CN105756560B - A kind of drill assembly and drainage pipe arc lay method - Google Patents

A kind of drill assembly and drainage pipe arc lay method Download PDF

Info

Publication number
CN105756560B
CN105756560B CN201610098656.0A CN201610098656A CN105756560B CN 105756560 B CN105756560 B CN 105756560B CN 201610098656 A CN201610098656 A CN 201610098656A CN 105756560 B CN105756560 B CN 105756560B
Authority
CN
China
Prior art keywords
starter
drainage pipe
spline housing
drilling rod
drill assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610098656.0A
Other languages
Chinese (zh)
Other versions
CN105756560A (en
Inventor
付文堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Huaye Environmental Governance Co., Ltd.
Original Assignee
付文堂
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 付文堂 filed Critical 付文堂
Priority to CN201610098656.0A priority Critical patent/CN105756560B/en
Publication of CN105756560A publication Critical patent/CN105756560A/en
Application granted granted Critical
Publication of CN105756560B publication Critical patent/CN105756560B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/04Couplings; joints between rod or the like and bit or between rod and rod or the like
    • E21B17/046Couplings; joints between rod or the like and bit or between rod and rod or the like with ribs, pins, or jaws, and complementary grooves or the like, e.g. bayonet catches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes

Abstract

The present invention relates to a kind of drill assembly, including starter (1), spline housing (2) and drilling rod (3) with multiple keyways (111);The probe (4) for detecting starter (1) drilled hole bearing data and hole deviation angular data is equipped in spline housing (2), the bayonet joint that keyway (111) and spline (201) are used between spline housing (2) and starter (1), is threadedly coupled between drilling rod (3) and spline housing (2).The drainage pipe method that arc is laid in tailing dam is carried out using above-mentioned drill assembly the invention further relates to a kind of, this method is oriented to using starter (1), probe (4) transmits data, it is completed after laying, is extracted out drilling rod (3) by the direction of control drilling rod (3) adjustment starter (1).The invention has the benefit that the track of drainage pipe can be designed according to the saturation of tailing dam, and accurately constructed to drainage pipe according to preset track.

Description

A kind of drill assembly and drainage pipe arc lay method
[technical field]
The invention belongs to tailings dam drainage pipe laying technology field, it is related to a kind of drill assembly and applies above-mentioned drill set Close method drainage pipe arc being applied in tailing dam.
[background technique]
Tailing dam is all kinds of dressing plants of metallurgical industry, vigor power plant capital construction facility, is to guarantee all kinds of dressing plants, firepower hair The important link that power plant normally produces, as the construction of all kinds of factories and production scale increasingly increase, the tailing amount of dressing plant's exclusion And the grey quantity of slag smelting of power plant discharge sharply increases, it is following many in relation to tailing dam and ash dyke safety and environmental issue It becomes increasingly conspicuous, is in danger, collapses, the serious accidents such as dam break happen occasionally.It is gone through further, since expanding storage capacity and prolonging length of service etc. The problem of history is left, tailing dam are run in spite of illness, and there are more hidden danger.One critically important reason of above-mentioned security risk Be tailing dam measures for draining leakage it is ineffective, water seepage drainage effect is bad, cause dam body pressure excessive, occur leakage phenomenon.It soaks in order to prevent Profit line rising causes dam break just to need to drain.Current row seeps mode and excessively relies on construction environment, and complicated, and effect compares Slowly, and cost is very high.
It is not identical in view of the height of saturation, the substantially arc-shaped distribution in longitudinal section, therefore the drainage pipe reason laid Should be consistent with saturation or it is approximate it is consistent, and the prior art does not accomplish this point.
[summary of the invention]
The present invention provides a kind of drill assembly and the method using drill assembly implementation drainage pipe arc laying, with Overcome the technological deficiency that drainage pipe cannot be accurately distributed according to the actual curve of saturation in the prior art.
The scheme that the present invention solves above-mentioned technological deficiency existing in the prior art is:
A kind of drill assembly, including starter, spline housing and drilling rod with multiple keyways;One end of the spline housing It is interior to be equipped with spline compatible with the keyway of the starter;The starter passes through the keyway and the flower which is provided with Spline bayonet joint in key set, the drilling rod are threadedly coupled with the other end of the spline housing, also set in the spline housing Have a probe, the probe is used to measure the bearing data and hole deviation angular data of starter drilled hole, and with ground collector Real-time Transmission bearing data and hole deviation angular data.
Based on the above technical solution, the present invention can also be improved as follows.
Further, the starter includes interconnecting piece and head;The interconnecting piece opens up more for a tubular structure A keyway, the head are that a conical surface of a pyramidal structure is bonded a duckbill structure, and the top of duckbill structure is super Cross the central axes of pyramidal structure.
Based on the above technical solution, the present invention can also be improved as follows.
Further, the spline housing can block the probe.
Based on the above technical solution, the present invention can also be improved as follows.
Further, the starter is made of degradation material.
A method of the laying of drainage pipe arc is carried out using above-mentioned drill assembly, comprising the following steps:
Step 1 assembles drill assembly;
Drill assembly is connect by step 2 with directional drilling machine;
Step 3, the bearing data and hole deviation angular data of the received probe real-time Transmission of collector on base area, and combine Drilling rod is inserted by preset eyelet track, the direction for adjusting lead bit in real time using directional drilling machine according to preset eyelet track In tailing dam;
Drainage pipe is inserted into drilling rod by step 4;
Drainage pipe is fixedly connected by step 5 using reinforcing bar with directional drilling machine;
Drilling rod, spline housing and probe are risen, intraocularly leave drainage pipe and orientation drill in hole by step 6 using directional drilling machine Head.
Based on the above technical solution, the present invention can also be improved as follows.
Further, directional drilling machine is connect with drill rod thread in step 2.
Based on the above technical solution, the present invention can also be improved as follows.
Further, directional drilling machine is needing to adjust starter for drilling rod to be inserted into tailing dam in step 3 Direction when ability rotary drill rod.
Based on the above technical solution, the present invention can also be improved as follows.
Further, the drainage pipe in step 4 is subject to the bottom for being inserted into drilling rod.
The beneficial effects of the present invention are:
In drill assembly, starter and spline housing make it possible to transmit using the mating connection mode of keyway and spline Torque it is big, and when taking out after drainage pipe is inserted into drilling rod drilling rod, since spline and keyway are with being combined into detachable company Mode is connect, as long as therefore firmly the separation of starter and spline housing can be realized in extraction drilling rod;Starter uses degradable material Matter is made, and advantageously reduces waste, protects environment;Starter with duckbill structure being capable of orientation well;Flower Key set can block probe, solve the technological deficiency that may cause probe loss when separating starter and spline housing.
The method that the laying of drainage pipe arc is carried out using above-mentioned drill assembly, since probe being capable of real-time Transmission bearing data Operator with hole deviation angular data, therefore aperture can be easily using computer system according to preset eyelet axis (eyelet track in other words) controls starter, obtains the inbuilt eyelet of drainage pipe of the needs according to infiltration line computation Track, after being inserted into drainage pipe, additionally it is possible to smoothly extract very much drilling rod out, have on the technical issues of tailing dam drains huge Economy and application value.
[Detailed description of the invention]
Fig. 1-1 is the main view of starter of the present invention;
Fig. 1-2 is the side view of starter of the invention;
Fig. 2-1 is the axial sectional view of spline housing of the invention;
Fig. 2-2 is the side view of spline housing of the invention;
Fig. 3 is the structural schematic diagram of drilling rod of the invention;
Fig. 4 is the structural schematic diagram of probe of the invention.
The reference numerals are as follows:
1- starter;2- spline housing;3- drilling rod;4- probe;11- interconnecting piece;The head 12-;111- keyway;121- pyramid Structure;122- duckbill structure;201- spline.
[specific embodiment]
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.It is described in an attached drawing of the invention or a kind of embodiment Elements and features can be combined with elements and features shown in one or more other attached drawings or embodiment.It should Note that for purposes of clarity, being omitted in attached drawing and explanation unrelated to the invention, known to persons of ordinary skill in the art The expression and description of component and processing.Based on the embodiments of the present invention, those of ordinary skill in the art are not paying creation Property labour under the premise of every other embodiment obtained, shall fall within the protection scope of the present invention.
In the following embodiment of the present invention, the serial number and/or sequencing of embodiment are merely convenient of description, do not represent reality Apply the superiority and inferiority of example.It all emphasizes particularly on different fields to the description of each embodiment, there is no the part being described in detail in some embodiment, may refer to it The associated description of his embodiment.
As shown in Fig. 1-1, Fig. 1-2, Fig. 2-1, Fig. 2-2, Fig. 3 and Fig. 4, the present invention provides a kind of drill assembly, including Starter 1, spline housing 2 and drilling rod 3 with multiple keyways 111;It is equipped with and the orientation drill in one end of the spline housing 2 The first 1 compatible spline 201 of keyway 111;The starter 1 passes through in the keyway 111 and the spline housing 2 which is provided with 201 bayonet joint of spline, the drilling rod 3 is threadedly coupled with the other end of the spline housing 2, also sets in the spline housing 2 There is probe 4, the probe 4 is used to measure the bearing data and hole deviation angular data of 1 drilled hole of starter, and acquires with ground Device real-time Transmission bearing data and hole deviation angular data.The starter 1 includes interconnecting piece 11 and head 12;The interconnecting piece 11 Multiple keyways 111 are opened up for a tubular structure, the head 12 is that a conical surface of a pyramidal structure 121 is bonded a duck Mouth shape structure 122, the top of duckbill structure 122 are more than the central axes of pyramidal structure 121.The spline housing 2 can block institute State probe 4.
A method of the laying of drainage pipe arc is carried out using above-mentioned drill assembly, comprising the following steps:
Step 1 assembles drill assembly;
Drill assembly is connect by step 2 with directional drilling machine;
Step 3, the bearing data and hole deviation angular data of the received probe real-time Transmission of collector on base area, and combine Drilling rod is inserted by preset eyelet track, the direction for adjusting lead bit in real time using directional drilling machine according to preset eyelet track In tailing dam;
Drainage pipe is inserted into drilling rod by step 4;
Drainage pipe is fixedly connected by step 5 using reinforcing bar with directional drilling machine;
Drilling rod, spline housing and probe are risen, intraocularly leave drainage pipe and orientation drill in hole by step 6 using directional drilling machine Head.
Based on the above technical solution, the present invention can also be improved as follows.
Further, directional drilling machine is connect with drill rod thread in step 2.
Based on the above technical solution, the present invention can also be improved as follows.
Further, directional drilling machine is needing to adjust starter for drilling rod to be inserted into tailing dam in step 3 Direction when ability rotary drill rod.
Based on the above technical solution, the present invention can also be improved as follows.
Further, the drainage pipe in step 4 is subject to the bottom for being inserted into drilling rod.
In drill assembly, starter and spline housing make it possible to transmit using the mating connection mode of keyway and spline Torque it is big, and when taking out after drainage pipe is inserted into drilling rod drilling rod, since spline and keyway are with being combined into detachable company Mode is connect, as long as therefore firmly the separation of starter and spline housing can be realized in extraction drilling rod;Starter uses degradable material Matter is made, and advantageously reduces waste, protects environment;Starter with duckbill structure being capable of orientation well;Flower Key set can block probe, solve the technological deficiency that may cause probe loss when separating starter and spline housing.
The method that the laying of drainage pipe arc is carried out using above-mentioned drill assembly, since probe being capable of real-time Transmission bearing data Operator with hole deviation angular data, therefore aperture can be easily using computer system according to preset eyelet axis (eyelet track in other words) controls starter, obtains the inbuilt eyelet of drainage pipe of the needs according to infiltration line computation Track, after being inserted into drainage pipe, additionally it is possible to smoothly extract very much drilling rod out, have on the technical issues of tailing dam drains huge Economy and application value.
The present invention is not limited to above-mentioned preferred forms, and those of ordinary skill in the art may be used under the inspiration of the present invention Obtain other various forms of methods, however, it makees any variation on the basis of this method, it is all with same as the present application Or similar technical solution, it is within the scope of the present invention.

Claims (6)

1. a kind of drill assembly, which is characterized in that including with multiple keyways (111) starter (1), spline housing (2) and Drilling rod (3);Spline (201) compatible with the keyway of the starter (1) is equipped in one end of the spline housing (2);Institute It states starter (1) and passes through the keyway (111) which is provided with and spline (201) bayonet joint in the spline housing (2), institute It states drilling rod (3) to be threadedly coupled with the other end of the spline housing (2), is additionally provided with probe (4), the spy in the spline housing (2) Stick (4) is used to measure the bearing data and hole deviation angular data of starter (1) drilled hole, and with ground collector real-time Transmission Bearing data and hole deviation angular data;
The starter (1) includes interconnecting piece (11) and head (12);The interconnecting piece (11) is that a tubular structure opens up Multiple keyways (111), the head (12) are that a conical surface an of pyramidal structure (121) is bonded a duckbill structure (122), the top of duckbill structure (122) is more than the central axes of pyramidal structure (121);
The spline housing (2) can block the probe (4).
2. drill assembly according to claim 1, which is characterized in that the starter (1) uses degradation material system At.
3. a kind of method for carrying out the laying of drainage pipe arc using any one of claim 1 to 2 drill assembly, feature exist In, comprising the following steps:
Step 1 assembles drill assembly;
Drill assembly is connect by step 2 with directional drilling machine;
Step 3, the bearing data and hole deviation angular data of the received probe of collector (4) real-time Transmission on base area, and combine pre- If eyelet track, adjust the direction of lead bit (1) in real time using directional drilling machine for drilling rod (3) according to preset eyelet track It is inserted into tailing dam;
Step 4, will be in drainage pipe insertion drilling rod (3);
Drainage pipe is fixedly connected by step 5 using reinforcing bar with directional drilling machine;
Step 6, using directional drilling machine by drilling rod (3), spline housing (2) and probe (4) rise, hole intraocularly leave drainage pipe and Starter (1).
4. according to the method described in claim 3, it is characterized in that, directional drilling machine is connect with drill rod thread in step 2.
5. according to the method described in claim 3, it is characterized in that, directional drilling machine is used to drilling rod being inserted into tailing in step 3 In dam, the ability rotary drill rod at the direction for needing to adjust starter.
6. according to the method described in claim 3, it is characterized in that, the drainage pipe in step 4 is with the bottom for being inserted into drilling rod It is quasi-.
CN201610098656.0A 2016-02-23 2016-02-23 A kind of drill assembly and drainage pipe arc lay method Active CN105756560B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610098656.0A CN105756560B (en) 2016-02-23 2016-02-23 A kind of drill assembly and drainage pipe arc lay method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610098656.0A CN105756560B (en) 2016-02-23 2016-02-23 A kind of drill assembly and drainage pipe arc lay method

Publications (2)

Publication Number Publication Date
CN105756560A CN105756560A (en) 2016-07-13
CN105756560B true CN105756560B (en) 2018-12-21

Family

ID=56331073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610098656.0A Active CN105756560B (en) 2016-02-23 2016-02-23 A kind of drill assembly and drainage pipe arc lay method

Country Status (1)

Country Link
CN (1) CN105756560B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882506A (en) * 2017-12-15 2018-04-06 大庆荣氏采油技术开发有限公司 Radial bore guider
CN109184569A (en) * 2018-11-05 2019-01-11 无锡市钻通工程机械有限公司 A kind of infiltration starter

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07133614A (en) * 1993-11-10 1995-05-23 Tone Chika Gijutsu Kk Excavator and excavating shaft
CN1392326A (en) * 2001-06-15 2003-01-22 希尔蒂股份公司 Rock drill
CN201050303Y (en) * 2007-04-04 2008-04-23 沈阳中建东设岩土工程有限公司 Self-dumping cone type spiral anchor drill bit
CN101994312A (en) * 2010-10-15 2011-03-30 中冶沈勘工程技术有限公司 Soil side slope or tailings dam drainage construction method
CN202064833U (en) * 2011-05-26 2011-12-07 无锡市钻通工程机械有限公司 Direction-controllable pilot guide bit for horizontal directional drilling pipe-laying drilling machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07133614A (en) * 1993-11-10 1995-05-23 Tone Chika Gijutsu Kk Excavator and excavating shaft
CN1392326A (en) * 2001-06-15 2003-01-22 希尔蒂股份公司 Rock drill
CN201050303Y (en) * 2007-04-04 2008-04-23 沈阳中建东设岩土工程有限公司 Self-dumping cone type spiral anchor drill bit
CN101994312A (en) * 2010-10-15 2011-03-30 中冶沈勘工程技术有限公司 Soil side slope or tailings dam drainage construction method
CN202064833U (en) * 2011-05-26 2011-12-07 无锡市钻通工程机械有限公司 Direction-controllable pilot guide bit for horizontal directional drilling pipe-laying drilling machine

Also Published As

Publication number Publication date
CN105756560A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN105756560B (en) A kind of drill assembly and drainage pipe arc lay method
CN206487508U (en) A kind of draining steel pipe device for rich water class earth tunnel face
CN207419439U (en) The buried anti-shear concrete structure drainage system of side slope
CN104848891A (en) Dynamic monitoring system and monitoring method for connection structure of concrete dam and earth and rockfill dam
CN209642270U (en) A kind of novel power cable protection pipe
CN203145001U (en) Probe static probing equipment
CN202359542U (en) Press-in feeler lever for probe static cone penetration equipment
CN108709019A (en) The construction method for connecting of built-in pipe box and penetration pipe in Bars In Poured Concrete Slab in PC components
CN107675715A (en) A kind of high-steep slope protection structure and its construction method
CN207583398U (en) A kind of weak surrounding rock combination supporting device
CN204282416U (en) A kind of diaphragm wall steel bar anchoring protos test suite PROTOS
CN208717950U (en) A kind of subway enters and leaves and wears waterline supportive structure under line shield method
CN206680951U (en) A kind of channel protection structure of hydraulic engineering
CN204831211U (en) Side slope slope table warp monitoring system based on protection of frame roof beam
CN104727551B (en) Ring beam screw thread core pulling embedded steel bar construction method
CN203890885U (en) Connecting device for steel cable and pull rod of horizontally-stayed cable bridge
CN207064868U (en) The horizontal directional drilling of extra long distance passes through the water supply line structure of complex barrier
CN113323049A (en) Pipe burying device
CN206398232U (en) A kind of natural gas line lays protector
CN204343291U (en) Split type reusable anchor pole
CN205370609U (en) Stock is strutted in colliery
CN206059786U (en) Submersible pump cable core copper rod sealing structure
CN105908779B (en) Tunnel immersed tube joint Horizontal concrete shear key preparation method
CN205823307U (en) One draws hole grouting behind shaft or drift lining joint filling device
CN106767681A (en) Suitable for the surface subsidence monitoring device and its monitoring method of Canal in Loess Area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190506

Address after: 133400 Longjing Industrial Concentration Area, Longjing City, Yanbian Korean Autonomous Prefecture, Jilin Province

Patentee after: Jilin Huaye Environmental Governance Co., Ltd.

Address before: Room 2010, Building 2, Industrial Bank District, Baishan Road, Mayor of Yanji, Yanbian Korean Autonomous Prefecture, Jilin Province

Patentee before: Fu Wentang