CN101994312B - Soil side slope or tailings dam drainage construction method - Google Patents

Soil side slope or tailings dam drainage construction method Download PDF

Info

Publication number
CN101994312B
CN101994312B CN2010105080536A CN201010508053A CN101994312B CN 101994312 B CN101994312 B CN 101994312B CN 2010105080536 A CN2010105080536 A CN 2010105080536A CN 201010508053 A CN201010508053 A CN 201010508053A CN 101994312 B CN101994312 B CN 101994312B
Authority
CN
China
Prior art keywords
soil
construction
drainage pipe
drilling rod
drill stems
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105080536A
Other languages
Chinese (zh)
Other versions
CN101994312A (en
Inventor
刘利华
姜宏
李福奎
魏可峰
滕海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd filed Critical ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Priority to CN2010105080536A priority Critical patent/CN101994312B/en
Publication of CN101994312A publication Critical patent/CN101994312A/en
Application granted granted Critical
Publication of CN101994312B publication Critical patent/CN101994312B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention relates to a soil side slope or tailings dam drainage construction method comprising the following steps of: drilling: drilling on a soil side slope or a tailings dam by adopting a directional drilling machine from top to bottom or from bottom to top according to the design requirement; installing drainage pipes, removing the directional drills or directional drilling machine power head connecting rods after drilling to the designed position, and placing the drainage pipes into drill stems; and retreating the drill stems: retreating the drill stems from drilled holes by utilizing the directional drilling machine one by one, and then the drainage pipes can drain off water. In the invention, due to the fact that the drill stems are used as the construction casing pipes of the drainage pipes, the construction is simple and the operation procedures are few. The back dragging resistance is small when the drill stems are retreated, and moreover, the piping phenomenon is not easy to generate in the construction process, and the construction is safe. In the construction method, for example, drilling from top to bottom, a sand stopping ring is not needed when the drill stems are retreated, the drill stems can be conveniently retreated and the construction efficiency is high.

Description

A kind of soil-slope or tailing dam row are oozed job practices
Technical field
The present invention relates to the geotechnical engineering field, be meant that specifically soil-slope or metal mine tailing dam, red mud dam, power plant ash quarrel dam etc. carry out a kind of job practices that horizontal rows is oozed.
Background technology
At present, tailing dam, red mud dam, ash quarrel dam and soil-slope carry out horizontal rows when oozing, and often adopt methods such as horizontal jacking pipe and horizontal directional drill pore-forming.Because characteristics such as the horizontal directional drill walking conveniently, and is directed good, and the construction distance is big use in recent years often, but existing job practices construction sequence are complicated, efficient is low.
Summary of the invention
The technical problem that the present invention will solve is to ooze job practices for the deficiency that overcomes existing job practices provides soil-slope or the tailing dam row that a kind of construction sequence is simple, easy to operate, production efficiency is high.
The technical scheme that adopts is:
A kind of soil-slope or tailing dam row are oozed job practices, may further comprise the steps:
Step 1 boring:
On tailing dam or soil-slope, adopt directional drilling machine or from the bottom to top from top to bottom, hole by designing requirement.
Step 2 is installed drainage pipe:
Hole to design attitude, lay down lead bit or directional drilling machine unit head connecting rod, drainage pipe is placed in the drilling rod.
Step 3 is moved back drilling rod:
Utilize directional drilling machine that drilling rod is withdrawed from by root from boring, drainage pipe can draining.
Above-mentioned step 2 adopts drilling rod directly to make the construction sleeve pipe of drainage pipe, can directly drainage pipe be installed in the drilling rod.
Above-mentioned steps one adopts from top to bottom holes from tailing dam or soil-slope, when moving back drilling rod, need not end the sand ring.
Above-mentioned drainage pipe outsourcing nylon wire.
Advantage of the present invention: owing to adopt drilling rod to make the construction sleeve pipe of drainage pipe, construction is simple, and operation sequence is few.Return when moving back drilling rod and drag resistance little, and be difficult for producing piping phenomenon, construction safety in the work progress.This method construction like boring from the top down, can end the sand ring when moving back drilling rod, moves back drilling rod conveniently, and efficiency of construction is high.
Description of drawings
Fig. 1 is a boring sketch map of the present invention.
Fig. 2 installs the drainage pipe sketch map for the present invention.
Fig. 3 withdraws from back drainage pipe draining sketch map for drilling rod of the present invention.
The specific embodiment
A kind of soil-slope or tailing dam row are oozed job practices, may further comprise the steps:
Step 1 boring:
Directional drilling machine 2 is fixed on a certain assigned address on the tailing dam 1, holes from the bottom to top,,, when moving back drilling rod, can end the sand ring if adopt boring from top to bottom until getting into design attitude by designing requirement.
Step 2 is installed drainage pipe:
To design attitude, lay down directional drilling machine 2 drill bits or drill power head connecting rod when holing, adopt drilling rod 3 directly to make the construction sleeve pipe of drainage pipe, the drainage pipe of making in advance 4 is placed in the drilling rod 3.Said drainage pipe 4 is a known technology.Adopt PE pipe or PPR water service pipe, the drain hole on the pipe adopts the plum blossom shape to arrange, drainage pipe 4 outsourcing several layers nylon wires, or white steel mesh, or geotextiles, slot scraping or add rib on pipe in case of necessity.
Step 3 is moved back drilling rod:
Utilize directional drilling machine 2 that drilling rod 3 is withdrawed from by root from boring, drainage pipe 4 can the draining (see figure 3).

Claims (4)

1. soil-slope or tailing dam row is oozed job practices, may further comprise the steps:
Step 1 boring:
On tailing dam (1) or soil-slope, adopt directional drilling machine (2) or from the bottom to top from top to bottom, hole by designing requirement;
Step 2 is installed drainage pipe:
Hole to design attitude, lay down lead bit or directional drilling machine unit head connecting rod, drainage pipe (4) is placed in the drilling rod (3):
Step 3 is moved back drilling rod;
Utilize directional drilling machine that drilling rod (3) is withdrawed from by root from boring, drainage pipe (4) can draining.
2. a kind of soil-slope according to claim 1 or tailing dam row are oozed job practices, it is characterized in that described step 2 adopts drilling rod (3) directly to make the construction sleeve pipe of drainage pipe (4), directly is installed in drainage pipe in the drilling rod.
3. a kind of soil-slope according to claim 1 or tailing dam row is oozed job practices, it is characterized in that described step 1 adopts from top to bottom to hole from tailing dam or soil-slope, when moving back drilling rod, need not end the sand ring.
4. a kind of soil-slope according to claim 1 or tailing dam row are oozed job practices, it is characterized in that described drainage pipe (4) outsourcing nylon wire.
CN2010105080536A 2010-10-15 2010-10-15 Soil side slope or tailings dam drainage construction method Active CN101994312B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105080536A CN101994312B (en) 2010-10-15 2010-10-15 Soil side slope or tailings dam drainage construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105080536A CN101994312B (en) 2010-10-15 2010-10-15 Soil side slope or tailings dam drainage construction method

Publications (2)

Publication Number Publication Date
CN101994312A CN101994312A (en) 2011-03-30
CN101994312B true CN101994312B (en) 2012-02-01

Family

ID=43785015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105080536A Active CN101994312B (en) 2010-10-15 2010-10-15 Soil side slope or tailings dam drainage construction method

Country Status (1)

Country Link
CN (1) CN101994312B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103122639B (en) * 2011-11-18 2015-05-27 中冶集团武汉勘察研究院有限公司 New construction method of postposition drainage reinforced belt for governing tailing fill dam
CN105756560B (en) * 2016-02-23 2018-12-21 付文堂 A kind of drill assembly and drainage pipe arc lay method
CN106436776A (en) * 2016-09-18 2017-02-22 上海胜义环境科技有限公司 Method for applying horizontal directional drilling to refuse landfill leachate drainage
CN106759242B (en) * 2017-02-17 2018-06-29 福建省地质工程勘察院 A kind of construction method of white-out slope underground water system
CN109356144A (en) * 2018-10-29 2019-02-19 河海大学 A kind of dedicated drainage pipe of Tailings Dam and its method for slowing down silting
CN110080201A (en) * 2019-05-21 2019-08-02 唐山工业职业技术学院 A kind of row's infiltration system and construction method for accelerating the dam body consolidation settlement of alkaline residue library
CN115478779B (en) * 2022-08-30 2023-10-24 福建亿钻机械有限公司 Slope drilling machine for geological disaster management and intubation construction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2033016U (en) * 1988-05-01 1989-02-22 南昌有色冶金设计研究院 Bleeding-bailing system with vertical bleeding well and level bleeding pipe
CN1037943A (en) * 1988-05-20 1989-12-13 唐纳德·斯科特·鲁宾逊 Improved union
CN1022428C (en) * 1992-04-30 1993-10-13 宁夏回族自治区水利学会 Leakage-removing device for dam body
KR100394433B1 (en) * 2000-06-23 2003-08-09 대한주택공사 Method of horizontal drainage for pore water pumping of soft ground improvement
KR100681349B1 (en) * 2004-05-13 2007-02-09 정대익 The improvement method for the strengthening to strength the soft ground using to good-environment drain materia and the system for realtime monitering to mothod thereof
CN100460603C (en) * 2006-11-30 2009-02-11 付文堂 Seepage drainage method for tailing dam and seepage drainage pipe for use therein
CA2642181A1 (en) * 2008-10-21 2010-04-21 Hasan Chikh Mohamad Method to speed up the consolidation process of tailing slurry by embedded drainage system
CN101629417B (en) * 2009-08-14 2011-07-20 中国科学院武汉岩土力学研究所 Chemical siltation resisting drainage device for tailing dam

Also Published As

Publication number Publication date
CN101994312A (en) 2011-03-30

Similar Documents

Publication Publication Date Title
CN101994312B (en) Soil side slope or tailings dam drainage construction method
CN102661167B (en) Protected seam bottom plate upward comb-shaped drilled hole gas extraction method
CN100460603C (en) Seepage drainage method for tailing dam and seepage drainage pipe for use therein
CN203655249U (en) In-situ leaching uranium mining process well
CN202544925U (en) One-hole dual-purpose tunnel drain hole structure
CN103742188B (en) Colliery drawing-off gas well and boring method
CN104481489B (en) Coiled tubing fracturing and well completion integrated process method for gas well vertical well
CN102777185A (en) Inclined well shaft construction technology
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN201826811U (en) Drifting scraping device
CN1963044A (en) Construction method for withdrawal of waste pile
CN102606070B (en) Combined drilling technique of vegetable gum diamond coring and downhole hammer casing drilling
CN102635389A (en) Method for gas drainage from high-position roadway coal seam containing shielded soft rock
CN202228029U (en) Sand bailer for down-hole operation of oil field
CN203847014U (en) Auxiliary device facilitating recovering of offshore drilling marine riser
CN204530736U (en) High pressure grouting ring-type grid type pit waterproof curtain
CN111270994A (en) Casing running process and device for deep sea riser-free pipe following drilling
CN204040966U (en) A kind of drilling sampling device
CN104213882A (en) Coalbed methane horizontal well PE screen pipe well completion method and device
CN105134125A (en) Construction process for blocking bottom end of annular space behind gas vertical well wall
CN104453983A (en) Upper-fracturing lower-release permeability improvement and extraction method adopting stratum-through drilled holes for heavy-pitch coal stratum
CN102644285A (en) Anti-collapse hole construction method for anchor drilling
CN102808583B (en) Hydrological exploration drilling well pipe, coal mining pipe descending method and hydrological exploration method
CN205277306U (en) Modified high pressure is washed by water and is cut a hole mud drill bit
CN202610818U (en) Water dropping structure for foundation pit by pipe sinking of prefabricated concrete pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant