CN102069100A - 一种铝型材热挤压分流组合模具结构 - Google Patents

一种铝型材热挤压分流组合模具结构 Download PDF

Info

Publication number
CN102069100A
CN102069100A CN2009102471588A CN200910247158A CN102069100A CN 102069100 A CN102069100 A CN 102069100A CN 2009102471588 A CN2009102471588 A CN 2009102471588A CN 200910247158 A CN200910247158 A CN 200910247158A CN 102069100 A CN102069100 A CN 102069100A
Authority
CN
China
Prior art keywords
die
hole
section bar
aluminium section
installing hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009102471588A
Other languages
English (en)
Other versions
CN102069100B (zh
Inventor
严荣庆
郑晓军
陈纪欢
邹国林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ZHENXING ALUMINIUM INDUSTRY Co Ltd
XINSHI ALUMINUM (SHANGHAI) CO Ltd
SHANGHAI RUISILE DOORS AND WINDOWS CO Ltd
Original Assignee
SHANGHAI ZHENXING ALUMINIUM INDUSTRY Co Ltd
XINSHI ALUMINUM (SHANGHAI) CO Ltd
SHANGHAI RUISILE DOORS AND WINDOWS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ZHENXING ALUMINIUM INDUSTRY Co Ltd, XINSHI ALUMINUM (SHANGHAI) CO Ltd, SHANGHAI RUISILE DOORS AND WINDOWS CO Ltd filed Critical SHANGHAI ZHENXING ALUMINIUM INDUSTRY Co Ltd
Priority to CN200910247158A priority Critical patent/CN102069100B/zh
Publication of CN102069100A publication Critical patent/CN102069100A/zh
Application granted granted Critical
Publication of CN102069100B publication Critical patent/CN102069100B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

本发明提供一种铝型材热挤压分流组合模具结构,包括上模和下模,上下模通过螺钉连接在一起,上模和下模上加工有对应的安装孔;安装孔中安装有圆筒状结构的定位销;螺钉穿过圆筒结构定位销将上下模固定在一起。本发明结构紧凑、简单,加工方便,减小了模具尺寸,降低了铝型材生产成本。

Description

一种铝型材热挤压分流组合模具结构
技术领域
本发明涉及一种铝型材加工装置,尤其是一种铝型材热挤压分流组合模具结构。
背景技术
铝型材热挤压分流组合模具是广泛应用于不带独立穿孔系统的挤压机上,用于生产各种规格和形状的管材、空心或半空心铝型材。它通常有上模、下模、定位销和连接螺钉四部分组成,如图1、图2和图3所示;上模上有分流孔、分流桥、模芯;分流孔是金属通往型孔的通道,分流桥是支撑模芯的支架,模芯用来形成型材内腔的形状和尺寸。下模上有焊合室、模孔型腔、工作带和空刀;焊合室把分流孔流出来的金属汇集在一起重新焊合起来形成以模芯为中心的整体料,由于金属不断聚集,静压力不断增大,直到把金属挤压出模孔;空刀是为了减小摩擦,使制品能够顺利通过,保证表面质量。定位销用来进行上下模的装配定位,保证上下模的装配定位精度,确保模孔型腔的尺寸和位置;连接螺钉用来保证上下模的装配牢固,确保上下模在使用过程中受力时不偏移、不松动。
现有技术中,一般是在下模上加工四个通孔,在上模上加工四个盲孔,分别为两组定位销孔和两组螺钉孔;通过定位销将上下模定位,通过螺钉将上下模固定装配。这样模具上最少要加工四组孔,当需要加工的型材具有比较复杂的形状,或者需要较大的分流比时,四组孔的存在往往会影响模具的强度,从而不得不采用更大规格的模具尺寸,进而增加了生产成本。
发明内容
本发明为解决现有技术中铝型材热挤压分流组合模具在上下模分别开定位销孔和螺钉孔,进而影响到模具强度,造成成本增加的技术问题,提供一种结构紧凑的铝型材热挤压分流组合模具结构,该结构加工方便、装配容易,可以减小模具尺寸,降低铝型材生产成本。
为了达到上述目的,本发明所采用的技术方案是,提供一种铝型材热挤压分流组合模具结构,它包括上模和下模,上下模通过螺钉固定在一起,上模和下模上加工有对应的安装孔;安装孔中安装有定位销,定位销为圆筒状结构;螺钉穿过圆筒状定位销将上模和下模固定在一起。
进一步地,下模上的安装孔为通孔,上模的安装孔为盲孔。
进一步地,上、下模的安装孔为两组,两组安装孔以模具轴为中心对称分布。
本发明与现有技术相比其效果是积极和明显的。本铝型材热挤压分流组合模具结构中,通过圆筒状定位销结构,将定位销和螺钉结合在一起,避免了定位销孔和螺钉孔重复开设的问题,减少了模具上的开孔,增加了模具的强度,降低了铝型材的生产成本。
附图说明
图1是现有技术铝型材热挤压分流组合模具的上模结构示意图;
图2是现有技术铝型材热挤压分流组合模具的下模结构示意图;
图3是现有技术铝型材热挤压分流组合模具上下模的装配图;
图4是本发明铝型材热挤压分流组合模具的上模结构示意图;
图5是本发明铝型材热挤压分流组合模具的下模结构示意图;
图6是本发明铝型材热挤压分流组合模具上下模的装配图。
具体实施方式
下面结合附图对本发明做进一步的说明。
如图1所示,上模1上设置有分流孔3、分流桥4、模芯5;分流孔3是金属通往下模型孔的通道,分流桥4是支撑模芯5的支架,模芯5用来形成型材内腔的形状和尺寸。
如图2所示,下模2上有焊合室8、模孔型腔9;焊合室8把分流孔流出来的金属汇集在一起重新焊合起来形成以模芯5为中心的整体料,由于金属不断聚集,静压力不断增大,直到把金属挤压出模型孔腔9。
如图1、图2所示,上模1和下模2都开设有一组螺钉孔7和一组定位销孔6;其中上模1上的螺钉孔7和定位销孔6是盲孔,下模2上的螺钉孔7和定位销孔6为通孔。
如图3所示,定位销61通过定位销孔6将上下模定位,保证上下模的装配精度;螺钉71通过螺钉孔7将上下模的固定装配,确保上下模在使用过程中受力时不偏移、不松动。
如图4、图5所示,本发明中,在上模11和下模12上加工有两组对应的安装孔20,两组安装孔以模具轴为中心对称分布;其中下模12上的安装孔为通孔,上模11上的安装孔为盲孔。
如图6所示,定位销62为圆筒状结构,圆筒状定位销62通过安装孔20将上下模定位;螺钉72穿过圆筒状结构的定位销62,通过安装孔20将上模11和下模12固定装配。

Claims (3)

1.一种铝型材热挤压分流组合模具结构,它包括上模和下模,所述的上下模通过螺钉固定在一起,其特征在于:所述的上模和下模上加工有对应的安装孔;所述的安装孔中安装有定位销,所述的定位销为圆筒状结构;所述的螺钉穿过圆筒状定位销将上模和下模固定在一起。
2.根据权利要求1所述的一种铝型材热挤压分流组合模具结构,其特征在于:所述下模上的安装孔为通孔,所述上模上的安装孔为盲孔。
3.如权利要求1或2所述的一种铝型材热挤压分流组合模具结构,其特征在于:所述上、下模的安装孔为两组,所述的两组安装孔以模具轴为中心对称分布。
CN200910247158A 2009-11-24 2009-11-24 一种铝型材热挤压分流组合模具结构 Expired - Fee Related CN102069100B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910247158A CN102069100B (zh) 2009-11-24 2009-11-24 一种铝型材热挤压分流组合模具结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910247158A CN102069100B (zh) 2009-11-24 2009-11-24 一种铝型材热挤压分流组合模具结构

Publications (2)

Publication Number Publication Date
CN102069100A true CN102069100A (zh) 2011-05-25
CN102069100B CN102069100B (zh) 2012-09-19

Family

ID=44027977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910247158A Expired - Fee Related CN102069100B (zh) 2009-11-24 2009-11-24 一种铝型材热挤压分流组合模具结构

Country Status (1)

Country Link
CN (1) CN102069100B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102922212A (zh) * 2012-11-16 2013-02-13 汪涛 铝型材挤压分流组合模复新方法
CN109702174A (zh) * 2019-03-07 2019-05-03 佛山市顺德区铭固模具有限公司 热挤压分流模具定位方法及实现该方法的热挤压分流模具

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2113115U (zh) * 1991-12-26 1992-08-19 国营星光工模具厂 组合式双层面多孔管材挤压模
CN2593924Y (zh) * 2002-12-30 2003-12-24 天津渤海中鸥表业技术有限公司 微小精密异型环槽零件挤压模具
CN201565487U (zh) * 2009-11-24 2010-09-01 上海瑞斯乐门窗有限公司 一种铝型材热挤压分流组合模具结构

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102922212A (zh) * 2012-11-16 2013-02-13 汪涛 铝型材挤压分流组合模复新方法
CN109702174A (zh) * 2019-03-07 2019-05-03 佛山市顺德区铭固模具有限公司 热挤压分流模具定位方法及实现该方法的热挤压分流模具
CN109702174B (zh) * 2019-03-07 2023-09-22 佛山市顺德区铭固模具有限公司 热挤压分流模具定位方法及实现该方法的热挤压分流模具

Also Published As

Publication number Publication date
CN102069100B (zh) 2012-09-19

Similar Documents

Publication Publication Date Title
CN201565487U (zh) 一种铝型材热挤压分流组合模具结构
CN102069100B (zh) 一种铝型材热挤压分流组合模具结构
CN105081096A (zh) 管端缩口加工模具
CN205995946U (zh) 一种挤制同孔径不同壁厚管材的镶块式模具
CN203235774U (zh) 铝合金管材挤压用组合模具
CN102430687A (zh) 一种双端压铆方法及其铆销和压铆装置
CN202070592U (zh) 一模多支共挤模具
CN203470972U (zh) 一种汽车面板安装孔钻模工装
CN201020498Y (zh) 液压多功能冲孔装置
CN202219273U (zh) 一种挤压机针式穿孔装置
CN102909231A (zh) 一种无缝管材挤压装置
CN105562549A (zh) 内六角螺栓内六角孔的冲制成型设备
CN203304635U (zh) 一种泵体四孔同步加工的钻模工装
CN202343609U (zh) 铝无缝管型材挤压机
CN205463673U (zh) 铝合金电机壳的挤压模具
CN201565486U (zh) 一模多支共挤铝型材模具
CN104759762A (zh) 一种激光切割机用挤压铝横梁及生产工艺
CN202377713U (zh) 一种叉车内门架焊接夹具
CN204412784U (zh) 用于制作变截面铝合金钻杆管体的挤压装置
CN202893856U (zh) 一种无缝管材挤压装置
CN202498375U (zh) 火车车轮辐板孔钻孔辅助装置
CN202271001U (zh) 一种同轴套零件的粗、精复合镗孔装置
CN102451853A (zh) 一种用于卧式型材挤压机的反向挤压杆
CN201632509U (zh) 一种铜管挤压机的穿孔针
CN104874835A (zh) 一种纵向可调的复合材料构件钻模板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 201611 Shanghai Songjiang District Chedun Town Xin Lang Road No. 155 -3

Applicant after: Shanghai Ruisile Composite Metal Materials Co., Ltd.

Co-applicant after: Shanghai Zhenxing Aluminium Industry Co., Ltd.

Co-applicant after: Xinshi Aluminum (Shanghai) Co., Ltd.

Address before: 201611 Shanghai Songjiang District Chedun Town Xin Lang Road No. 155 -3

Applicant before: Shanghai Ruisile Doors and Windows Co.,Ltd.

Co-applicant before: Shanghai Zhenxing Aluminium Industry Co., Ltd.

Co-applicant before: Xinshi Aluminum (Shanghai) Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI RUISILE DOOR AND WINDOW CO., LTD. TO: SHANGHAI RUISILE COMPOSITE METAL MATERIALS CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20140728

Granted publication date: 20120919

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20150128

Granted publication date: 20120919

PP01 Preservation of patent right

Effective date of registration: 20150211

Granted publication date: 20120919

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20150811

Granted publication date: 20120919

RINS Preservation of patent right or utility model and its discharge
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120919

Termination date: 20151124

EXPY Termination of patent right or utility model