CN102017883A - 薄壳山核桃早果丰产整形方法 - Google Patents

薄壳山核桃早果丰产整形方法 Download PDF

Info

Publication number
CN102017883A
CN102017883A CN 201010290707 CN201010290707A CN102017883A CN 102017883 A CN102017883 A CN 102017883A CN 201010290707 CN201010290707 CN 201010290707 CN 201010290707 A CN201010290707 A CN 201010290707A CN 102017883 A CN102017883 A CN 102017883A
Authority
CN
China
Prior art keywords
branch
major branch
major
layer
branches
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010290707
Other languages
English (en)
Other versions
CN102017883B (zh
Inventor
刘广勤
朱海军
藏旭
生静雅
周蓓蓓
兰平友
彭干
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Academy of Agricultural Sciences
Original Assignee
Jiangsu Academy of Agricultural Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Academy of Agricultural Sciences filed Critical Jiangsu Academy of Agricultural Sciences
Priority to CN2010102907072A priority Critical patent/CN102017883B/zh
Publication of CN102017883A publication Critical patent/CN102017883A/zh
Application granted granted Critical
Publication of CN102017883B publication Critical patent/CN102017883B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

本发明公开一种薄壳山核桃的整形方法,属于果树栽培方法。包括以下步骤:在定干高度80cm以上,不同方向选留2个壮枝或壮芽,培养成第一、二主枝;主干拉平作为第三条主枝;三条主枝组成第一层主枝,三大主枝竖直间距不少于20cm,水平夹角120度。在第一层主枝上距主干50cm处各选留一条变向直立枝,拉平培养成第二层主枝。第二、三层主枝培养方法同第一层主枝,三层主枝层间距120-150cm以上,三层主枝间不交叉、不重叠。结果枝及结果枝组培养:主枝上长出的枝条进行扭稍、拉枝,培养为中短枝,组成结果枝或结果枝组。本发明的目的是提供一种薄壳山核桃幼树整形技术,控制树体干性优势,达到植株的早产、高产和稳产的目的。

Description

薄壳山核桃早果丰产整形方法
所属技术领域
本发明涉及一种薄壳山核桃的整形方法,属于果树栽培方法。
背景技术
薄壳山核桃[Carya illinoensis(Wangenn.)K.Koch],又名长山核桃,为胡桃科山核桃属落叶乔木。是世界著名干果、高档木本食用油料、绿化及林材兼用树种,极具经济价值和开发潜力,国内国际市场前景广阔。
我国自十九世纪末引入薄壳山核桃,多以实生苗栽植,林果兼用为目的。因其干性强,顶端优势明显,不易形成中短枝,一、二十年未形成产量,结果极晚,成为薄壳山核桃至今未能果园化规模栽植的主要原因之一。
目前薄壳山核桃生产中多以主干疏层形和自然开心形为主。前者特点是成形后通风透光好,寿命长、产量高,负载量大,适于生长条件较好的地方和干性强的品种;缺点是成形慢,结果晚,早期产量低。后者特点是成形快,结果早,整形容易,便于掌握,适于生长条件不良的地区和树势开张的早实品种;缺点是树冠形成早,发展空间受到限制,影响后期产量。整形修剪是薄壳山核桃树体管理中的一项重要技术措施。合理的整形修剪措施,可调整树体结构,使骨架牢固,枝条疏密得当,改善通风透光条件,促进树体早果丰产,提高核桃早果性和果实产量。
发明内容
技术问题
本发明的目的是提供一种薄壳山核桃幼树整形技术,促进植株提早结果并形成早期产量。采用本发明整形技术,使薄壳山核桃幼树定植第二年单株枝量由6-12条提高到50条以上;定植第三年单株枝量由10-32条提高到100条以上,为第三、四年始果奠定基础。
技术方案
一种薄壳山核桃的整形方法,其特征在于,整形包括以下步骤:
(1)定干:第一年,在主干80cm上方选留一个壮芽进行短截,定干;
(2)主枝培养:
第二年春季第一层主枝培养,在定干高度80cm以上,正北方向选择一个芽培养为第一主枝,顺时针或逆时针隔120度螺旋向上确定一个芽培养为第二主枝;主干拉平,与第一、二主枝间呈120度水平夹角,作为第三条主枝;三条主枝作为第一层主枝,三主枝竖向间距不少于20cm;
第二年夏季第二层主枝培养:在第一层主枝上距主干50cm处各选留一条变向直立枝,任其向上生长,待选留枝条长至80-100cm时,将三条选留枝条沿不同方向拉平,培养成第二层主枝,与第一层主枝不交叉、不重叠;
第三年春季第三层主枝培养:第三层主枝培养和第二层主枝培养方法一样,要求第二、三层主枝间的距离在120-150cm以上,三层主枝方向不交叉,利于后期的通风透光;
(3)结果枝及结果枝组培养:
全树共有3层、9个主枝,不培养侧枝,只在主枝上配备结果枝及结果枝组,方法是主枝培养的同时,主枝上长出的枝条全部通过扭稍、拉枝,培养为中短枝,中型枝长度50-70cm,短枝长度小于50cm,各主枝及枝组互相错落,不交叉不重叠。
有益效果
本发明提供一种薄壳山核桃幼树整形技术。通过对幼树的整形,促进植株提早结果并形成早期产量。采用该发明整形技术,使薄壳山核桃幼树定植第二年单株枝量由6-12条提高到50条以上;定植第三年单株枝量由10-32条提高到100条以上,为第三、四年始果奠定基础。使薄壳山核桃单株枝量提高3-4倍以上,为薄壳山核桃第三、四年始果,第五、六年丰产奠定基础。
具体实施方式
在河南洛宁县东林苗木有限公司基地建立试验田10亩,株行距为4×6m,品种为波尼。
(1)定干:该试验田立地条件好,土层较厚,土质较肥沃,不考虑以后的间作,定干高度80cm。2009年3月20日前后树体萌动发芽后,在定干高度的上方选留一个壮芽进行短截。
(2)主枝培养:第一层主枝培养,定干后第二年春季3月15日树体萌动后进行,具体做法是在定干高度80cm以上,正北方向选择一个壮芽或壮枝培养为第一主枝,顺时针或逆时针隔120度螺旋向上确定一个壮芽或壮枝培养为第二主枝;另外,将主干拉平(平行于地面)。这样,拉平的主干与选留的2个枝条组成第一层主枝,主枝要错落排列开,避免邻接,枝间竖直距不少于20cm,防止出现“卡脖”现象;三大主枝之间保持120度水平夹角。
第二层主枝培养:第二年夏季6月15日前后,第一层主枝培养形成,然后在拉平的第一层主枝上各选一条生长健壮的变向直立枝,任其生长,作为第二层主枝培养,选留的直立枝距主干50cm。待选留枝条长至80-100cm时,将三条选留枝条拉平生长,培养成第二层主枝;第一层与第二层主枝间合理搭配,不交叉,不重叠,充分考虑后期枝条疏密得当、通风透光。
第三层主枝培养:第三年春季3月26日树体萌动后,对已形成第二层主枝的树进行第三层主枝培养。按照第二层主枝培养的方法进行三层主枝培养,第二、三层主枝间的距离控制在120-150cm以上,保证后期优良的通风透光条件,提高光能利用率。
(3)结果枝及结果枝组培养:
全树共有3层、9个主枝,不培养侧枝,只在主枝上配备结果枝及结果枝组。方法是主枝培养的同时,主枝上长出的枝条全部通过扭稍、拉枝,培养为中短枝。中型枝长度50-70cm,短枝长度小于50cm,各主枝及枝组互相错落,避免交叉重叠。
目前,试验田经过“该整形技术措施”后,树势得到明显控制,生长健壮整齐,各枝条分布均匀,空间利用率高;使薄壳山核桃幼树定植第二年单株枝量由6-12条提高到50条以上;经过测定,叶片营养指标合理,预计第三年可挂果,第三年单株枝量由10-32条提高到100条以上,单株枝量提高3-4倍以上,为薄壳山核桃第三、四年始果,第五、六年丰产奠定基础。第四年单株产量可达2kg以上,亩产60kg以上。

Claims (1)

1.一种薄壳山核桃的整形方法,其特征在于,整形包括以下步骤:
(1)定干:第一年,在主干80cm上方选留一个壮芽进行短截,定干;
(2)主枝培养:
第二年春季第一层主枝培养,在定干高度80cm以上,正北方向选择一个芽培养为第一主枝,顺时针或逆时针隔120度螺旋向上确定一个芽培养为第二主枝;主干拉平,与第一、二主枝间呈120度水平夹角,作为第三条主枝;三条主枝作为第一层主枝,三主枝竖向间距不少于20cm;
第二年夏季第二层主枝培养:在第一层主枝上距主干50cm处各选留一条变向直立枝,任其向上生长,待选留枝条长至80-100cm时,将三条选留枝条沿不同方向拉平,培养成第二层主枝,与第一层主枝不交叉、不重叠;
第三年春季第三层主枝培养:第三层主枝培养和第二层主枝培养方法一样,要求第二、三层主枝间的距离在120-150cm以上,三层主枝方向不交叉,利于后期的通风透光;
(3)结果枝及结果枝组培养:
全树共有3层、9个主枝,不培养侧枝,只在主枝上配备结果枝及结果枝组,方法是主枝培养的同时,主枝上长出的枝条全部通过扭稍、拉枝,培养为中短枝,中型枝长度50-70cm,短枝长度小于50cm,各主枝及枝组互相错落,不交叉不重叠。
CN2010102907072A 2010-09-21 2010-09-21 薄壳山核桃早果丰产整形方法 Expired - Fee Related CN102017883B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102907072A CN102017883B (zh) 2010-09-21 2010-09-21 薄壳山核桃早果丰产整形方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102907072A CN102017883B (zh) 2010-09-21 2010-09-21 薄壳山核桃早果丰产整形方法

Publications (2)

Publication Number Publication Date
CN102017883A true CN102017883A (zh) 2011-04-20
CN102017883B CN102017883B (zh) 2012-04-25

Family

ID=43859983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102907072A Expired - Fee Related CN102017883B (zh) 2010-09-21 2010-09-21 薄壳山核桃早果丰产整形方法

Country Status (1)

Country Link
CN (1) CN102017883B (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102823439A (zh) * 2012-09-20 2012-12-19 江苏省中国科学院植物研究所 一种薄壳山核桃控温控湿嫁接繁殖方法
CN103461051A (zh) * 2013-09-17 2013-12-25 江苏省农业科学院 一种水田薄壳山核桃的栽植模式
CN104429673A (zh) * 2014-11-12 2015-03-25 袁昌选 一种油茶幼树分层拉枝扩冠的方法
CN104488636A (zh) * 2014-11-28 2015-04-08 苏州青青生态种植园 一种提高核桃树成长速度的种植技术
CN104584974A (zh) * 2015-02-05 2015-05-06 江苏省中国科学院植物研究所 一种薄壳山核桃篱壁形树形及其整形方法
CN105075625A (zh) * 2015-08-25 2015-11-25 全椒林农生态农业科技有限公司 一种薄壳山核桃的种植及其养护方法
CN105284523A (zh) * 2015-09-30 2016-02-03 广西八桂石漠化核桃产业开发有限公司 核桃树整形修剪方法
CN105981544A (zh) * 2015-02-12 2016-10-05 江苏省农业科学院 一种薄壳山核桃幼树腋芽成花技术
CN106416893A (zh) * 2016-09-30 2017-02-22 陆良县营林管理站 一种选择核桃树嫩枝定向培育主枝的方法
CN108476845A (zh) * 2018-03-09 2018-09-04 江苏林丰绿化工程有限公司 薄壳山核桃树冠定向培育方法
CN109197322A (zh) * 2018-09-07 2019-01-15 田东县文设芒果专业合作社 一种使芒果树枝规则生长的方法
CN110710410A (zh) * 2019-12-03 2020-01-21 江苏丘陵地区镇江农业科学研究所 一种薄壳山核桃栽培管理和整形方法
CN110800534A (zh) * 2019-11-18 2020-02-18 广西壮族自治区农业科学院园艺研究所 一种适合南方地区的山核桃枝梢培养方法
CN110800539A (zh) * 2019-11-29 2020-02-18 河北省农林科学院石家庄果树研究所 一种苹果实生苗提早结果的枝条培养方法
CN114051881A (zh) * 2021-10-20 2022-02-18 河北省农林科学院昌黎果树研究所 一种窄冠低干核桃幼树的整形方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101595819A (zh) * 2009-07-09 2009-12-09 保山市林业技术推广总站 核桃良种选育和丰产栽培方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101595819A (zh) * 2009-07-09 2009-12-09 保山市林业技术推广总站 核桃良种选育和丰产栽培方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《吉林农业科学》 20081231 宋尚伟等 早实核桃的生长发育特点和整形修剪技术 第56-58页和第61页 1 第33卷, 第4期 2 *
《核桃单层高位开心形树相指标及光照特性研究》 20071231 齐国辉等 核桃单层高位开心形树相指标及光照特性研究 第23-26页 1 第25卷, 第2期 2 *
《陕西农业科学》 20081231 张永乐等 核桃整形修剪技术 第192-193页 1 , 第6期 2 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102823439A (zh) * 2012-09-20 2012-12-19 江苏省中国科学院植物研究所 一种薄壳山核桃控温控湿嫁接繁殖方法
CN102823439B (zh) * 2012-09-20 2014-03-26 江苏省中国科学院植物研究所 一种薄壳山核桃控温控湿嫁接繁殖方法
CN103461051A (zh) * 2013-09-17 2013-12-25 江苏省农业科学院 一种水田薄壳山核桃的栽植模式
CN104429673A (zh) * 2014-11-12 2015-03-25 袁昌选 一种油茶幼树分层拉枝扩冠的方法
CN104488636A (zh) * 2014-11-28 2015-04-08 苏州青青生态种植园 一种提高核桃树成长速度的种植技术
CN104584974A (zh) * 2015-02-05 2015-05-06 江苏省中国科学院植物研究所 一种薄壳山核桃篱壁形树形及其整形方法
CN105981544A (zh) * 2015-02-12 2016-10-05 江苏省农业科学院 一种薄壳山核桃幼树腋芽成花技术
CN105981544B (zh) * 2015-02-12 2020-08-04 江苏省农业科学院 一种薄壳山核桃幼树腋芽成花结果方法
CN105075625A (zh) * 2015-08-25 2015-11-25 全椒林农生态农业科技有限公司 一种薄壳山核桃的种植及其养护方法
CN105284523A (zh) * 2015-09-30 2016-02-03 广西八桂石漠化核桃产业开发有限公司 核桃树整形修剪方法
CN106416893A (zh) * 2016-09-30 2017-02-22 陆良县营林管理站 一种选择核桃树嫩枝定向培育主枝的方法
CN108476845A (zh) * 2018-03-09 2018-09-04 江苏林丰绿化工程有限公司 薄壳山核桃树冠定向培育方法
CN108476845B (zh) * 2018-03-09 2019-12-24 江苏省林业科学研究院 薄壳山核桃树冠定向培育方法
CN109197322A (zh) * 2018-09-07 2019-01-15 田东县文设芒果专业合作社 一种使芒果树枝规则生长的方法
CN110800534A (zh) * 2019-11-18 2020-02-18 广西壮族自治区农业科学院园艺研究所 一种适合南方地区的山核桃枝梢培养方法
CN110800539A (zh) * 2019-11-29 2020-02-18 河北省农林科学院石家庄果树研究所 一种苹果实生苗提早结果的枝条培养方法
CN110710410A (zh) * 2019-12-03 2020-01-21 江苏丘陵地区镇江农业科学研究所 一种薄壳山核桃栽培管理和整形方法
CN114051881A (zh) * 2021-10-20 2022-02-18 河北省农林科学院昌黎果树研究所 一种窄冠低干核桃幼树的整形方法

Also Published As

Publication number Publication date
CN102017883B (zh) 2012-04-25

Similar Documents

Publication Publication Date Title
CN102017883B (zh) 薄壳山核桃早果丰产整形方法
CN103636454B (zh) 葡萄一年结两次果的栽培方法
CN104160906B (zh) 一种桃树整形修剪方法
CN102893836B (zh) 苹果树两枝一干树形、栽植方法及其整形方法
CN103430803B (zh) 一种桃树三主枝一中心干形整形栽培方法
CN103461055B (zh) 一种密植桃树高光效树形的整形修剪方法
CN103503735B (zh) 一种密植大樱桃树高光效树形的整形修剪方法
CN103430805B (zh) 一种桃树二主枝一中心干形整形栽培方法
CN108094029B (zh) 一种高干y形双主干树形栽培桃的方法
CN104429641B (zh) 一种苹果树矮砧集约高效栽培方法
CN103444484B (zh) 一种夏黑葡萄单主干双主枝整形及二芽修剪栽培方法
CN103477933B (zh) 一种大樱桃树倒伞形树形的整形修剪方法
CN101946671B (zh) 一种桃树中间砧控冠的方法
CN107371855B (zh) 一种梨树“四臂篱架形”树形及整形方法
CN105052481A (zh) 一种杉木丰产造林方法
CN106069558A (zh) 一种低主蔓t形平棚架葡萄树形及其构建方法
CN105009910A (zh) 一种桃树优质省力化整形栽培方法
CN105248211B (zh) 砂梨水平棚架单主枝联体“梳形”整形栽培方法
CN107371965B (zh) 一种音叉形梨树树形及其整形修剪方法
CN104823788A (zh) 一种适合设施油桃高密度栽培的柱状树形培养方法
CN105027962A (zh) 一种大樱桃的控根控冠栽培方法
CN104115721A (zh) 一种樱桃的种植方法
CN104221800A (zh) 设施桃、杏、李专用树形“细柱形”的培育方法
CN103053378A (zh) 一种新型棚架梨树结果枝组及其培养方法
CN103477932B (zh) 一种柿树倒伞形树形的整形修剪方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120425

Termination date: 20130921