CN101962950A - 长螺旋喷搅振动沉管cfg桩施工方法及其形成的cfg复合桩 - Google Patents

长螺旋喷搅振动沉管cfg桩施工方法及其形成的cfg复合桩 Download PDF

Info

Publication number
CN101962950A
CN101962950A CN 201010282533 CN201010282533A CN101962950A CN 101962950 A CN101962950 A CN 101962950A CN 201010282533 CN201010282533 CN 201010282533 CN 201010282533 A CN201010282533 A CN 201010282533A CN 101962950 A CN101962950 A CN 101962950A
Authority
CN
China
Prior art keywords
pile
cfg
cement
stake
vibration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010282533
Other languages
English (en)
Other versions
CN101962950B (zh
Inventor
何世鸣
李江
田震远
周与诚
张明中
王之军
贾城
陈辉
李长生
司呈庆
杨敏
王建明
程金霞
黄鑫峰
洪伟
翟宇翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Building Material Geotechnical Engineering Corp
BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION
Shenzhen Nanhua Geotechnical Engineering Co ltd
Zhongcai Geological Engineering Exploration Academy Co ltd
Original Assignee
Beijing Urban Construction Science And Technology Promotion Association
SINOMA GEOLOGICAL ENGINEERING EXPLORATION ACADEMY
BEIJING CONSTRUCTION MATERIAL AND GEOLOGICAL ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Science And Technology Promotion Association, SINOMA GEOLOGICAL ENGINEERING EXPLORATION ACADEMY, BEIJING CONSTRUCTION MATERIAL AND GEOLOGICAL ENGINEERING Co filed Critical Beijing Urban Construction Science And Technology Promotion Association
Priority to CN2010102825335A priority Critical patent/CN101962950B/zh
Publication of CN101962950A publication Critical patent/CN101962950A/zh
Application granted granted Critical
Publication of CN101962950B publication Critical patent/CN101962950B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种长螺旋喷搅振动沉管CFG桩施工方法,采用长螺旋钻机进行引孔;回填至设计位置;然后换旋喷搅拌桩复合钻具对准引孔孔位,进行旋喷钻进至设计孔底;依据地层不同由变频器控制定喷提升速度进行定喷上提至设计标高,再次旋喷下去,旋转角度再次定喷上行至设计标高形成带多个凸耳的水泥土桩;然后将小功率振动沉管设备就位,利用该小功率振动沉管设备的振动锤及沉管自重或加以振动辅助下行至设计位置,灌料后振动上提,在该水泥土桩的轴心形成振动沉管CFG桩。本发明的优点是:长螺旋旋喷搅拌桩的应用使得硬土层钻进变得不再困难,多喷嘴旋喷并转角定喷可形成多个带凸耳的水泥土桩,其侧摩阻就更大,其中形成的CFG桩单桩承载力也就更大。

Description

长螺旋喷搅振动沉管CFG桩施工方法及其形成的CFG复合桩
技术领域
本发明属于建筑地基基础施工中的成桩工艺,特别涉及一种长螺旋喷搅振动沉管CFG(水泥、粉煤灰、碎石)桩及其成桩方法。用于复合地基桩,也可用于护坡桩、帷幕桩、基础桩抗压桩及抗拔抗浮桩的母桩的成桩。
背景技术
CFG桩复合地基以其广泛的实用性以及比钢筋混凝土桩基廉价的多的优势,得到了迅速的推广应用,并取得了显著的经济效益和社会效益。振动沉管CFG桩复合地基在较软地层中应用有其较大的优势,设备简单而便宜,施工速度快,干作业,作业条件好。但多年来应用实践证明,振动沉管CFG桩施工中也存在诸多不尽人意之处。例如有振动有噪音,对环境影响较大,尤其遇到砂或砂卵石等密实地层时,为达到设计深度,留振时间长,或改用更大功率沉管设备,则其振动和噪音就更大,对环境影响也更大。如本人曾主持过一个振动沉管CFG桩工程,距民房尚有近百米的距离,但由于用75kW振动锤,致使居民有明显震感,门窗发出沙沙声响,更有一家门不能关上,施工中遇到了居民猛烈的反击,停工一月有余,最后被迫修改了设计方案。因振动、噪音的缘故,在城市中已渐趋淘汰。
遇到上下分段软硬不同地层时,硬层不易通过,而软层易缩颈甚至断桩,承载力不能满足设计要求,振动沉管CFG桩质量就达不到保证。而当硬层为砂层时,而水位又恰位于该层,振动沉管就易使孔隙水产生超孔隙水压力,在施打新桩时易将已施桩“挤断”。凡此种种,不一而足,所有这些都制约了振动沉管CFG桩的应用,使得廉价设备不能使用,干作业而快速的施工优势达不到发挥,许多非城市地域也将其淘汰。
近几年来长螺旋成孔压灌混凝土后插钢筋笼成桩专利技术的广泛应用,所采用的后插钢筋笼振动锤常用的为15~30kW,其振动噪音人们是可以接受的。这就给我们一个启示,采用15~30kW的振动锤在搅拌后的水泥土中施工CFG桩,其产生的振动噪音是可以被人们接受的。
有文献报道,无论搅拌桩或旋喷桩形成的水泥土桩与其周围的土没有明确的界限,这使得搅拌或旋喷形成的水泥土桩与土的侧摩阻是普通混凝土桩侧摩阻的5倍之多。
发明内容
本发明目的是提供一种振动沉管CFG桩及其施工方法,以解决其振动噪音扰民对邻近建构筑物及地下管线道路等的影响损坏,同时使得其易于实施,广泛适用,施工质量易于保证,大大提高其单桩承载力,取得明显的经济效益和环保效益社会效益。
本发明的技术方案是:先采用长螺旋钻机进行引孔,然后回填至设计位置,如遇易塌孔地层,反转上提,土留在孔内,换旋喷搅拌桩专用复合钻具对准引孔孔位,进行旋喷钻进至设计孔底,依据地层不同由变频器控制定喷提升速度进行定喷上提至设计标高,再次旋喷下行,旋转角度再次定喷上行至设计标高形成如图所示水泥土桩。振动沉管设备就位,利用振动锤及沉管(所用沉管可以是带4个凸耳的异型管)自重或加以振动辅助下行至设计位置,灌料后振动上提形成振动沉管CFG桩。
本发明的优点是:长螺旋旋喷搅拌桩的应用使得硬土层钻进变得不再困难,多喷嘴旋喷并转角定喷可形成多个带“耳朵”的水泥土桩,其侧摩阻就更大,其中形成的CFG桩单桩承载力也就更大,从而使振动沉管CFG桩易于实施,广泛适用,质量易于保证,同时也大大提高其承载力,经济效益十分显著。
附图说明
图1是本发明的工艺流程图;
图2是本发明施工形成的桩体第一实施例的总体结构示意图;
图3是图2的A-A剖视图;
图4是本发明施工形成的桩体第二实施例的总体结构示意图;
图5是图4的B-B剖视图;
图6是本发明施工形成的桩体第三实施例的总体结构示意图;
图7是图6的C-C剖视图。
具体实施方式
本发明的基本工艺流程如图1所示,依次进行现场三通一平、测量放线定桩位,采用长螺旋钻机引孔钻到设计深度,并选土回填至不塌孔位置或离孔口1/3~1/4处(需要时可将反转上提土留在孔内)。然后将旋喷搅拌桩机就位,并用高压泵送水泥浆旋喷搅拌下行至设计深度,随后依次进行定喷上升、旋喷下行、转换角度再定喷上升形成水泥土桩1。在形成水泥土桩1的过程中,采用变频器控制提升旋喷搅拌桩机的钻具速度,实施分段变速。然后将振动沉管桩机就位下沉至该水泥土桩1轴心内的设计深度,随后灌CFG料振动(将振动沉管桩机)提升至设计标高,在水泥土桩1轴线形成直径较小(一般是水泥土桩1直径的1/2~2/3)的CFG桩3,至此,便形成本发明的成桩。最后验收成桩并进行下一根桩施工。上述形成水泥土桩1使用的水泥等材料进场验收,送试验室复试,水泥浆搅拌/清水储备,水泥浆经振动筛过滤,高压泵泵送水泥浆。
所述的水泥土桩1可以是圆柱形,在水泥土桩1的外周面形成渗透层5(如图6和图7所示),也可是在圆柱形桩芯1(采用旋喷搅拌形成)的外周面设有多个沿圆周均布的凸耳2(采用定喷形成),如图2~图5所示。
所述的CFG桩3的形状可以是图3和图5所示的圆柱形,也可以是图6和图7所示的在圆柱形桩芯(采用旋喷搅拌形成)的外周面设有多个沿圆周均布的凸耳4(形成该现状的CFG桩3,需采用截面如图7所示的CFG桩3的异型沉管的振动沉管桩机按照常规方法施工)。
变频器是依据重载种类、钻机主卷扬电机功率大小,转数以及级别进行选择,并安装在不易碰撞、不易雨淋且容易看到容易操作的司机室里。可根据地层不同,水位不同,实现分段变速控制,对于硬质地层减速提升,反之加速提升,所形成的桩是变直径桩,提高了侧摩阻力,提高单桩承载力,同时节能明显,原需要300kW发电机,加变频器后只要250kW发电机就足够。柴油节省不少。电机电流由原180A降到50~60A。操作感觉也很灵便。
水泥浆使用的水泥可采用普通硅酸盐水泥、矿渣硅酸盐水泥、或粉煤灰水泥等;粉煤灰有低标号水泥作用,同时可节约水泥;必要时加入早强剂,以提高其早期强度,缩短凝结时间。
下面是本发明的两个具体实施例:
实施例1,某工程地上30层,基坑深8m,伐板基础,坑底以下土层是:粉细砂层厚4.2~5.0m,粘性土、粉土厚8.1~9.5m,中砂厚5.0~5.8m。砂卵石厚大于10m。设计开始选用桩基础,经比较后地基处理方案选CFG桩复合地基,桩长以进入中砂1~2m为宜,经优化设计采用长螺旋喷搅振动沉管CFG桩,采用先制作长螺旋喷搅水泥土桩做母桩,利用当地价廉的振动沉管(采用20kW小型振动锤)工艺在该水泥土桩中心做成CFG桩(桩长小于喷搅桩1m),形成复合地基,大幅度提高单桩承载力,达到了造价低、工期短、质量好的目的。
实施例2,某软土地层,地上6层住宅及3层厂房,基础埋深1.5m,条形基础,基础下粘性土层承载力80~90kPa,空隙比0.85~1.0,厚度10.2~11.5m,下部为第四纪沉积粉细砂,中密,厚3.5~4.2m。设计开始选用桩基础,经比较后地基处理方案选CFG桩复合地基,桩长以进入粉细砂1.5m为宜,经优化设计采用长螺旋喷搅振动沉管CFG桩,采用先制作长螺旋喷搅水泥土桩做母桩,利用当地价廉的振动沉管(采用15kW小型振动锤)工艺在该水泥土桩中心做成CFG桩(桩长小于喷搅桩1m),形成复合地基,大幅度提高单桩承载力,减小沉降量,达到了造价低、工期短、质量好的目的。

Claims (5)

1.一种长螺旋喷搅振动沉管CFG桩施工方法,其特征在于:先采用长螺旋钻机进行引孔;然后回填至设计位置,如遇易塌孔地层,反转上提,土留在孔内;然后换旋喷搅拌桩复合钻具对准引孔孔位,进行旋喷钻进至设计孔底,随后依据地层不同由变频器控制提升旋喷搅拌桩复合钻具速度进行旋喷上提至设计标高,或者依据地层不同由变频器控制定喷提升速度进行定喷上提至设计标高,再次旋喷下去,旋转角度再次定喷上行至设计标高形成带多个凸耳的水泥土桩;然后将小功率振动沉管设备就位,利用该小功率振动沉管设备的振动锤及沉管自重或加以振动辅助下行至设计位置,灌料后振动上提,在该水泥土桩的轴心形成振动沉管CFG桩。
2.根据权利要求1所述的长螺旋喷搅振动沉管CFG桩施工方法,其特征在于:所述的振动沉管CFG桩为圆柱形或在圆周带有凸耳,采用截面与该振动沉管CFG桩相同截面的圆管或异型管沉管施工形成。
3.根据权利要求1所述的长螺旋喷搅振动沉管CFG桩及其施工方法,其特征在于:所述的提升旋喷搅拌桩复合钻具速度由变频器控制,根据不同地质的地层情况分段变速,对于硬质地层减速提升,反之加速提升,形成的水泥土桩是变直径桩,可以较大幅度提高单桩承载力,同时节能。
4.一种采用权利要求1、2或3所述的长螺旋喷搅振动沉管CFG桩施工方法形成的CFG复合桩体,其特征在于:包括水泥土桩和CFG桩,CFG桩位于水泥土桩的轴心;该水泥土桩是圆柱形或者是在圆柱形桩芯的外周面设有多个沿圆周均布的凸耳,在该水泥土桩的外周面形成渗透层;该CFG桩形状是圆柱形,或是在圆柱形桩芯的外周面设有多个沿圆周均布的凸耳。
5.根据权利要求4所述的CFG复合桩体,其特征在于:所述的水泥土桩使用的水泥采用普通硅酸盐水泥、矿渣硅酸盐水泥、或粉煤灰水泥等;粉煤灰有低标号水泥作用,同时可节约水泥;必要时加入早强剂,以提高其早期强度,缩短凝结时间。
CN2010102825335A 2010-09-14 2010-09-14 长螺旋喷搅振动沉管cfg桩施工方法及其形成的cfg复合桩 Active CN101962950B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102825335A CN101962950B (zh) 2010-09-14 2010-09-14 长螺旋喷搅振动沉管cfg桩施工方法及其形成的cfg复合桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102825335A CN101962950B (zh) 2010-09-14 2010-09-14 长螺旋喷搅振动沉管cfg桩施工方法及其形成的cfg复合桩

Publications (2)

Publication Number Publication Date
CN101962950A true CN101962950A (zh) 2011-02-02
CN101962950B CN101962950B (zh) 2011-11-09

Family

ID=43515991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102825335A Active CN101962950B (zh) 2010-09-14 2010-09-14 长螺旋喷搅振动沉管cfg桩施工方法及其形成的cfg复合桩

Country Status (1)

Country Link
CN (1) CN101962950B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322057A (zh) * 2011-06-30 2012-01-18 广东省长大公路工程有限公司 一种可连续施工作业注浆式cfg桩施工方法
CN103046568A (zh) * 2012-12-04 2013-04-17 北京建材地质工程公司 长螺旋潜孔锤振动旋喷水泥土帷幕桩施工工艺
CN103061328A (zh) * 2013-01-29 2013-04-24 方泰建设集团有限公司 一种带砂墙翼板的后注浆碎石桩及施工方法
CN108677912A (zh) * 2018-06-07 2018-10-19 江苏科技大学 一种cfg芯砂石组合桩、其构成的复合地基及施工方法
CN115059053A (zh) * 2022-07-01 2022-09-16 中国建筑第七工程局有限公司 一种深埋多标高cfg群桩深度及桩长控制装置及控制方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0911449A1 (en) * 1997-10-24 1999-04-28 Yinsheng Shi A cast-in-place pile and the process for manufacturing of the same
WO2001036753A1 (en) * 1999-11-18 2001-05-25 Cementation Foundations Skanska Limited Pile forming
CN2608557Y (zh) * 2003-04-18 2004-03-31 雷玉华 高压旋喷插芯扩底桩
CN1718939A (zh) * 2005-07-07 2006-01-11 何世鸣 一种新型水泥土桩及施工方法
CN101761073A (zh) * 2010-01-19 2010-06-30 广东省长大公路工程有限公司 Cfg桩的改进施工技术

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0911449A1 (en) * 1997-10-24 1999-04-28 Yinsheng Shi A cast-in-place pile and the process for manufacturing of the same
WO2001036753A1 (en) * 1999-11-18 2001-05-25 Cementation Foundations Skanska Limited Pile forming
CN2608557Y (zh) * 2003-04-18 2004-03-31 雷玉华 高压旋喷插芯扩底桩
CN1718939A (zh) * 2005-07-07 2006-01-11 何世鸣 一种新型水泥土桩及施工方法
CN101761073A (zh) * 2010-01-19 2010-06-30 广东省长大公路工程有限公司 Cfg桩的改进施工技术

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20060331 李波 CFG 桩和旋喷桩复合地基施工技术 全文 1-5 第32卷, 第5期 2 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322057A (zh) * 2011-06-30 2012-01-18 广东省长大公路工程有限公司 一种可连续施工作业注浆式cfg桩施工方法
CN103046568A (zh) * 2012-12-04 2013-04-17 北京建材地质工程公司 长螺旋潜孔锤振动旋喷水泥土帷幕桩施工工艺
CN103061328A (zh) * 2013-01-29 2013-04-24 方泰建设集团有限公司 一种带砂墙翼板的后注浆碎石桩及施工方法
CN108677912A (zh) * 2018-06-07 2018-10-19 江苏科技大学 一种cfg芯砂石组合桩、其构成的复合地基及施工方法
CN115059053A (zh) * 2022-07-01 2022-09-16 中国建筑第七工程局有限公司 一种深埋多标高cfg群桩深度及桩长控制装置及控制方法
CN115059053B (zh) * 2022-07-01 2024-01-26 中国建筑第七工程局有限公司 一种深埋多标高cfg群桩深度及桩长控制装置及控制方法

Also Published As

Publication number Publication date
CN101962950B (zh) 2011-11-09

Similar Documents

Publication Publication Date Title
CN101962950B (zh) 长螺旋喷搅振动沉管cfg桩施工方法及其形成的cfg复合桩
CN103603342B (zh) 大直径组合套管超长灌注桩施工方法
CN108708372B (zh) 一种有压复合水泥风积砂浆搅拌桩成桩工艺
CN102011391A (zh) 一种软弱地基的加固处理方法
CN102011399A (zh) 一种基于phc桩的多重高喷扩底桩施工方法
CN103015429A (zh) 长螺旋旋喷搅拌水泥土型钢桩基坑止水支护方法
CN105297712A (zh) 一种螺旋钻孔高喷水泥土复合变截面混凝土桩组合桩工法
CN105297710A (zh) 一种高喷水泥土螺旋钻挤、扩孔钢筋混凝土灌注组合桩及制作方法
CN105464079A (zh) 一种长螺旋成孔桩板桩支护、防渗连续墙成型工法
CN104234057A (zh) 高聚物注浆帷幕与预应力管桩组合基坑支护结构
CN107338790A (zh) 旋喷搅拌复合桩施工方法
CN107190769A (zh) 一种软土地基用的地下深空间停车井结构
CN105714832B (zh) 一种深基坑大尺寸预制围护结构及施工方法
CN105672329B (zh) 深基坑大尺寸预制围护结构及施工方法
CN110144872B (zh) 水平动力固结排水装置及施工方法
CN211646445U (zh) 抛石层桩
CN1786351A (zh) 非取土引孔预应力管桩或预制方桩沉桩施工方法
CN104141303A (zh) 钉型水泥土搅拌桩施工工艺
CN104005416A (zh) 一种用于高陡边坡素填土反压条件下大直径孔桩塌孔的处理方法
CN104213553A (zh) 振冲沉箱无接缝防渗墙施工工艺
CN203891012U (zh) 一种预设粘土桩的新型灌注桩
CN103015435A (zh) 长螺旋潜孔锤振动旋喷水泥土型钢桩基坑止水支护方法
JP2001098541A (ja) 鋼管ソイルセメント合成杭及びその施工法と装置
CN110318392A (zh) 一种大直径水泥土桩建造方法
CN203129143U (zh) 静压射流桩墙成型设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100102, Beijing, Wangjing, Chaoyang District West Road, stone world building, block A, 4

Patentee after: BEIJING BUILDING MATERIAL GEOLOGICAL ENGINEERING Corp.

Patentee after: ZHONGCAI GEOLOGICAL ENGINEERING EXPLORATION ACADEMY CO.,LTD.

Patentee after: BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION

Address before: 100102, Beijing, Wangjing, Chaoyang District West Road, stone world building, block A, 4

Patentee before: BEIJING BUILDING MATERIAL GEOLOGICAL ENGINEERING Corp.

Patentee before: SINOMA GEOL ENGINEERING EXPLORATION ACADEMY

Patentee before: BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20110202

Assignee: Beijing Geotechnical Engineering Association

Assignor: ZHONGCAI GEOLOGICAL ENGINEERING EXPLORATION ACADEMY CO.,LTD.|BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION|BEIJING BUILDING MATERIAL GEOLOGICAL ENGINEERING Corp.

Contract record no.: 2015990000887

Denomination of invention: Long-spiral spray stirring vibration pipe sinking CFG (Cement Flyash Gravel) pile construction method and CFG composite file therefrom

Granted publication date: 20111109

License type: Exclusive License

Record date: 20160129

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100102 Fourth Floor, Block A, Rolling Stone Tiandi Building, Wangjing West Road, Chaoyang District, Beijing

Co-patentee after: ZHONGCAI GEOLOGICAL ENGINEERING EXPLORATION ACADEMY CO.,LTD.

Patentee after: BEIJING BUILDING MATERIAL GEOTECHNICAL ENGINEERING Corp.

Co-patentee after: BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION

Address before: 100102 Fourth Floor, Block A, Rolling Stone Tiandi Building, Wangjing West Road, Chaoyang District, Beijing

Co-patentee before: ZHONGCAI GEOLOGICAL ENGINEERING EXPLORATION ACADEMY CO.,LTD.

Patentee before: BEIJING BUILDING MATERIAL GEOLOGICAL ENGINEERING Corp.

Co-patentee before: BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190329

Address after: 518020 North Block 7B of Tianbei Road Grand Garden, Luohu District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen Nanhua Geotechnical Engineering Co.,Ltd.

Address before: 100102 Fourth Floor, Block A, Rolling Stone Tiandi Building, Wangjing West Road, Chaoyang District, Beijing

Co-patentee before: ZHONGCAI GEOLOGICAL ENGINEERING EXPLORATION ACADEMY CO.,LTD.

Patentee before: BEIJING BUILDING MATERIAL GEOTECHNICAL ENGINEERING Corp.

Co-patentee before: BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION