CN102061780A - 钢板混凝土柱及施工方法 - Google Patents

钢板混凝土柱及施工方法 Download PDF

Info

Publication number
CN102061780A
CN102061780A CN2009101732237A CN200910173223A CN102061780A CN 102061780 A CN102061780 A CN 102061780A CN 2009101732237 A CN2009101732237 A CN 2009101732237A CN 200910173223 A CN200910173223 A CN 200910173223A CN 102061780 A CN102061780 A CN 102061780A
Authority
CN
China
Prior art keywords
concrete
steel plate
concreting
reinforcing bar
job practices
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009101732237A
Other languages
English (en)
Other versions
CN102061780B (zh
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yu Jianfang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009101732237A priority Critical patent/CN102061780B/zh
Publication of CN102061780A publication Critical patent/CN102061780A/zh
Application granted granted Critical
Publication of CN102061780B publication Critical patent/CN102061780B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • General Induction Heating (AREA)

Abstract

本发明公开一种钢板混凝土柱及施工方法,其特征是在浇筑混凝土前在钢筋上埋设塑料皮铝芯导线,利用电磁感应法对未硬化的混凝土进行加热,当混凝土硬化后,钢板收缩大于混凝土,相当于混凝土对钢管施加预应力。在浇筑混凝土前埋设导电管与阳极电源联接,将钢筋与阴极电源联接,混凝土浇筑过程中将电源连通,通过在混凝土中形成不同的电势分布使混凝土中自由水排出。本发明具有强度高、重量轻、塑性好、耐冲击、耐疲劳等优点,而且在施工方面还具有省去模板、省工省料、方便施工、不受季节限制等特点。

Description

钢板混凝土柱及施工方法
技术领域
本发明涉及一种钢板混凝土柱及施工方法,适用于建筑施工领域。
背景技术
钢板混凝土柱借助钢板对核心混凝土的套箍作用,使核心混凝土处于三向受压状态,从而使核心混凝土具有更高的抗压强度和抗压缩变形的能力。在工程实际中钢板混凝土柱不能理想地应用,致使设计过程中常把钢管和混凝土按组合截面考虑,其钢板混凝土柱的材质不能得到充分发挥。钢板混凝土柱不能充分发挥其能力的原因有二点:一、外界温度上升时由于钢的线膨胀系数大于混凝土线膨胀系数,且钢管在外直接受热,而混凝土在内受热相对小,二者间还存在着一个温度差,温度引起的钢板和混凝土出现间隙,显然将影响构件的工作性能和承载力。二、常温下钢板混凝土柱在水化凝结过程中由于混凝土的收缩,使钢管和混凝土之间产生离析作用,在实际应用中这一离析作用的存在使混凝土承压时不能充分发挥混凝土三向受压的性能优势。
发明内容
本发明所要解决的技术问题是提供一种钢板混凝土柱及施工方法,通过在浇筑混凝土过程中利用电磁感应加热法解决温度引起的钢板和混凝土不共同工作的问题,在混凝土浇筑过程中形成电场进行滤水的方法解决钢板和混凝土柱因为水化而产生离析作用的问题。
本发明在浇筑混凝土前在钢筋上埋设塑料皮铝芯导线,利用电磁感应法对未硬化的混凝土进行加热,当混凝土硬化后,钢板收缩大于混凝土,相当于混凝土对钢管施加预应力。在浇筑混凝土前埋设导电管与阳极电源联接,将钢筋与阴极电源联接,混凝土浇筑过程中将电源连通,通过在混凝土中形成不同的电势分布使混凝土中自由水排出。
本发明施工步骤包括:
(1)绑扎钢筋
(2)在对角钢筋上缠绕塑料皮铝芯导线,塑料皮铝芯导线与交流电源联接。
(3)下放导电管
导电管为带孔金属管或者导电纤维制作的带孔导电管,导电管与直流电源阳极联接。导电管底部连接排水管,排水管坡度为2%。混凝土柱中一条钢筋联接直流电源阴极。
(4)支设钢板
(5)通电预热
混凝土浇筑前接通缠绕在钢筋上塑料皮铝芯导线的电源,使钢筋发热。
(6)浇筑混凝土
当混凝土温度达到70℃~80℃时浇筑混凝土,浇筑混凝土时接通阳极导电管电源和阴极钢筋电源,使混凝土在浇筑过程中排水。
本发明具有强度高、重量轻、塑性好、耐冲击、耐疲劳等优点,而且在施工方面还具有省去模板、省工省料、方便施工、不受季节限制等特点。
附图说明
图1施工工艺图
图2钢板混凝土柱立面图
图3钢板混凝土柱平面图
1、缠绕塑料皮铝芯导线的钢筋,2、塑料皮铝芯导线,3、阳极导电管,4、钢板,5、混凝土,6、阴极钢筋,7、排水管
具体实施方式
本发明在浇筑混凝土过程中对钢板混凝土进行加热,由于钢板4线膨胀系数大于混凝土5线膨胀系数,钢板4膨胀比混凝土5膨胀大,当混凝土5硬化后,钢板4收缩大于混凝土5,相当于混凝土5对钢管4施加预应力,从而使钢管混凝土在受荷初期就使其混凝土5保持在三向受压状态。通过在浇筑混凝土5过程通过在混凝土5中形成不同的电势分布使混凝土5中自由水排出,避免钢板4和混凝土柱因为水化而产生离析作用的问题。
本发明施工步骤包括:
(1)绑扎钢筋
(2)在对角钢筋1上缠绕塑料皮铝芯导线2,塑料皮铝芯导线2与三相低压变压器联接,采用星形结线法,变压器应装有可变电阻,同时应带有冷却设备。
(3)下放导电管
导电管3为漏孔铝管,与直流电源阳极联接,导电管3直径为60mm。导电管3底部连接排水管7,排水管7直径为60mm,排水管7坡度为2%,便于排水。混凝土柱中阴极钢筋6联接WYJ直流电源阴极。
(4)支设钢板4
(5)通电预热
混凝土5浇筑前接通缠绕在钢筋上塑料皮铝芯导线2的电源,利用在电磁场中金属材料发热的原理,用塑料皮铝芯导线做线圈,将其缠绕在结构钢筋1上通电使钢筋1发热。
(6)浇筑混凝土5
当混凝土5温度达到70℃~80℃时浇筑混凝土5,浇筑混凝土5时接通阳极导电管3电源和阴极钢筋6电源,使混凝土5在浇筑过程中排水。

Claims (8)

1.一种钢板混凝土柱及施工方法,其特征是:在浇筑混凝土前在钢筋上埋设塑料皮铝芯导线,利用电磁感应法对未硬化的混凝土进行加热。在浇筑混凝土前埋设导电管与阳极电源联接,将钢筋与阴极电源联接,混凝土浇筑过程中将电源连通,通过在混凝土中形成不同的电势分布使混凝土中自由水排出。
2.根据权利要求1所述的钢板混凝土柱及施工方法,其特征是施工步骤包括:
(1)绑扎钢筋
(2)在对角钢筋上缠绕塑料皮铝芯导线。
(3)下放导电管
导电管为带孔金属管或者导电纤维制作的带孔导电管,导电管底部连接排水管,排水管坡度为2%。
(4)支设钢板
(5)通电预热
混凝土浇筑前接通缠绕在钢筋上塑料皮铝芯导线的电源,使钢筋发热。
(6)浇筑混凝土
浇筑混凝土时接通阳极导电管电源和阴极钢筋电源,使混凝土在浇筑过程中排水。
3.根据权利要求1或所述权利要求2的钢板混凝土柱及施工方法,其特征是:塑料皮铝芯导线交流电源联接。
4.根据权利要求1或所述权利要求2所述的钢板混凝土柱及施工方法,其特征是:阴极钢筋和阳极导电管与直流电源联接。
5.根据权利要求3所述的钢板混凝土柱及施工方法,其特征是:阴极钢筋和阳极导电管与直流电源联接。
6.根据根据权利要求1或所述权利要求2所述的钢板混凝土柱及施工方法,其特征是:当混凝土温度达到70℃~80℃时浇筑混凝土。
7.根据根据权利要求3所述的钢板混凝土柱及施工方法,其特征是:当混凝土温度达到70℃~80℃时浇筑混凝土。
8.根据权利要求4所述的钢板混凝土柱及施工方法,其特征是:当混凝土温度达到70℃~80℃时浇筑混凝土。
CN2009101732237A 2009-09-11 2009-09-11 钢板混凝土柱及施工方法 Expired - Fee Related CN102061780B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101732237A CN102061780B (zh) 2009-09-11 2009-09-11 钢板混凝土柱及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101732237A CN102061780B (zh) 2009-09-11 2009-09-11 钢板混凝土柱及施工方法

Publications (2)

Publication Number Publication Date
CN102061780A true CN102061780A (zh) 2011-05-18
CN102061780B CN102061780B (zh) 2012-05-30

Family

ID=43997259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101732237A Expired - Fee Related CN102061780B (zh) 2009-09-11 2009-09-11 钢板混凝土柱及施工方法

Country Status (1)

Country Link
CN (1) CN102061780B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642244A (zh) * 2012-04-10 2012-08-22 中南大学 一种低温环境下钢筋混凝土结构养护装置
CN102767286A (zh) * 2012-07-27 2012-11-07 中铁十六局集团有限公司 一种架子管支模方法
CN103510519A (zh) * 2013-06-03 2014-01-15 徐萍 一种快速凝固水泥土的施工方法
CN104675118A (zh) * 2015-02-11 2015-06-03 刘明瑞 一种混凝土冬季施工电加热工艺
CN106836227A (zh) * 2017-01-03 2017-06-13 深圳大学 一种自带阴极防护功能的钢筋混凝土结构及其建造方法
CN107100323A (zh) * 2017-05-22 2017-08-29 中国铁建大桥工程局集团有限公司 一种冬季混凝土柱体施工的保温工艺
CN109653437A (zh) * 2019-01-14 2019-04-19 沈阳建筑大学 一种采用钢管主动约束的高强圆钢管混凝土柱的制备方法
CN111501520A (zh) * 2020-05-08 2020-08-07 重庆交通大学 防钢管混凝土脱空的灌注工艺
CN113502920A (zh) * 2021-06-16 2021-10-15 江阴市先锋建筑有限责任公司 装配式绿色房屋建筑的钢-混凝土结构
CN113700221A (zh) * 2021-08-11 2021-11-26 河北省建筑工程质量检测中心有限公司 一种预制预应力钢管混凝土柱及施工方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3216756B2 (ja) * 1994-05-12 2001-10-09 電気化学工業株式会社 コンクリートの電気化学的処理方法
CN1189635C (zh) * 2002-12-14 2005-02-16 大连理工大学 混凝土电渗方法
CN100519959C (zh) * 2006-03-10 2009-07-29 南京大学 用电测井法探测混凝土灌注桩中钢筋笼长度的方法
CN100567670C (zh) * 2007-01-05 2009-12-09 同济大学 变形可调节混凝土构件及其制备方法
CN101334353B (zh) * 2008-08-01 2010-12-08 厦门大学 一种用于监测钢筋混凝土结构腐蚀的多功能传感器

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642244B (zh) * 2012-04-10 2015-07-08 中南大学 一种低温环境下钢筋混凝土结构养护装置
CN102642244A (zh) * 2012-04-10 2012-08-22 中南大学 一种低温环境下钢筋混凝土结构养护装置
CN102767286A (zh) * 2012-07-27 2012-11-07 中铁十六局集团有限公司 一种架子管支模方法
CN103510519A (zh) * 2013-06-03 2014-01-15 徐萍 一种快速凝固水泥土的施工方法
CN104675118A (zh) * 2015-02-11 2015-06-03 刘明瑞 一种混凝土冬季施工电加热工艺
CN106836227B (zh) * 2017-01-03 2019-11-26 深圳大学 一种自带阴极防护功能的钢筋混凝土结构及其建造方法
CN106836227A (zh) * 2017-01-03 2017-06-13 深圳大学 一种自带阴极防护功能的钢筋混凝土结构及其建造方法
CN107100323A (zh) * 2017-05-22 2017-08-29 中国铁建大桥工程局集团有限公司 一种冬季混凝土柱体施工的保温工艺
CN109653437A (zh) * 2019-01-14 2019-04-19 沈阳建筑大学 一种采用钢管主动约束的高强圆钢管混凝土柱的制备方法
CN111501520A (zh) * 2020-05-08 2020-08-07 重庆交通大学 防钢管混凝土脱空的灌注工艺
CN111501520B (zh) * 2020-05-08 2021-08-24 重庆交通大学 防钢管混凝土脱空的灌注工艺
CN113502920A (zh) * 2021-06-16 2021-10-15 江阴市先锋建筑有限责任公司 装配式绿色房屋建筑的钢-混凝土结构
CN113700221A (zh) * 2021-08-11 2021-11-26 河北省建筑工程质量检测中心有限公司 一种预制预应力钢管混凝土柱及施工方法

Also Published As

Publication number Publication date
CN102061780B (zh) 2012-05-30

Similar Documents

Publication Publication Date Title
CN102061780B (zh) 钢板混凝土柱及施工方法
CN106836622B (zh) 一种纤维复合材料多功能免拆模板及其制备方法
CN107254884A (zh) 一种可拆卸预制装配式方钢管混凝土柱脚节点
CN104947831A (zh) 预制装配式型钢混凝土剪力墙及其施工方法
CN108643585A (zh) 预制混凝土夹心保温外墙板及其制备施工方法
CN109372169A (zh) 一种双向预应力预制钢筋混凝土空心楼板及其制备方法
CN204098345U (zh) 内外页墙板断桥传力杆件
CN106592777A (zh) 装配式钢‑混结合梁柱节点结构及其实施方法
CN105064759A (zh) 一种gfrp管钢筋混凝土组合构件多回路输电杆
CN103352584B (zh) 一种外套式加固方法
CN106193351A (zh) 保温板组件、用其制成的夹芯墙及夹芯墙的施工方法
CN103866866B (zh) 超高层核心筒与外框架梁后浇节点
CN103590419B (zh) 装配式可调高压电抗器基础
CN105715093A (zh) 小弯矩钢棒混凝土电杆、生产设备及其制作工艺
CN207314578U (zh) 一种装配式建筑结构用保温一体化外墙
CN213390825U (zh) 一种预制混凝土双面叠合剪力墙墙体结构
KR102481066B1 (ko) 면상 발열체를 이용한 콘크리트 양생용 균일 발열 시스템
CN202273454U (zh) 有限部分预应力混凝土电杆
CN101245642A (zh) 一种条状分块底板混凝土双向叠合板
CN104047381A (zh) 装配整体式少筋混凝土剪力墙结构
CN204850639U (zh) 一种gfrp管钢筋混凝土组合构件多回路输电杆
CN204608975U (zh) 一种预制装配式型钢混凝土柱—钢梁框架结构体系
CN207827677U (zh) 一种用于混凝土预制构件的预埋吊装装置
CN103306285A (zh) 用于补强基础承载力的锚杆静压桩施工系统
CN210857593U (zh) 夹心保温叠合剪力墙

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: YU JIANFANG

Free format text: FORMER OWNER: ZHU KUI

Effective date: 20111231

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20111231

Address after: Nanxiang Road in Longwan District of Wenzhou City, Zhejiang Province, No. 86 325000

Applicant after: Yu Jianfang

Address before: 325000 Wenzhou City, Ouhai province Jingshan Hill group of the building of the 302 room, room 11, Zhejiang

Applicant before: Zhu Kui

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20150911

EXPY Termination of patent right or utility model