CN101956402A - Rear pouring band with prefabricated concrete edge sealing plate for basement outer shear wall - Google Patents

Rear pouring band with prefabricated concrete edge sealing plate for basement outer shear wall Download PDF

Info

Publication number
CN101956402A
CN101956402A CN 201010252480 CN201010252480A CN101956402A CN 101956402 A CN101956402 A CN 101956402A CN 201010252480 CN201010252480 CN 201010252480 CN 201010252480 A CN201010252480 A CN 201010252480A CN 101956402 A CN101956402 A CN 101956402A
Authority
CN
China
Prior art keywords
wall
precast concrete
banded plate
suspension member
fixing hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010252480
Other languages
Chinese (zh)
Other versions
CN101956402B (en
Inventor
王喆
王静波
周文静
致栓明
韩永利
刘瑞权
丁继军
郭曙光
马宝青
郭太平
陈致炳
马政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingtai Construction Group Co., Ltd
Original Assignee
INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd filed Critical INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd
Priority to CN 201010252480 priority Critical patent/CN101956402B/en
Publication of CN101956402A publication Critical patent/CN101956402A/en
Application granted granted Critical
Publication of CN101956402B publication Critical patent/CN101956402B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a rear pouring band with a prefabricated concrete edge sealing plate for a basement outer shear wall, comprising a two-side coagulated wall body, transverse reinforcing steel bars, longitudinal reinforcing steel bars, an inner pouring template of the rear pouring band and a prefabricated concrete edge sealing plate. The invention can realize the synchronous deformation of the prefabricated concrete edge sealing plate and structural entities at two sides of the rear pouring band so as to realize tight fitting. The rear pouring band has the advantages of convenient construction and good waterproof effect.

Description

The post-poured strip of outer shear wall of basement that has precast concrete banded plate
Technical field:
The present invention relates to a kind of post-poured strip of outer shear wall of basement, especially relate to a kind of post-poured strip of outer shear wall of basement that has precast concrete banded plate.
Background technology:
In building engineering construction, the waterproof construction of basement and peripheral backfill generally need be built in the ater-casting and just can be carried out after sealing is finished, and to build the ater-casting, generally by designing requirement all after the concreting of outer wall of basement body 60 days or top out after just can carry out the closure construction of ater-casting, just can carry out the work of the waterproof construction and the backfilling of earthwork of the external side of outer wall of basement after finishing Deng the ater-casting closure construction, so just influence the building operations progress greatly.For addressing this problem, the method that generally adopts brick retaining wall in the prior art is with after the brick work barricade is done sealing outside the outer wall of basement body indentation, there at place, ater-casting, carry out the backfilling of earthwork work of the external side of outer wall of basement again, this job practices is not only complicated, but also the construction of the follow-up basement waterproofing of shadow, and the pouring construction of later stage ater-casting is very inconvenient, and its waterproof effect is poor, occurs drainage easily.In addition, also there is the edge sealing that adopts precast concrete plank to carry out the ater-casting to handle, four jiaos of pre-embedded steel slabs of precast concrete plank and shear force wall reinforcing steel bar welding, and be close to shear wall and install, this method easy construction, waterproof effect makes moderate progress, but the rigid connection method that welds with shear force wall reinforcing steel bar has been adopted in its installation, can't make the structural solid of precast concrete banded plate and both sides, ater-casting realize three-dimensional moving, therefore also have mass defect.
Summary of the invention:
The object of the present invention is to provide a kind of post-poured strip of outer shear wall of basement that has precast concrete banded plate, precast concrete banded plate can be realized three-D displacement, and precast concrete banded plate and wall outer side are fitted tightly.
The present invention is implemented by following technical scheme: a kind of post-poured strip of outer shear wall of basement that has precast concrete banded plate, it comprises the two sides body of wall that condenses, transverse reinforcement, longitudinal reinforcement, inner formword is built in the ater-casting, be embedded with described transverse reinforcement and described longitudinal reinforcement between the body of wall described condensing, described ater-casting is built inner formword and is placed described condensing between the body of wall, away from back fill course one side, the two ends that inner formword is built in described ater-casting are close on the corresponding described body of wall that condenses, it also comprises precast concrete banded plate, described precast concrete banded plate comprises the steel bar concrete body, suspension member, described suspension member one end is preset in the described steel bar concrete body, the other end is protruding, the end bent of external part becomes U type hook, the U type is linked up with a side along laterally opening oval fixing hole, opposite side is longitudinally opened oval fixing hole, fixture inserts in described horizontal oval fixing hole and the vertical oval fixing hole, fixedly connected described suspension member and described transverse reinforcement or described longitudinal reinforcement; The external part that is described suspension member bends to U type hook around described transverse reinforcement or described longitudinal reinforcement, make horizontal and vertical two described oval fixed hole positions in the both sides of described transverse reinforcement or described longitudinal reinforcement, pass as bolt fixing hole as described in two with fixture then, and fix with nut screwing clamping, make described precast concrete banded plate be close to the side of the described body of wall that condenses.
Described suspension member is two or more; Described precast concrete banded plate places described condensing between the body of wall, and near a side of described back fill course, the two ends of described precast concrete banded plate are close on the corresponding described body of wall that condenses.
Advantage of the present invention: the present invention can realize that the structural solid distortion of precast concrete banded plate and both sides, ater-casting is synchronous, thereby realizes fitting tightly easy construction, good water-proof effect.
Description of drawings:
Fig. 1 is the precast concrete banded plate front view;
Fig. 2 is the precast concrete banded plate vertical view;
Fig. 3 is the post-poured strip of outer shear wall of basement schematic diagram that has precast concrete banded plate.
Condense body of wall 1, transverse reinforcement 2, longitudinal reinforcement 3, ater-casting built inner formword 4, back fill course 5, precast concrete banded plate 6, steel bar concrete body 7, suspension member 8, U type hook 9, horizontal oval fixing hole 10, vertical oval fixing hole 11, bolt 12, nut 13.
The specific embodiment: a kind of post-poured strip of outer shear wall of basement that has precast concrete banded plate, it comprises the two sides body of wall 1 that condenses, transverse reinforcement 2, longitudinal reinforcement 3, inner formword 4 is built in the ater-casting, be embedded with transverse reinforcement 2 and longitudinal reinforcement 3 between the body of wall 1 condensing, the ater-casting is built inner formword 4 and is placed and condense between the body of wall 1, away from back fill course 5 one sides, the two ends that inner formword 4 is built in the ater-casting are close on the corresponding body of wall 1 that condenses, it also comprises precast concrete banded plate 6, precast concrete banded plate 6 comprises steel bar concrete body 7, suspension member 8, suspension member 8 one ends are preset in the steel bar concrete body 7, the other end is protruding, the end bent of external part becomes U type hook 9, the U type is linked up with 9 one sides along laterally opening oval fixing hole 10, opposite side is longitudinally opened oval fixing hole 11, bolt 12 inserts in horizontal oval fixing hole 10 and the vertical oval fixing hole 11, and tighten with nut 13 fixing, fixedly connected suspension member 8 and transverse reinforcement 2 or longitudinal reinforcement 3; The external part that is suspension member 8 bends to U type hook 9 around transverse reinforcement 2 or longitudinal reinforcement 3, make horizontal and vertical two oval fixing holes 10,11 be positioned at the both sides of transverse reinforcement 2 or longitudinal reinforcement 3, pass from two described oval fixing holes 10,11 with bolt 12 then, and tighten fixingly with nut 13, make precast concrete banded plate 6 be close to the side of condensing body of wall 1.
Suspension member 8 is two or more, and suspension member 8 is 4 in the present embodiment; Precast concrete banded plate 6 places and condenses between the body of wall 1, and near a side of back fill course 5, the two ends of precast concrete banded plate 6 are close on the corresponding body of wall 1 that condenses.

Claims (1)

1. post-poured strip of outer shear wall of basement that has precast concrete banded plate, it comprises the two sides body of wall that condenses, transverse reinforcement, longitudinal reinforcement, inner formword is built in the ater-casting, be embedded with described transverse reinforcement and described longitudinal reinforcement between the body of wall described condensing, described ater-casting is built inner formword and is placed described condensing between the body of wall, away from back fill course one side, the two ends that inner formword is built in described ater-casting are close on the corresponding described body of wall that condenses, it is characterized in that, it also comprises precast concrete banded plate, described precast concrete banded plate comprises the steel bar concrete body, suspension member, described suspension member one end is preset in the described steel bar concrete body, the other end is protruding, the end bent of external part becomes U type hook, the U type is linked up with a side along laterally opening oval fixing hole, opposite side is longitudinally opened oval fixing hole, and fixture inserts in described horizontal oval fixing hole and the vertical oval fixing hole, fixedly connected described suspension member and described transverse reinforcement or described longitudinal reinforcement; Described suspension member is two or more; Described precast concrete banded plate places described condensing between the body of wall, and near a side of described back fill course, the two ends of described precast concrete banded plate are close on the corresponding described body of wall that condenses.
CN 201010252480 2010-08-13 2010-08-13 Rear pouring band with prefabricated concrete edge sealing plate for basement outer shear wall Active CN101956402B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010252480 CN101956402B (en) 2010-08-13 2010-08-13 Rear pouring band with prefabricated concrete edge sealing plate for basement outer shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010252480 CN101956402B (en) 2010-08-13 2010-08-13 Rear pouring band with prefabricated concrete edge sealing plate for basement outer shear wall

Publications (2)

Publication Number Publication Date
CN101956402A true CN101956402A (en) 2011-01-26
CN101956402B CN101956402B (en) 2013-04-03

Family

ID=43483974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010252480 Active CN101956402B (en) 2010-08-13 2010-08-13 Rear pouring band with prefabricated concrete edge sealing plate for basement outer shear wall

Country Status (1)

Country Link
CN (1) CN101956402B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352454A (en) * 2013-07-10 2013-10-16 上海大学 Pile leg locking mechanism of self-elevating type ocean platform lifting system
CN105756083A (en) * 2016-03-24 2016-07-13 中水北方勘测设计研究有限责任公司 High retaining wall structure
CN110273505A (en) * 2019-07-17 2019-09-24 金点石(北京)建筑设计咨询服务有限责任公司 Collar tie beam module, collar tie beam, building body and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030046782A (en) * 2001-12-06 2003-06-18 김해영 Elastic Joint of Retaining Wall
CN201241343Y (en) * 2008-07-15 2009-05-20 北京建工集团有限责任公司 Rear pouring belt precast concrete suspending board
CN201280725Y (en) * 2008-09-27 2009-07-29 中国建筑第五工程局有限公司 Post-casting construction precast slab for basement of buildings
CN101666125A (en) * 2009-09-15 2010-03-10 中建四局第三建筑工程有限公司 Sealing method and structure of late poured band of basement

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030046782A (en) * 2001-12-06 2003-06-18 김해영 Elastic Joint of Retaining Wall
CN201241343Y (en) * 2008-07-15 2009-05-20 北京建工集团有限责任公司 Rear pouring belt precast concrete suspending board
CN201280725Y (en) * 2008-09-27 2009-07-29 中国建筑第五工程局有限公司 Post-casting construction precast slab for basement of buildings
CN101666125A (en) * 2009-09-15 2010-03-10 中建四局第三建筑工程有限公司 Sealing method and structure of late poured band of basement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352454A (en) * 2013-07-10 2013-10-16 上海大学 Pile leg locking mechanism of self-elevating type ocean platform lifting system
CN105756083A (en) * 2016-03-24 2016-07-13 中水北方勘测设计研究有限责任公司 High retaining wall structure
CN110273505A (en) * 2019-07-17 2019-09-24 金点石(北京)建筑设计咨询服务有限责任公司 Collar tie beam module, collar tie beam, building body and construction method

Also Published As

Publication number Publication date
CN101956402B (en) 2013-04-03

Similar Documents

Publication Publication Date Title
CN202000380U (en) Basement outer wall post-pouring belt backfill protective plate
CN205296388U (en) Apron is sealed to garage wall post -cast strip
CN205024731U (en) A prefabricated plate component for basement outer wall post -cast strip
CN101956403B (en) Construction method of rear pouring band with prefabricated concrete edge sealing plate for basement outer shear wall
CN104790684A (en) Wall hole opening construction method adopting encased angle iron method
CN204199330U (en) The overall steel plate for sealing water in a kind of ater-casting
CN101956402B (en) Rear pouring band with prefabricated concrete edge sealing plate for basement outer shear wall
CN108000689A (en) Concrete component gang form and its casting method and concrete component with window frame
CN203229972U (en) Basement external wall post-pouring-band prefabricated blocking hanging plate
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN108858731B (en) Grouting template and tower barrel manufacturing method
KR100735681B1 (en) Thick wall using truss decks as permanent concrete form
CN207376661U (en) A kind of plugging structure of poured band of outer wall of basement
CN215291608U (en) Reinforced structure of newly-increased entrance to a cave lintel of geomorphic building outer wall
CN205637650U (en) Concrete sump fast -assembling nipple joint
CN208934012U (en) A kind of poured band of outer wall of basement structure
CN208072929U (en) Scaffold wall connecting piece
CN209779949U (en) Prefabricated assembled profiled steel sheet concrete shear force wall
CN110206070A (en) A kind of basement wall post-cast strip protection wall construction method
CN220183845U (en) Hanging die mounting structure at chamfer of rainwater box culvert
CN204626714U (en) A kind of dismantled and assembled stealthy partition wall system
CN204252171U (en) The rubber fastening band at basement shrinkage joint installs fixing special tool
CN201972251U (en) Water stopping device for construction joint
CN205558000U (en) Evaporate and press aerated concrete gusset plate
KR20100072510A (en) Steel-concrete composite sheet pile and method of construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161010

Address after: 017010 the Inner Mongolia Autonomous Region Ordos Ulan New District of Kangbashi City, the South Bank of the Mulun River Xingtai Business Plaza (CBD) T4 tower room 2207

Patentee after: INNER MONGOLIA XINGTAI CONSTRUCTION GROUP CO., LTD.

Address before: The Inner Mongolia Autonomous Region city Dongsheng District 017000 Erdos ejinhuro Street No. 7 Room 308

Patentee before: Inner Mongolia Xingtai Construction Co., Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: The Inner Mongolia Autonomous Region city Dongsheng District 017000 Ordos ejinhuro Street No. 7

Patentee after: Xingtai Construction Group Co., Ltd

Address before: 017010 the Inner Mongolia Autonomous Region Ordos Ulan New District of Kangbashi City, the South Bank of the Mulun River Xingtai Business Plaza (CBD) T4 tower room 2207

Patentee before: INNER MONGOLIA XINGTAI CONSTRUCTION GROUP Co.,Ltd.