Summary of the invention
For the deficiencies in the prior art, the technical problems to be solved in the utility model is to provide in a kind of offshore oil gas well abandoned well process, is convenient to the servicing unit of being convenient to Offshore Drilling Riser recovery that reduces operating risk, improves operating efficiency.
In order to solve the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of servicing unit of being convenient to Offshore Drilling Riser recovery, be sheathed on described marine riser and be positioned at drilling well-head position, described servicing unit comprise downside and be fixedly connected on the retainer ring of described marine riser, upside and be fixedly connected on described marine riser spacing ring, be located at the rigidity between described retainer ring and spacing ring ring sheath, be located at the sealing ring of ring sheath both ends inner side, described ring sheath two ends respectively with retainer ring, spacing ring butt.
The one of being convenient to the technical scheme of the servicing unit of Offshore Drilling Riser recovery as the utility model is improved, and the external diameter of described retainer ring, spacing ring is greater than the interior diameter of described ring sheath.
The one of being convenient to the technical scheme of the servicing unit of Offshore Drilling Riser recovery as the utility model is improved, and the external diameter of described retainer ring, spacing ring is consistent with the external diameter of described ring sheath.
The one of being convenient to the technical scheme of the servicing unit of Offshore Drilling Riser recovery as the utility model is improved, and described ring sheath is cement ring set, ceramic ring set or plastics ring set.
The one of being convenient to the technical scheme of the servicing unit of Offshore Drilling Riser recovery as the utility model is improved, and described ring sheath is straight body cylindrical shell.
The beneficial effects of the utility model are: when field operation, reclaim under the marine riser of servicing unit near mud line be preinstalled with marine riser on land, make to encircle on sheath and correct and (having 4~5m ring set below mud line) near mud line.When marine riser well cementation, ring set and cement sheath form cementation interface, thereby the marine riser that has ensured the following certain length of mud line is not together with cementing, uses ring sheath to replace marine riser together with cementing.In the time of later stage abandoned well operation, after mud line is with next segment distance place cutting marine riser, on can effectively reducing, lift power, greatly improve and reclaim marine riser timeliness, significantly reduce operating risk.And this assistant apparatus structure is simple, can be according to different marine riser sizes, the device of processing corresponding size, material is common materials, and cost of investment is low.This new device can improve reclaim marine riser operating efficiency, and there is very little risk.
Detailed description of the invention
Further illustrate detailed description of the invention of the present utility model below in conjunction with accompanying drawing.
As shown in Figure 1, a kind of servicing unit of being convenient to Offshore Drilling Riser recovery of the utility model, be sheathed on described marine riser and be positioned at drilling well-head position, described servicing unit comprise downside and be fixedly connected on the retainer ring 18 of marine riser 10, upside and be fixedly connected on marine riser 10 spacing ring 12, be located at the rigidity between described retainer ring 18 and spacing ring 12 ring sheath 15, be located at the sealing ring 16 of ring sheath 15 both ends inner sides, described ring sheath 15 two ends respectively with retainer ring 18, spacing ring 12 butts.Taking ¢ 30 〞 marine risers under ¢ 36 〞 wells as example, its concrete scheme is: when processing marine riser, before welding marine riser box and pin, doing an internal diameter is ¢ 31 〞, and external diameter is ¢ 33 〞, the ring set that length is 4~5m.Weld a retainer ring in marine riser body lower end (being 4~5m below mud line in the position of well after calculating good being lowered to), ring set is packed on ¢ 30 〞 marine riser bodies, sealing ring pusher is filled in to retainer ring place in ring set lower end.Fill in another sealing ring in ring set upper end, then locating ring is welded on to marine riser upper end.Retainer ring and locating ring ensure that cement sheath can not slide up and down, and sealing encloses sealing and effect placed in the middle.Complete after the installation of this marine riser recovery servicing unit, marine riser box and pin in welding, completes the prepackage of this device in base, land.Ring sheath also can be called ring set.
When field operation, reclaim under this root marine riser of servicing unit near mud line be preinstalled with marine riser on land, make band set upper side just in time near mud line, (have 4~5m ring set below mud line).When marine riser well cementation, ring set and cement sheath form cementation interface, thereby ensure that the marine riser of the following 4~5m of mud line, not together with cementing, uses ring sheath 15 to replace marine riser 10 together with cementing, be convenient to abandoned well and cut the rear extraction marine riser 10 of marine riser 10.In the time of later stage abandoned well operation, below mud line, after 4~5m place cutting marine riser, on can effectively reducing, lift power, greatly improve the timeliness that reclaims marine riser, significantly reduce operating risk.
For the ring set of cement sheath material, because of the too thin insufficient strength of cement sheath, should suitably increase the thickness (for example, external diameter is ¢ 34 〞) of cement sheath.For ensureing that it is lowered to smoothly, the following 4~5m of top layer well suitably reaming hole to (can calculate the reamer that good position place adds corresponding size at drill string) about ¢ 38 〞.Because abandoned well operation final step is for note block cement plug, trip out after the marine riser of partition, cement ring set can not process direct note block cement plug.
For the ring sheath of pottery or plastic material, trip out and cut off after marine riser because of different from block cement plug material, be considered as legacy and should do certain processing, the drill bit that can be lowered to corresponding size is drilled and note the cement plug of blocking a shot again after the following 4m of mud line is eliminated legacy.
Therefore, this assistant apparatus structure is simple, can be according to different marine riser sizes, and the device of processing corresponding size, material is common materials, and cost of investment is low.This new device can improve reclaim marine riser operating efficiency, and there is very little risk.
More preferably, the external diameter of described retainer ring 18, spacing ring 12 is greater than the interior diameter of described ring sheath 15, thereby the effect of the support of playing and stop collar sheath position makes to encircle sheath 15 and is set in definite position, in well head place, is convenient to abandoned well operation.
More preferably, the external diameter of described retainer ring 18, spacing ring 12 is consistent with the external diameter of described ring sheath 15, realizes the effect of support and stop collar sheath position, make to encircle sheath 15 and be set in definite position, in well head place, be convenient to abandoned well operation, do not waste material, be convenient to install under water simultaneously.
More preferably, described ring sheath 15 is cement ring set, ceramic ring set or plastics ring set, can realize the effect of sheath, can trip out easily marine riser 10 and reclaim in the time of abandoned well, is convenient to seal well head after abandoned well.
More preferably, described ring sheath 15 is straight body cylindrical shells, is convenient to and marine riser 10 Matching installations, is convenient to be arranged at the excavation of well head and well head.
Use a kind of recovery of casing of the present utility model to reclaim servicing unit, with ¢ 36 〞 wells, lower ¢ 30 〞 sleeve pipes are example, and concrete operations are as follows:
Land prepackage program:
1) be internal diameter ¢ 31 〞, external diameter ¢ 33 〞, the ring set of height 4~5m;
2) by the bad support marine riser body (measuring the position of 4~5m from one end) that is welded on;
3) ring set is inserted on marine riser, sealing ring pusher is filled in to retainer ring place in lower end;
4) fill in another sealing ring in ring set upper end, then locating ring is welded on to marine riser upper end.
Operation on the sea program:
1) with workboat, the marine riser that is pre-installed marine riser recovery servicing unit is transported to scene, notes protection;
2) bore the eye that drives a well, borehole depth should be corresponding with the marine riser degree of depth, to ensure under this device at mud line place;
3) process well, pulled out of hole;
4) be lowered to marine riser, under the marine riser with servicing unit, near mud line, make band set upper side just in time near mud line, (have 4~5m ring set below mud line);
5) lower marine riser puts in place, well cementation (next column before jack-up unit well cementation).
6) complete other operations of this well, determine abandoned well;
7) complete the abandoned well operation in the past of cutting marine riser by abandoned well program;
8) lower cutter is to the following 4m of mud line, and marine riser is reclaimed in cutting;
9) further process ring set legacy;
10) note block cement plug.
Above disclosed is only preferred embodiment of the present utility model, certainly can not limit with this interest field of the utility model, and the equivalent variations of therefore doing according to the utility model claim, still belongs to the scope that the utility model is contained.