的定位施工方法 Download PDFInfo
- Publication number
- CN102094391B CN102094391B CN2011100507900A CN201110050790A CN102094391B CN 102094391 B CN102094391 B CN 102094391B CN 2011100507900 A CN2011100507900 A CN 2011100507900A CN 201110050790 A CN201110050790 A CN 201110050790A CN 102094391 B CN102094391 B CN 102094391B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- top layer
- reinforced mesh
- layer reinforced
- reinforcing mesh
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Foundations (AREA)
Abstract
本发明公开了一种铁路桥梁承台中顶层钢筋网片的定位施工方法,其特征是首先以承台内钻孔桩桩头或基坑内混凝土垫层为基础,搭设钢管支架;以钢管支架为支撑,通过钢筋绑扎形成顶层钢筋网片,在钢筋网片中间隔设置钢管横担,钢管横担的两端搭设在承台两侧模板上,在钢管横担上设置吊钩,使用吊钩提吊顶层钢筋网片,使顶层钢筋网片脱离钢管支架的承托,拆除钢管支架以作回用,由钢管横担及吊钩保持顶层钢筋网片的设计位置;在后续混凝土浇筑时,顶层钢筋网片连同吊钩均被埋于混凝土中。本发明使钢管支架得以回用,有效改善了传统铁路承台钢筋安装施工支撑体系耗用材料多、重复利用率低、施工困难的现况。
Description
技术领域
本发明涉及铁路桥梁承台中顶层钢筋网片的定位方法。
背景技术
随着我国客运专线及高速铁路的快速发展及大规模建设,大量采用铁路桥结构,铁路桥的下部多采用桩基承台基础,在桩基承台基础中,承台钢筋一般分为顶层钢筋和底层钢筋,侧面采用直径较小的钢筋联接成“箱”形。施工期间,承台顶部钢筋网片必须采用搭设支架的形式进行固定,否则无法确保网片的标高的准确性、无法确保网片不出现较大下拱。目前的支撑体系多采用Φ48×3.5mm钢管、Φ20~Φ25钢筋支立、梅花型布置,直接支撑承台顶层钢筋网片,施工期间和施工后支撑体系无法取出,相应的结构不能重复利用,因此造成投入大。
发明内容
本发明是为避免上述现有技术所存在的不足之处,提供一种铁路桥梁承台中顶层钢筋网片的定位施工方法,以改善传统铁路承台钢筋安装施工支撑体系耗用材料多、重复利用率低、施工困难的现况。
本发明解决技术问题采用如下技术方案:
本发明铁路桥梁承台中顶层钢筋网片的定位施工方法,其特点是按如下过程施工:
a、以承台内钻孔桩桩头或基坑内混凝土垫层为基础,在所述基础上搭设各钢管支架,所述各钢管支架的顶端在顶层钢筋网片所在平面中形成“井”字形平面;
b、以所述钢管支架为支撑,通过钢筋绑扎形成顶层钢筋网片,在所述顶层钢筋网片的上方设置钢管横担,所述钢管横担的两端搭设在承台侧模板上,在钢管横担上设置吊钩;
c、使用吊钩提吊顶层钢筋网片,使所述顶层钢筋网片脱离钢管支架的承托,拆除可作回用的钢管支架,由所述钢管横担及吊钩保持顶层钢筋网片的设计位置;在后续混凝土浇筑时,顶层钢筋网片连同吊钩均被埋于混凝土中。
所述钢管支架采用Φ48×3.5mm的钢管。
所述钢管横担采用Φ48×3.5mm的钢管。
与已有技术相比,本发明有益效果体现在:
1、本发明利用承台顶面钢筋网片安装前后支撑体系的转换,有效避免了承台混凝土施工时用于支撑体系的钢管支架的浪费,并且具有良好的结构稳定性,钢管支架可重复利用,减少了一次投入,经济效益明显;
2、本发明结构设计及支撑体系的转换简单方便,所用材料为标准件,现场施工速度快,能有效的缩短施工周期。
附图说明
图1为本发明顶层钢筋网片绑扎阶段支撑体系平面示意图;
图2为本发明顶层钢筋网片绑扎阶段支撑体系立面示意图;
图3为本发明顶层钢筋网片固定阶段支撑体系平面示意图;
图4为本发明顶层钢筋网片固定阶段支撑体系立面示意图。
图中标号:1钢管支架、2顶层钢筋网片、3钢管横担、4承台两侧模板、5吊钩、6十字扣件。
具体实施方式
本实施例按如下过程施工:
1、以承台内钻孔桩桩头或基坑内混凝土垫层为基础,在基础上搭设钢管支架1,钢管支架1的顶端在顶层钢筋网片2所在平面中以其水平钢管和直立钢管通过十字扣件6固定连接形成“井”字形平面,以此构成具有设计标高的安装阶段支撑体系,用于承托顶层钢筋网片2,承受顶层钢筋网片2的荷载及其他施工荷载;
2、以钢管支架1为支撑,通过钢筋绑扎形成顶层钢筋网片2,在顶层钢筋网片2的上方设置各钢管横担3,钢管横担3的两端搭设在承台侧模板4上,在钢管横担3上设置吊钩5;
3、使用吊钩5向上提吊顶层钢筋网片2,使顶层钢筋网片2脱离钢管支架1的承托,拆除钢管支架1以作回用;转而采用固定阶段支撑体系,即由钢管横担3及吊钩5保持顶层钢筋网片2的设计位置上,钢管横担3上的荷载通过承台侧模板4传递到模板底部的混凝土垫层上;在后续混凝土浇筑时,顶层钢筋网片2连同吊钩5被埋于混凝土中。
具体实施中,钢管支架1和钢管横担3均采用Φ48×3.5mm的钢管。
Claims (3)
1.一种铁路桥梁承台中顶层钢筋网片的定位施工方法,其特征是按如下过程施工:
a、以承台内钻孔桩桩头或基坑内混凝土垫层为基础,在所述基础上搭设钢管支架(1),所述钢管支架(1)的顶端在顶层钢筋网片(2)所在平面中以其水平钢管和直立钢管通过十字扣件(6)固定连接形成“井”字形平面;
b、以所述钢管支架(1)为支撑,通过钢筋绑扎形成顶层钢筋网片(2),在所述顶层钢筋网片(2)的上方设置钢管横担(3),所述钢管横担(3)的两端搭设在承台侧模板(4)上,在钢管横担(3)上设置吊钩(5);
c、使用吊钩(5)提吊顶层钢筋网片(2),使所述顶层钢筋网片(2)脱离钢管支架(1)的承托,拆除可作回用的钢管支架(1),由所述钢管横担(3)及吊钩(5)保持顶层钢筋网片(2)的设计位置;在后续混凝土浇筑时,顶层钢筋网片(2)连同吊钩(5)均被埋于混凝土中。
2.根据权利要求1所述的铁路桥梁承台中顶层钢筋网片的定位施工方法,其特征是所述钢管支架(1)采用Φ48×3.5mm的钢管。
3.根据权利要求1所述的铁路桥梁承台中顶层钢筋网片的定位施工方法,其特征是所述钢管横担(3)采用Φ48×3.5mm的钢管。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100507900A CN102094391B (zh) | 2011-03-03 | 2011-03-03 | 铁路桥梁承台中顶层钢筋网片的定位施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100507900A CN102094391B (zh) | 2011-03-03 | 2011-03-03 | 铁路桥梁承台中顶层钢筋网片的定位施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102094391A CN102094391A (zh) | 2011-06-15 |
CN102094391B true CN102094391B (zh) | 2012-08-22 |
Family
ID=44127642
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100507900A Active CN102094391B (zh) | 2011-03-03 | 2011-03-03 | 铁路桥梁承台中顶层钢筋网片的定位施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102094391B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110344428B (zh) * | 2019-06-21 | 2021-04-27 | 中铁四局集团第四工程有限公司 | 一种销装式预制板替代承台砖胎模的施工方法 |
CN113863354B (zh) * | 2021-09-26 | 2022-10-11 | 中国建筑第八工程局有限公司 | 超高独立承台面筋整体安装结构及其施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2087648U (zh) * | 1991-05-03 | 1991-10-30 | 胡晓 | 钢筋定位支架 |
CN101041974A (zh) * | 2007-04-19 | 2007-09-26 | 浙江省建工集团有限责任公司 | 结构转换层型钢砼大梁挂模施工方法 |
CN201090027Y (zh) * | 2007-09-27 | 2008-07-23 | 中冶京唐建设有限公司 | 简易吊环架空钢管支模 |
CN101886468A (zh) * | 2010-03-29 | 2010-11-17 | 南京大地建设集团有限责任公司 | 高位连体结构悬挂式模板支撑施工方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6294642A (ja) * | 1985-10-18 | 1987-05-01 | 勝村建設株式会社 | 鉄骨鉄筋コンクリ−ト造における梁主鉄筋の配筋方法 |
WO2009002865A1 (en) * | 2007-06-22 | 2008-12-31 | Diversakore Llc | Framing structure |
-
2011
- 2011-03-03 CN CN2011100507900A patent/CN102094391B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2087648U (zh) * | 1991-05-03 | 1991-10-30 | 胡晓 | 钢筋定位支架 |
CN101041974A (zh) * | 2007-04-19 | 2007-09-26 | 浙江省建工集团有限责任公司 | 结构转换层型钢砼大梁挂模施工方法 |
CN201090027Y (zh) * | 2007-09-27 | 2008-07-23 | 中冶京唐建设有限公司 | 简易吊环架空钢管支模 |
CN101886468A (zh) * | 2010-03-29 | 2010-11-17 | 南京大地建设集团有限责任公司 | 高位连体结构悬挂式模板支撑施工方法 |
Non-Patent Citations (1)
Title |
---|
JP昭62-94642A 1987.05.01 |
Also Published As
Publication number | Publication date |
---|---|
CN102094391A (zh) | 2011-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206784951U (zh) | 一种混凝土浇筑楼板厚度控制装置 | |
CN202509683U (zh) | 一种frp管的钢骨混凝土混合结构 | |
CN103485574B (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN102900024A (zh) | 大型混凝土结构翻升模板以及使用方法 | |
CN105133754A (zh) | 一种预制混凝土剪力墙板的锥口引导式安装装置及其方法 | |
CN207268073U (zh) | 新型柔性支模承重架 | |
CN205530888U (zh) | 一种利用nz内置支撑管模的现浇混凝土楼盖结构 | |
CN102094391B (zh) | 铁路桥梁承台中顶层钢筋网片的定位施工方法 | |
CN202000265U (zh) | 桥梁高墩混凝土施工模板 | |
CN201648978U (zh) | 桥位现浇预应力混凝土连续梁的系杆拱支架 | |
CN102691267A (zh) | 一种外置整体操作平台高墩施工方法 | |
CN102465605A (zh) | 建筑底板钢筋支架方法 | |
CN202064359U (zh) | 大梁湿接缝悬吊施工装置 | |
CN202369931U (zh) | 一种拱圈支架 | |
CN103046743A (zh) | 一种超高层转换层型钢混凝土大梁吊挂式模板支撑体系及施工方法 | |
CN202108296U (zh) | 一种拼装节式水箱塔架 | |
CN103921347B (zh) | 预制t梁肋板钢筋、预应力管道固定抽插式安装模架 | |
CN203755173U (zh) | 用于桥梁高墩液压爬升的模板装置 | |
CN110273432A (zh) | 一种既有地铁车站主体结构扩建施工方法 | |
CN203200719U (zh) | 悬空式倒坡模板装置 | |
CN205975995U (zh) | 现浇混凝土楼板压槽钢管支撑架 | |
CN203411992U (zh) | 大体积混凝土内深孔预留孔洞模板 | |
CN104153299B (zh) | 大型墩柱混凝土钢筋的整体对接方法 | |
CN204510688U (zh) | 一种预制外墙板的临时固定结构 | |
CN203765784U (zh) | 预制t梁肋板钢筋、预应力管道固定抽插式安装模架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |