CN105756560A - Drilling tool combination and arc-shaped laying method for seepage drainage pipes - Google Patents

Drilling tool combination and arc-shaped laying method for seepage drainage pipes Download PDF

Info

Publication number
CN105756560A
CN105756560A CN201610098656.0A CN201610098656A CN105756560A CN 105756560 A CN105756560 A CN 105756560A CN 201610098656 A CN201610098656 A CN 201610098656A CN 105756560 A CN105756560 A CN 105756560A
Authority
CN
China
Prior art keywords
spline housing
starter
bha
drilling rod
drainage pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610098656.0A
Other languages
Chinese (zh)
Other versions
CN105756560B (en
Inventor
付文堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Huaye Environmental Governance Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610098656.0A priority Critical patent/CN105756560B/en
Publication of CN105756560A publication Critical patent/CN105756560A/en
Application granted granted Critical
Publication of CN105756560B publication Critical patent/CN105756560B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/04Couplings; joints between rod or the like and bit or between rod and rod or the like
    • E21B17/046Couplings; joints between rod or the like and bit or between rod and rod or the like with ribs, pins, or jaws, and complementary grooves or the like, e.g. bayonet catches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to a drilling tool combination.The drilling tool combination comprises a guiding drill bit (1) provided with multiple key slots (111), a spline housing (2) and a drill stem (3); a detecting rod (4) used for detecting orientation data and oblique angle data of a hole drilled by the guiding drill bit (1) is arranged in the spline housing (2), socket type connection formed by a key groove (111) and a spline (201) is adopted between the spline housing (2) and the guiding drill bit (1), and threaded connection is adopted between the drill stem (3) and the spline housing (2).The invention further relates to a method for conducting arc-shaped laying on seepage drainage pipes in a tailing dam through the drilling tool combination.According to the method, the guiding drill bit (1) is used for conducting guiding, the detecting rod (4) is used for transmitting data, the direction of the guiding drill bit (1) is adjusted by controlling the drill stem (3) to complete arrangement, and the drill stem (3) is drawn out.The drilling tool combination and the arc-shaped laying method for the seepage drainage pipes have the advantages that the track of the seepage drainage pipes can be designed according to the seepage line of the tailing dam, and accurate construction is conducted on the seepage drainage pipes according to the preset track.

Description

A kind of BHA and drainage pipe arc lay method
[technical field]
The invention belongs to tailings dam drainage pipe laying technology field, relate to a kind of BHA and apply above-mentioned BHA by drainage pipe arc be applied in tailing dam method.
[background technology]
Tailing dam is all kinds of ore dressing plant of metallurgical industry, vigor power plant capital construction facility, it is to ensure that the important step that all kinds of ore dressing plant, thermal power plant normally produce, along with construction and the production scale of all kinds of factories increase day by day, mine tailing amount and the grey quantity of slag smelting of power plant discharge that ore dressing plant is got rid of sharply increase, the thing followed is many to become increasingly conspicuous about tailing dam and ash dyke safety and environmental issue, is in danger, caves in, the serious accident such as dam break happens occasionally.Additionally, due to expand storage capacity and the problem of left over by history such as prolonging length of service, tailing dam runs in spite of illness, there is more hidden danger.The measures for draining leakage that one critically important reason of the potential safety hazard of above-mentioned existence is tailing dam is ineffective, and water seepage drainage effect is bad, causes dam body pressure excessive, and Seepage occurs.Dam break is caused to be accomplished by draining in order to prevent saturation from rising.Current row is oozed mode and is excessively relied on construction environment, and complicated, and effectiveness comparison is slow, and cost is very high.
In view of the height of saturation and differ, its longitudinal section is substantially in the form of arc distribution, the drainage pipe therefore laid ought to keep with saturation consistent or approximate unanimously, and prior art does not accomplish this point.
[summary of the invention]
The present invention provides a kind of BHA and applies the method that described BHA enforcement drainage pipe arc lays, to overcome the technological deficiency that in prior art, drainage pipe accurately can not be distributed according to the actual curve of saturation.
This invention address that the scheme of the technological deficiency existed in above-mentioned prior art is:
A kind of BHA, including having the starter of multiple keyway, spline housing and drilling rod;The spline suitable with the keyway of described starter it is provided with in one end of described spline housing;Described starter is by the keyway which is provided with and the spline bayonet joint in described spline housing, described drilling rod is threadeded with the other end of described spline housing, it is additionally provided with probe in described spline housing, described probe for measuring bearing data and the hole deviation angular data of starter drilled hole, and with ground harvester real-time Transmission bearing data and hole deviation angular data.
On the basis of technique scheme, the present invention can also do following improvement.
Further, described starter includes connecting portion and head;Described connecting portion is that a tubular structure offers multiple keyway, and described head is the conical surface one duckbill structure of laminating of a pyramidal structure, and the top of duckbill structure exceedes the axis of pyramidal structure.
On the basis of technique scheme, the present invention can also do following improvement.
Further, described spline housing can block described probe.
On the basis of technique scheme, the present invention can also do following improvement.
Further, described starter adopts degradation material to make.
A kind of adopt above-mentioned BHA to carry out the method that drainage pipe arc lays, comprise the following steps:
Step one, assembles BHA;
Step 2, is connected BHA with directional drilling machine;
Step 3, the bearing data of probe real-time Transmission that on base area, harvester receives and hole deviation angular data, and combine the eyelet track preset, using directed rig adjusts the direction of lead bit in real time and is inserted in tailing dam according to default eyelet track by drilling rod;
Step 4, inserts drainage pipe in drilling rod;
Step 5, uses reinforcing bar to be connected fixing to drainage pipe and directional drilling machine;
Step 6, uses directional drilling machine drilling rod, spline housing and probe to be tripped out, leaves drainage pipe and starter in eyelet.
On the basis of technique scheme, the present invention can also do following improvement.
Further, in step 2, directional drilling machine is connected with drill rod thread.
On the basis of technique scheme, the present invention can also do following improvement.
Further, in step 3, directional drilling machine is for being inserted in tailing dam by drilling rod, the ability rotary drill rod when needing the direction adjusting starter.
On the basis of technique scheme, the present invention can also do following improvement.
Further, the drainage pipe in step 4 is as the criterion with the bottom being inserted into drilling rod.
The invention has the beneficial effects as follows:
In BHA, starter adopts the mode that is connected of keyway and spline with spline housing, the moment of torsion making it possible to transmission is big, and when drainage pipe is inserted into and takes out drilling rod after drilling rod, coordinate for detachable connected mode due to spline and keyway, as long as therefore firmly extracting drilling rod out and can realize separating of starter and spline housing;Starter adopts degradable material to make, and advantageously reduces garbage, protects environment;The starter with duckbill structure can orientation well;Spline housing can block probe, solves and may result in the technological deficiency that probe is lost when separating starter with spline housing.
Above-mentioned BHA is adopted to carry out the method that drainage pipe arc lays, owing to probe can real-time Transmission bearing data and hole deviation angular data, therefore the operator in aperture can utilize computer system according to default eyelet axis (in other words eyelet track), starter to be controlled easily, obtain the eyelet track that the drainage pipe of the needs according to saturation calculating is buried underground, after inserting drainage pipe, drilling rod can also be extracted very smoothly out, the technical problem of tailing dam draining has huge economy and using value.
[accompanying drawing explanation]
Fig. 1-1 is the front view of starter of the present invention;
Fig. 1-2 is the side view of the starter of the present invention;
Fig. 2-1 is the axial sectional view of the spline housing of the present invention;
Fig. 2-2 is the side view of the spline housing of the present invention;
Fig. 3 is the structural representation of the drilling rod of the present invention;
Fig. 4 is the structural representation of the probe of the present invention.
Description of reference numerals is as follows:
1-starter;2-spline housing;3-drilling rod;4-probe;11-connecting portion;12-head;111-keyway;121-pyramidal structure;122-duckbill structure;201-spline.
[detailed description of the invention]
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is a part of embodiment of the present invention, rather than whole embodiments.Can combine with the element shown in one or more other accompanying drawing or embodiment and feature at the element described in the accompanying drawing of the present invention or a kind of embodiment and feature.It should be noted that, for purposes of clarity, accompanying drawing and eliminate expression and the description of unrelated to the invention, parts known to persons of ordinary skill in the art and process in illustrating.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art obtain under the premise not paying creative work, broadly fall into the scope of protection of the invention.
In the following embodiment of the present invention, sequence number and/or the sequencing of embodiment are merely convenient of description, do not represent the quality of embodiment.The description of each embodiment is all emphasized particularly on different fields, certain embodiment there is no the part described in detail, it is possible to referring to the associated description of other embodiments.
As shown in Fig. 1-1, Fig. 1-2, Fig. 2-1, Fig. 2-2, Fig. 3 and Fig. 4, the invention provides a kind of BHA, including having the starter 1 of multiple keyway 111, spline housing 2 and drilling rod 3;The spline 201 suitable with the keyway 111 of described starter 1 it is provided with in one end of described spline housing 2;Described starter 1 is by the keyway 111 which is provided with and spline 201 bayonet joint in described spline housing 2, described drilling rod 3 is threadeded with the other end of described spline housing 2, it is additionally provided with probe 4 in described spline housing 2, described probe 4 for measuring bearing data and the hole deviation angular data of starter 1 drilled hole, and with ground harvester real-time Transmission bearing data and hole deviation angular data.Described starter 1 includes connecting portion 11 and head 12;Described connecting portion 11 is that a tubular structure offers multiple keyway 111, and described head 12 is the conical surface one duckbill structure 122 of laminating of a pyramidal structure 121, and the top of duckbill structure 122 exceedes the axis of pyramidal structure 121.Described spline housing 2 can block described probe 4.
A kind of adopt above-mentioned BHA to carry out the method that drainage pipe arc lays, comprise the following steps:
Step one, assembles BHA;
Step 2, is connected BHA with directional drilling machine;
Step 3, the bearing data of probe real-time Transmission that on base area, harvester receives and hole deviation angular data, and combine the eyelet track preset, using directed rig adjusts the direction of lead bit in real time and is inserted in tailing dam according to default eyelet track by drilling rod;
Step 4, inserts drainage pipe in drilling rod;
Step 5, uses reinforcing bar to be connected fixing to drainage pipe and directional drilling machine;
Step 6, uses directional drilling machine drilling rod, spline housing and probe to be tripped out, leaves drainage pipe and starter in eyelet.
On the basis of technique scheme, the present invention can also do following improvement.
Further, in step 2, directional drilling machine is connected with drill rod thread.
On the basis of technique scheme, the present invention can also do following improvement.
Further, in step 3, directional drilling machine is for being inserted in tailing dam by drilling rod, the ability rotary drill rod when needing the direction adjusting starter.
On the basis of technique scheme, the present invention can also do following improvement.
Further, the drainage pipe in step 4 is as the criterion with the bottom being inserted into drilling rod.
In BHA, starter adopts the mode that is connected of keyway and spline with spline housing, the moment of torsion making it possible to transmission is big, and when drainage pipe is inserted into and takes out drilling rod after drilling rod, coordinate for detachable connected mode due to spline and keyway, as long as therefore firmly extracting drilling rod out and can realize separating of starter and spline housing;Starter adopts degradable material to make, and advantageously reduces garbage, protects environment;The starter with duckbill structure can orientation well;Spline housing can block probe, solves and may result in the technological deficiency that probe is lost when separating starter with spline housing.
Above-mentioned BHA is adopted to carry out the method that drainage pipe arc lays, owing to probe can real-time Transmission bearing data and hole deviation angular data, therefore the operator in aperture can utilize computer system according to default eyelet axis (in other words eyelet track), starter to be controlled easily, obtain the eyelet track that the drainage pipe of the needs according to saturation calculating is buried underground, after inserting drainage pipe, drilling rod can also be extracted very smoothly out, the technical problem of tailing dam draining has huge economy and using value.
The present invention is not limited to above-mentioned preferred forms; those of ordinary skill in the art can draw other various forms of methods under the enlightenment of the present invention; no matter but it does any change on this method basis; every have same or like with the application like technical scheme, all fall within protection scope of the present invention.

Claims (8)

1. a BHA, it is characterised in that include that there is the starter (1) of multiple keyway (111), spline housing (2) and drilling rod (3);The spline (201) suitable with the keyway of described starter (1) it is provided with in one end of described spline housing (2);Described starter (1) is by the keyway (111) which is provided with and spline (201) bayonet joint in described spline housing (2), described drilling rod (3) is threadeded with the other end of described spline housing (2), probe (4) it is additionally provided with in described spline housing (2), described probe (4) is used for measuring bearing data and the hole deviation angular data of starter (1) drilled hole, and with ground harvester real-time Transmission bearing data and hole deviation angular data.
2. BHA according to claim 1, it is characterised in that described starter (1) includes connecting portion (11) and head (12);Described connecting portion (11) is that a tubular structure offers multiple keyway (111), described head (12) is the conical surface one duckbill structure (122) of laminating of a pyramidal structure (121), and the top of duckbill structure (122) exceedes the axis of pyramidal structure (121).
3. BHA according to claim 1, it is characterised in that described spline housing (2) can block described probe (4).
4. BHA according to claim 1, it is characterised in that described starter (1) adopts degradation material to make.
5. one kind adopts BHA described in any one of Claims 1-4 to carry out the method that drainage pipe arc lays, it is characterised in that comprise the following steps:
Step one, assembles BHA;
Step 2, is connected BHA with directional drilling machine;
Step 3, the bearing data of probe (4) real-time Transmission that on base area, harvester receives and hole deviation angular data, and combining the eyelet track preset, using directed rig adjusts the direction of lead bit (1) in real time and is inserted in tailing dam according to default eyelet track by drilling rod (3);
Step 4, inserts drainage pipe in drilling rod (3);
Step 5, uses reinforcing bar to be connected fixing to drainage pipe and directional drilling machine;
Step 6, uses directional drilling machine drilling rod (3), spline housing (2) and probe (4) to be tripped out, leaves drainage pipe and starter (1) in eyelet.
6. method according to claim 5, it is characterised in that in step 2, directional drilling machine is connected with drill rod thread.
7. method according to claim 5, it is characterised in that in step 3, directional drilling machine is for being inserted in tailing dam by drilling rod, the ability rotary drill rod when needing the direction adjusting starter.
8. method according to claim 5, it is characterised in that the drainage pipe in step 4 is as the criterion with the bottom being inserted into drilling rod.
CN201610098656.0A 2016-02-23 2016-02-23 A kind of drill assembly and drainage pipe arc lay method Active CN105756560B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610098656.0A CN105756560B (en) 2016-02-23 2016-02-23 A kind of drill assembly and drainage pipe arc lay method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610098656.0A CN105756560B (en) 2016-02-23 2016-02-23 A kind of drill assembly and drainage pipe arc lay method

Publications (2)

Publication Number Publication Date
CN105756560A true CN105756560A (en) 2016-07-13
CN105756560B CN105756560B (en) 2018-12-21

Family

ID=56331073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610098656.0A Active CN105756560B (en) 2016-02-23 2016-02-23 A kind of drill assembly and drainage pipe arc lay method

Country Status (1)

Country Link
CN (1) CN105756560B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882506A (en) * 2017-12-15 2018-04-06 大庆荣氏采油技术开发有限公司 Radial bore guider
CN109184569A (en) * 2018-11-05 2019-01-11 无锡市钻通工程机械有限公司 A kind of infiltration starter
CN111173459A (en) * 2020-01-02 2020-05-19 达坦能源科技(上海)有限公司 Screw rod with impact effect for petroleum drilling

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07133614A (en) * 1993-11-10 1995-05-23 Tone Chika Gijutsu Kk Excavator and excavating shaft
CN1392326A (en) * 2001-06-15 2003-01-22 希尔蒂股份公司 Rock drill
CN201050303Y (en) * 2007-04-04 2008-04-23 沈阳中建东设岩土工程有限公司 Self-dumping cone type spiral anchor drill bit
CN101994312A (en) * 2010-10-15 2011-03-30 中冶沈勘工程技术有限公司 Soil side slope or tailings dam drainage construction method
CN202064833U (en) * 2011-05-26 2011-12-07 无锡市钻通工程机械有限公司 Direction-controllable pilot guide bit for horizontal directional drilling pipe-laying drilling machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07133614A (en) * 1993-11-10 1995-05-23 Tone Chika Gijutsu Kk Excavator and excavating shaft
CN1392326A (en) * 2001-06-15 2003-01-22 希尔蒂股份公司 Rock drill
CN201050303Y (en) * 2007-04-04 2008-04-23 沈阳中建东设岩土工程有限公司 Self-dumping cone type spiral anchor drill bit
CN101994312A (en) * 2010-10-15 2011-03-30 中冶沈勘工程技术有限公司 Soil side slope or tailings dam drainage construction method
CN202064833U (en) * 2011-05-26 2011-12-07 无锡市钻通工程机械有限公司 Direction-controllable pilot guide bit for horizontal directional drilling pipe-laying drilling machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882506A (en) * 2017-12-15 2018-04-06 大庆荣氏采油技术开发有限公司 Radial bore guider
CN109184569A (en) * 2018-11-05 2019-01-11 无锡市钻通工程机械有限公司 A kind of infiltration starter
CN111173459A (en) * 2020-01-02 2020-05-19 达坦能源科技(上海)有限公司 Screw rod with impact effect for petroleum drilling

Also Published As

Publication number Publication date
CN105756560B (en) 2018-12-21

Similar Documents

Publication Publication Date Title
CN105756560A (en) Drilling tool combination and arc-shaped laying method for seepage drainage pipes
EP1802844A1 (en) Method for laying pipes without digging trenches
SA519410776B1 (en) Wellbore Parted Casing Access Tool
DE69936940T2 (en) METHOD AND DRILLING DEVICE FOR CONTROLLING CUTTING
CN105626111B (en) A kind of coal column two-way reinforcing concertina type two-ended cables
WO2015197828A1 (en) Method and device for creating a borehole
EP2447462A1 (en) Method for subterranean insertion of a conduit
CN206957583U (en) A kind of equipment of coal mine long range throughbore
CN102748033A (en) Filling mechanism for ultra-long jacking-pipe resistance-reducing slurry bin
CN105888700B (en) A kind of scalable steelframe connector suitable for serious deformation
CN212642653U (en) Fishing assistor for fishing broken rods of directional drilling machine in coal mine
CN205049135U (en) Solve inclinometer card gauge head unit
CA2648661A1 (en) Slotted thread protection device
CN108232484A (en) A kind of Underground Substation earthing pole structure and method
CN204691676U (en) A kind of bore angle calibrator
CN204663390U (en) A kind of drilling rod with deviation-correcting function
DE102013205319A1 (en) Drilling and jet blasting rods
CN207064868U (en) The horizontal directional drilling of extra long distance passes through the water supply line structure of complex barrier
CN206398232U (en) A kind of natural gas line lays protector
EP2150674B1 (en) Method and device for verifying the casing of a pipeline when the pipeline is inserted into a liquid-filled borehole
CN207177733U (en) A kind of side slope rig for carrying guide instrument
CN207761678U (en) A kind of device of the first branch steel arch-shelf shear stability of raising
CN206418528U (en) A kind of direct burial test system of cooperation inclinometer pipe
CN106567679A (en) oil drill pipe
DE102010032134B4 (en) Method for introducing a hole in the ground and Erdbohrvorrichtung

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190506

Address after: 133400 Longjing Industrial Concentration Area, Longjing City, Yanbian Korean Autonomous Prefecture, Jilin Province

Patentee after: Jilin Huaye Environmental Governance Co., Ltd.

Address before: Room 2010, Building 2, Industrial Bank District, Baishan Road, Mayor of Yanji, Yanbian Korean Autonomous Prefecture, Jilin Province

Patentee before: Fu Wentang

TR01 Transfer of patent right