CN108385711A - A kind of anchor cage ring formula basis and its installation method - Google Patents

A kind of anchor cage ring formula basis and its installation method Download PDF

Info

Publication number
CN108385711A
CN108385711A CN201810350437.6A CN201810350437A CN108385711A CN 108385711 A CN108385711 A CN 108385711A CN 201810350437 A CN201810350437 A CN 201810350437A CN 108385711 A CN108385711 A CN 108385711A
Authority
CN
China
Prior art keywords
anchor
anchor bolt
nut
leveling
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810350437.6A
Other languages
Chinese (zh)
Other versions
CN108385711B (en
Inventor
阎舜
林将
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xingda Energy Technology Co ltd
Original Assignee
Shanghai Pan Wu Industrial Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Pan Wu Industrial Technology Co Ltd filed Critical Shanghai Pan Wu Industrial Technology Co Ltd
Priority to CN201810350437.6A priority Critical patent/CN108385711B/en
Publication of CN108385711A publication Critical patent/CN108385711A/en
Application granted granted Critical
Publication of CN108385711B publication Critical patent/CN108385711B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1685Shapes cylindrical
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The present invention discloses a kind of anchor cage ring formula basis and its installation method.The anchor cage ring formula basis includes anchor bolt, upper anchor slab and lower anchor slab, upper anchor slab includes ontology and adapter, the run-though space axially through ontology along anchor bolt is provided on ontology, adapter is detachably arranged in run-though space, anchor cage ring formula basis further includes leveling nut, leveling nut can form screw-thread fit to carry out leveling to upper anchor slab with anchor bolt, the anchor bolt that can coordinate with leveling nut passes through adapter, in the plane vertical with the axis of anchor bolt, the physical dimension of leveling nut is less than the size of run-though space.Anchor cage ring formula basis provided by the invention can either realize the leveling of upper anchor slab in the installation process on anchor cage ring formula basis by leveling nut, leveling nut can be taken out again by run-though space from anchor cage ring formula basis after the completion of leveling, leveling nut is avoided to influence the replacement of anchor bolt.

Description

A kind of anchor cage ring formula basis and its installation method
Technical field
The present invention relates to field of engineering technology more particularly to a kind of anchor cage ring formula basis and its installation methods.
Background technology
At present for large-scale or large equipment rack, pylon, including wind-driven generator, wind turbine, power transmission line It is connected to the buildings such as illumination and signal device, bridge pad and is all made of the concrete foundation support built at scene.Especially in recent years, With the raising of China's rapid development of economy and social environment consciousness, wind-power electricity generation scale increasingly increases, wind generator tower It is increasingly becoming mainstream.For this purpose, anchor cage ring formula basis is also more and more important in wind power generation stepped middle role.
In the construction process, anchor bolt will appear because the case where damaging and being broken occur in the reasons such as stress overloading, for this Problem proposes the replaceable anchor cage ring formula basis of anchor bolt in the prior art so that anchor bolt can be from the upper of anchor cage ring formula basis Side takes out, since the leveling nut on usual anchor cage ring formula basis is to be located at the lower section of upper anchor slab, and size is pacified more than anchor bolt Through-hole is filled, this, which results in the replaceable anchor cage ring formula basis of existing anchor bolt, can not install leveling nut, and then cannot achieve The leveling of anchor slab, or leveling nut can deform and hinder the removal of anchor bolt after installing and applying load.
Invention content
In view of this, the purpose of the present invention is to provide a kind of leveling that can either realize upper anchor slab and can realize anchor The anchor cage ring formula basis and its installation method that bolt is replaced.
In order to achieve the above objectives, on the one hand, the present invention uses following technical scheme:
A kind of anchor cage ring formula basis, including anchor bolt, upper anchor slab and lower anchor slab, the upper anchor slab include ontology and adapter, The run-though space axially through the ontology along the anchor bolt is provided on the ontology, the adapter is detachably arranged at In the run-though space, the anchor cage ring formula basis further includes leveling nut, and the leveling nut can be formed with the anchor bolt For screw-thread fit to carry out leveling to the upper anchor slab, the anchor bolt that can coordinate with the leveling nut passes through the switching Part, the leveling nut and the run-though space are set as, and the leveling nut can be taken out through the run-though space.
Preferably, in the plane vertical with the axis of the anchor bolt, under at least one orientation mode, the leveling spiral shell Female physical dimension is less than the size of the run-though space.
Preferably, the ontology is split structure, includes the anchor slab of multiple fan annulars spaced circumferentially from one another Unit;
The adjacent anchor slab unit is linked together by the adapter;And/or
Space between the adjacent anchor slab unit constitutes the run-though space.
Preferably, the adapter includes connecting plate and protrudes from the positioning region of the lower surface setting of the connecting plate, institute The first through hole that the connecting plate and the positioning region are provided through on adapter is stated, so that the top of the anchor bolt passes through, In the plane vertical with the axis of the anchor bolt, the physical dimension of the leveling nut is less than the outer rim ruler of the positioning region It is very little.
Preferably, sheath, the shield are arranged on part of the anchor bolt between the upper anchor slab and the lower anchor slab There is gap between set and the anchor bolt.
Preferably, be set in the sheath in the anchor bolt that the leveling nut coordinates includes seperated multiple in an axial direction Sheath unit, the relative position between the sheath unit is adjustable.
Preferably, the multiple sheath unit from top to bottom include the first sheath unit and the second sheath unit,
The leveling nut is arranged in first sheath unit;And/or
It is threadedly coupled between the medial surface of first sheath unit and the lateral surface of second sheath unit.
Preferably, the anchor cage ring formula basis further includes location nut and shield, and it is logical that second is provided on the lower anchor slab The lower part in hole, the anchor bolt is pierced by the lower anchor slab through second through-hole, and the location nut is located at the upper of the lower anchor slab Side, the shield is arranged in the lower section of the lower anchor slab and the anchor bolt is pierced by the part of the lower anchor slab covers, described fixed Position nut and the shield position the anchor bolt on the lower anchor slab.
Preferably, the location nut is located in the sheath;And/or
In the plane vertical with the axis of the anchor bolt, the physical dimension of the location nut is less than the first through hole Size;And/or
In the plane vertical with the axis of the anchor bolt, the physical dimension of the location nut is less than and the anchor cage ring The size of through-hole on the matched tower drum flange disk in formula basis;And/or
The third through-hole passed through for the anchor bolt that does not coordinate with the leveling nut is provided on the upper anchor slab, with it is described In the vertical plane of the axis of anchor bolt, the physical dimension of the location nut is less than the size of the third through-hole;And/or
The location nut is round nut;
Alternatively,
The location nut includes the protrusion of plate positioning region and the side protrusion setting by the positioning region, described fixed Be provided through the threaded hole of the positioning region and the protrusion on the nut of position, the positioning region be located at the sheath with it is described Between lower anchor slab, the protrusion stretches into the sheath;
Preferably, the plate positioning region is polygonal panel.
Preferably, it is provided with threaded hole on the upper surface of the anchor bolt;And/or
The lower end of the anchor bolt is provided with guide part, and the cross-sectional area of the guide part gradually increases from the bottom to top;With/ Or,
The anchor bolt includes top half and lower half portion, and the cross-sectional area of the top half is less than the lower half portion Cross-sectional area.
In order to achieve the above objectives, on the other hand, the present invention also uses following technical scheme:
A kind of installation method on anchor cage ring formula as described above basis, the installation method include:
The lower anchor slab is installed and leveling is carried out to the lower anchor slab;
The anchor bolt and the lower anchor slab are located by connecting;
The upper anchor slab is installed in the anchor bolt;
Leveling is carried out to upper anchor slab using leveling nut;
Anchor cage is poured;
The adapter is dismantled after the completion of pouring, the leveling nut is taken out from the run-though space, then described will be turned Fitting reinstalls the ontology;
Tower drum flange disk is installed.
Anchor cage ring formula basis provided by the invention is provided with run-though space on upper anchor slab, and adapter, which is detachably arranged at, to be passed through In logical space, and in the plane vertical with the axis of anchor bolt, the physical dimension of leveling nut is less than the size of run-though space, such as This, can either realize the leveling of upper anchor slab, and can be in leveling in the installation process on anchor cage ring formula basis by leveling nut Leveling nut is taken out by run-though space from anchor cage ring formula basis after the completion, leveling nut is avoided to influence the replacement of anchor bolt.
Description of the drawings
By referring to the drawings to the description of the embodiment of the present invention, the above and other purposes of the present invention, feature and Advantage will be apparent from.
Fig. 1 shows the structural schematic diagram on the anchor cage ring formula basis that the specific embodiment of the invention provides;
The dress of the first anchor bolt, upper anchor slab, tower drum flange disk, lower anchor slab that are provided Fig. 2 shows the specific embodiment of the invention One of distribution structure sectional view;
Fig. 3 show the specific embodiment of the invention provide the second anchor bolt, upper anchor slab, tower drum flange disk, lower anchor slab dress Distribution structure sectional view;
Fig. 4 shows the structural schematic diagram for the upper anchor slab that the specific embodiment of the invention provides;
Fig. 5 shows the structural schematic diagram for the adapter that the specific embodiment of the invention provides;
Fig. 6 shows the structural schematic diagram for the shield that the specific embodiment of the invention provides;
Fig. 7 show the specific embodiment of the invention provide the first anchor bolt, upper anchor slab, tower drum flange disk, lower anchor slab dress The two of distribution structure sectional view.
In figure:
1, anchor bolt;11, the first anchor bolt;12, the second anchor bolt;13, guide part;2, upper anchor slab;21, ontology;212, perforation is empty Between;22, adapter;221, connecting plate;222, positioning region;223, first through hole;23, third through-hole;3, lower anchor slab;31, second Through-hole;4, leveling nut;5, sheath;51, the first sheath unit;52, the second sheath unit;6, location nut;61, positioning region; 62, protrusion;7, shield;71, tetragonal nut;72, plug;81, nut shim;82, fastening nut;9, protective case;10, tower Ring flange;101, through-hole.
Specific implementation mode
Below based on embodiment, present invention is described, it should be understood by one skilled in the art that provided herein Attached drawing is provided to the purpose of explanation, and attached drawing is not necessarily drawn to scale.
Unless the context clearly requires otherwise, "include", "comprise" otherwise throughout the specification and claims etc. are similar Word should be construed as the meaning for including rather than exclusive or exhaustive meaning;That is, being containing for " including but not limited to " Justice.
"upper" "lower" described herein refers to orientation of anchor cage ring formula basis during normal use, can refer to Orientation shown in Fig. 2.
This application provides a kind of anchor cage ring formula bases, as shown in Figure 1 comprising multiple anchor bolts 1, upper anchor slab in a ring 2 pass through upper anchor slab 2 and are fixed with the relative position of upper anchor slab 2, the lower part of anchor bolt 1 with annular lower anchor slab 3, the top of anchor bolt 1 It is fixedly connected across lower anchor slab 3 and with lower anchor slab 3, to form anchor cage ring formula foundation structure.
Anchor cage ring formula basis further includes the leveling nut 4 for carrying out leveling to upper anchor slab 2, it is preferable that leveling nut 4 is set Be equipped with it is multiple, have in multiple anchor bolts 1 part anchor bolt 1 can with leveling nut 4 formed screw-thread fit, specifically, anchor bolt 1 include it is more A first anchor bolt 11 and multiple second anchor bolts 12, multiple first anchor bolts 11 are preferably circumferentially arranged, for being formed with leveling nut 4 Screw-thread fit includes four in every group for example, in the embodiment shown in fig. 1, including four groups of first anchor bolts 11 being evenly distributed A first anchor bolt 11, is distributed along the circumference with multiple second anchor bolts 12 between the first anchor bolt of adjacent sets 11, the second anchor bolt 12 not with tune Flush nut 4 coordinates.As shown in Figures 4 to 6, upper anchor slab 2 includes ontology 21 and adapter 22, is provided with along anchor bolt 1 on ontology 21 The run-though space 212 axially through ontology, adapter 22 is detachably arranged in run-though space 212, by run-though space 212 It blocks, the first anchor bolt 11 passes through the setting of adapter 22, and leveling nut 4 and run-though space 212 be set as, and leveling nut 4 can be through Run-though space 212 takes out, in this way, can take leveling nut 4 by run-though space 212 after leveling nut 4 completes leveling work Go out, avoid leveling nut 4 influence anchor bolt 1 replacement (presence of leveling nut 4 can detach anchor bolt 1 on anchor cage ring formula basis and be formed Interference).
Preferably, in the plane vertical with the axis of anchor bolt 1, under at least one orientation mode, outside leveling nut 2 Edge size is less than the size of run-though space 212, in this way, when needing to take out leveling nut 4, leveling nut 4 is gone to suitably Orientation can take out leveling nut 4 through run-though space 212, it is further preferred that no matter under orientation state in office, with anchor In the vertical plane of the axis of bolt 1, the physical dimension of leveling nut 4 is consistently less than the size of run-though space 212, so, it is possible Further facilitate the operation for taking out leveling nut 4.
Run-though space 212 therein can be formed by the through-hole on upper anchor slab 2 or slot is arranged, preferred at one In embodiment, as shown in figure 4, ontology 21 is in cirque structure, fluted, the slot bottom setting of groove is set on cirque structure The fourth hole for having perforation further includes having adapter, as shown in figure 5, adapter 22 includes connecting plate 221 and protrudes from connecting plate The positioning region 222 of 221 lower surface setting, the first through hole of connecting plate 221 and positioning region 222 is provided through on adapter 22 223, so that the top of the first anchor bolt 11 passes through, as shown in Fig. 2, in the plane vertical with the axis of anchor bolt 1, leveling nut 4 Physical dimension be less than positioning region 222 physical dimension, so so that when adapter 22 disassembles, leveling nut 4 It can be taken out by run-though space 212.Positioning region 222 for example in tubular structure shown in fig. 6, is matched with fourth hole, even Fishplate bar 22 is in fan annular, with the fit depressions on ontology 21.As shown in figure 3, being provided on upper anchor slab 2 for the second anchor bolt 12 The third through-hole 23 passed through.It is further preferred that ontology 21 is split structure comprising spaced more circumferentially from one another A to fan annular anchor slab unit, the space between adjacent anchor slab unit constitutes the run-though space 212, leads between anchor slab unit Adapter 22 is crossed to link together.Set ontology 21 to the split structure conveniently above transport and storage of anchor slab 2.
In order to ensure the protective action to anchor bolt 1, it usually is arranged sheath 5 in the outside of anchor bolt 1, existing way is typically Pvc pipe is set in anchor bolt 1, is then closed the two-port of pvc pipe with heat-shrink tube, this can influence the taking-up of anchor bolt 1, for This problem, in the application, as shown in Figures 2 and 3, anchor bolt 1 is arranged with shield on the part between upper anchor slab 2 and lower anchor slab 3 Set 5 has gap, in this way, facilitating the taking-up of anchor bolt 1, it is further preferred that first to 1 table of anchor bolt between sheath 5 and anchor bolt 1 Face carries out corrosion resistant surfaces processing or coats anti-corrosive grease on the surface of anchor bolt 1, then carries out thorough seal to anchor bolt 1 with heat-shrink tube To protect anchor bolt 1, the abrasion in installation process is reduced, contact of the isolation anchor bolt 1 with outside moisture finally puts on the sheath again 5, fluid sealant can also be stamped between sheath 5 and upper anchor slab 2, lower anchor slab 3, so that it is guaranteed that will not be poured into when cement grout To inside sheath 5, the protection effect to anchor bolt 1 can be further increased in this way, and sheath 5 for example can be hard PVC pipe.
The sheath 5 being set in the second anchor bolt 12 is preferably structure as a whole, and further preferably internal-and external diameter is consistent in an axial direction Tubular structure.In order to avoid sheath 5 influences the operation to leveling nut 4, it is preferable that the sheath being set in the first anchor bolt 11 5 include multiple sheath units of fission in an axial direction, and the position between sheath unit is adjustable, such as sheath 5 is telescopic tube structure, In this way, can be when needing to operate leveling nut 4 by adjusting the position between sheath unit come so that leveling nut 4 It is exposed to outside, in addition, after the completion of leveling, it can be by adjusting the position between sheath unit come so that adjusting the length of sheath Increase, so that sheath 5 can be respectively formed tight fit with upper anchor slab 2 and lower anchor slab 3.
In a specific embodiment, as shown in Fig. 2, multiple sheath units include the first sheath unit 51 from top to bottom With the second sheath unit 52, the internal diameter of the first sheath unit 51 is more than the outer diameter of leveling nut 4, the internal diameter of the second sheath unit 52 Less than the outer diameter of leveling nut 4, screw thread connects between the medial surface of the first sheath unit 51 and the lateral surface of the second sheath unit 52 It connects, in this way, when needing to operate leveling nut 4, the first sheath unit 51 of rotation is so that the first sheath unit 51 is downward Movement reversely rotates the first sheath unit 51 so that the first sheath unit to expose leveling nut 4, and after the completion of leveling 51 move upwards, so that the first sheath unit 51 is in close contact with upper anchor slab 3.Preferably, the first sheath unit 51 and second It is provided with fluid sealant between sheath unit 52, so, it is possible to further increase the protection effect to anchor bolt 1.
Further, as shown in Figures 2 and 3, anchor cage ring formula basis further includes location nut 6 and shield 7, location nut 6 It is used to anchor bolt 1 being located in lower anchor slab 3 with shield 7.Specifically, the second through-hole 31 is provided on lower anchor slab 3, under anchor bolt 1 The second through-hole of portion 31 is pierced by lower anchor slab 3, and location nut 6 is located at the top of lower anchor slab 3, and shield 7 is arranged in the lower section of lower anchor slab 3 And the part that anchor bolt 1 is pierced by lower anchor slab 3 covers, in this way, can be by anchor bolt 1 and lower anchor slab 3 by location nut 6 and shield 7 It is fixedly connected, and is all covered since anchor bolt 1 can be exposed to external structure by shield 7, improve the effect of the protection to anchor bolt 1 Fruit.In order to facilitate the screens of location nut 6, it is preferable that the diameter of the aperture ratio anchor bolt 1 of the second through-hole 31 is only big by 1 to 3mm.For Location nut 6 can be interfered with other structures when avoiding taking out anchor bolt 1, it is preferable that as shown in Fig. 2, in the axis with anchor bolt 1 In the vertical plane of line, the physical dimension of location nut 6 is less than the size of first through hole 223 and is less than and anchor cage ring formula basis phase The size of through-hole 101 on the tower drum flange disk 10 of cooperation, as shown in figure 3, in the plane vertical with the axis of anchor bolt 1, it is fixed The physical dimension of position nut 6 be less than the size of third through-hole 23 and less than with the matched tower drum flange disk in anchor cage ring formula basis 10 On through-hole 101 size, in this way, ensureing that the first anchor bolt 11 and the second anchor bolt 12 can be taken out conveniently.In order to further Facilitate the taking-up of location nut 6,6 preferably circular nut of location nut.
Wherein, shield 7 may include hex nut, can also include tetragonal nut 71 as shown in FIG. 6, in this way, convenient The rotation of shield 7 is limited after shield 7 is wrapped up by Grouting Cement.Preferably, the threaded hole on tetragonal nut 71 or hex nut It is processed as through-hole form, to improve processing technology and be handled convenient for thread surface, shield 7 further includes plug 72, and plug 72 is matched Fluid sealant is closed to block the threaded hole of nut 1.It is further preferred that the seaming position between shield 7 and lower anchor slab 3 passes through Fluid sealant is sealed, to further increase the protection effect to anchor bolt 1.
Preferably, anchor bolt 1 is replaced for the ease of lifting, hole is threaded in the upper surface of anchor bolt 1, with installation lifting dress It sets.Lower thread is convenient for centering when in order to ensure that anchor bolt 1 is replaced, and the lower end of anchor bolt 1 is provided with guide part 13, the cross of guide part 13 Gradually (cross section herein refers to what the face vertical with the axis of anchor bolt 1 intercepted in anchor bolt 1 to sectional area for increase from the bottom to top Face), for example, processing chamfering in the lower end of anchor bolt 1, and more eye-catching color can be used to be marked.
For the ease of processing, anchor bolt 1, which can be used, waits gauge structures, i.e., radius is consistent in the axial direction, for the ease of being broken anchor The taking-up of bolt 1, it is preferable that anchor bolt 1 includes top half and lower half portion, and the cross-sectional area of top half is less than lower half portion Cross-sectional area, so, it is ensured that fracture position is in top half when stress overloading damages for anchor bolt 1, to be conducive to be broken The taking-up of anchor bolt 1.
Further, anchor cage ring formula basis further includes nut shim 81, fastening nut 82 and protective case 9, in 2 He of upper anchor slab For tower drum flange disk 10 after installation is complete, the part that anchor bolt 1 is pierced by tower drum flange disk 10 passes through fastening nut 82 and nut shim 81 Fastening, the part that anchor bolt 1 is pierced by by protective case 9 tower drum flange disk 10 again later cover, it is preferable that protective case 9 includes top Portion and circumference, are provided with tapped blind hole on the top, and the upper end of anchor bolt 1 is threadedly coupled with tapped blind hole.Preferably, protective case 9 It is sealed by fluid sealant between tower drum flange disk 10, to ensure the protection to anchor bolt 2.
The installation method on anchor cage ring formula provided by the present application basis includes:
The lower anchor slab 3 of installation simultaneously carries out leveling to lower anchor slab 3;
Sheath 5 is arranged in the first anchor bolt 11 and the second anchor bolt 12 respectively and connects location nut 6, then by the first anchor bolt 11 and second the lower part of anchor bolt 12 be each passed through the second through-hole 31 of lower anchor slab 3, fastened, be utilized respectively with location nut 6 First anchor bolt 11 of location nut 6 and the completion of shield 7, the second anchor bolt 12 are fixed and positioned with lower anchor slab 3,
Leveling nut 6 is installed in the first anchor bolt 11;
Multiple anchor slab units are assembled into the upper anchor slab 2 of annular by adapter 22, upper anchor slab 2 is lifted so that First anchor bolt 11 passes through first through hole 223, the second anchor bolt 12 to pass through third through-hole 23;
By adjusting the relative position of the first sheath unit 51 and the second sheath unit 52 leveling nut 4 is exposed, leads to It crosses and the operation of leveling nut 4 to carry out leveling to upper anchor slab 2;
The first sheath unit 51 is rotated after the completion of leveling so that the first sheath unit 51 covers leveling nut 6, and ensures The top surface of first sheath unit 51 is in close contact with upper anchor slab 2, is such as had the gap, can the first sheath unit 51 and upper anchor slab 2 it Between break fluid sealant;
Anchor cage is poured;
After pouring completion and concrete pedestal solidification, adapter 22 is dismantled, leveling nut 6 is taken out from run-though space 212, then Adapter 22 is reinstalled on ontology 21;
It lifts tower drum flange disk 10 and makes the through-hole 101 on tower drum flange disk 10 with anchor bolt 1 to just, installing nut shim 81 and fastening nut 82, it is required after being fastened to anchor bolt 1 and fastening nut 82 according to technology, carries out corresponding antirust treatment and guarantor is installed Sheath 9.
Due to during the installation process removing leveling nut 6, the replacement of anchor bolt 1 is not interfered with, specifically, works as needs When replacing anchor bolt 1,1 whiz of anchor bolt is positioned spiral shell by dismounting protective case 9, fastening nut 82 and nut shim 81 using specific purpose tool Mother 6, anchor bolt 1 is hung out, and new anchor bolt 1 is lifted into corresponding hole position, anchor bolt 1 is screwed according to the calibrated length of anchor bolt 1 and determines In the nut 6 of position, nut shim 81, fastening nut 82 and protective case 9 are installed again, that is, complete the replacement of anchor bolt 1.
In the embodiment shown in Figure 2, it when needing replacing anchor bolt 1, needs together to take the connection of anchor bolt 1 location nut 6 Go out, causes 101 size of through-hole on first through hole 223 and tower drum flange disk 10 very big in this way, structural strength is influenced, for this One problem, it is preferable that as shown in fig. 7, location nut 6 includes plate positioning region 61 and the side protrusion setting by positioning region 61 Protrusion 62 is provided through the threaded hole of positioning region 61 and protrusion 62 in location nut 6, and anchor bolt 1 coordinates with threaded hole, fixed Position portion 61 is located between sheath 7 and lower anchor slab 3, and protrusion 62 stretches into sheath 7, it is preferable that the outer diameter of positioning region 61 is more than shield Set 7 outer diameter so that positioning region 61 have radially part-structure stretch out sheath 7 except, to facilitate casting after to positioning region 61 positioning.In this way, when needing replacing anchor bolt 1, anchor bolt 1 can be made to be separated with location nut 6 by rotating anchor bolt 1.For Improve locating effect of the cement to positioning region 61, it is preferable that positioning region 61 is polygonal panel, for example, hexagonal plate.
Anchor cage ring formula basis provided by the invention is provided with run-though space 212 on upper anchor slab 2, and adapter 22 is detachably set It sets in run-though space 212, and in the plane vertical with the axis of anchor bolt 1, the physical dimension of leveling nut 4 is less than perforation sky Between 212 size, in this way, the tune that leveling nut 4 realizes upper anchor slab 2 can either be passed through in the installation process on anchor cage ring formula basis It is flat, and can take out leveling nut 4 from anchor cage ring formula basis by run-though space 212 after the completion of leveling, avoid leveling Nut 4 influences the replacement of anchor bolt 1.
Those skilled in the art will readily recognize that under the premise of not conflicting, above-mentioned each preferred embodiment can be free Ground combination, superposition.
The foregoing is merely the preferred embodiment of the present invention, are not intended to restrict the invention, for those skilled in the art For, the present invention can have various modifications and changes.It is all within spirit and principles of the present invention made by any modification, equivalent Replace, improve etc., it should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of anchor cage ring formula basis, which is characterized in that including anchor bolt, upper anchor slab and lower anchor slab, the upper anchor slab includes ontology And adapter, the run-though space axially through the ontology along the anchor bolt is provided on the ontology, the adapter can Dismounting is arranged in the run-though space, and the anchor cage ring formula basis further includes leveling nut, and the leveling nut can be with institute It states anchor bolt and forms screw-thread fit to carry out leveling to the upper anchor slab, the anchor bolt that can coordinate with the leveling nut passes through The adapter, the leveling nut and the run-though space are set as, and the leveling nut can take through the run-though space Go out.
2. anchor cage ring formula basis according to claim 1, which is characterized in that in the plane vertical with the axis of the anchor bolt Interior, under at least one orientation mode, the physical dimension of the leveling nut is less than the size of the run-though space.
3. anchor cage ring formula basis according to claim 1, which is characterized in that the ontology is split structure, including edge The anchor slab unit of multiple fans annular of circumferential spaced setting, the adjacent anchor slab unit are connected to one by the adapter It rises, the space between the adjacent anchor slab unit constitutes the run-though space;Alternatively,
Fourth hole is provided on the ontology, the fourth hole constitutes the run-though space.
4. anchor cage ring formula basis according to claim 3, which is characterized in that the adapter includes connecting plate and protrudes from The positioning region of the lower surface setting of the connecting plate is provided through the connecting plate and the positioning region on the adapter First through hole, so that the top of the anchor bolt passes through, in the plane vertical with the axis of the anchor bolt, the leveling nut Physical dimension is less than the physical dimension of the positioning region.
5. anchor cage ring formula according to claim 4 basis, which is characterized in that the anchor bolt the upper anchor slab and it is described under It is arranged with sheath on part between anchor slab, there is gap between the sheath and the anchor bolt.
6. anchor cage ring formula basis according to claim 5, which is characterized in that be set in the anchor coordinated with the leveling nut The sheath on bolt includes multiple sheath units of fission in an axial direction, and the relative position between the sheath unit is adjustable;
Preferably, the multiple sheath unit from top to bottom include the first sheath unit and the second sheath unit,
The leveling nut is arranged in first sheath unit;And/or
It is threadedly coupled between the medial surface of first sheath unit and the lateral surface of second sheath unit.
7. anchor cage ring formula basis according to claim 5, which is characterized in that the anchor cage ring formula basis further includes positioning spiral shell Female and shield is provided with the second through-hole on the lower anchor slab, and the lower part of the anchor bolt is pierced by described cast anchor through second through-hole Plate, the location nut are located at the top of the lower anchor slab, and the shield is arranged in the lower section of the lower anchor slab and by the anchor The part that bolt is pierced by the lower anchor slab covers, and the location nut and the shield carry out the anchor bolt on the lower anchor slab Positioning.
8. anchor cage ring formula basis according to claim 7, which is characterized in that the location nut is located in the sheath; And/or
In the plane vertical with the axis of the anchor bolt, the physical dimension of the location nut is less than the ruler of the first through hole It is very little;And/or
In the plane vertical with the axis of the anchor bolt, the physical dimension of the location nut is less than and the anchor cage cyclic group The size of through-hole on the matched tower drum flange disk of plinth;And/or
The third through-hole passed through for the anchor bolt that does not coordinate with the leveling nut is provided on the upper anchor slab, with the anchor bolt The vertical plane of axis in, the physical dimension of the location nut is less than the size of the third through-hole;And/or
The location nut is round nut;
Alternatively,
The location nut includes the protrusion of plate positioning region and the side protrusion setting by the positioning region, the positioning spiral shell The threaded hole of the positioning region and the protrusion is provided through on mother, the positioning region is located at the sheath and casts anchor with described Between plate, the protrusion stretches into the sheath;
Preferably, the plate positioning region is polygonal panel.
9. the anchor cage ring formula basis according to one of claim 1 to 8, which is characterized in that set on the upper surface of the anchor bolt It is equipped with threaded hole;And/or
The lower end of the anchor bolt is provided with guide part, and the cross-sectional area of the guide part gradually increases from the bottom to top;And/or
The anchor bolt includes top half and lower half portion, and the cross-sectional area of the top half is less than the cross of the lower half portion Sectional area.
10. a kind of installation method on anchor cage ring formula basis as described in one of claim 1 to 9, which is characterized in that the installation Method includes:
The lower anchor slab is installed and leveling is carried out to the lower anchor slab;
The anchor bolt and the lower anchor slab are located by connecting;
The upper anchor slab is installed in the anchor bolt;
Leveling is carried out to upper anchor slab using leveling nut;
Anchor cage is poured;
The adapter is dismantled after the completion of pouring, the leveling nut is taken out from the run-though space, then by the adapter Reinstall the ontology;
Tower drum flange disk is installed.
CN201810350437.6A 2018-04-18 2018-04-18 Anchor cage ring type foundation and installation method thereof Active CN108385711B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810350437.6A CN108385711B (en) 2018-04-18 2018-04-18 Anchor cage ring type foundation and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810350437.6A CN108385711B (en) 2018-04-18 2018-04-18 Anchor cage ring type foundation and installation method thereof

Publications (2)

Publication Number Publication Date
CN108385711A true CN108385711A (en) 2018-08-10
CN108385711B CN108385711B (en) 2024-03-22

Family

ID=63065398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810350437.6A Active CN108385711B (en) 2018-04-18 2018-04-18 Anchor cage ring type foundation and installation method thereof

Country Status (1)

Country Link
CN (1) CN108385711B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372007A (en) * 2018-11-28 2019-02-22 长江三峡集团福建能源投资有限公司 A kind of Oversea wind unit installation anchor bolt cage sealing anchor bolt and its construction method
CN111661746A (en) * 2019-03-07 2020-09-15 江苏金风科技有限公司 Lifting appliance
CN112482430A (en) * 2020-11-16 2021-03-12 中国空气动力研究与发展中心设备设计及测试技术研究所 Replaceable secondary grouting anchor bolt foundation and replacement and installation method
CN112482428A (en) * 2020-11-16 2021-03-12 中国空气动力研究与发展中心设备设计及测试技术研究所 Replaceable anchor bolt assembly for concrete foundation

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102051888A (en) * 2009-11-06 2011-05-11 中冶天工建设有限公司 Method for constructing built-in foundation bolt regulating hole of equipment foundation
CN102616696A (en) * 2012-04-19 2012-08-01 东南大学 Assembled continuous lifting jack for finish-rolling threaded steel bar vertical columns
CN203924098U (en) * 2014-07-07 2014-11-05 闵怡红 Hang adjustable type prestressing force crab-bolt cage
CN203960895U (en) * 2014-07-16 2014-11-26 新疆金风科技股份有限公司 Anchor slab bolt assembly and tower foundation assembly
CN104696333A (en) * 2014-05-27 2015-06-10 徐宝余 External hanging type detachable hole expanding anchor bolt
CN205530254U (en) * 2016-04-19 2016-08-31 上海高强度螺栓厂有限公司 Big shaped steel constructs installation utensil of earth anchor subassembly
CN106351247A (en) * 2016-10-11 2017-01-25 北京健安诚岩土工程有限公司 Anchor cage ring type foundation with replaceable anchor bolt
CN208266904U (en) * 2018-04-18 2018-12-21 上海磐武工业科技有限公司 A kind of anchor cage ring formula basis

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102051888A (en) * 2009-11-06 2011-05-11 中冶天工建设有限公司 Method for constructing built-in foundation bolt regulating hole of equipment foundation
CN102616696A (en) * 2012-04-19 2012-08-01 东南大学 Assembled continuous lifting jack for finish-rolling threaded steel bar vertical columns
CN104696333A (en) * 2014-05-27 2015-06-10 徐宝余 External hanging type detachable hole expanding anchor bolt
CN203924098U (en) * 2014-07-07 2014-11-05 闵怡红 Hang adjustable type prestressing force crab-bolt cage
CN203960895U (en) * 2014-07-16 2014-11-26 新疆金风科技股份有限公司 Anchor slab bolt assembly and tower foundation assembly
CN205530254U (en) * 2016-04-19 2016-08-31 上海高强度螺栓厂有限公司 Big shaped steel constructs installation utensil of earth anchor subassembly
CN106351247A (en) * 2016-10-11 2017-01-25 北京健安诚岩土工程有限公司 Anchor cage ring type foundation with replaceable anchor bolt
CN208266904U (en) * 2018-04-18 2018-12-21 上海磐武工业科技有限公司 A kind of anchor cage ring formula basis

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372007A (en) * 2018-11-28 2019-02-22 长江三峡集团福建能源投资有限公司 A kind of Oversea wind unit installation anchor bolt cage sealing anchor bolt and its construction method
CN109372007B (en) * 2018-11-28 2023-11-07 长江三峡集团福建能源投资有限公司 Sealing anchor bolt for installing anchor bolt cage of offshore wind turbine and construction method of sealing anchor bolt
CN111661746A (en) * 2019-03-07 2020-09-15 江苏金风科技有限公司 Lifting appliance
CN112482430A (en) * 2020-11-16 2021-03-12 中国空气动力研究与发展中心设备设计及测试技术研究所 Replaceable secondary grouting anchor bolt foundation and replacement and installation method
CN112482428A (en) * 2020-11-16 2021-03-12 中国空气动力研究与发展中心设备设计及测试技术研究所 Replaceable anchor bolt assembly for concrete foundation
CN112482430B (en) * 2020-11-16 2022-02-01 中国空气动力研究与发展中心设备设计及测试技术研究所 Replaceable secondary grouting anchor bolt foundation and replacement and installation method

Also Published As

Publication number Publication date
CN108385711B (en) 2024-03-22

Similar Documents

Publication Publication Date Title
CN108385711A (en) A kind of anchor cage ring formula basis and its installation method
CN102730552B (en) Special hold hoop equipment for complete machine installation of marine fan
CN208266904U (en) A kind of anchor cage ring formula basis
CN205859357U (en) One removably connects fixing device
CN108978725B (en) adjustable manhole cover with square outside and round inside and installation and adjustment method thereof
CN106351247B (en) The anchor cage ring formula basis of replaceable anchor bolt
CN107414212B (en) A kind of male thread processing device
CN206128110U (en) Anchor cage ring type basis of removable crab -bolt
CN206256474U (en) Inspection shaft quick-mounting protective grate
CN203942377U (en) The electric motor end cap of easy access
CN204510265U (en) Adjustable height inspection well cover
CN108360592A (en) A kind of bridge trunnion base protective device
CN105329714B (en) A kind of new remaining cable disk
CN208088380U (en) A kind of bridge trunnion base protective device
CN207511652U (en) A kind of rotatable suspended ceiling mounting structure
CN204569271U (en) Open pulley support seat
CN206487679U (en) Impeller shaft end nut check anti-loose structure
CN215633354U (en) Transition section connecting structure with reinforcing structure for gas turbine
CN204076181U (en) A kind of crane rotation supports more changing device
CN203756766U (en) Installation assembly of large-sized rotary bearing
CN210414391U (en) Hydroelectric set guide bearing oil groove bottom plate dismouting device
CN206743056U (en) Wind turbine power generation unit collector ring provision for disengagement
CN216382810U (en) Double-shaft torque-free adjustable wheelbase connecting device
CN203699753U (en) Positioning device for crane
JP3239028U (en) Bolt protection device for the base of the tower of a wind power plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20240226

Address after: 314300 Qingshan Road, Changqianshan Industrial Park, Ganpu Town, Haiyan County, Jiaxing City, Zhejiang Province

Applicant after: Zhejiang Xingda Energy Technology Co.,Ltd.

Country or region after: China

Address before: Room A1138, Building 1, No. 947 Jinle Road, Baoshan District, Shanghai

Applicant before: SHANGHAI PANWU INDUSTRIAL TECHNOLOGY Co.,Ltd.

Country or region before: China

GR01 Patent grant
GR01 Patent grant