CN1022428C - Leakage-removing device for dam body - Google Patents

Leakage-removing device for dam body Download PDF

Info

Publication number
CN1022428C
CN1022428C CN 92103566 CN92103566A CN1022428C CN 1022428 C CN1022428 C CN 1022428C CN 92103566 CN92103566 CN 92103566 CN 92103566 A CN92103566 A CN 92103566A CN 1022428 C CN1022428 C CN 1022428C
Authority
CN
China
Prior art keywords
dam
seepage
discharging
dam body
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 92103566
Other languages
Chinese (zh)
Other versions
CN1067465A (en
Inventor
汤茗辉
曹善和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WATER CONSERVANCY INST NINGXIA HUI AUTONOMOUS REGION
Original Assignee
WATER CONSERVANCY INST NINGXIA HUI AUTONOMOUS REGION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WATER CONSERVANCY INST NINGXIA HUI AUTONOMOUS REGION filed Critical WATER CONSERVANCY INST NINGXIA HUI AUTONOMOUS REGION
Priority to CN 92103566 priority Critical patent/CN1022428C/en
Publication of CN1067465A publication Critical patent/CN1067465A/en
Application granted granted Critical
Publication of CN1022428C publication Critical patent/CN1022428C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to a seepage-discharging pipe of a sluicing siltation earth dam body and an arrangement method thereof. The seepage-discharging pipe comprises seepage-discharging conduits which are plastic corrugated pipes provided with micro-pores, and the maximum inside diameter of each plastic corrugated pipe is 55mm; seepage-discharging pipes are layered and staggered in the dam along a dam axis, and the seepage-discharging conduits communicated with the seepage-discharging pipes are communicated with drainage pipes led out of a dam toe. The present invention has the advantages of reasonable design, convenient construction and favorable seepage discharging effect, and also has the advantages of effectively reducing seepage lines, accelerating the dehydration and the consolidation of the sluicing siltation dam, reducing the depth of an area in a flowing state in the dam body by one fourth, improving hole-pressure dissipating rate by 30 percent, enabling a side slope steeper by 0.25 to 0.5, reducing the earth quantity of the dam body by more than 10 percent and reducing drainage engineering investments by 60 percent. The present invention has obvious social and economic benefits.

Description

Leakage-removing device for dam body
The present invention relates to water conservancy industry, specially refer to the sluicing siltation earth dam construction period and utilization phase dam body row is oozed device.
Sluicing siltation earth dam belongs to China's initiative.By the SD122-84(of Ministry of Water Resources and Power Industry sluicing siltation earth dam design and construction temporary provisions) drainage of sluicing siltation earth dam can be divided into two kinds of permanent drainage and temporary drainage facilities.The permanent drainage of dam body adopts the drainage prism of drainage prism or band mattress more.Main effect is an infiltration flowing water of getting rid of the utilization phase, reduces dam seepage line, can get rid of the fixed infiltration of dredger fill body simultaneously again.Dam body temporary drainage facility mainly contains sand drain, sand furrow, vertical permeable wall, vertical shaft and gallery etc.The main effect of temporary drainage facility is the fixed infiltration of getting rid of construction period dredger fill body, reduces the pore water pressure that bankets, and strengthens the stability of dam body and reduces the phreatic line of utilization phase dam body.Not only discharge structure more complicated but also difficulty of construction are bigger for sluicing siltation earth dam in practice of construction.Especially in most of area in loess plateau, the water resource and the sandstone gravel material utmost point lack.Must utilize the water source that is held to construct again in the dam upstream inpoundment earlier in construction, this have just strengthened the draining difficulty of dam body.Particularly in the impervious foundation and the higher area of soil property clay content, district of building a dam, the draining difficulty more need solve.In addition because existing drainage is unreasonable, so the difficult sluicing siltation earth dam of grasping dashes the speed of filling out in the construction, when dashing the speed of filling out when fast, the fluidised form district degree of depth causes dam body bulge crack even landslide and breaking down of causing greatly easily in the dam.When dashing the speed of filling out when slow, the fluidised form district is little, and dam body has been stablized, but construction speed is slow, work efficiency is low, does not reach the flood control height of dam before not only having strengthened construction investment but also often having caused flood season, has strengthened passive situations such as the flood control expense causes that break down flood season.
The object of the present invention is to provide a kind of the raising to ooze device towards the dam body row who fills out work efficiency and alternative conventional dam body drainage works.
The objective of the invention is to realize with following proposal: the drainage pipe that row is oozed device is the intersecting parallels layering and is laid staggeredly in the dam, the row who is communicated with drainage pipe ooze conduit be shrunk to gradually downstream pencil and with draw base of dam gutter outward and be communicated with.
Above-mentioned drainage pipe, row are oozed conduit and are the plastic film capicitor that is provided with micropore, and its pipe maximum inner diameter is 55 millimeters, can coat geotextile on the plastic film capicitor, combine skin or polypropylene fibre silk etc.
Above-mentioned drainage pipe floor height is a 7-10 rice apart from bottom, and the upper strata is a 4-6 rice, and horizontal range is a 8-18 rice.
The present invention is applicable to that the dam body row of sluicing siltation earth dam and earth dam oozes conventional dam body drainage works such as alternative drainage prism.Easy construction of the present invention, water seepage drainage effect be good, can effectively reduce phreatic line.Solved the sluicing siltation earth dam dewatering and coagulating preferably, it is significant that sand gravel is lacked the area.The present invention is reasonable in design, not only can shorten the sluicing siltation earth dam discharging consolidation time, improve to dash and fill out the shear strength of body and caused the redistribution of dam body water content, reduce the fluidised form district degree of depth about 1/4 in the dam body, improve pore pressure dissipation speed 30%, but constriction rolls the ridge, limit width 20-30% under identical dam body stability and security degree, makes side slope put steep 0.25-0.5, thereby reduces the dam body earth volume more than 10%.Invest about 30,000 yuan according to every dam saving of measuring and calculating, can reduce drainage works investment 60%, have remarkable social benefit and economic benefit.
The invention will be further described below in conjunction with accompanying drawing:
Fig. 1 is the three-dimensional schematic diagram of laying of the present invention.
Drainage pipe (1) is the intersecting parallels layering and is laid staggeredly in dam body as shown in Figure 1.Drainage pipe (1) floor height is 9 meters apart from bottom, and upper strata (three layers of the second layers to the) is 5 meters, and the horizontal range of drainage pipe (1) is 13 meters.Row is oozed conduit (2) and is communicated with drainage pipe (1) and also is shrunk to pencil downstream gradually and is communicated with the gutter of drawing base of dam (3).Drainage pipe (1) oozes conduit (2) with row and is the plastic film capicitor that is provided with micropore.The caliber of bellows is 50mm and is connected by sleeve pipe or tee piece.Outer geotextile that coats of bellows or brown micromicro are tied shape with galvanized wire wrapping well-thought-out plan.
Embodiment two: drainage pipe (1) floor height bottom is 10 meters, and the upper strata is 6 meters, and horizontal range is 16 meters.The outer polypropylene fibre silk that also can directly twine of pipe is laid.

Claims (3)

1, a kind of dam body row is oozed device, comprise drainage pipe (1), gutter (3), it is characterized in that arranging the drainage pipe (1) that oozes device and be the intersecting parallels layering be laid staggeredly in the dam, the row who is communicated with drainage pipe (1) oozes that conduit (2) is shrunk to pencil downstream gradually and the gutter (3) outer with drawing base of dam is communicated with.
2, dam body as claimed in claim 1 row is oozed device, it is characterized in that drainage pipe (1), row ooze conduit (2) and be the plastic film capicitor that is provided with micropore, and its pipe maximum inner diameter is 55 millimeters, can coat geotextile on the plastic film capicitor, combine skin or polypropylene fibre silk etc.
3, dam body row as claimed in claim 1 is oozed device, it is characterized in that drainage pipe (1) floor height is a 7-10 rice apart from bottom, and the upper strata is a 4-6 rice, and horizontal range is a 8-18 rice.
CN 92103566 1992-04-30 1992-04-30 Leakage-removing device for dam body Expired - Fee Related CN1022428C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92103566 CN1022428C (en) 1992-04-30 1992-04-30 Leakage-removing device for dam body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92103566 CN1022428C (en) 1992-04-30 1992-04-30 Leakage-removing device for dam body

Publications (2)

Publication Number Publication Date
CN1067465A CN1067465A (en) 1992-12-30
CN1022428C true CN1022428C (en) 1993-10-13

Family

ID=4940284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92103566 Expired - Fee Related CN1022428C (en) 1992-04-30 1992-04-30 Leakage-removing device for dam body

Country Status (1)

Country Link
CN (1) CN1022428C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1297713C (en) * 2004-07-15 2007-01-31 国家电力公司华东勘测设计研究院 Back ward water draining system of face plate rock-fill dam dam body and its construction method
RU2768715C1 (en) * 2021-10-13 2022-03-24 Федеральное государственное бюджетное образовательное учреждение высшего образования «Государственный университет морского и речного флота имени адмирала С.О. Макарова» Earth dam drainage system

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100362173C (en) * 2004-07-16 2008-01-16 贵阳铝镁设计研究院 Drainage assembly of dry process red mud stockyard outer dam
CN100373012C (en) * 2004-11-15 2008-03-05 贵阳铝镁设计研究院 Dry redmud yard drainage method and apparatus
CN100460603C (en) * 2006-11-30 2009-02-11 付文堂 Seepage drainage method for tailing dam and seepage drainage pipe for use therein
CN101994312B (en) * 2010-10-15 2012-02-01 中冶沈勘工程技术有限公司 Soil side slope or tailings dam drainage construction method
RU2528700C1 (en) * 2013-04-02 2014-09-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" (Сфу) Earth dam
CN103216003A (en) * 2013-04-17 2013-07-24 河海大学 Sectionally constructed seepage drainage pipe for tailings dam
CN103526760B (en) * 2013-10-30 2015-04-15 陕西省水土保持局 Mud pump damming integrated machine
CN110359430A (en) * 2019-07-30 2019-10-22 中国电建集团成都勘测设计研究院有限公司 A kind of Gravity Dam Foundation discharge structure
CN110670546B (en) * 2019-10-18 2021-03-26 付文堂 Method for building dam by bidirectional permeation and reverse laying of seepage drainage arrises
CN112281755A (en) * 2020-11-25 2021-01-29 昆明理工大学 Novel seepage drainage system of earth and rockfill dam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1297713C (en) * 2004-07-15 2007-01-31 国家电力公司华东勘测设计研究院 Back ward water draining system of face plate rock-fill dam dam body and its construction method
RU2768715C1 (en) * 2021-10-13 2022-03-24 Федеральное государственное бюджетное образовательное учреждение высшего образования «Государственный университет морского и речного флота имени адмирала С.О. Макарова» Earth dam drainage system

Also Published As

Publication number Publication date
CN1067465A (en) 1992-12-30

Similar Documents

Publication Publication Date Title
CN1022428C (en) Leakage-removing device for dam body
CN104878760B (en) A kind of side slope is from draining electric osmose anchor pole and construction method
CN204023501U (en) A remove dangerous and consolidate prevention of seepage processing structure for earth and rockfill dam
CN102172198A (en) Water-saving irrigation device for road greenbelt and forming method thereof
CN103643689A (en) Pipe type underground water drainage blind ditch and construction technology and application thereof
CN205035768U (en) Enrockment concrete permeable dike
CN205591066U (en) Fine grained soil is received sloping embankment and is filled structure
CN205116148U (en) Retaining wall wall back of body drainage system
CN202273236U (en) Inner dams in karst reservoir
CN106703053A (en) Construction method for reinforced soil drainage composite revetment structure
CN204326032U (en) Drainage gallery structure in concrete dam
CN206625181U (en) River course soil layer safeguard structure
CN206220998U (en) A kind of discharge structure on the outside of tunnel inverted arch
CN206157760U (en) Honeycomb geotechnique check room retaining wall with ecological recovery function
CN219080372U (en) Treatment structure of abandoned kiln cave dwelling of loess slope toe with large thickness
CN202124863U (en) Screw anchor excavated composite foundation
CN203741852U (en) Tubular groundwater drainage and seepage blind ditch
CN201649121U (en) Balled plant-growing concrete retaining wall building block
CN203096697U (en) Ballast field structure at earth and rockfill dam toe
CN206352302U (en) A kind of protective slope structure
CN202323906U (en) Assembly type culvert component
CN212388475U (en) Structure for preventing concrete dam bank slope dam section fracture water leakage
CN203270515U (en) Full tailing hydraulic reclamation split film yarn woven geofabriform piled dam
CN209429054U (en) Seepage prevention of dam founda structure in ultra-deep thick-covering
CN207260124U (en) Slip casting method reinforces shallow layer foundation hole sealing structure

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee