CN102051888A - Method for constructing built-in foundation bolt regulating hole of equipment foundation - Google Patents

Method for constructing built-in foundation bolt regulating hole of equipment foundation Download PDF

Info

Publication number
CN102051888A
CN102051888A CN2009102280580A CN200910228058A CN102051888A CN 102051888 A CN102051888 A CN 102051888A CN 2009102280580 A CN2009102280580 A CN 2009102280580A CN 200910228058 A CN200910228058 A CN 200910228058A CN 102051888 A CN102051888 A CN 102051888A
Authority
CN
China
Prior art keywords
polystyrene foam
burried
direct
stone bolt
equipment foundations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009102280580A
Other languages
Chinese (zh)
Other versions
CN102051888B (en
Inventor
申培利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
MCC Tiangong Construction Co Ltd
Original Assignee
MCC Tiangong Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Construction Co Ltd filed Critical MCC Tiangong Construction Co Ltd
Priority to CN2009102280580A priority Critical patent/CN102051888B/en
Publication of CN102051888A publication Critical patent/CN102051888A/en
Application granted granted Critical
Publication of CN102051888B publication Critical patent/CN102051888B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a method for constructing a built-in foundation bolt regulating hole of an equipment foundation, which comprises the step of: firstly, embedding a built-in foundation bolt of the equipment foundation to a preset position where concrete is poured, and also comprises the steps of: 1, wrapping two semicircle polystyrene foam tubes on the outer wall of the built-in foundation bolt of the equipment foundation, wherein the top elevation of the polystyrene foam tubes is equal to the top elevation of poured concrete, and the bottom elevation of the polystyrene foam tubes is 300-400mm lower than the top elevation of the poured concrete; 2, binding the outer parts of the polystyrene foam tubes with iron wires for fixing before the concrete is poured, pouring the concrete; and 3, after the concrete poured at the outer parts of the two semicircle polystyrene foam tubes in the step 2 is strengthened, melting the polystyrene foam tubes with gasoline and forming the built-in foundation bolt regulating hole. The method has the advantages of being simple and easy to operate, effectively improving the construction quality, shortening the construction time, improving the construction efficiency, and being high in operation safety and accuracy.

Description

Equipment Foundations direct-burried stone bolt is adjusted the job practices in hole
Technical field
The invention belongs to the realm of building construction, especially a kind of Equipment Foundations direct-burried stone bolt is adjusted the job practices in hole.
Background technology
Along with expanding economy, the infrastructure construction of steel industry is increasing, in the construction of the infrastructure of steel industry, its civil works part is mainly based on Equipment Foundations, the most of direct-burried stone bolt that adopts of Equipment Foundations in design, the installation accuracy of direct-burried stone bolt directly has influence on next process unit and installs, and therefore, the installation accuracy of stone bolt is particularly important in the construction.The Equipment Foundations direct-burried stone bolt center displacement allowable variation that national regulation requires to have constructed is ± 2mm, because the installation accuracy height of Equipment Foundations direct-burried stone bolt, difficulty of construction is big, the Equipment Foundations direct-burried stone bolt of having constructed does not often reach the national regulation requirement, need Equipment Foundations direct-burried stone bolt is carried out the secondary adjustment, promptly Equipment Foundations direct-burried stone bolt is adjusted the hole and construct, traditional job practices has two kinds at present: 1, manually cut a hole concrete forming device basis direct-burried stone bolt and adjust the hole; 2, adopt the prefabricated direct-buried stone bolt of cement perlite to adjust the hole; Above-mentioned two kinds of methods are carried out construction that Equipment Foundations direct-burried stone bolt adjusts the hole, and there are the following problems: (1), manually cut a hole concrete and waste time and energy, prolonged the engineering time, reduced efficiency of construction; (2), cement perlite intensity is low, cracky, complex process, concrete pours and is difficult to take out.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art, the job practices that provides a kind of Equipment Foundations direct-burried stone bolt to adjust the hole, this method construction precision height, operation is simple, effectively improve construction quality, shorten the engineering time, improve efficiency of construction, processing safety height.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of Equipment Foundations direct-burried stone bolt is adjusted the job practices in hole, at first Equipment Foundations direct-burried stone bolt is buried underground the precalculated position of pour concrete, and it also comprises the steps:
(1) the polystyrene foam pipe of two semicircles is wrapped in the outer wall of Equipment Foundations direct-burried stone bolt, polystyrene foam pipe top absolute altitude is identical with pour concrete top absolute altitude, and polystyrene foam pipe bottom absolute altitude is than the low 300~400mm of pour concrete top absolute altitude;
(2) pour concrete after fixedly finishing is fixed in the polystyrene foam pipe outside of two semicircles with the iron wire colligation before pour concrete;
(3) treat on the outside pour concrete of polystyrene foam pipe of two semicircles in the step (2) with gasoline the polystyrene foam pipe to be dissolved after the intensity, form the direct-burried stone bolt and adjust the hole.
And the polystyrene foam bore of described two semicircles equals the external diameter of Equipment Foundations direct-burried stone bolt.
And the polystyrene foam pipe of described two semicircles adopts the iron wire colligation to fix.
Advantage of the present invention and beneficial effect are:
1, the job practices in these Equipment Foundations direct-burried stone bolt adjustment hole adopts the polystyrene foam pipe of two semicircles as the mould of adjusting the hole, after casting and constructing is finished, only need the polystyrene foam pipe be dissolved with gasoline, easy for installation, need not dismounting work, save the engineering time, improved efficiency of construction, and construction quality.
2, the polystyrene foam pipe adopts the iron wire colligation to fix in the job practices in these Equipment Foundations direct-burried stone bolt adjustment hole, and after the polystyrene foam pipe dissolved, the iron wire of colligation can reuse, economical with materials.
3, operation is simple, effectively improve construction quality, shorten the engineering time, improve efficiency of construction, processing safety height in the present invention, is the job practices that the high Equipment Foundations direct-burried stone bolt of a kind of precision is adjusted the hole.
Description of drawings
Fig. 1 carries out structural representation after the concrete cast for the present invention;
Fig. 2 is the structural representation after the polystyrene foam pipe of two semicircles of the present invention dissolves.
The specific embodiment
The invention will be further described below by specific embodiment, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A kind of Equipment Foundations direct-burried stone bolt is adjusted the job practices in hole, at first carries out the concrete construction of Equipment Foundations, in the process of construction Equipment Foundations direct-burried stone bolt 3 is buried underground on the precalculated position of pour concrete 1, wherein also comprises the steps:
(1) the polystyrene foam pipe 2 of two semicircles is wrapped in the outside of Equipment Foundations direct-burried stone bolt, the polystyrene foam bore of two semicircles equals the external diameter of Equipment Foundations direct-burried stone bolt, polystyrene foam pipe top absolute altitude is identical with pour concrete top absolute altitude, polystyrene foam pipe bottom absolute altitude is than the low 300~400mm of pour concrete top absolute altitude, and the polystyrene foam pipe of present embodiment bottom absolute altitude is than the low 400mm of pour concrete top absolute altitude;
(2) the polystyrene foam pipe outside of two semicircles is fixed with iron wire 4 colligations before pour concrete after, also can adopt bonding mode that the polystyrene foam pipe of two semicircles is fixed, adopt iron wire colligation mode shown in the present embodiment accompanying drawing, pour concrete after fixedly finishing;
(3) treat on the outside pour concrete of polystyrene foam pipe of two semicircles in the step (2) with gasoline the polystyrene foam pipe to be dissolved after the intensity, form the direct-burried stone bolt and adjust hole 5, the iron wire that colligation is used can directly take out from adjust the hole, recycles.
The present invention utilizes the polystyrene foam pipe can be dissolved in characteristics in the gasoline in work progress, and constructing operation is simple, has effectively ensured the accuracy at Equipment Foundations direct-burried stone bolt center, the adjustment of foot bolt easily.

Claims (3)

1. an Equipment Foundations direct-burried stone bolt is adjusted the job practices in hole, at first Equipment Foundations direct-burried stone bolt is buried underground the precalculated position of pour concrete, it is characterized in that: also comprise the steps:
(1) the polystyrene foam pipe of two semicircles is wrapped in the outer wall of Equipment Foundations direct-burried stone bolt, polystyrene foam pipe top absolute altitude is identical with pour concrete top absolute altitude, and polystyrene foam pipe bottom absolute altitude is than the low 300~400mm of pour concrete top absolute altitude;
(2) pour concrete after fixedly finishing is fixed in the polystyrene foam pipe outside of two semicircles with the iron wire colligation before pour concrete;
(3) treat on the outside pour concrete of polystyrene foam pipe of two semicircles in the step (2) with gasoline the polystyrene foam pipe to be dissolved after the intensity, form the direct-burried stone bolt and adjust the hole.
2. Equipment Foundations direct-burried stone bolt according to claim 1 is adjusted the job practices in hole, and it is characterized in that: the polystyrene foam bore of described two semicircles equals the external diameter of Equipment Foundations direct-burried stone bolt.
3. Equipment Foundations direct-burried stone bolt according to claim 1 is adjusted the job practices in hole, it is characterized in that: the polystyrene foam pipe of described two semicircles adopts the iron wire colligation to fix.
CN2009102280580A 2009-11-06 2009-11-06 Method for constructing built-in foundation bolt regulating hole of equipment foundation Active CN102051888B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102280580A CN102051888B (en) 2009-11-06 2009-11-06 Method for constructing built-in foundation bolt regulating hole of equipment foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102280580A CN102051888B (en) 2009-11-06 2009-11-06 Method for constructing built-in foundation bolt regulating hole of equipment foundation

Publications (2)

Publication Number Publication Date
CN102051888A true CN102051888A (en) 2011-05-11
CN102051888B CN102051888B (en) 2012-07-18

Family

ID=43956662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102280580A Active CN102051888B (en) 2009-11-06 2009-11-06 Method for constructing built-in foundation bolt regulating hole of equipment foundation

Country Status (1)

Country Link
CN (1) CN102051888B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493643A (en) * 2011-12-15 2012-06-13 中国一冶集团有限公司 Method for constructing circular hole of anchor bolt reserved by equipment foundation
CN108385711A (en) * 2018-04-18 2018-08-10 上海磐武工业科技有限公司 A kind of anchor cage ring formula basis and its installation method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100348395C (en) * 2005-07-27 2007-11-14 上海人造板机器厂有限公司 Structure of bottom girder of continuous press and installation
KR100874033B1 (en) * 2007-11-15 2008-12-17 주식회사 젠트로 Waterproof structure and constructing method of the same
KR100808560B1 (en) * 2007-11-22 2008-02-29 영성산업 주식회사 Self level adjustment method of constructing a water tank using the foundation pad
CN101450578A (en) * 2007-11-30 2009-06-10 天津市世纪东方建筑景观雕塑技术开发中心 Method of using polystyrol compression-board as relief die

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493643A (en) * 2011-12-15 2012-06-13 中国一冶集团有限公司 Method for constructing circular hole of anchor bolt reserved by equipment foundation
CN102493643B (en) * 2011-12-15 2013-12-11 中国一冶集团有限公司 Method for constructing circular hole of anchor bolt reserved by equipment foundation
CN108385711A (en) * 2018-04-18 2018-08-10 上海磐武工业科技有限公司 A kind of anchor cage ring formula basis and its installation method
CN108385711B (en) * 2018-04-18 2024-03-22 浙江星达能源科技有限公司 Anchor cage ring type foundation and installation method thereof

Also Published As

Publication number Publication date
CN102051888B (en) 2012-07-18

Similar Documents

Publication Publication Date Title
CN206091299U (en) A floor buried sleeve fixing device for aluminum alloy template
CN206267422U (en) A kind of assembly concrete superposed column
CN103422674A (en) Cast-in-place section concrete construction method of assembling-type concrete structure
CN203270599U (en) Foundation bolt pre-buried die
CN103485370B (en) A kind of concrete construction control method preventing wallboard harmful cracks
CN102535849A (en) Constructional column top concreting method
CN201826437U (en) Structure for accurately embedding column pin bolts for steel structures
CN103568109A (en) Hole forming method of precast concrete hollow component
CN102051888B (en) Method for constructing built-in foundation bolt regulating hole of equipment foundation
CN203022222U (en) Wholly-cast ring beam of brick-concrete building support
CN104727339B (en) Power equipment basis two-step construction method
CN204343319U (en) Cableway pipe patten pre-embedded anchoring bolts jig
CN206408951U (en) A kind of architectural industrialization project conversion layer position level ladder muscle
CN102041806A (en) Construction method for inserting steel column in bored pile
CN113503032A (en) Double-sided superposed shear wall cavity concrete pouring tool
CN211113740U (en) Prestressed steel cylinder concrete pipe with base
CN205712565U (en) A kind of prefabricated two-sided wall
CN102041918A (en) Construction method of hyperboloidal concrete structure of coal tower storage bunker incline wall
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN205476528U (en) Precast pile device of taking one's place fast
CN204780928U (en) Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN207193782U (en) A kind of pole type box culvert supporting embedded part of primary concreting Underground Culvert
CN205343431U (en) Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar
CN203730920U (en) Sill anchor used in tunnel and used for fixing petroleum and natural gas pipelines
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant