CN101941027B - High-speed coil unloading and aligning method of qualified finished wire coils - Google Patents

High-speed coil unloading and aligning method of qualified finished wire coils Download PDF

Info

Publication number
CN101941027B
CN101941027B CN2010102330718A CN201010233071A CN101941027B CN 101941027 B CN101941027 B CN 101941027B CN 2010102330718 A CN2010102330718 A CN 2010102330718A CN 201010233071 A CN201010233071 A CN 201010233071A CN 101941027 B CN101941027 B CN 101941027B
Authority
CN
China
Prior art keywords
coil
unloading
stripping car
wire
volume
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102330718A
Other languages
Chinese (zh)
Other versions
CN101941027A (en
Inventor
黄辉
黄立志
张欢
赵智刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Iron and Steel Co Ltd
Original Assignee
Nanjing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Iron and Steel Co Ltd filed Critical Nanjing Iron and Steel Co Ltd
Priority to CN2010102330718A priority Critical patent/CN101941027B/en
Publication of CN101941027A publication Critical patent/CN101941027A/en
Application granted granted Critical
Publication of CN101941027B publication Critical patent/CN101941027B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Winding, Rewinding, Material Storage Devices (AREA)

Abstract

The invention belongs to a coil unloading and aligning method in the field of metallurgy, and in particular relates to a high-speed coil unloading and aligning method of qualified finished wire coils. In the invention, when a PF wire coil unloading station has coils to be unloaded, an unloading trolley is lifted at an unloading position to prop up a coil, and then the trolley walks towards an unloading platform rack by carrying the coil; when a phototube PH4 sends out a signal and the walking distance L of the trolley is larger than or equal to L3, the trolley stops advancing and descends to unload the coil onto the unloading platform rack; when a second coil is unloaded, a stopping position L4 of the trolley is equal to L3-LPJ-L0, and after the trolley arrives at an appointed position, the trolley descends to unload the second coil onto the unloading platform rack; and when a third coil is unloaded, a phototube PH3 sends out a signal, the L is larger than or equal to L5=L4-LPJ, and L5 is larger than LMIN. The invention can realize the coil unloading and aligning method without increasing expensive detection equipment, thereby solving the grazing problem of the coils due to coil unloading; and moreover, the coil unlading capacity is enhanced, therefore, the production requirements are met.

Description

The qualified finished product coil of wire of high-speed rod unload the volume alignment schemes
Technical field
What the invention belongs to field of metallurgy unloads the volume alignment schemes, the qualified finished product coil of wire of a kind of specifically high-speed rod unload the volume alignment schemes.
Background technology
Be rolled into the coil of wire at the steel rolling high-speed wire factory, after the economy-combat chartered plane is packed, weighed, need coil stripping car to be transported to the coil of wire to unload to roll up and lift on the frame, hang through driving again.
The typical coil stripping method of the qualified finished product coil of wire of high-speed rod is to be transported to the coil of wire successively to unload to roll up through coil stripping car to lift on the frame, and unloading on the volume stand has A, B two passages, and each passage can be put two reels respectively; When one of them passage is piled, be changed to another passage automatically, coil stripping car unloads when volume in a passage, just through by placing and coil unloading photoelectric tube signal on the volume stand; Therefore; It is very big to coil spacing two of same passage, and driving also need be carried out the secondary lifting when lifting warehouse-in or delivery; Coil alignment to two and be adjacent to, be convenient to the sign indicating number heap.Driving is coiled and ground friction in the secondary alignment procedure; Coil and travelling crane hook friction bump, cause not only that to coil galled spots serious, influenced the surface quality of wire rod; And be easy to roll out and smash the device security accident of unloading volume equipment, cause equipment downtime.
In addition, along with the raising greatly of rhythm of production, driving has consumed great amount of time in carrying out the secondary alignment procedure, makes to unload the volume rhythm rhythm of production that seriously lagged behind.
Summary of the invention
Technical problem to be solved by this invention is: to the problem that above prior art exists, what propose the qualified finished product coil of wire of a kind of high-speed rod unloads the volume alignment schemes,
The technical scheme that the present invention solves above technical problem is:
The qualified finished product coil of wire of high-speed rod unload the volume alignment schemes, comprise coil stripping car and unload the volume stand, carry out according to the following steps:
(1) coil stripping car and unload the volume stand between; On same vertical plane; Two photoelectric tubes are installed, first photoelectric tube aloft, second photoelectric tube is at lower; First photoelectric tube is between the highest of coil stripping car and at the coil of wire on the coil stripping car the highest, and second photoelectric tube is under the highest of coil stripping car;
(2) two photoelectric tubes one in front and one in back are installed above the stand unloading volume, the 3rd photoelectric tube is preceding, the 4th photoelectric tube after;
(3) on the coil stripping car power transmission shaft, install an incremental encoder additional, communicate by letter with photoelectric tube;
(4) coil and to unload when rolling up when unloading volume station; Coil stripping car rises unloading material level, coils picking-up to first, and the coil stripping car holder first and coiled toward unloading skid and walk; Poor according to the code value of the code value of coil stripping car encoder when first photoelectric tube has signal and dolly encoder when the first photoelectric tube no signal; Draw first length coiled, the distance of coil stripping car walking is poor when with first photoelectric tube one signal being arranged according to the distance of the walking of coil stripping car when second photoelectric tube one has signal, draw first coil end face and coil stripping car edge distance; Coil stripping car is walked the 4th photoelectric tube when signal is arranged; Coil stripping car halts, and coil stripping car stops to fall to coil first and is discharged on the unloading skid, and measures the distance of coil stripping car walking;
When (5) unloading second volume; The coil stripping car stop position is that the distance of coil stripping car walking in the step (4) deducts first length coiled, deduct again first coil end face and coil stripping car edge distance, after coil stripping car puts in place; Coil stripping car is unloading the material level rise; Coil picking-up to second, the coil stripping car holder second and is coiled toward the unloading skid walking, and the back that puts in place is coiled second and is discharged on the unloading skid;
(6) unloaded for the 3rd when volume, the 3rd photoelectric tube has signal, and the stop position of carriage walking distance when unloading the 3rd volume more than or equal to dolly;
(7) unsnatch three the volume after, unloading skid moves, and changes another group and unloads the volume passage, again repeating step (4)~step (6).
Advantage of the present invention is: the present invention need not increase expensive detection equipment can realize the above-mentioned volume alignment schemes of unloading, and has avoided coiling because of unloading the scratch problem that winding comes; And unload the volume ability and strengthen, satisfied the needs of producing.
Description of drawings
Fig. 1 is a location diagram of the present invention.
The specific embodiment
Embodiment one
Install two photoelectric tube PH1, PH2 additional unloading the volume place, on the dolly power transmission shaft, install an incremental encoder S1 additional, as shown in Figure 1; The installation site of PH1, PH2 must and be unloaded between the volume stand at dolly; And on same vertical plane, PH1 aloft, PH2 is at lower; The height of PH1 is that the height of PH2 is the below of the highest of dolly between the highest of the highest of dolly and the coil of wire.When coiling when being discharged on the coil stripping car; Dolly is walked to the feeding skid direction; At this moment if coil end face and the dolly justified margin is L0=0; Then PH1 and PH2 almost have signal simultaneously, and L1 is that the distance L 1 of carriage walking when 2# photoelectric tube one has the distance L 2 of signal carriage walking with 1# photoelectric tube one signal to be arranged is poor, i.e. L0=L2-L1.
Guarantee that back one volume can be near last volume, must stretch out the dolly face or flush near unloading skid side panel volume face, i.e. L0>=0, but can not be excessive, in order to avoid roll out.If L0<0, then the dolly face stretches out and coils, and dolly is when unloading second volume because the dolly face has been adjacent to last volume, therefore, at this moment two coil can not near, leave the gap of L0.Because the bundling length respectively coiled is different, the central point of therefore coiling is also inconsistent, guarantee that the face of coiling must stretch out the dolly face or flushes, and the position that dolly is return at every turn is also inconsistent.Calculate according to the encoder code value that is contained in dolly this position.
The zero-bit of dolly to unload the volume stand distance be constant, so dolly when unloading the first volume, the travel distance L3 of dolly is constant, stops when promptly carriage walking is to L3, unloads to be rolled onto here.Can be regarded as out the length L of coiling according to photoelectric tube PH1 PJThe i.e. code value L of dolly encoder when PH1 has signal PH11Code value L with dolly encoder when the PH1 no signal PH12Poor, L PJ=L PH12-L PH11Then dolly is at the stop position L4=L3-L that unloads second volume PJAnd the like can calculate the 3rd the volume unload the volume position.
Two photoelectric tube PH3, PH4 are housed on unloading skid, and as shown in Figure 1, dolly photoelectric tube PH4 when unloading the first volume must have signal, and the carriage walking distance L must be more than or equal to L3.When unloading the 3rd volume, photoelectric tube PH3 must have signal, and L must be more than or equal to L MINJudge whether encoder work is normal, detecting the pulse change amount of encoder each second, if no change or change less than certain numerical value encoder operation irregularity then, otherwise, if it is also unusual to change excessive encoder work.When this situation occurring, then can stop the operative employee who unloads volume and send the announcement of reporting to the police.
The qualified finished product coil of wire of the high-speed rod of present embodiment unload the volume alignment schemes, carry out according to the following steps:
Coil and will unload when volume when the PF line unloads volume station, coil stripping car is unloading the material level rise, coiling picking-up; The dolly holder and is coiled toward the unloading skid walking; The photoelectric tube PH4 that walks has signal and carriage walking distance L more than or equal to L3, and the dolly decline that halts is discharged on the unloading skid coiling;
When unloading second volume, dolly stop position L4=L3-L PJ-L0, after putting in place, dolly descends, and is discharged on the unloading skid coiling;
Unloaded for the 3rd when volume, photoelectric tube PH3 has signal, and the stop position L5=L4-L of carriage walking distance L when unloading the 3rd volume more than or equal to dolly PJ
After unsnatching three volumes, unloading skid moves, and changes another group passage, repeats first step again.
The present invention can also have other embodiment, and the technical scheme that equal replacement of all employings or equivalent transformation form all drops within the scope of requirement protection of the present invention.

Claims (1)

  1. The qualified finished product coil of wire of high-speed rod unload the volume alignment schemes, comprise coil stripping car and unload the volume stand, it is characterized in that: carry out according to the following steps:
    (1) coil stripping car and unload the volume stand between; On same vertical plane; Two photoelectric tubes are installed, first photoelectric tube aloft, second photoelectric tube is at lower; First photoelectric tube is between the highest of coil stripping car and at the coil of wire on the coil stripping car the highest, and second photoelectric tube is under the highest of coil stripping car;
    (2) two photoelectric tubes one in front and one in back are installed above the stand unloading volume, the 3rd photoelectric tube is preceding, the 4th photoelectric tube after;
    (3) on the coil stripping car power transmission shaft, install an incremental encoder additional, communicate by letter with photoelectric tube;
    (4) when unloading volume station when having the coil of wire to unload to roll up; Coil stripping car holds up first coil of wire unloading the material level rise, and the coil stripping car holder first coil of wire toward the unloading skid walking; Poor according to the code value of the code value of incremental encoder when first photoelectric tube has signal and incremental encoder when the first photoelectric tube no signal; Draw the length of first coil of wire, the distance of coil stripping car walking is poor when with first photoelectric tube one signal being arranged according to the distance of coil stripping car when second photoelectric tube one has signal walking, draws the distance at first coil of wire end face and coil stripping car edge; Coil stripping car is walked the 4th photoelectric tube when signal is arranged; Coil stripping car halts, and coil stripping car stops to fall and is discharged to first coil of wire on the unloading skid, and measures the distance of coil stripping car walking;
    When (5) unloading second coil of wire; The coil stripping car stop position is the length that the distance of coil stripping car walking in the step (4) deducts first coil of wire, deducts the distance at first coil of wire end face and coil stripping car edge again, after coil stripping car puts in place; Coil stripping car is unloading the material level rise; Hold up second coil of wire, the coil stripping car holder second coil of wire toward the unloading skid walking, and the back that puts in place is discharged to second coil of wire on the unloading skid;
    (6) unloaded for the 3rd when volume, the 3rd photoelectric tube has signal, and the stop position of carriage walking distance when unloading the 3rd volume more than or equal to dolly;
    (7) unsnatch the 3rd the volume after, unloading skid moves, and changes another group and unloads the volume passage, again repeating step (4)~step (6).
CN2010102330718A 2010-07-22 2010-07-22 High-speed coil unloading and aligning method of qualified finished wire coils Expired - Fee Related CN101941027B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102330718A CN101941027B (en) 2010-07-22 2010-07-22 High-speed coil unloading and aligning method of qualified finished wire coils

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102330718A CN101941027B (en) 2010-07-22 2010-07-22 High-speed coil unloading and aligning method of qualified finished wire coils

Publications (2)

Publication Number Publication Date
CN101941027A CN101941027A (en) 2011-01-12
CN101941027B true CN101941027B (en) 2012-02-29

Family

ID=43433342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102330718A Expired - Fee Related CN101941027B (en) 2010-07-22 2010-07-22 High-speed coil unloading and aligning method of qualified finished wire coils

Country Status (1)

Country Link
CN (1) CN101941027B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102896183B (en) * 2012-10-12 2014-11-12 首钢京唐钢铁联合有限责任公司 Method for judging successful coil contact action of hot rolled steel coil stripper car
CN105259925B (en) * 2015-10-28 2017-10-27 北京佰能电气技术有限公司 Volume positioner and method are unloaded in one kind collection volume station coiling
CN107344335A (en) * 2017-03-20 2017-11-14 杭州自强链传动有限公司 A kind of chain hinge pin wire surface processing method
CN110817530B (en) * 2019-11-06 2021-01-05 北京首钢自动化信息技术有限公司 Automatic and accurate coil unloading method for finished wire coil
CN111596700A (en) * 2020-05-28 2020-08-28 广东科学技术职业学院 Infusion heating safety control method and circuit and infusion heating instrument
CN113353735B (en) * 2021-05-26 2022-10-28 首钢水城钢铁(集团)有限责任公司 Automatic length measuring and positioning and circulating automatic coil unloading method for high-speed wire coil unloading

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3353240B2 (en) * 1994-02-25 2002-12-03 石川島播磨重工業株式会社 Coil car
CN2261900Y (en) * 1995-04-27 1997-09-10 鞍山钢铁公司 Support roll type unloading cart for steel roll
TW290482B (en) * 1995-05-17 1996-11-11 Nikko Kinzoku Kk
JP2003192196A (en) * 2001-12-28 2003-07-09 Sumitomo Metal Ind Ltd Bar steel conveyance system
CN201098704Y (en) * 2006-11-22 2008-08-13 中色科技股份有限公司 Upper coil unloading dolly precise positioning structure
CN101439367B (en) * 2008-12-23 2010-06-02 南京南钢产业发展有限公司 Coil stripping method of rod iron of large diameter

Also Published As

Publication number Publication date
CN101941027A (en) 2011-01-12

Similar Documents

Publication Publication Date Title
CN101941027B (en) High-speed coil unloading and aligning method of qualified finished wire coils
CN201801657U (en) Automatic spun yarn bobbin conveying device of combined spinning and winding machine
CN108298318A (en) A kind of liquid crystal display foam box splits conveying device automatically
CN103183212B (en) Method for preparation and transportation before warehousing of steel coil finished product
CN201485076U (en) Waterproof coiled material stacking device
CN102674189A (en) Automatic counting alignment winch for offshore oil well high pressure oil pipe
CN201043186Y (en) Automatic positioning cradle carriage
CN103539039A (en) Steel wire rope stacking machine
CN104150053B (en) A kind of yarn transporting equipment with compression function
CN111889905B (en) Transverse steel bar arrangement welding device and method for four-side rib steel bar net
CN205151340U (en) Horizontal sending mechanism of printed matter paper buttress
CN202506770U (en) Automatic blanking mechanism for plate-reeling machine
CN209536579U (en) A kind of production board band volume unloads winding apparatus
CN104261308A (en) Vertical lifting sliding mechanism and application thereof
CN217858095U (en) Cold-rolled steel bar feeding equipment
CN207107907U (en) Automatic de-stacking palletizing apparatus
CN206345486U (en) A kind of uncoiling trolley lifted with material volume
CN206633140U (en) A kind of shifting apparatus for picking and placeing stable woodwork plate
CN206407608U (en) The rewinding material placing mechanism of air-conditioning lower margin transporter
CN206199876U (en) A kind of strip calibration devices
CN212220671U (en) Steel coil lifting device
CN210824098U (en) Yarn roll stacking production line
CN107934841A (en) Transfer equipment with wood composite pallet coil of strip
CN210059340U (en) Conveying system of rolling mill roll system
CN109573679B (en) Wrapping paper rewinding blanking and coding packaging production line and operating method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120229

Termination date: 20190722