CN102071792B - Method for sticking cakes in plastering engineering by using laser - Google Patents

Method for sticking cakes in plastering engineering by using laser Download PDF

Info

Publication number
CN102071792B
CN102071792B CN 201010560751 CN201010560751A CN102071792B CN 102071792 B CN102071792 B CN 102071792B CN 201010560751 CN201010560751 CN 201010560751 CN 201010560751 A CN201010560751 A CN 201010560751A CN 102071792 B CN102071792 B CN 102071792B
Authority
CN
China
Prior art keywords
laser
cake
control line
line
datum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010560751
Other languages
Chinese (zh)
Other versions
CN102071792A (en
Inventor
张明
刘军
李毅
杜秀佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN 201010560751 priority Critical patent/CN102071792B/en
Publication of CN102071792A publication Critical patent/CN102071792A/en
Application granted granted Critical
Publication of CN102071792B publication Critical patent/CN102071792B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for sticking cakes in plastering engineering by using laser. The method comprises the step that: the cakes are stuck by taking a crossed vertical laser surface output by a laser marking gauge as a reference surface for sticking the mud cakes, namely, a control line is set on a floor of a building which is required to be subjected to plastering construction in a conventional mode, and the laser marking gauge is placed on the control line to keep a straight line projected to laser cross on the floor coincided or parallel with the control line; thus the mud cakes can be stuck by taking the laser surface which is coincided or parallel with the control line as the reference surface for sticking the cakes, the distance from the end face of each mud cake to the laser surface serving as the reference surface is measured by using an angle steel ruler, and the distance from the end face of each stuck mud cake to the laser surface serving as the reference surface is kept same. The method has the advantages of high construction efficiency, good quality, low construction cost, low requirement on the technical level of the construction personnel and the like, and is easy and convenient to operate, and the raw materials are saved.

Description

Adopt laser to paste the method for cake in a kind of plastering engineering
Technical field
The present invention relates to adopt in a kind of plastering engineering the method for laser subsides cake, belong to the building finishing plastering engineering and paste the cake technical field.
Background technology
At present, the subsides cake method that in traditional interior decoration plastering engineering, is adopted generally all is to need earlier fixed 1 of a end on the plastered wall face to select and produce the subsides cake, the cable inlet bracket that utilizes the plumb bob principle then surely in addition 1 select and make obedient cake; Select to make and paste cake fixed 1 of the other end again, utilize plumb bob and this subsides cake other 1 subsides cake of selecting surely; Surely fixed other the point of the logical line of intact 4 some post-tensionings, and then do the floating screed bar between fixed 2, accomplish subsides cake and the work of floating screed bar of 1 metope like this, be the plastering construction that benchmark carries out metope with subsides cake or rib more afterwards.The subsides cake method of this traditional interior decoration plastering engineering, its shortcoming is that the Founder property in room is poor, can't select best depth of plastering; And the glacing flatness of metope is low, and the precision of construction is also low, and high to workman's technical requirements; The dimensional uniformity in room is also uncontrollable, and efficiency of construction is very low.Therefore, the subsides cake method in the existing plastering engineering is very undesirable, can not satisfy efficient high-quality building plastering construction requirement.
Summary of the invention
The objective of the invention is: the method that adopts laser to paste cake in the plastering engineering that a kind of efficiency of construction is high, quality is good, simple to operation is provided, to overcome the deficiency of prior art.
Technical scheme of the present invention is achieved in that the method that adopts laser to paste cake in a kind of plastering engineering of the present invention is when the subsides cake construction of carrying out plastering engineering; Adopt the vertical lasing area of cross type of Laser Line Marker output to paste cake as the datum that pastes ash cake; Promptly earlier, needs control line is set on carrying out the flooring in house of plastering construction by traditional approach; Then Laser Line Marker is placed on the control line; Laser Line Marker is adjusted the projection that the vertical lasing area of cross type that makes its output after the levelling is incident upon on the ceiling or on the flooring be respectively two laser cross hairs that intersect vertically; Straight line and control line in the laser cross hairs that is incident upon on the flooring overlapped or parallel after; Just can be with pasting ash cake as the datum that pastes cake with control line coincidence or parallel lasing area; And when pasting cake, adopt steel set-square to measure each ash cake end face, make each paste solid good ash cake end face and be consistent to this distance as the lasing area of datum to this distance as the lasing area of datum.
When control line is set; Make control line and metope body of wall to build reference line by laying bricks or stones parallel; And control line is arranged on 280~500 millimeters scope to the distance of building reference line by laying bricks or stones of metope body of wall; Every control line of house inner wall metope is set to two bilinears that are parallel to each other, and every control line of external wall of house metope is set to straight line.
When the control line 3 that is provided with is bilinear; The control line of the orthogonal body of wall in every two sides is intersected vertically each other; Then Laser Line Marker is placed on the joining of control line; And make the following vertical laser rays of Laser Line Marker output and the crosspoint centering of two control lines; Straight line in the formed cross hairs of the lasing area that is incident upon on the flooring is in the bilinear of two control lines and parallel with the bilinear of control line respectively respectively, so just can pastes ash cake as the datum of two orthogonal wall and surfaces subsides cakes with these two orthogonal lasing areas, and when pasting ash cake; Adopt the steel set-square to measure each ash cake end face, make each paste solid good ash cake end face and be consistent to this distance as the lasing area of datum to this distance as the lasing area of datum.
The above-mentioned Laser Line Marker that adopts is multi-functional self leveling Laser Line Marker.
Owing to adopted technique scheme; The present invention adopts the vertical lasing area of cross type of existing Laser Line Marker output to paste cake as the datum that pastes cake; Therefore it is very simple to paste the cake operation; And when construction the constructor can be flexibly, construct accurately, it is high to have improved efficiency of construction greatly.The present invention adopts the vertical lasing area of Laser Line Marker output as the datum level that pastes cake; Can guarantee the Founder property in room, its lasing area can be measured with steel set-square to metope, can select best depth of plastering; Thereby reduce the arbitrariness of depth of plastering, also improved construction quality simultaneously reducing cost; Adopt method of the present invention, the workmen can confirm fixedly depth of plastering based on best depth of plastering easily, thereby realizes guaranteeing the uniformity of room-sized; Adopt each workman of the present invention all can paste the cake construction, low to workman's specification requirement, and efficiency of construction is very high, is 3 times of traditional efficiency of construction, can reduce labour cost effectively and reduce cost.And the present invention's precision that the ability specified data is accomplished in construction is high, reduce the amount of doing over again and reduce cost, and whether the vertical lasing area that Laser Line Marker also capable of using is exported when construction checks the construction line upright at any time.So, the present invention compared with prior art, the present invention not only has efficiency of construction height, advantage that quality is good, simple to operation, but also have construction cost low, save material, to advantage such as constructor's technical level is less demanding.
Description of drawings
Fig. 1 is the floor map that plastering engineering laser pastes cake when adopting the present invention to construct;
Fig. 2 is the elevational schematic view that plastering engineering laser pastes cake when adopting the present invention to construct.
Description of reference numerals: the 1-Laser Line Marker, the 2-lasing area, the 3-control line, the 4-body of wall, 5-builds reference line by laying bricks or stones, 6-ash cake, 7-steel set-square.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is done further detailed description.
Embodiments of the invention: when the subsides cake construction of carrying out plastering engineering; Adopt the method that adopts laser to paste cake in a kind of plastering engineering of the present invention to construct; Promptly when the subsides cake construction of carrying out plastering engineering; Adopt the vertical lasing area 2 of cross type of Laser Line Marker 1 output to paste cake as the datum that pastes ash cake 6; Promptly earlier, needs control line 3 is set on carrying out the flooring in house of plastering construction by traditional approach; Then Laser Line Marker 1 is placed on the control line 3, the projection that the vertical lasing area 2 of cross type that makes its output after the Laser Line Marker 1 adjustment levelling is incident upon on the ceiling or on the flooring is respectively two laser cross hairs that intersect vertically, make in the laser cross hairs that is incident upon on the flooring straight line and control line coincidence or parallel after; Just can be with pasting ash cake 6 as the datum that pastes cake with control line 3 coincidences or parallel lasing area 2; And when pasting cake, adopt steel set-square 7 to measure each ash cake 6 end face, make each paste solid good ash cake 6 end faces and be consistent to this distance as the lasing area 2 of datum to this distance as the lasing area 2 of datum.
When control line 3 is set; Make control line 3 and metope body of wall 4 to build reference line 5 by laying bricks or stones parallel; And control line 3 is arranged on 280~500 millimeters scope to the distance of building reference line 5 by laying bricks or stones of metope body of wall 4; In order to use convenient identification, can every control line 3 of house inner wall metope be set to two bilinears that are parallel to each other, every control line 3 of external wall of house metope is set to straight line.
When the control line 3 that is provided with is bilinear; The control line 3 of the orthogonal body of wall 4 in every two sides is intersected vertically each other; Then Laser Line Marker 1 is placed on the joining of control line 3; And make the following vertical laser rays of Laser Line Marker 1 output and the crosspoint centering of two control lines 3; Straight line in the lasing area 2 formed cross hairs that are incident upon on the flooring is in the bilinear of two control lines 3 and parallel with the bilinear of control line 3 respectively respectively; So just can paste ash cake 6 as the datum that two orthogonal body of wall 4 metopes paste cake with these two orthogonal lasing areas 2; And when pasting ash cake 6, adopt steel set-square 7 to measure each ash cake 6 end face, make each paste solid good ash cake 6 end faces and be consistent to this distance as the lasing area 2 of datum to this distance as the lasing area 2 of datum.
The above-mentioned Laser Line Marker that adopts 1 can directly adopt the multi-functional self leveling Laser Line Marker of selling on the market to get final product.
When pasting cake can be that 15 ㎜, 20 ㎜ or other thickness requirements are constructed according to the depth of plastering of drawing requirement.For example:, measure the surface of 285 ㎜ from lasing area 2 optional positions as ash cake 6 end faces with steel set-square 7 if depth of plastering is that 15 ㎜ are thick; If depth of plastering is that 20 ㎜ are thick, measure the surface of 280 ㎜ from lasing area 2 optional positions as ash cake 6 end faces with steel set-square 7.Each ash cake 6 is pressed thickness requirement control construction and is got final product.
Embodiment of the present invention is not limited to the foregoing description, and the various variations of under the prerequisite that does not break away from aim of the present invention, making all belong within protection scope of the present invention.

Claims (3)

1. adopt laser to paste the method for cake in a plastering engineering; It is characterized in that: when the subsides cake construction of carrying out plastering engineering; Adopt the vertical lasing area of cross type of Laser Line Marker output to paste cake as the datum that pastes ash cake; Promptly earlier, needs control line is set on carrying out the flooring in house of plastering construction by traditional approach; Then Laser Line Marker is placed on the control line, Laser Line Marker is adjusted the projection that the vertical lasing area of cross type that makes its output after the levelling is incident upon on the ceiling or on the flooring be respectively two laser cross hairs that intersect vertically, straight line in the laser cross hairs that is incident upon on the flooring is overlapped with control line or parallel after; Just can be with pasting ash cake as the datum that pastes cake with control line coincidence or parallel lasing area; And when pasting cake, adopt steel set-square to measure each ash cake end face, make each paste solid good ash cake end face and be consistent to this distance as the lasing area of datum to this distance as the lasing area of datum; When control line is set; Make control line and metope body of wall to build reference line by laying bricks or stones parallel; And control line is arranged on 280~500 millimeters scope to the distance of building reference line by laying bricks or stones of metope body of wall; Every control line of house inner wall metope is set to two bilinears that are parallel to each other, and every control line of external wall of house metope is set to straight line.
2. adopt laser to paste the method for cake in the plastering engineering according to claim 1; It is characterized in that: when the control line that is provided with is bilinear; The control line of the orthogonal body of wall in every two sides is intersected vertically each other; Then Laser Line Marker is placed on the joining of control line; And make the following vertical laser rays of Laser Line Marker output and the crosspoint centering of two control lines; Straight line in the formed cross hairs of the lasing area that is incident upon on the flooring is in the bilinear of two control lines and parallel with the bilinear of control line respectively respectively, so just can pastes ash cake as the datum of two orthogonal wall and surfaces subsides cakes with these two orthogonal lasing areas, and when pasting ash cake; Adopt the steel set-square to measure each ash cake end face, make each paste solid good ash cake end face and be consistent to this distance as the lasing area of datum to this distance as the lasing area of datum.
3. adopt laser to paste the method for cake in the plastering engineering according to claim 1 and 2, it is characterized in that: the Laser Line Marker that is adopted is multi-functional self leveling Laser Line Marker.
CN 201010560751 2010-11-26 2010-11-26 Method for sticking cakes in plastering engineering by using laser Expired - Fee Related CN102071792B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010560751 CN102071792B (en) 2010-11-26 2010-11-26 Method for sticking cakes in plastering engineering by using laser

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010560751 CN102071792B (en) 2010-11-26 2010-11-26 Method for sticking cakes in plastering engineering by using laser

Publications (2)

Publication Number Publication Date
CN102071792A CN102071792A (en) 2011-05-25
CN102071792B true CN102071792B (en) 2012-07-04

Family

ID=44030532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010560751 Expired - Fee Related CN102071792B (en) 2010-11-26 2010-11-26 Method for sticking cakes in plastering engineering by using laser

Country Status (1)

Country Link
CN (1) CN102071792B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103090857B (en) * 2011-10-27 2015-06-24 鞍钢建设集团有限公司 Point location installation method for foot support of thermal radiation tube
CN102888977B (en) * 2012-10-26 2014-11-26 深圳广田装饰集团股份有限公司 Inner wall reinforcement punching method
CN104088416A (en) * 2014-07-16 2014-10-08 上海隆振建筑工程有限公司 Gypsum heat preservation painting mortar construction process
CN105484476B (en) * 2015-09-29 2018-05-08 郑君 Building decoration gets patch cake device and ash cake forming method ready
CN106013645A (en) * 2016-06-23 2016-10-12 中铁建设集团有限公司 Method adopting multiple automatic leveling laser demarcation devices for sticking plaster cakes through cooperation with wall surfaces
CN106441247B (en) * 2016-12-08 2018-08-03 潘文玥 Construction wall plastering plane real-time monitor
CN107620449B (en) * 2017-08-28 2022-11-29 中建八局第三建设有限公司 Cylindrical surface annular screeding tool and cylindrical surface plastering method
CN108547452A (en) * 2018-05-18 2018-09-18 崔玉来 New-type foot bar, trowel, ash shovel get method ready in conjunction with frame for line marking instrument indoor plastering
CN108708531A (en) * 2018-06-06 2018-10-26 崔玉来 A kind of big thick stick combination frame for line marking instrument floating screed method of aluminium alloy
CN109356362B (en) * 2018-11-13 2021-01-26 中冶建工集团有限公司 Ash cake auxiliary making tool and method for making ash cake by using same
CN111042531A (en) * 2019-12-23 2020-04-21 中冶天工集团有限公司 Quick construction method for common plastering engineering plaster cake
CN111910888A (en) * 2020-07-30 2020-11-10 上海宝冶集团有限公司 Method for making screeding of wall decoration gypsum plaster
CN112343272B (en) * 2020-10-22 2022-02-25 中建桥梁有限公司 Arc-shaped section wall plastering method
CN114541676B (en) * 2022-03-11 2023-06-23 筑橙科技(深圳)有限公司 Exterior wall putty scraping method and device based on mechanical arm
CN114718279B (en) * 2022-04-27 2023-10-17 中冶建工集团有限公司 Cake sticking and rib punching system

Also Published As

Publication number Publication date
CN102071792A (en) 2011-05-25

Similar Documents

Publication Publication Date Title
CN102071792B (en) Method for sticking cakes in plastering engineering by using laser
CN106013645A (en) Method adopting multiple automatic leveling laser demarcation devices for sticking plaster cakes through cooperation with wall surfaces
CN201502164U (en) Tool for paving floor tile
CN102888977B (en) Inner wall reinforcement punching method
CN106284929A (en) A kind of furring tile anti-hollowing edge patch construction method
CN103899072B (en) A kind of for wet extension stone material or the suspension member of ceramic tile and wet hanging method
CN104631829B (en) Technique for high-precision leveling of structural flooring
CN103790334A (en) Combined splicing floor tile and laying technology of combined splicing floor tile
CN103912127A (en) Building formwork or floor slab construction control method and special straightedge
CN200940342Y (en) Horizontal ruler with mortar plastering mechanism
CN106677495B (en) A kind of multi-functional charge veins device of automatically calibrating verticality
CN104018651B (en) Wall plastering Yang Jiao rushes muscle bar and using method thereof
CN211007718U (en) Slurry paving tool for assisting high-precision masonry building
CN111042531A (en) Quick construction method for common plastering engineering plaster cake
CN209836807U (en) Bridge guardrail concrete floating device
CN207499345U (en) Ash cake shaping jig
CN215167968U (en) Concrete building template for civil engineering
CN208780204U (en) A kind of reflective observing and controlling patch for bridge steel column
CN211850620U (en) Device of straightness and thickness is plastered to accurate control ardealite
CN105464242A (en) Building method of plastering-free high-precision infilled wall
CN109736484B (en) Parametric brick splicing and building method for clean water bricks
CN110984515A (en) Device and method for accurately controlling verticality and thickness of phosphogypsum plastering
CN205857650U (en) A kind of Multifunctional trowel for building
CN217840622U (en) Hanging tile correcting ruler
CN204676711U (en) A kind of external wall anti-leakage structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION 4TH BUREAU 6TH CORP.

Free format text: FORMER OWNER: CHINA CONSTRUCTION FOURTH ENGINEERING BUREAU LTD.

Effective date: 20130614

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 510665 GUANGZHOU, GUANGDONG PROVINCE TO: 230011 HEFEI, ANHUI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130614

Address after: 5, 230011 floor, Dongfang shopping mall, Yaohai District, Anhui, Hefei

Patentee after: China Construction 4th Engineering Bureau, 6th Co., Ltd.

Address before: 5, 510665 floor, B building, Guangzhou information port, No. 16, Yun Yun Road, Guangzhou, Guangdong, Tianhe District

Patentee before: China Construction Fourth Engineering Bureau Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20181126